83_FR_62553 83 FR 62321 - Submission for OMB Review; Subcontract Consent and Contractors' Purchasing System Review

83 FR 62321 - Submission for OMB Review; Subcontract Consent and Contractors' Purchasing System Review

DEPARTMENT OF DEFENSE
GENERAL SERVICES ADMINISTRATION
NATIONAL AERONAUTICS AND SPACE ADMINISTRATION

Federal Register Volume 83, Issue 232 (December 3, 2018)

Page Range62321-62322
FR Document2018-26165

Under the provisions of the Paperwork Reduction Act, the Regulatory Secretariat Division will be submitting to the Office of Management and Budget (OMB) a request to review and approve an extension of a previously approved information collection requirement concerning consent to subcontract, advance notification, and Contractors' purchasing system review.

Federal Register, Volume 83 Issue 232 (Monday, December 3, 2018)
[Federal Register Volume 83, Number 232 (Monday, December 3, 2018)]
[Notices]
[Pages 62321-62322]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-26165]


=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF DEFENSE

GENERAL SERVICES ADMINISTRATION

NATIONAL AERONAUTICS AND SPACE ADMINISTRATION

[OMB Control No. 9000-0149; Docket No. 2018-0003; Sequence No. 16]


Submission for OMB Review; Subcontract Consent and Contractors' 
Purchasing System Review

AGENCY: Department of Defense (DOD), General Services Administration 
(GSA), and National Aeronautics and Space Administration (NASA).

ACTION: Notice.

-----------------------------------------------------------------------

SUMMARY: Under the provisions of the Paperwork Reduction Act, the 
Regulatory Secretariat Division will be submitting to the Office of 
Management and Budget (OMB) a request to review and approve an 
extension of a previously approved information collection requirement 
concerning consent to subcontract, advance notification, and 
Contractors' purchasing system review.

DATES: Submit comments on or before January 2, 2019.

ADDRESSES: Submit comments regarding this burden estimate or any other 
aspect of this collection of information, including suggestions for 
reducing this burden to: Office of Information and Regulatory Affairs 
of OMB, Attention: Desk Officer for GSA, Room 10236, NEOB, Washington, 
DC 20503. Additionally submit a copy to GSA by any of the following 
methods:
     Federal eRulemaking Portal: This website provides the 
ability to type short comments directly into the comment field or 
attach a file for lengthier comments. Go to http://www.regulations.gov 
and follow the instructions on the site.
     Mail: General Services Administration, Regulatory 
Secretariat Division (MVCB), 1800 F Street NW, Washington, DC 20405. 
ATTN: Ms. Mandell/IC 9000-0149, Subcontract Consent and Contractors' 
Purchasing System Review.
    Instructions: All items submitted must cite Information Collection 
9000-0149, Subcontract Consent and Contractors' Purchasing System 
Review.
    Comments received generally will be posted without change to http://www.regulations.gov, including any personal and/or business 
confidential information provided. To confirm receipt of your 
comment(s), please check www.regulations.gov, approximately two to 
three days after submission to verify posting (except allow 30 days for 
posting of comments submitted by mail).

FOR FURTHER INFORMATION CONTACT: Ms. Mahruba Uddowla, Procurement 
Analyst, at telephone 703-605-2868, or email [email protected].

SUPPLEMENTARY INFORMATION: 

A. Purpose

    This information collection requirement, OMB Control No. 9000-0149, 
currently titled ``Subcontract Consent,'' is proposed to be retitled 
``Subcontract Consent and Contractors' Purchasing System Review,'' due 
to consolidation with currently approved information collection 
requirement OMB Control No. 9000-0132, Contractors' Purchasing System 
Review.
    This clearance covers the information that a contractor must submit 
to comply with the requirements in Federal Acquisition Regulation (FAR) 
52.244-2, Subcontracts, regarding consent to subcontract, advance 
notification, and Contractors' purchasing system review as follows:
    1. Consent to subcontract. This is the contracting officer's 
written consent for the prime contractor to enter into a particular 
subcontract. In order for the contracting officer responsible for 
consent to make an informed decision, the prime contractor must submit 
adequate information to ensure that the proposed subcontract is 
appropriate for the risks involved and consistent with current policy 
and sound business judgment. The review allows the Government to 
determine whether the contractor's purchasing policies and practices 
are efficient and adequately protect the Government's interests.
    If the contractor has an approved purchasing system, consent is 
required for subcontracts specifically identified by the contracting 
officer in the subcontracts clause of the contract. The contracting 
officer may require consent to subcontract if the contracting officer 
has determined that an individual consent action is required to protect 
the Government adequately because of the subcontract type, complexity, 
or value, or because the subcontract needs special surveillance. These 
can be subcontracts for critical systems, subsystems, components, or 
services.
    If the contractor does not have an approved purchasing system, 
consent to subcontract is required for cost-reimbursement, time-and-
materials, labor-hour, or letter contracts, and also for unpriced 
actions under fixed-price contracts that exceed the simplified 
acquisition threshold.
    2. Advance notification. Prime contractors must provide contracting 
officers notification before the award of any cost-plus-fixed-fee 
subcontract, or certain fixed-price subcontracts. This requirement for 
advance notification is driven by statutory requirements in 10 U.S.C. 
2306 and 41 U.S.C. 3905.
    3. Contractors' Purchasing System Review. The objective of a 
contractor purchasing system review (CPSR), is to evaluate the 
efficiency and effectiveness with which a contractor spends Government 
funds and complies with Government policy when subcontracting.
    Paragraph (i) of FAR clause 52.244-2 specifies that the Government 
reserves the right to review the contractor's purchasing system as set 
forth in FAR subpart 44.3. FAR 44.302 requires the administrative 
contracting officer (ACO) to determine the need for a CPSR based on, 
but not limited to, the past performance of the contractor, and the 
volume, complexity and dollar value of subcontracts. If a contractor's 
sales to the Government (excluding competitively awarded firm-fixed-
price and competitively awarded fixed-price with economic price 
adjustment contracts and sales of commercial items pursuant to Part 12) 
are expected to exceed $25 million during the next 12 months, the ACO 
will perform a review to determine if a CPSR is needed. Sales include 
those represented by prime contracts, subcontracts under

[[Page 62322]]

Government prime contracts, and modifications. Generally, a CPSR is not 
performed for a specific contract. The head of the agency responsible 
for contract administration may raise or lower the $25 million review 
level if it is considered to be in the Government's best interest. Once 
an initial determination has been made to conduct a review, at least 
every three years the ACO shall determine whether a purchasing system 
review is necessary. If necessary, the cognizant contract 
administration office will conduct a purchasing system review.
    A CPSR provides the administrative contracting officer (ACO) a 
basis for granting, withholding, or withdrawing approval of a 
contractor's purchasing system. An approved purchasing system allows 
the contractor more autonomy in subcontracting actions. Without an 
approved purchasing system more Government oversight is necessary, and 
Government consent to subcontract is required. Generally, a CPSR is not 
performed for a specific contract. Rather, CPSRs are conducted on 
contractors based on the factors identified above.
    The cognizant ACO is responsible for granting, withholding, or 
withdrawing approval of a contractor's purchasing system and for 
promptly notifying the contractor of same (FAR 44.305-1).
    Related administrative requirements are as follows: FAR 44.305-2(c) 
requires that when recommendations are made for improvement of an 
approved system, the contractor shall be requested to reply within 15 
days with a position regarding the recommendations. FAR 44.305-3(b) 
requires when approval of the contractor's purchasing system is 
withheld or withdrawn, the ACO shall within 10 days after completing 
the in-plant review (1) inform the contractor in writing, (2) specify 
the deficiencies that must be corrected to qualify the system for 
approval, and (3) request the contractor to furnish within 15 days a 
plan for accomplishing the necessary actions. If the plan is accepted, 
the ACO shall make a follow-up review as soon as the contractor 
notifies the ACO that the deficiencies have been corrected.

B. Public Comment

    A notice was published in the Federal Register at 83 FR 42651, on 
August 23, 2018. No comments were received.

C. Annual Reporting Burden

    The burden estimates provided in the notice published in the 
Federal Register at 83 FR 42651, on August 23, 2018, have been adjusted 
to reflect current, relevant data and appropriate methodology.
    1. Consent to subcontract.
    Respondents: 2,053.
    Responses per Respondent: 3.
    Total Annual Responses: 6,159.
    Hours per Response: 3.
    Total Burden Hours: 18,477.
    2. Advance notification.
    Respondents: 1,336.
    Responses per Respondent: 3.
    Total Annual Responses: 4,008.
    Hours per Response: 0.25.
    Total Burden Hours: 1,002.
    3. Contractors' Purchasing System Review.
    Respondents: 240.
    Responses per Respondent: 1.
    Total Annual Responses: 240.
    Hours per Response: 160.
    Total Burden Hours: 38,400.
    4. Summary.
    Respondents: 3,629.
    Total Annual Responses: 10,407.
    Total Burden Hours: 57,879.
    Affected Public: Businesses or other for-profit and not-for-profit 
institutions.
    Obtaining Copies: Requesters may obtain a copy of the information 
collection documents from the General Services Administration, 
Regulatory Secretariat Division (MVCB), 1800 F Street NW, Washington, 
DC 20405, telephone 202-501-4755. Please cite OMB Control No. 9000-
0149, Subcontract Consent and Contractors' Purchasing System Review, in 
all correspondence.

    Dated: November 27, 2018.
Janet Fry,
Director, Federal Acquisition Policy Division, Office of Governmentwide 
Acquisition Policy, Office of Acquisition Policy, Office of 
Governmentwide Policy.
[FR Doc. 2018-26165 Filed 11-30-18; 8:45 am]
 BILLING CODE 6820-EP-P



                                                                           Federal Register / Vol. 83, No. 232 / Monday, December 3, 2018 / Notices                                           62321

                                               notices are set forth in paragraph 7 of                 burden to: Office of Information and                  proposed subcontract is appropriate for
                                               the Act (12 U.S.C. 1817(j)(7)).                         Regulatory Affairs of OMB, Attention:                 the risks involved and consistent with
                                                 The notices are available for                         Desk Officer for GSA, Room 10236,                     current policy and sound business
                                               immediate inspection at the Federal                     NEOB, Washington, DC 20503.                           judgment. The review allows the
                                               Reserve Bank indicated. The notices                     Additionally submit a copy to GSA by                  Government to determine whether the
                                               also will be available for inspection at                any of the following methods:                         contractor’s purchasing policies and
                                               the offices of the Board of Governors.                    • Federal eRulemaking Portal: This                  practices are efficient and adequately
                                               Interested persons may express their                    website provides the ability to type                  protect the Government’s interests.
                                               views in writing to the Reserve Bank                    short comments directly into the                        If the contractor has an approved
                                               indicated for that notice or to the offices             comment field or attach a file for                    purchasing system, consent is required
                                               of the Board of Governors. Comments                     lengthier comments. Go to http://                     for subcontracts specifically identified
                                               must be received not later than                         www.regulations.gov and follow the                    by the contracting officer in the
                                               December 19, 2018.                                      instructions on the site.                             subcontracts clause of the contract. The
                                                 A. Federal Reserve Bank of Kansas                       • Mail: General Services                            contracting officer may require consent
                                               City (Dennis Denney, Assistant Vice                     Administration, Regulatory Secretariat                to subcontract if the contracting officer
                                               President) 1 Memorial Drive, Kansas                     Division (MVCB), 1800 F Street NW,                    has determined that an individual
                                               City, Missouri 64198–0001:                              Washington, DC 20405. ATTN: Ms.                       consent action is required to protect the
                                                 1. Jane Chance, Fowler, Kansas,                       Mandell/IC 9000–0149, Subcontract                     Government adequately because of the
                                               Trustee of the Lynn and Jane Chance                     Consent and Contractors’ Purchasing                   subcontract type, complexity, or value,
                                               Revocable Trust; to acquire voting                      System Review.                                        or because the subcontract needs special
                                               shares of FSB Bankshares, Inc., and                        Instructions: All items submitted                  surveillance. These can be subcontracts
                                               thereby indirectly acquire Fowler State                 must cite Information Collection 9000–                for critical systems, subsystems,
                                               Bank, Fowler, Kansas.                                   0149, Subcontract Consent and                         components, or services.
                                                                                                       Contractors’ Purchasing System Review.                  If the contractor does not have an
                                                 Board of Governors of the Federal Reserve
                                               System, November 28, 2018.                                 Comments received generally will be                approved purchasing system, consent to
                                                                                                       posted without change to http://                      subcontract is required for cost-
                                               Yao-Chin Chao,
                                                                                                       www.regulations.gov, including any                    reimbursement, time-and-materials,
                                               Assistant Secretary of the Board.                                                                             labor-hour, or letter contracts, and also
                                               [FR Doc. 2018–26192 Filed 11–30–18; 8:45 am]
                                                                                                       personal and/or business confidential
                                                                                                       information provided. To confirm                      for unpriced actions under fixed-price
                                               BILLING CODE P
                                                                                                       receipt of your comment(s), please                    contracts that exceed the simplified
                                                                                                       check www.regulations.gov,                            acquisition threshold.
                                                                                                                                                               2. Advance notification. Prime
                                                                                                       approximately two to three days after
                                               DEPARTMENT OF DEFENSE                                                                                         contractors must provide contracting
                                                                                                       submission to verify posting (except
                                                                                                                                                             officers notification before the award of
                                               GENERAL SERVICES                                        allow 30 days for posting of comments
                                                                                                                                                             any cost-plus-fixed-fee subcontract, or
                                               ADMINISTRATION                                          submitted by mail).
                                                                                                                                                             certain fixed-price subcontracts. This
                                                                                                       FOR FURTHER INFORMATION CONTACT: Ms.                  requirement for advance notification is
                                               NATIONAL AERONAUTICS AND                                Mahruba Uddowla, Procurement                          driven by statutory requirements in 10
                                               SPACE ADMINISTRATION                                    Analyst, at telephone 703–605–2868, or                U.S.C. 2306 and 41 U.S.C. 3905.
                                                                                                       email mahruba.uddowla@gsa.gov.                          3. Contractors’ Purchasing System
                                               [OMB Control No. 9000–0149; Docket No.
                                               2018–0003; Sequence No. 16]                             SUPPLEMENTARY INFORMATION:                            Review. The objective of a contractor
                                                                                                                                                             purchasing system review (CPSR), is to
                                                                                                       A. Purpose
                                               Submission for OMB Review;                                                                                    evaluate the efficiency and effectiveness
                                               Subcontract Consent and Contractors’                       This information collection                        with which a contractor spends
                                               Purchasing System Review                                requirement, OMB Control No. 9000–                    Government funds and complies with
                                                                                                       0149, currently titled ‘‘Subcontract                  Government policy when
                                               AGENCY: Department of Defense (DOD),                    Consent,’’ is proposed to be retitled                 subcontracting.
                                               General Services Administration (GSA),                  ‘‘Subcontract Consent and Contractors’                  Paragraph (i) of FAR clause 52.244–2
                                               and National Aeronautics and Space                      Purchasing System Review,’’ due to                    specifies that the Government reserves
                                               Administration (NASA).                                  consolidation with currently approved                 the right to review the contractor’s
                                               ACTION: Notice.                                         information collection requirement                    purchasing system as set forth in FAR
                                                                                                       OMB Control No. 9000–0132,                            subpart 44.3. FAR 44.302 requires the
                                               SUMMARY:    Under the provisions of the                 Contractors’ Purchasing System Review.                administrative contracting officer (ACO)
                                               Paperwork Reduction Act, the                               This clearance covers the information              to determine the need for a CPSR based
                                               Regulatory Secretariat Division will be                 that a contractor must submit to comply               on, but not limited to, the past
                                               submitting to the Office of Management                  with the requirements in Federal                      performance of the contractor, and the
                                               and Budget (OMB) a request to review                    Acquisition Regulation (FAR) 52.244–2,                volume, complexity and dollar value of
                                               and approve an extension of a                           Subcontracts, regarding consent to                    subcontracts. If a contractor’s sales to
                                               previously approved information                         subcontract, advance notification, and                the Government (excluding
                                               collection requirement concerning                       Contractors’ purchasing system review                 competitively awarded firm-fixed-price
                                               consent to subcontract, advance                         as follows:                                           and competitively awarded fixed-price
                                               notification, and Contractors’                             1. Consent to subcontract. This is the             with economic price adjustment
khammond on DSK30JT082PROD with NOTICES




                                               purchasing system review.                               contracting officer’s written consent for             contracts and sales of commercial items
                                               DATES: Submit comments on or before                     the prime contractor to enter into a                  pursuant to Part 12) are expected to
                                               January 2, 2019.                                        particular subcontract. In order for the              exceed $25 million during the next 12
                                               ADDRESSES: Submit comments regarding                    contracting officer responsible for                   months, the ACO will perform a review
                                               this burden estimate or any other aspect                consent to make an informed decision,                 to determine if a CPSR is needed. Sales
                                               of this collection of information,                      the prime contractor must submit                      include those represented by prime
                                               including suggestions for reducing this                 adequate information to ensure that the               contracts, subcontracts under


                                          VerDate Sep<11>2014   16:52 Nov 30, 2018   Jkt 247001   PO 00000   Frm 00032   Fmt 4703   Sfmt 4703   E:\FR\FM\03DEN1.SGM   03DEN1


                                               62322                       Federal Register / Vol. 83, No. 232 / Monday, December 3, 2018 / Notices

                                               Government prime contracts, and                            1. Consent to subcontract.                         GSA Public Buildings Service NEPA
                                               modifications. Generally, a CPSR is not                    Respondents: 2,053.                                Desk Guide, and the FHWA Policy
                                               performed for a specific contract. The                     Responses per Respondent: 3.                       Guide, GSA, PBS, the Federal Highway
                                               head of the agency responsible for                         Total Annual Responses: 6,159.                     Administration (FHWA), and
                                               contract administration may raise or                       Hours per Response: 3.                             MaineDOT, in cooperation with the U.S.
                                               lower the $25 million review level if it                   Total Burden Hours: 18,477.                        Coast Guard and in coordination with
                                               is considered to be in the Government’s                    2. Advance notification.                           the U.S. Customs and Border Protection
                                               best interest. Once an initial                             Respondents: 1,336.                                (CBP), announce the availability of a
                                               determination has been made to                             Responses per Respondent: 3.                       Draft Supplemental Environmental
                                               conduct a review, at least every three                     Total Annual Responses: 4,008.                     Impact Statement (DSEIS) assessing the
                                               years the ACO shall determine whether                      Hours per Response: 0.25.                          potential impacts of a proposed new
                                               a purchasing system review is                              Total Burden Hours: 1,002.                         U.S. Land Port of Entry (LPOE) in
                                               necessary. If necessary, the cognizant                     3. Contractors’ Purchasing System                  Madawaska, Maine and an International
                                               contract administration office will                     Review.                                               Bridge project between Madawaska and
                                               conduct a purchasing system review.                        Respondents: 240.                                  Edmundston, New Brunswick, Canada
                                                  A CPSR provides the administrative                      Responses per Respondent: 1.                       (the ‘‘Proposed Action’’).
                                               contracting officer (ACO) a basis for                      Total Annual Responses: 240.
                                                                                                          Hours per Response: 160.                           DATES: The GSA, FHWA, and
                                               granting, withholding, or withdrawing
                                                                                                          Total Burden Hours: 38,400.                        MaineDOT will host a public hearing on
                                               approval of a contractor’s purchasing
                                                                                                          4. Summary.                                        Wednesday, December 12, 2018.
                                               system. An approved purchasing system
                                               allows the contractor more autonomy in                     Respondents: 3,629.                                ADDRESSES: Madawaska High School
                                               subcontracting actions. Without an                         Total Annual Responses: 10,407.                    gymnasium at 135 7th Avenue,
                                               approved purchasing system more                            Total Burden Hours: 57,879.                        Madawaska, Maine 04756, at 6:30 p.m.
                                               Government oversight is necessary, and                     Affected Public: Businesses or other               EST (Eastern Standard Time). The
                                               Government consent to subcontract is                    for-profit and not-for-profit institutions.           evening of the public hearing will
                                               required. Generally, a CPSR is not                         Obtaining Copies: Requesters may                   consist of an open house to view
                                               performed for a specific contract.                      obtain a copy of the information                      displays beginning at 6:00 p.m., a brief
                                               Rather, CPSRs are conducted on                          collection documents from the General                 presentation beginning at 6:30 p.m.,
                                               contractors based on the factors                        Services Administration, Regulatory                   followed by an opportunity to provide
                                               identified above.                                       Secretariat Division (MVCB), 1800 F                   comments on the contents of the DSEIS.
                                                  The cognizant ACO is responsible for                 Street NW, Washington, DC 20405,                      Interested parties are encouraged to
                                               granting, withholding, or withdrawing                   telephone 202–501–4755. Please cite                   attend and provide written comments
                                               approval of a contractor’s purchasing                   OMB Control No. 9000–0149,                            by Thursday, January 31, 2019.
                                               system and for promptly notifying the                   Subcontract Consent and Contractors’                     Written comments can be submitted
                                               contractor of same (FAR 44.305–1).                      Purchasing System Review, in all                      by the following methods:
                                                  Related administrative requirements                  correspondence.                                          • Regulations.gov: http://
                                               are as follows: FAR 44.305–2(c) requires                  Dated: November 27, 2018.                           www.regulations.gov (http://
                                               that when recommendations are made                      Janet Fry,                                            www.regulations.gov). Submit
                                               for improvement of an approved system,                  Director, Federal Acquisition Policy Division,        comments via the Federal eRulemaking
                                               the contractor shall be requested to                    Office of Governmentwide Acquisition Policy,          portal by searching the Notice number
                                               reply within 15 days with a position                    Office of Acquisition Policy, Office of               or ‘‘New U.S. Land Port of Entry in
                                               regarding the recommendations. FAR                      Governmentwide Policy.                                Madawaska, Maine and Madawaska-
                                               44.305–3(b) requires when approval of                   [FR Doc. 2018–26165 Filed 11–30–18; 8:45 am]          Edmundston International Bridge
                                               the contractor’s purchasing system is                   BILLING CODE 6820–EP–P                                Project.’’ Select the link ‘‘Comment
                                               withheld or withdrawn, the ACO shall                                                                          Now’’ that corresponds with ‘‘Notice of
                                               within 10 days after completing the in-                                                                       Availability of a Draft Supplemental
                                               plant review (1) inform the contractor in               GENERAL SERVICES                                      Environmental Impact Statement for the
                                               writing, (2) specify the deficiencies that              ADMINISTRATION                                        New U.S. Land Port of Entry in
                                               must be corrected to qualify the system                 [Notice–PBS–2018–14; Docket No. 2018–                 Madawaska, Maine and Madawaska-
                                               for approval, and (3) request the                       0002; Sequence No. 33]                                Edmundston International Bridge
                                               contractor to furnish within 15 days a                                                                        Project’’ on your attached document.
                                               plan for accomplishing the necessary                    Notice of Availability of a Draft                        • Postal Mail or Email: Ms. Alexas
                                               actions. If the plan is accepted, the ACO               Supplemental Environmental Impact                     Kelly, Project Manager, GSA, 10
                                               shall make a follow-up review as soon                   Statement for the New U.S. Land Port                  Causeway Street, 11th Floor, Boston,
                                               as the contractor notifies the ACO that                 of Entry in Madawaska, Maine and                      MA 02222, or alexandria.kelly@gsa.gov.
                                               the deficiencies have been corrected.                   Madawaska-Edmundston International                       • Postal Mail: Ms. Cheryl Martin,
                                               B. Public Comment                                       Bridge Project                                        Assistant Division Administrator,
                                                                                                       AGENCY: Public Buildings Service (PBS),               FHWA, Edmund S. Muskie Federal
                                                 A notice was published in the Federal
                                                                                                       General Services Administration (GSA);                Building, 40 Western Avenue, Room
                                               Register at 83 FR 42651, on August 23,
                                                                                                       Federal Highway Administration                        614, Augusta, ME 04330.
                                               2018. No comments were received.
                                                                                                                                                             FOR FURTHER INFORMATION CONTACT:
khammond on DSK30JT082PROD with NOTICES




                                                                                                       (FHWA); Maine Department of
                                               C. Annual Reporting Burden                              Transportation (MaineDOT).                            Alexas Kelly, Project Manager, GSA,
                                                  The burden estimates provided in the                 ACTION: Notice of availability.                       New England Region, by phone at 617–
                                               notice published in the Federal Register                                                                      549–8190 or by email at
                                               at 83 FR 42651, on August 23, 2018,                     SUMMARY:   Pursuant to the requirements               alexandria.kelly@gsa.gov. Please also
                                               have been adjusted to reflect current,                  of the National Environmental Policy                  call this number if special assistance is
                                               relevant data and appropriate                           Act of 1969 (NEPA), the Council on                    needed to attend and participate in the
                                               methodology.                                            Environmental Quality Regulations, the                public hearing.


                                          VerDate Sep<11>2014   16:52 Nov 30, 2018   Jkt 247001   PO 00000   Frm 00033   Fmt 4703   Sfmt 4703   E:\FR\FM\03DEN1.SGM   03DEN1



Document Created: 2018-12-01 00:56:54
Document Modified: 2018-12-01 00:56:54
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice.
DatesSubmit comments on or before January 2, 2019.
ContactMs. Mahruba Uddowla, Procurement Analyst, at telephone 703-605-2868, or email [email protected]
FR Citation83 FR 62321 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR