83_FR_59599 83 FR 59373 - City of Woonsocket; Notice of Application Tendered for Filing With the Commission and Soliciting Additional Study Requests and Establishing Procedural Schedule for Relicensing and a Deadline for Submission of Final Amendments

83 FR 59373 - City of Woonsocket; Notice of Application Tendered for Filing With the Commission and Soliciting Additional Study Requests and Establishing Procedural Schedule for Relicensing and a Deadline for Submission of Final Amendments

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 83, Issue 226 (November 23, 2018)

Page Range59373-59374
FR Document2018-25472

Federal Register, Volume 83 Issue 226 (Friday, November 23, 2018)
[Federal Register Volume 83, Number 226 (Friday, November 23, 2018)]
[Notices]
[Pages 59373-59374]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-25472]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2972-027]


City of Woonsocket; Notice of Application Tendered for Filing 
With the Commission and Soliciting Additional Study Requests and 
Establishing Procedural Schedule for Relicensing and a Deadline for 
Submission of Final Amendments

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: Subsequent Minor License.
    b. Project No.: 2972-027.
    c. Date filed: November 1, 2018.
    d. Applicant: City of Woonsocket, Rhode Island (City).
    e. Name of Project: Woonsocket Falls Project.
    f. Location: On the Blackstone River in the City of Woonsocket, 
Providence County, Rhode Island. The project diverts water from the 
impoundment created by the U.S. Army Corps of Engineers' (Corps) 
Woonsocket Falls Dam; however, there are no federal or tribal lands 
within the project boundary.
    g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
    h. Applicant Contact: Mr. Michael Debroisse, City of Woonsocket, 
Engineering, 169 Main Street, Woonsocket, RI 02895; (401) 767-9213.
    i. FERC Contact: Patrick Crile, (202) 502-8042 or 
[email protected].
    j. Cooperating agencies: Federal, state, local, and tribal agencies 
with jurisdiction and/or special expertise with respect to 
environmental issues that wish to cooperate in the preparation of the 
environmental document should follow the instructions for filing such 
requests described in item l below. Cooperating agencies should note 
the Commission's policy that agencies that cooperate in the preparation 
of the environmental document cannot also intervene. See 94 FERC ] 
61,076 (2001).
    k. Pursuant to section 4.32(b)(7) of the Commission's regulations, 
if any resource agency, Indian Tribe, or person believes that an 
additional scientific study should be conducted in order to form an 
adequate factual basis for a complete analysis of the application on 
its merit, the resource agency, Indian Tribe, or person must file a 
request for a study with the Commission not later than 60 days from the 
date of filing of the application, and serve a copy of the request on 
the applicant.

[[Page 59374]]

    l. Deadline for filing additional study requests and requests for 
cooperating agency status: December 31, 2018.
    The Commission strongly encourages electronic filing. Please file 
additional study requests and requests for cooperating agency status 
using the Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. For assistance, please contact FERC Online Support 
at [email protected], (866) 208-3676 (toll free), or (202) 
502-8659 (TTY). In lieu of electronic filing, please send a paper copy 
to: Secretary, Federal Energy Regulatory Commission, 888 First Street 
NE, Washington, DC 20426. The first page of any filing should include 
docket number P-2972-027.
    m. The application is not ready for environmental analysis at this 
time.
    n. The City electronically filed the application with the 
Commission after the close of business on October 31, 2018. Pursuant to 
18 CFR 385.2001(a)(2), any document received after regular business 
hours is considered filed on the next regular business day. By this 
notice, the requirement under 18 CFR 16.20(c) to file the subsequent 
license application at least 24 months before the expiration of the 
existing license (i.e., no later than October 31, 2018) is waived.
    o. The Woonsocket Falls Project utilizes water from the impoundment 
created by the Corps' Woonsocket Falls Dam, and consists of: (1) A 14-
foot-wide, 20.5-foot-high concrete intake structure located about 60 
feet upstream of the Woonsocket Falls Dam and fitted with a 12-foot-
wide, 18-foot-high steel trash rack having 3.5-inch clear bar spacing; 
(2) a 275-foot long, 12-foot-wide, 10-foot-high concrete penstock; (3) 
a 65-foot-long, 25-foot-wide, 20-foot-high concrete powerhouse 
containing one adjustable blade turbine-generator unit with an 
authorized capacity of 1,200 kilowatts; (4) a 50-foot-long, 12.5-foot-
diameter steel draft tube; (5) an approximately 50-foot-long, 20-foot-
wide, 15-foot-deep tailrace; (6) a 35-foot-long 4.16 kilovolt (kV) 
generator lead line, a 4.16/13.8-kV step-up transformer, a 1,200-foot-
long, and a 13.8-kV transmission line connecting the project generator 
to the regional grid; and (7) appurtenant facilities.
    The project bypasses approximately 360 feet of the Blackstone River 
and there is currently no required minimum instream flow for the 
bypassed reach. However, the City operates the project in a run-of-
river (ROR) mode and voluntarily maintains a minimum flow of 20 cubic 
feet per second (cfs) over the crest of the dam to the bypassed reach 
using an automatic pond level controller. The Woonsocket Falls project 
has an average annual generation of approximately 4,580 megawatt-hours.
    The City proposes to: (1) Continue operating the project in a ROR 
mode; (2) provide a year-round minimum flow of 20 cfs into the bypassed 
reach; (3) provide upstream eel passage at the project; and (4) 
implement targeted nighttime turbine shutdowns to facilitate downstream 
eel passage.
    p. A copy of the application is available for review at the 
Commission in the Public Reference Room or may be viewed on the 
Commission's website at http://www.ferc.gov using the ``eLibrary'' 
link. Enter the docket number excluding the last three digits in the 
docket number field to access the document. For assistance, contact 
FERC Online Support. A copy is also available for inspection and 
reproduction at the address in item h above.
    You may also register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    q. Procedural schedule and final amendments: The application will 
be processed according to the following preliminary schedule. Revisions 
to the schedule will be made as appropriate.

------------------------------------------------------------------------
 
------------------------------------------------------------------------
Issue Deficiency Letter (if            January 2019.
 necessary).
Request Additional Information.......  January 2019.
Issue Acceptance Letter..............  April 2019.
Issue Scoping Document 1 for comments  May 2019.
Request Additional Information (if     July 2019.
 necessary).
Issue Scoping Document 2.............  August 2019.
Issue Notice of Ready for              August 2019.
 Environmental Analysis.
Issue Notice of Availability of        February 2020.
 Environmental Assessment.
------------------------------------------------------------------------

    Final amendments to the application must be filed with the 
Commission no later than 30 days from the issuance date of the notice 
of ready for environmental analysis.

    Dated: November 15, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-25472 Filed 11-21-18; 8:45 am]
BILLING CODE 6717-01-P



                                                                          Federal Register / Vol. 83, No. 226 / Friday, November 23, 2018 / Notices                                            59373

                                              17. Reports on Recent Oil Market and                    Commission’s Procedural Rules                         DEPARTMENT OF ENERGY
                                                Policy Developments in IEA Countries                  Applicable to Oil Pipeline proceedings,3
                                              18. Update on the Current Oil Market                    CITGO Petroleum Corporation                           Federal Energy Regulatory
                                                Situation: Followed by Q&A                            (Complainant) filed a formal complaint                Commission
                                              19. Presentation: ‘‘Update on the                       against Colonial Pipeline Company                     [Project No. 2972–027]
                                                implementation of the International                   (Respondent) alleging that the
                                                Maritime Organisation’s 2020 fuel                     Respondent’s untarriffed increase of a                City of Woonsocket; Notice of
                                                specifications’’ followed by Q&A                      product loss allocation rate is unlawful              Application Tendered for Filing With
                                              20. Presentation: On ‘‘substitute                       under sections 6, 13, and 15 of the ICA,              the Commission and Soliciting
                                                Producer Economies’’ followed by                      as more fully explained in the                        Additional Study Requests and
                                                Q&A                                                   complaint.                                            Establishing Procedural Schedule for
                                              21. Presentation: Long term oil market                     The Complainant states that a copy of              Relicensing and a Deadline for
                                                outlook—Chevron, followed by Q&A                      the complaint was served on the                       Submission of Final Amendments
                                              22. Presentation: ‘‘Uncertainty and                     contacts for the Respondent listed on
                                                Prosperity: A View from Unipec,’’                     the Commission’s list of Corporate                       Take notice that the following
                                                followed by Q&A                                       Officials.                                            hydroelectric application has been filed
                                              23. Presentation: ‘‘World Energy                                                                              with the Commission and is available
                                                                                                         Any person desiring to intervene or to
                                                Investment 2018’’ followed by Q&A                                                                           for public inspection.
                                                                                                      protest this filing must file in
                                              24. Presentation: ‘‘Russian oil                                                                                  a. Type of Application: Subsequent
                                                                                                      accordance with Rules 211 and 214 of
                                                perspective’’ followed by Q&A                                                                               Minor License.
                                                                                                      the Commission’s Rules of Practice and                   b. Project No.: 2972–027.
                                              25. Other Business:                                     Procedure (18 CFR 385.211, 385.214).
                                                —Tentative schedule of the next SOM                                                                            c. Date filed: November 1, 2018.
                                                                                                      Protests will be considered by the                       d. Applicant: City of Woonsocket,
                                                   meeting: 21 March 2019, Location                   Commission in determining the                         Rhode Island (City).
                                                   TBC                                                appropriate action to be taken, but will                 e. Name of Project: Woonsocket Falls
                                                Representatives of the Directorate-                   not serve to make protestants parties to              Project.
                                              General for Competition of the European                 the proceeding. Any person wishing to                    f. Location: On the Blackstone River
                                              Commission and representatives of                       become a party must file a notice of                  in the City of Woonsocket, Providence
                                              members of the IEA Group of Reporting                   intervention or motion to intervene, as               County, Rhode Island. The project
                                              Companies may attend the meeting as                     appropriate. The Respondent’s answer                  diverts water from the impoundment
                                              observers. The meeting will also be                     and all interventions, or protests must               created by the U.S. Army Corps of
                                              open to representatives of the Secretary                be filed on or before the comment date.               Engineers’ (Corps) Woonsocket Falls
                                              of Energy, the Secretary of State, the                  The Respondent’s answer, motions to                   Dam; however, there are no federal or
                                              Attorney General, and the Federal Trade                 intervene, and protests must be served                tribal lands within the project boundary.
                                              Commission severally, to any United                     on the Complainant.                                      g. Filed Pursuant to: Federal Power
                                              States Government employee designated                      The Commission encourages                          Act 16 U.S.C. 791(a)–825(r).
                                              by the Secretary of Energy, and to the                  electronic submission of protests and                    h. Applicant Contact: Mr. Michael
                                              representatives of Committees of the                    interventions in lieu of paper using the              Debroisse, City of Woonsocket,
                                              Congress.                                               ‘‘eFiling’’ link at http://www.ferc.gov.              Engineering, 169 Main Street,
                                                Signed in Washington, DC, November 16,
                                                                                                      Persons unable to file electronically                 Woonsocket, RI 02895; (401) 767–9213.
                                              2018.                                                   should submit an original and 5 copies                   i. FERC Contact: Patrick Crile, (202)
                                              Thomas Reilly,
                                                                                                      of the protest or intervention to the                 502–8042 or Patrick.Crile@ferc.gov.
                                                                                                      Federal Energy Regulatory Commission,                    j. Cooperating agencies: Federal, state,
                                              Assistant General Counsel for International
                                              and National Security Programs.
                                                                                                      888 First Street NE, Washington, DC                   local, and tribal agencies with
                                                                                                      20426.                                                jurisdiction and/or special expertise
                                              [FR Doc. 2018–25526 Filed 11–21–18; 8:45 am]
                                                                                                         This filing is accessible on-line at               with respect to environmental issues
                                              BILLING CODE 6450–01–P
                                                                                                      http://www.ferc.gov, using the                        that wish to cooperate in the
                                                                                                      ‘‘eLibrary’’ link and is available for                preparation of the environmental
                                                                                                      electronic review in the Commission’s                 document should follow the
                                              DEPARTMENT OF ENERGY
                                                                                                      Public Reference Room in Washington,                  instructions for filing such requests
                                              Federal Energy Regulatory                               DC. There is an ‘‘eSubscription’’ link on             described in item l below. Cooperating
                                              Commission                                              the website that enables subscribers to               agencies should note the Commission’s
                                                                                                      receive email notification when a                     policy that agencies that cooperate in
                                              [Docket No. OR19–7–000]                                 document is added to a subscribed                     the preparation of the environmental
                                                                                                      docket(s). For assistance with any FERC               document cannot also intervene. See 94
                                              CITGO Petroleum Corporation v.
                                                                                                      Online service, please email                          FERC ¶ 61,076 (2001).
                                              Colonial Pipeline Company; Notice of
                                                                                                      FERCOnlineSupport@ferc.gov, or call                      k. Pursuant to section 4.32(b)(7) of the
                                              Complaint
                                                                                                      (866) 208–3676 (toll free). For TTY, call             Commission’s regulations, if any
                                                Take notice that on November 15,                      (202) 502–8659.                                       resource agency, Indian Tribe, or person
                                              2018, pursuant to sections 13(1), 15(1)                    Comment Date: 5 p.m. Eastern Time                  believes that an additional scientific
                                              and 15(7) of the Interstate Commerce                    on December 5, 2018.                                  study should be conducted in order to
                                              Act (ICA),1 Rules 211 and 214 of the                                                                          form an adequate factual basis for a
amozie on DSK3GDR082PROD with NOTICES1




                                                                                                        Dated: November 15, 2018.
                                              Federal Energy Regulatory                                                                                     complete analysis of the application on
                                                                                                      Kimberly D. Bose,                                     its merit, the resource agency, Indian
                                              Commission’s (Commission) Rules of
                                                                                                      Secretary.                                            Tribe, or person must file a request for
                                              Practice and Procedure,2 and sections
                                              343.2, 343.3, and 385.206 of the                        [FR Doc. 2018–25464 Filed 11–21–18; 8:45 am]          a study with the Commission not later
                                                                                                      BILLING CODE 6717–01–P                                than 60 days from the date of filing of
                                                1 49 App. U.S.C. 15(1) and 15(7) (1988).                                                                    the application, and serve a copy of the
                                                2 18 CFR 385.211 and 385.214.                           3 18   CFR 343.3.                                   request on the applicant.


                                         VerDate Sep<11>2014   18:33 Nov 21, 2018   Jkt 247001   PO 00000   Frm 00020   Fmt 4703   Sfmt 4703   E:\FR\FM\23NON1.SGM   23NON1


                                              59374                                Federal Register / Vol. 83, No. 226 / Friday, November 23, 2018 / Notices

                                                 l. Deadline for filing additional study                                 o. The Woonsocket Falls Project                                       controller. The Woonsocket Falls project
                                              requests and requests for cooperating                                   utilizes water from the impoundment                                      has an average annual generation of
                                              agency status: December 31, 2018.                                       created by the Corps’ Woonsocket Falls                                   approximately 4,580 megawatt-hours.
                                                 The Commission strongly encourages                                   Dam, and consists of: (1) A 14-foot-                                        The City proposes to: (1) Continue
                                              electronic filing. Please file additional                               wide, 20.5-foot-high concrete intake                                     operating the project in a ROR mode; (2)
                                              study requests and requests for                                         structure located about 60 feet upstream                                 provide a year-round minimum flow of
                                              cooperating agency status using the                                     of the Woonsocket Falls Dam and fitted                                   20 cfs into the bypassed reach; (3)
                                              Commission’s eFiling system at http://                                  with a 12-foot-wide, 18-foot-high steel                                  provide upstream eel passage at the
                                              www.ferc.gov/docs-filing/efiling.asp. For                               trash rack having 3.5-inch clear bar                                     project; and (4) implement targeted
                                              assistance, please contact FERC Online                                  spacing; (2) a 275-foot long, 12-foot-                                   nighttime turbine shutdowns to
                                              Support at FERCOnlineSupport@                                           wide, 10-foot-high concrete penstock;                                    facilitate downstream eel passage.
                                              ferc.gov, (866) 208–3676 (toll free), or                                (3) a 65-foot-long, 25-foot-wide, 20-foot-                                  p. A copy of the application is
                                              (202) 502–8659 (TTY). In lieu of                                        high concrete powerhouse containing                                      available for review at the Commission
                                              electronic filing, please send a paper                                  one adjustable blade turbine-generator                                   in the Public Reference Room or may be
                                              copy to: Secretary, Federal Energy                                      unit with an authorized capacity of                                      viewed on the Commission’s website at
                                              Regulatory Commission, 888 First Street                                 1,200 kilowatts; (4) a 50-foot-long, 12.5-                               http://www.ferc.gov using the
                                              NE, Washington, DC 20426. The first                                     foot-diameter steel draft tube; (5) an                                   ‘‘eLibrary’’ link. Enter the docket
                                              page of any filing should include docket                                approximately 50-foot-long, 20-foot-                                     number excluding the last three digits in
                                              number P–2972–027.                                                      wide, 15-foot-deep tailrace; (6) a 35-foot-                              the docket number field to access the
                                                                                                                      long 4.16 kilovolt (kV) generator lead                                   document. For assistance, contact FERC
                                                 m. The application is not ready for                                  line, a 4.16/13.8-kV step-up transformer,                                Online Support. A copy is also available
                                              environmental analysis at this time.                                    a 1,200-foot-long, and a 13.8-kV                                         for inspection and reproduction at the
                                                 n. The City electronically filed the                                 transmission line connecting the project                                 address in item h above.
                                              application with the Commission after                                   generator to the regional grid; and (7)                                     You may also register online at http://
                                              the close of business on October 31,                                    appurtenant facilities.                                                  www.ferc.gov/docs-filing/
                                              2018. Pursuant to 18 CFR                                                   The project bypasses approximately                                    esubscription.asp to be notified via
                                              385.2001(a)(2), any document received                                   360 feet of the Blackstone River and                                     email of new filings and issuances
                                              after regular business hours is                                         there is currently no required minimum                                   related to this or other pending projects.
                                              considered filed on the next regular                                    instream flow for the bypassed reach.                                    For assistance, contact FERC Online
                                              business day. By this notice, the                                       However, the City operates the project                                   Support.
                                              requirement under 18 CFR 16.20(c) to                                    in a run-of-river (ROR) mode and                                            q. Procedural schedule and final
                                              file the subsequent license application                                 voluntarily maintains a minimum flow                                     amendments: The application will be
                                              at least 24 months before the expiration                                of 20 cubic feet per second (cfs) over the                               processed according to the following
                                              of the existing license (i.e., no later than                            crest of the dam to the bypassed reach                                   preliminary schedule. Revisions to the
                                              October 31, 2018) is waived.                                            using an automatic pond level                                            schedule will be made as appropriate.

                                              Issue Deficiency Letter (if necessary) ........................................................................................................................................         January 2019.
                                              Request Additional Information ..................................................................................................................................................       January 2019.
                                              Issue Acceptance Letter .............................................................................................................................................................   April 2019.
                                              Issue Scoping Document 1 for comments .................................................................................................................................                 May 2019.
                                              Request Additional Information (if necessary) ...........................................................................................................................               July 2019.
                                              Issue Scoping Document 2 ........................................................................................................................................................       August 2019.
                                              Issue Notice of Ready for Environmental Analysis ....................................................................................................................                   August 2019.
                                              Issue Notice of Availability of Environmental Assessment ........................................................................................................                       February 2020.



                                                 Final amendments to the application                                  DEPARTMENT OF ENERGY                                                        The EA contains staff’s analysis of the
                                              must be filed with the Commission no                                                                                                             potential environmental impacts of the
                                              later than 30 days from the issuance                                    Federal Energy Regulatory                                                project and concludes that licensing the
                                              date of the notice of ready for                                         Commission                                                               project, with appropriate environmental
                                              environmental analysis.                                                                                                                          protective measures, would not
                                                                                                                      [Project No. 1235–017]                                                   constitute a major federal action that
                                                Dated: November 15, 2018.
                                                                                                                                                                                               would significantly affect the quality of
                                              Kimberly D. Bose,                                                       City of Radford; Notice of Availability                                  the human environment.
                                              Secretary.                                                              of Environmental Assessment                                                 A copy of the EA is available for
                                              [FR Doc. 2018–25472 Filed 11–21–18; 8:45 am]                                                                                                     review at the Commission in the Public
                                                                                                                        In accordance with the National
                                              BILLING CODE 6717–01–P
                                                                                                                      Environmental Policy Act of 1969 and                                     Reference Room or may be viewed on
                                                                                                                      the Federal Energy Regulatory                                            the Commission’s website at http://
                                                                                                                      Commission’s (Commission)                                                www.ferc.gov using the ‘‘eLibrary’’ link.
                                                                                                                      regulations, 18 CFR part 380, the Office                                 Enter the docket number excluding the
                                                                                                                      of Energy Projects has reviewed the                                      last three digits in the docket number
amozie on DSK3GDR082PROD with NOTICES1




                                                                                                                      application for a subsequent license for                                 field to access the document. For
                                                                                                                      the Municipal Hydroelectric Project,                                     assistance, contact FERC Online
                                                                                                                      located on the Little River, near the City                               Support at FERCOnlineSupport@
                                                                                                                      of Radford, in Montgomery and Pulaski                                    ferc.gov, (866) 208–3676 (toll free), or
                                                                                                                      Counties, Virginia, and has prepared an                                  (202) 502–8659 (TTY).
                                                                                                                      Environmental Assessment (EA) for the                                       You may also register online at http://
                                                                                                                      project.                                                                 www.ferc.gov/docs-filing/


                                         VerDate Sep<11>2014        18:33 Nov 21, 2018        Jkt 247001      PO 00000       Frm 00021       Fmt 4703      Sfmt 4703      E:\FR\FM\23NON1.SGM              23NON1



Document Created: 2018-11-27 12:59:07
Document Modified: 2018-11-27 12:59:07
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation83 FR 59373 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR