83_FR_6039 83 FR 6010 - University of Notre Dame; Notice of Application Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests

83 FR 6010 - University of Notre Dame; Notice of Application Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 83, Issue 29 (February 12, 2018)

Page Range6010-6011
FR Document2018-02785

Federal Register, Volume 83 Issue 29 (Monday, February 12, 2018)
[Federal Register Volume 83, Number 29 (Monday, February 12, 2018)]
[Notices]
[Pages 6010-6011]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-02785]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 7569-006]


University of Notre Dame; Notice of Application Accepted for 
Filing, Soliciting Comments, Motions To Intervene, and Protests

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection. 
Please note that this application was previously noticed by the 
Commission on October 3, 2017. However, due to a clerical error, the 
Commission is reissuing this notice for public comment. There have been 
no significant changes to the exemptee's application since the October 
3, 2017.
    a. Type of Application: Application to amend 5 MW exemption from 
licensing.
    b. Project No.: 7569-006.
    c. Date Filed: April 24, 2017, and supplemented on September 21, 
2017.
    d. Applicant: University of Notre Dame.
    e. Name of Project: South Bend Hydroelectric Project.
    f. Location: The project is located on the St. Joseph River in St. 
Joseph County, Indiana.
    g. Filed Pursuant to: 18 CFR 4.104 (2016).
    h. Applicant Contact: Mr. Paul A. Kempf, University of Notre Dame, 
100 Facilities Building, Notre Dame, IN 46556, (574) 631-0142.

[[Page 6011]]

    i. FERC Contact: Jennifer Polardino, (202) 502-6437, or 
[email protected].
    j. Deadline for filing comments, motions to intervene, protests, 
and recommendations is 30 days from the issuance date of this notice by 
the Commission.
    The Commission strongly encourages electronic filing. Please file 
motions to intervene, protests, comments, or recommendations using the 
Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 
characters, without prior registration, using the eComment system at 
http://www.ferc.gov/docs-filing/ecomment.asp. You must include your 
name and contact information at the end of your comments. For 
assistance, please contact FERC Online Support at 
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE, 
Washington, DC 20426. Please include the project number (P-7569-006) on 
any comments, motions to intervene, protests, or recommendations filed.
    k. Project as Authorized: The South Bend project consists of: (1) 
An existing reservoir with a surface area of 150 acres and a storage 
capacity of 800 acre-feet at a pool elevation of 680 feet mean sea 
level; (2) an existing concrete and timber-crib dam approximately 18-
feet-high and 435 feet long; (3) powerhouse containing one 50-kilowatt 
(kW) and two 890 kW generating units, for a total authorized capacity 
of 1,830 kW; and (4) appurtenant facilities.
    l. Description of Request: The exemptee requests approval to amend 
the exemption for the South Bend Hydroelectric Project with the 
following modifications to the project's facilities: Ten 250 kilowatt 
(kW) units for a total generating capacity of 2,500 kW; a 390-foot-long 
conveyance channel, a coarse trash rack at the inlet to the conveyance 
channel; a secondary trash rack with a traveling brush; and a 1.5 mile 
long, 1.47 kilovolt transmission line buried from the hydro site to the 
tie-in point at the Notre Dame campus. The proposed modifications would 
require changes to the project's boundary.
    m. Locations of the Application: A copy of the application is 
available for inspection and reproduction at the Commission's Public 
Reference Room, located at 888 First Street NE, Room 2A, Washington, DC 
20426, or by calling (202) 502-8371. This filing may also be viewed on 
the Commission's website at http://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number excluding the last three digits 
in the docket number field to access the document. You may also 
register online at http://www.ferc.gov/docs-filing/esubscription.asp to 
be notified via email of new filings and issuances related to this or 
other pending projects. For assistance, call 1-866-208-3676 or email 
[email protected], for TTY, call (202) 502-8659. A copy is 
also available for inspection and reproduction at the address in item 
(h) above.
    n. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    o. Comments, Protests, or Motions to Intervene: Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
.214. In determining the appropriate action to take, the Commission 
will consider all protests or other comments filed, but only those who 
file a motion to intervene in accordance with the Commission's Rules 
may become a party to the proceeding. Any comments, protests, or 
motions to intervene must be received on or before the specified 
comment date for the particular application.
    p. Filing and Service of Responsive Documents: Any filing must (1) 
bear in all capital letters the title COMMENTS, PROTEST, or MOTION TO 
INTERVENE as applicable; (2) set forth in the heading, the name of the 
applicant and the project number of the application to which the filing 
responds; (3) furnish the name, address, and telephone number of the 
person protesting or intervening; and (4) otherwise comply with the 
requirements of 18 CFR 385.2001 through 385.2005. All comments, motions 
to intervene, or protests must set forth their evidentiary basis and 
otherwise comply with the requirements of 18 CFR 4.34(b). All comments, 
motions to intervene, or protests should relate to project works which 
are the subject of the license amendment. Agencies may obtain copies of 
the application directly from the applicant. A copy of any protest or 
motion to intervene must be served upon each representative of the 
applicant specified in the particular application. If an intervener 
files comments or documents with the Commission relating to the merits 
of an issue that may affect the responsibilities of a particular 
resource agency, they must also serve a copy of the document on that 
resource agency. A copy of all other filings in reference to this 
application must be accompanied by proof of service on all persons 
listed in the service list prepared by the Commission in this 
proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.

    Dated: February 6, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-02785 Filed 2-9-18; 8:45 am]
BILLING CODE 6717-01-P



                                               6010                         Federal Register / Vol. 83, No. 29 / Monday, February 12, 2018 / Notices

                                               viewed on the Commission’s website at                   A copy of all other filings in reference              of the intervention or protest to the
                                               http://www.ferc.gov/docs-filing/                        to this application must be accompanied               Federal Energy Regulatory Commission,
                                               elibrary.asp. Enter the docket number                   by proof of service on all persons listed             888 First Street NE, Washington, DC
                                               excluding the last three digits in the                  in the service list prepared by the                   20426.
                                               docket number field to access the                       Commission in this proceeding, in                        The filings in the above-referenced
                                               document. You may also register online                  accordance with 18 CFR 4.34(b) and                    proceeding are accessible in the
                                               at http://www.ferc.gov/docs-filing/                     385.2010.                                             Commission’s eLibrary system by
                                               esubscription.asp to be notified via                      Dated: February 6, 2018.                            clicking on the appropriate link in the
                                               email of new filings and issuances                                                                            above list. They are also available for
                                                                                                       Kimberly D. Bose,
                                               related to this or other pending projects.                                                                    electronic review in the Commission’s
                                                                                                       Secretary.
                                               For assistance, call 1–866–208- 3676 or                                                                       Public Reference Room in Washington,
                                               email FERCOnlineSupport@ferc.gov, for                   [FR Doc. 2018–02784 Filed 2–9–18; 8:45 am]
                                                                                                                                                             DC. There is an eSubscription link on
                                               TTY, call (202) 502–8659. A copy is also                BILLING CODE 6717–01–P
                                                                                                                                                             the website that enables subscribers to
                                               available for inspection and                                                                                  receive email notification when a
                                               reproduction at the address in item (h)                                                                       document is added to a subscribed
                                               above.                                                  DEPARTMENT OF ENERGY
                                                                                                                                                             docket(s). For assistance with any FERC
                                                  m. Individuals desiring to be included                                                                     Online service, please email
                                               on the Commission’s mailing list should                 Federal Energy Regulatory
                                                                                                       Commission                                            FERCOnlineSupport@ferc.gov. or call
                                               so indicate by writing to the Secretary                                                                       (866) 208–3676 (toll free). For TTY, call
                                               of the Commission.                                      [Docket No. ER18–784–000]                             (202) 502–8659.
                                                  n. Comments, Protests, or Motions to
                                               Intervene: Anyone may submit                            Upstream Wind Energy LLC;                               Dated: February 6, 2018.
                                               comments, a protest, or a motion to                     Supplemental Notice That Initial                      Kimberly D. Bose,
                                               intervene in accordance with the                        Market-Based Rate Filing Includes                     Secretary.
                                               requirements of Rules of Practice and                   Request for Blanket Section 204                       [FR Doc. 2018–02776 Filed 2–9–18; 8:45 am]
                                               Procedure, 18 CFR 385.210, .211, .214.                  Authorization                                         BILLING CODE 6717–01–P
                                               In determining the appropriate action to
                                               take, the Commission will consider all                     This is a supplemental notice in the
                                               protests or other comments filed, but                   above-referenced proceeding of                        DEPARTMENT OF ENERGY
                                               only those who file a motion to                         Upstream Wind Energy LLC‘s
                                               intervene in accordance with the                        application for market-based rate                     Federal Energy Regulatory
                                               Commission’s Rules may become a                         authority, with an accompanying rate                  Commission
                                               party to the proceeding. Any comments,                  tariff, noting that such application
                                               protests, or motions to intervene must                  includes a request for blanket                        [Project No. 7569–006]
                                               be received on or before the specified                  authorization, under 18 CFR part 34, of
                                               comment date for the particular                         future issuances of securities and                    University of Notre Dame; Notice of
                                               application.                                            assumptions of liability.                             Application Accepted for Filing,
                                                  o. Filing and Service of Responsive                     Any person desiring to intervene or to             Soliciting Comments, Motions To
                                               Documents: Any filing must (1) bear in                  protest should file with the Federal                  Intervene, and Protests
                                               all capital letters the title COMMENTS,                 Energy Regulatory Commission, 888
                                               PROTEST, or MOTION TO INTERVENE                         First Street NE, Washington, DC 20426,                  Take notice that the following
                                               as applicable; (2) set forth in the                     in accordance with Rules 211 and 214                  hydroelectric application has been filed
                                               heading the name of the applicant and                   of the Commission’s Rules of Practice                 with the Commission and is available
                                               the project number of the application to                and Procedure (18 CFR 385.211 and                     for public inspection. Please note that
                                               which the filing responds; (3) furnish                  385.214). Anyone filing a motion to                   this application was previously noticed
                                               the name, address, and telephone                        intervene or protest must serve a copy                by the Commission on October 3, 2017.
                                               number of the person protesting or                      of that document on the Applicant.                    However, due to a clerical error, the
                                               intervening; and (4) otherwise comply                      Notice is hereby given that the                    Commission is reissuing this notice for
                                               with the requirements of 18 CFR                         deadline for filing protests with regard              public comment. There have been no
                                               385.2001 through 385.2005. All                          to the applicant’s request for blanket                significant changes to the exemptee’s
                                               comments, motions to intervene, or                      authorization, under 18 CFR part 34, of               application since the October 3, 2017.
                                               protests must set forth their evidentiary               future issuances of securities and                      a. Type of Application: Application to
                                               basis and otherwise comply with the                     assumptions of liability, is February 26,             amend 5 MW exemption from licensing.
                                               requirements of 18 CFR 4.34(b). All                     2018.                                                   b. Project No.: 7569–006.
                                               comments, motions to intervene, or                         The Commission encourages                            c. Date Filed: April 24, 2017, and
                                               protests should relate to project works                 electronic submission of protests and                 supplemented on September 21, 2017.
                                               which are the subject of the amendment.                 interventions in lieu of paper, using the               d. Applicant: University of Notre
                                               Agencies may obtain copies of the                       FERC Online links at http://                          Dame.
                                               application directly from the applicant.                www.ferc.gov. To facilitate electronic                  e. Name of Project: South Bend
                                               A copy of any protest or motion to                      service, persons with internet access                 Hydroelectric Project.
                                               intervene must be served upon each                      who will eFile a document and/or be                     f. Location: The project is located on
                                               representative of the applicant specified               listed as a contact for an intervenor                 the St. Joseph River in St. Joseph
daltland on DSKBBV9HB2PROD with NOTICES




                                               in the particular application. If an                    must create and validate an                           County, Indiana.
                                               intervener files comments or documents                  eRegistration account using the                         g. Filed Pursuant to: 18 CFR 4.104
                                               with the Commission relating to the                     eRegistration link. Select the eFiling                (2016).
                                               merits of an issue that may affect the                  link to log on and submit the                           h. Applicant Contact: Mr. Paul A.
                                               responsibilities of a particular resource               intervention or protests.                             Kempf, University of Notre Dame, 100
                                               agency, they must also serve a copy of                     Persons unable to file electronically              Facilities Building, Notre Dame, IN
                                               the document on that resource agency.                   should submit an original and 5 copies                46556, (574) 631–0142.


                                          VerDate Sep<11>2014   19:23 Feb 09, 2018   Jkt 244001   PO 00000   Frm 00036   Fmt 4703   Sfmt 4703   E:\FR\FM\12FEN1.SGM   12FEN1


                                                                            Federal Register / Vol. 83, No. 29 / Monday, February 12, 2018 / Notices                                                  6011

                                                  i. FERC Contact: Jennifer Polardino,                 elibrary.asp. Enter the docket number                 application must be accompanied by
                                               (202) 502–6437, or Jennifer.Polardino@                  excluding the last three digits in the                proof of service on all persons listed in
                                               ferc.gov.                                               docket number field to access the                     the service list prepared by the
                                                  j. Deadline for filing comments,                     document. You may also register online                Commission in this proceeding, in
                                               motions to intervene, protests, and                     at http://www.ferc.gov/docs-filing/                   accordance with 18 CFR 4.34(b) and
                                               recommendations is 30 days from the                     esubscription.asp to be notified via                  385.2010.
                                               issuance date of this notice by the                     email of new filings and issuances                      Dated: February 6, 2018.
                                               Commission.                                             related to this or other pending projects.
                                                  The Commission strongly encourages                                                                         Kimberly D. Bose,
                                                                                                       For assistance, call 1–866–208–3676 or
                                               electronic filing. Please file motions to                                                                     Secretary.
                                                                                                       email FERCOnlineSupport@ferc.gov, for
                                               intervene, protests, comments, or                       TTY, call (202) 502–8659. A copy is also              [FR Doc. 2018–02785 Filed 2–9–18; 8:45 am]
                                               recommendations using the                               available for inspection and                          BILLING CODE 6717–01–P
                                               Commission’s eFiling system at http://                  reproduction at the address in item (h)
                                               www.ferc.gov/docs-filing/efiling.asp.                   above.
                                               Commenters can submit brief comments                       n. Individuals desiring to be included             DEPARTMENT OF ENERGY
                                               up to 6,000 characters, without prior                   on the Commission’s mailing list should
                                               registration, using the eComment system                 so indicate by writing to the Secretary               Federal Energy Regulatory
                                               at http://www.ferc.gov/docs-filing/                     of the Commission.                                    Commission
                                               ecomment.asp. You must include your                        o. Comments, Protests, or Motions to               [Project No. 2035–099]
                                               name and contact information at the end                 Intervene: Anyone may submit
                                               of your comments. For assistance,                       comments, a protest, or a motion to                   City and County of Denver, Colorado;
                                               please contact FERC Online Support at                   intervene in accordance with the                      Notice of Availability of Supplemental
                                               FERCOnlineSupport@ferc.gov, (866)                       requirements of Rules of Practice and                 Environmental Assessment
                                               208–3676 (toll free), or (202) 502–8659                 Procedure, 18 CFR 385.210, .211, .214.
                                               (TTY). In lieu of electronic filing, please             In determining the appropriate action to                 In accordance with the National
                                               send a paper copy to: Secretary, Federal                take, the Commission will consider all                Environmental Policy Act of 1969 and
                                               Energy Regulatory Commission, 888                       protests or other comments filed, but                 the Federal Energy Regulatory
                                               First Street NE, Washington, DC 20426.                  only those who file a motion to                       Commission’s (Commission or FERC)
                                               Please include the project number (P–                   intervene in accordance with the                      regulations, 18 Code of Federal
                                               7569–006) on any comments, motions to                   Commission’s Rules may become a                       Regulations (CFR) Part 380, Commission
                                               intervene, protests, or recommendations                 party to the proceeding. Any comments,                staff prepared a Supplemental
                                               filed.                                                  protests, or motions to intervene must                Environmental Assessment
                                                  k. Project as Authorized: The South                  be received on or before the specified                (Supplemental EA), to supplement a
                                               Bend project consists of: (1) An existing               comment date for the particular                       U.S. Army Corps of Engineers’ (Corps)
                                               reservoir with a surface area of 150 acres              application.                                          Final Environmental Impact Statement
                                               and a storage capacity of 800 acre-feet                    p. Filing and Service of Responsive                (Final EIS) completed on April 25, 2014.
                                               at a pool elevation of 680 feet mean sea                Documents: Any filing must (1) bear in                The Corps’ Final EIS addressed a
                                               level; (2) an existing concrete and                     all capital letters the title COMMENTS,               proposal by the City and County of
                                               timber-crib dam approximately 18-feet-                  PROTEST, or MOTION TO INTERVENE                       Denver, Colorado (Denver Water) to
                                               high and 435 feet long; (3) powerhouse                  as applicable; (2) set forth in the                   enlarge its Moffat Collection System.
                                               containing one 50-kilowatt (kW) and                     heading, the name of the applicant and                The Commission acted as a cooperating
                                               two 890 kW generating units, for a total                the project number of the application to              agency in the preparation of the Final
                                               authorized capacity of 1,830 kW; and (4)                which the filing responds; (3) furnish                EIS because Gross Reservoir, a
                                               appurtenant facilities.                                 the name, address, and telephone                      component of the Moffat Collection
                                                  l. Description of Request: The                       number of the person protesting or                    System which would be enlarged under
                                               exemptee requests approval to amend                     intervening; and (4) otherwise comply                 the proposal, is also a feature of the
                                               the exemption for the South Bend                        with the requirements of 18 CFR                       Commission-licensed Gross Reservoir
                                               Hydroelectric Project with the following                385.2001 through 385.2005. All                        Hydroelectric Project No. 2035. On
                                               modifications to the project’s facilities:              comments, motions to intervene, or                    November 25, 2016, Denver Water filed
                                               Ten 250 kilowatt (kW) units for a total                 protests must set forth their evidentiary             with the Commission its application to
                                               generating capacity of 2,500 kW; a 390-                 basis and otherwise comply with the                   raise the project’s Gross Dam, enlarge
                                               foot-long conveyance channel, a coarse                  requirements of 18 CFR 4.34(b). All                   Gross Reservoir, and amend the project
                                               trash rack at the inlet to the conveyance               comments, motions to intervene, or                    license. The project is located on South
                                               channel; a secondary trash rack with a                  protests should relate to project works               Boulder Creek near the City of Boulder,
                                               traveling brush; and a 1.5 mile long,                   which are the subject of the license                  Boulder County, Colorado. It occupies a
                                               1.47 kilovolt transmission line buried                  amendment. Agencies may obtain                        total of 1,056.92 acres of federal lands
                                               from the hydro site to the tie-in point at              copies of the application directly from               within the Roosevelt National Forest
                                               the Notre Dame campus. The proposed                     the applicant. A copy of any protest or               administered by the U.S. Forest Service,
                                               modifications would require changes to                  motion to intervene must be served                    and lands administered by the U.S.
                                               the project’s boundary.                                 upon each representative of the                       Bureau of Land Management.
                                                  m. Locations of the Application: A                   applicant specified in the particular                    The Supplemental EA analyzes
                                               copy of the application is available for                application. If an intervener files                   potential environmental effects specific
daltland on DSKBBV9HB2PROD with NOTICES




                                               inspection and reproduction at the                      comments or documents with the                        to a Commission approval of Denver
                                               Commission’s Public Reference Room,                     Commission relating to the merits of an               Water’s proposal, including amendment
                                               located at 888 First Street NE, Room 2A,                issue that may affect the responsibilities            of the project license, which were not
                                               Washington, DC 20426, or by calling                     of a particular resource agency, they                 addressed in the 2014 Final EIS. Based
                                               (202) 502–8371. This filing may also be                 must also serve a copy of the document                on staff’s independent analysis in the
                                               viewed on the Commission’s website at                   on that resource agency. A copy of all                Supplemental EA, a Commission
                                               http://www.ferc.gov/docs-filing/                        other filings in reference to this                    approval of Denver Water’s proposal, as


                                          VerDate Sep<11>2014   19:23 Feb 09, 2018   Jkt 244001   PO 00000   Frm 00037   Fmt 4703   Sfmt 4703   E:\FR\FM\12FEN1.SGM   12FEN1



Document Created: 2018-11-01 08:42:38
Document Modified: 2018-11-01 08:42:38
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation83 FR 6010 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR