The Environmental Protection Agency (EPA or ``Agency'') is notifying the public that the Agency has found that the motor vehicle emissions budgets (MVEBs or ``budgets'') for the years 2017 and 2019 in the 2016 South Coast Serious Area Plan for the 2006 24-hour fine particulate matter (PM<INF>2.5</INF>) National Ambient Air Quality Standards (NAAQS) (``2016 PM<INF>2.5</INF> Plan'' or ``Plan'') are adequate for transportation conformity purposes. The California Air Resources Board (CARB) submitted the 2016 PM<INF>2.5</INF> Plan to the EPA on April 27, 2017, as a revision to the California State Implementation Plan (SIP). Upon the effective date of this notice of adequacy, the Southern California Association of Governments (SCAG) and the U.S. Department of Transportation must use the adequate budgets in future transportation conformity analyses.

Federal Register, Volume 83 Issue 4 (Friday, January 5, 2018)
[Federal Register Volume 83, Number 4 (Friday, January 5, 2018)]
[Notices]
[Pages 679-680]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-00029]


-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[EPA-R09-OAR-2017-0490; FRL-9972-80-Region 9]


Adequacy Status of Motor Vehicle Emissions Budgets in Submitted 
PM2.5 Serious Area Plan for South Coast; California

AGENCY: Environmental Protection Agency (EPA).

ACTION: Notice of adequacy.

-----------------------------------------------------------------------

SUMMARY: The Environmental Protection Agency (EPA or ``Agency'') is 
notifying the public that the Agency has found that the motor vehicle 
emissions budgets (MVEBs or ``budgets'') for the years 2017 and 2019 in 
the 2016 South Coast Serious Area Plan for the 2006 24-hour fine 
particulate matter (PM2.5) National Ambient Air Quality 
Standards (NAAQS) (``2016 PM2.5 Plan'' or ``Plan'') are 
adequate for transportation conformity purposes. The California Air 
Resources Board (CARB) submitted the 2016 PM2.5 Plan to the 
EPA on April 27, 2017, as a revision to the California State 
Implementation Plan (SIP). Upon the effective date of this notice of 
adequacy, the Southern California Association of Governments (SCAG) and 
the U.S. Department of Transportation must use the adequate budgets in 
future transportation conformity analyses.

DATES: This finding is effective January 22, 2018.

FOR FURTHER INFORMATION CONTACT: Wienke Tax, EPA, Region IX, Air 
Division AIR-2, 75 Hawthorne Street, San Francisco, CA 94105-3901; 
(415) 947-4192 or [email protected].

SUPPLEMENTARY INFORMATION: Throughout this document, whenever ``we,'' 
``us,'' or ``our'' is used, we mean EPA.
    Today's notice is simply an announcement of a finding that we have 
already made. EPA Region IX sent a letter to CARB on December 19, 2017, 
stating that the MVEBs in the 2016 PM2.5 Plan for the 
reasonable further progress (RFP) milestone year of 2017 and attainment 
year of 2019 are adequate. The finding is available at the EPA's 
conformity website: https://www.epa.gov/state-and-local-transportation/adequacy-review-state-implementation-plan-sip-submissions-conformity. 
We announced the availability of the Plan and related budgets on the 
EPA's conformity website on October 18, 2017. We received no comments 
in response to this announcement. The adequate budgets are provided in 
the following table:

              Adequate Motor Vehicle Emissions Budgets in South Coast 2006 PM2.5 Serious Area Plan
                                          [Annual average tons per day]
----------------------------------------------------------------------------------------------------------------
                                                                     Volatile                        Directly
                           Budget Year                                organic        Nitrogen      emitted PM2.5
                                                                     compounds        oxides
----------------------------------------------------------------------------------------------------------------
2017............................................................              99             200              21
2019............................................................              83             169              20
----------------------------------------------------------------------------------------------------------------

    Transportation conformity is required by CAA section 176(c). The 
EPA's Transportation Conformity Rule at 40 CFR part 93, subpart A 
requires that transportation plans, transportation improvement 
programs, and projects conform to SIPs and establishes the criteria and 
procedures for determining whether or not they do. Conformity to a SIP 
means that transportation activities will not produce new air quality 
violations, worsen existing violations, or delay timely attainment of 
the NAAQS.
    The criteria we use to determine whether a SIP's motor vehicle 
emission budgets are adequate for conformity purposes are outlined in 
40 CFR 93.118(e)(4), promulgated on August 15, 1997 (62 FR 43780, 
43781-43783). We further described our process for determining the 
adequacy of submitted SIP budgets in our July 1, 2004 final rule (69 FR 
40004, 40038), and we used the information in these resources in making 
our adequacy determination. Please note that an adequacy review is 
separate from the EPA's completeness review and should not be used to 
prejudge the EPA's ultimate action on the SIP. Even if we find a budget 
adequate, the SIP could later be disapproved.
    Consistent with the requirements set forth in the Fine Particulate 
Matter National Ambient Air Quality Standards: State Implementation 
Plan Requirements, Final Rule (81 FR 58010, August 24, 2016) 
(``PM2.5 SIP Requirements Rule''), the 2016 PM2.5 
Plan contains RFP budgets for 2020, which is the year following the 
attainment year. As explained below, we are not taking action on the 
2020 budgets at this time.
    The Transportation Conformity Rule requires that control strategy 
SIPs, including the RFP plans and attainment plans required for Serious 
PM2.5 nonattainment areas,\1\ contain MVEBs for direct 
PM2.5 and PM2.5 precursors subject to 
transportation conformity analyses for each milestone year addressed in 
the control strategy.\2\

[[Page 680]]

Under the PM2.5 SIP Requirements Rule, Serious area 
PM2.5 attainment plans must define appropriate quantitative 
milestones and include projected RFP emission levels for direct 
PM2.5 and all PM2.5 plan precursors in each 
milestone year. For an area designated nonattainment for the 2006 
PM2.5 NAAQS before January 15, 2015, the attainment plan 
must contain quantitative milestones to be achieved no later than 3 
years after December 31, 2014, and every 3 years thereafter until the 
milestone date that falls within 3 years after the applicable 
attainment date (40 CFR 51.1013(a)(4)).\3\ As the EPA explained in the 
preamble to the PM2.5 SIP Requirements Rule, it is important 
to include a post-attainment year quantitative milestone to ensure 
that, if the area fails to attain by the attainment date, the EPA can 
continue to monitor the area's progress toward attainment while the 
state develops a new attainment plan (see 81 FR 58010, 58063-58064, 
August 24, 2016).
---------------------------------------------------------------------------

    \1\ See 40 CFR 93.101 (defining ``control strategy 
implementation plan revision'').
    \2\ See 40 CFR 93.101 (defining ``motor vehicle emissions 
budget''), 93.102(b)(2)(iv) and (v) (establishing applicability of 
part 93 requirements to PM2.5 precursor pollutants) and 
93.118(a) (requiring that each transportation plan, TIP, or project 
not from a conforming transportation plan and TIP be consistent with 
the motor vehicle emissions budget(s) in the applicable 
implementation plan (or implementation plan submission)).
    \3\ See also 81 FR 58010, 58058 and 58063-58064 (August 24, 
2016).
---------------------------------------------------------------------------

    Consistent with the requirements of 40 CFR 51.1013(a)(4), the 2016 
PM2.5 Plan identifies December 31, 2017, as the first 
quantitative milestone date (i.e., the date 3 years after December 31, 
2014). The second quantitative milestone date is December 31, 2020, and 
is also the last milestone date identified in the Plan because it falls 
within 3 years after the December 31, 2019 attainment date for the 
area.\4\ Although this post-attainment year quantitative milestone is a 
required element of the Serious area plan, it is not necessary to 
demonstrate transportation conformity for 2020 in the submitted SIP or 
to use the 2020 budgets in transportation conformity determinations 
until such time as the area fails to attain the 2006 PM2.5 
NAAQS. Therefore, the EPA is not taking action at this time on the 
submitted MVEBs for 2020 in the 2016 PM2.5 Plan. 
Additionally, the EPA has not yet started the adequacy process for the 
2020 budgets.
---------------------------------------------------------------------------

    \4\ Under CAA section 188(c)(2), a Serious PM2.5 
nonattainment area must attain the PM2.5 NAAQS as 
expeditiously as practicable but no later than the end of the tenth 
calendar year after the area is designated as nonattainment. Because 
the South Coast area was designated as nonattainment for the 2006 
PM2.5 NAAQS effective December 14, 2009 (74 FR 58688, 
November 13, 2009), the latest permissible attainment date for the 
area is December 31, 2019.
---------------------------------------------------------------------------

    If the EPA were to either find adequate or approve the post-
attainment milestone year MVEBs now, those budgets would have to be 
used in transportation conformity determinations that are made after 
the effective date of the adequacy finding or approval even if the 
South Coast area ultimately attains the PM2.5 NAAQS by the 
Serious area attainment date. This would mean that SCAG \5\ would be 
required to demonstrate conformity for the post-attainment date 
milestone year and all later years addressed in the conformity 
determination (e.g., the last year of the metropolitan transportation 
plan) to the post-attainment date RFP budgets rather than the budgets 
associated with the attainment year for the area (i.e., the budgets for 
2019). The EPA does not believe that it is necessary to demonstrate 
conformity using these post-attainment year budgets in areas that 
either the EPA anticipates will attain by the attainment date or in 
areas that attain by the attainment date. As discussed elsewhere in 
this notice, the EPA is announcing that it has found adequate the MVEBs 
for the first milestone year (2017) and the attainment year (2019) for 
the South Coast PM2.5 nonattainment area.
---------------------------------------------------------------------------

    \5\ SCAG is the Metropolitan Planning Organization for the South 
Coast 2006 PM2.5 nonattainment area.
---------------------------------------------------------------------------

    If and when the EPA determines that the South Coast area has failed 
to attain the 2006 PM2.5 NAAQS by the applicable attainment 
date, the EPA will begin the MVEB adequacy and approval processes for 
the post-attainment year (2020) budgets. If the EPA finds the 2020 
budgets adequate or approves them, those budgets will have to be used 
in subsequent transportation conformity determinations. The EPA 
believes that initiating the process to act on the submitted post-
attainment year MVEBs following a determination that the area has 
failed to attain by the Serious area attainment date ensures that 
transportation activities will not cause or contribute to new 
violations, increase the frequency or severity of any existing 
violations, or delay timely attainment or any required interim emission 
reductions or milestones in the South Coast PM2.5 
nonattainment area, consistent with the requirements of CAA section 
176(c)(1)(B).

    Authority: 42 U.S.C. 7401 et seq.

    Dated: December 20, 2017.
Alexis Strauss,
Acting Regional Administrator, Region IX.
[FR Doc. 2018-00029 Filed 1-4-18; 8:45 am]
 BILLING CODE 6560-50-P



                                                                                            Federal Register / Vol. 83, No. 4 / Friday, January 5, 2018 / Notices                                                                                  679

                                               Corporation, 7475 W. Main St.,                                              ENVIRONMENTAL PROTECTION                                                 must use the adequate budgets in future
                                               Milwaukee, WI 53214). Product name:                                         AGENCY                                                                   transportation conformity analyses.
                                               Romeo®. Active ingredient: Systemic                                                                                                                  DATES: This finding is effective January
                                               resistance inducer (SRI)—Cerevisane                                         [EPA–R09–OAR–2017–0490; FRL–9972–80–                                     22, 2018.
                                               (cell walls of Saccharomyces cerevisiae                                     Region 9]                                                                FOR FURTHER INFORMATION CONTACT:
                                               strain LAS117) at 94.1%. Proposed use:                                                                                                               Wienke Tax, EPA, Region IX, Air
                                               End-use product that is a systemic                                          Adequacy Status of Motor Vehicle                                         Division AIR–2, 75 Hawthorne Street,
                                               resistance inducer. Contact: BPPD.                                          Emissions Budgets in Submitted PM2.5                                     San Francisco, CA 94105–3901; (415)
                                                                                                                           Serious Area Plan for South Coast;                                       947–4192 or tax.wienke@epa.gov.
                                                  4. File Symbol: 91810–R. Docket ID                                       California
                                               number: EPA–HQ–OPP–2017–0316.                                                                                                                        SUPPLEMENTARY INFORMATION:
                                               Applicant: Technology Sciences Group                                        AGENCY: Environmental Protection                                         Throughout this document, whenever
                                               Inc., 712 Fifth St., Suite A, Davis, CA                                     Agency (EPA).                                                            ‘‘we,’’ ‘‘us,’’ or ‘‘our’’ is used, we mean
                                               95616 (on behalf of Lesaffre Yeast                                          ACTION: Notice of adequacy.                                              EPA.
                                               Corporation, 7475 W. Main St.,                                                                                                                          Today’s notice is simply an
                                               Milwaukee, WI 53214). Product name:                                         SUMMARY:   The Environmental Protection                                  announcement of a finding that we have
                                               Cerevisane Technical. Active ingredient:                                    Agency (EPA or ‘‘Agency’’) is notifying                                  already made. EPA Region IX sent a
                                               Systemic resistance inducer (SRI)—                                          the public that the Agency has found                                     letter to CARB on December 19, 2017,
                                               Cerevisane (cell walls of Saccharomyces                                     that the motor vehicle emissions                                         stating that the MVEBs in the 2016
                                               cerevisiae strain LAS117) at 94.1%.                                         budgets (MVEBs or ‘‘budgets’’) for the                                   PM2.5 Plan for the reasonable further
                                               Proposed use: For manufacturing use.                                        years 2017 and 2019 in the 2016 South                                    progress (RFP) milestone year of 2017
                                                                                                                           Coast Serious Area Plan for the 2006 24-                                 and attainment year of 2019 are
                                               Contact: BPPD.
                                                                                                                           hour fine particulate matter (PM2.5)                                     adequate. The finding is available at the
                                                  Authority: 7 U.S.C. 136 et seq.                                          National Ambient Air Quality Standards                                   EPA’s conformity website: https://
                                                 Dated: December 4, 2017.                                                  (NAAQS) (‘‘2016 PM2.5 Plan’’ or ‘‘Plan’’)                                www.epa.gov/state-and-local-
                                               Delores Barber,
                                                                                                                           are adequate for transportation                                          transportation/adequacy-review-state-
                                                                                                                           conformity purposes. The California Air                                  implementation-plan-sip-submissions-
                                               Director, Information Technology and                                        Resources Board (CARB) submitted the                                     conformity. We announced the
                                               Resources Management Division,Office of
                                                                                                                           2016 PM2.5 Plan to the EPA on April 27,                                  availability of the Plan and related
                                               Pesticide Programs.
                                                                                                                           2017, as a revision to the California                                    budgets on the EPA’s conformity
                                               [FR Doc. 2018–00021 Filed 1–4–18; 8:45 am]
                                                                                                                           State Implementation Plan (SIP). Upon                                    website on October 18, 2017. We
                                               BILLING CODE 6560–50–P                                                      the effective date of this notice of                                     received no comments in response to
                                                                                                                           adequacy, the Southern California                                        this announcement. The adequate
                                                                                                                           Association of Governments (SCAG) and                                    budgets are provided in the following
                                                                                                                           the U.S. Department of Transportation                                    table:

                                                                 ADEQUATE MOTOR VEHICLE EMISSIONS BUDGETS IN SOUTH COAST 2006 PM2.5 SERIOUS AREA PLAN
                                                                                                                                        [Annual average tons per day]

                                                                                                                                                                                                      Volatile                              Directly
                                                                                                                                                                                                                        Nitrogen
                                                                                                              Budget Year                                                                             organic                               emitted
                                                                                                                                                                                                                         oxides
                                                                                                                                                                                                    compounds                                PM2.5

                                               2017 .............................................................................................................................................              99                200                   21
                                               2019 .............................................................................................................................................              83                169                   20



                                                  Transportation conformity is required                                    SIP budgets in our July 1, 2004 final rule                               we are not taking action on the 2020
                                               by CAA section 176(c). The EPA’s                                            (69 FR 40004, 40038), and we used the                                    budgets at this time.
                                               Transportation Conformity Rule at 40                                        information in these resources in                                          The Transportation Conformity Rule
                                               CFR part 93, subpart A requires that                                        making our adequacy determination.                                       requires that control strategy SIPs,
                                               transportation plans, transportation                                        Please note that an adequacy review is                                   including the RFP plans and attainment
                                               improvement programs, and projects                                          separate from the EPA’s completeness                                     plans required for Serious PM2.5
                                               conform to SIPs and establishes the                                         review and should not be used to                                         nonattainment areas,1 contain MVEBs
                                               criteria and procedures for determining                                     prejudge the EPA’s ultimate action on                                    for direct PM2.5 and PM2.5 precursors
                                               whether or not they do. Conformity to                                       the SIP. Even if we find a budget                                        subject to transportation conformity
                                               a SIP means that transportation                                             adequate, the SIP could later be                                         analyses for each milestone year
                                               activities will not produce new air                                         disapproved.                                                             addressed in the control strategy.2
                                               quality violations, worsen existing
                                               violations, or delay timely attainment of                                      Consistent with the requirements set                                     1 See 40 CFR 93.101 (defining ‘‘control strategy

                                               the NAAQS.                                                                  forth in the Fine Particulate Matter                                     implementation plan revision’’).
                                                  The criteria we use to determine                                         National Ambient Air Quality                                                2 See 40 CFR 93.101 (defining ‘‘motor vehicle
daltland on DSKBBV9HB2PROD with NOTICES




                                               whether a SIP’s motor vehicle emission                                      Standards: State Implementation Plan                                     emissions budget’’), 93.102(b)(2)(iv) and (v)
                                                                                                                           Requirements, Final Rule (81 FR 58010,                                   (establishing applicability of part 93 requirements
                                               budgets are adequate for conformity                                                                                                                  to PM2.5 precursor pollutants) and 93.118(a)
                                               purposes are outlined in 40 CFR                                             August 24, 2016) (‘‘PM2.5 SIP                                            (requiring that each transportation plan, TIP, or
                                               93.118(e)(4), promulgated on August 15,                                     Requirements Rule’’), the 2016 PM2.5                                     project not from a conforming transportation plan
                                                                                                                           Plan contains RFP budgets for 2020,                                      and TIP be consistent with the motor vehicle
                                               1997 (62 FR 43780, 43781–43783). We                                                                                                                  emissions budget(s) in the applicable
                                               further described our process for                                           which is the year following the                                          implementation plan (or implementation plan
                                               determining the adequacy of submitted                                       attainment year. As explained below,                                     submission)).



                                          VerDate Sep<11>2014         16:30 Jan 04, 2018          Jkt 244001       PO 00000       Frm 00026        Fmt 4703       Sfmt 4703       E:\FR\FM\05JAN1.SGM      05JAN1


                                               680                              Federal Register / Vol. 83, No. 4 / Friday, January 5, 2018 / Notices

                                               Under the PM2.5 SIP Requirements Rule,                  effective date of the adequacy finding or              GENERAL SERVICES
                                               Serious area PM2.5 attainment plans                     approval even if the South Coast area                  ADMINISTRATION
                                               must define appropriate quantitative                    ultimately attains the PM2.5 NAAQS by
                                                                                                                                                              [Notice–MG–2017–04; Docket No. 2017–
                                               milestones and include projected RFP                    the Serious area attainment date. This                 0002; Sequence No. 27]
                                               emission levels for direct PM2.5 and all                would mean that SCAG 5 would be
                                               PM2.5 plan precursors in each milestone                 required to demonstrate conformity for                 Office of Federal High-Performance
                                               year. For an area designated                            the post-attainment date milestone year                Buildings; Green Building Advisory
                                               nonattainment for the 2006 PM2.5                        and all later years addressed in the                   Committee; Notification of Upcoming
                                               NAAQS before January 15, 2015, the                      conformity determination (e.g., the last               Teleconference
                                               attainment plan must contain
                                                                                                       year of the metropolitan transportation                AGENCY:  Office of Government-wide
                                               quantitative milestones to be achieved
                                                                                                       plan) to the post-attainment date RFP                  Policy (OGP), General Services
                                               no later than 3 years after December 31,
                                               2014, and every 3 years thereafter until                budgets rather than the budgets                        Administration (GSA).
                                               the milestone date that falls within 3                  associated with the attainment year for                ACTION: Meeting notice.
                                               years after the applicable attainment                   the area (i.e., the budgets for 2019). The
                                               date (40 CFR 51.1013(a)(4)).3 As the                    EPA does not believe that it is necessary              SUMMARY:    Notice of this teleconference
                                               EPA explained in the preamble to the                    to demonstrate conformity using these                  is being provided according to the
                                               PM2.5 SIP Requirements Rule, it is                      post-attainment year budgets in areas                  requirements of the Federal Advisory
                                               important to include a post-attainment                  that either the EPA anticipates will                   Committee Act. This notice provides the
                                               year quantitative milestone to ensure                   attain by the attainment date or in areas              schedule for a teleconference/web
                                               that, if the area fails to attain by the                that attain by the attainment date. As                 meeting of the Advisory Committee,
                                               attainment date, the EPA can continue                   discussed elsewhere in this notice, the                which is open for the public to listen to
                                               to monitor the area’s progress toward                   EPA is announcing that it has found                    and observe. Interested individuals
                                               attainment while the state develops a                   adequate the MVEBs for the first                       must register to attend as instructed
                                               new attainment plan (see 81 FR 58010,                   milestone year (2017) and the                          below under SUPPLEMENTARY
                                               58063–58064, August 24, 2016).                          attainment year (2019) for the South                   INFORMATION.
                                                  Consistent with the requirements of                  Coast PM2.5 nonattainment area.                        DATES: The Committee will hold a
                                               40 CFR 51.1013(a)(4), the 2016 PM2.5                                                                           teleconference/web meeting on Monday,
                                               Plan identifies December 31, 2017, as                      If and when the EPA determines that
                                                                                                       the South Coast area has failed to attain              February 5, 2018, from 2:00 p.m.,
                                               the first quantitative milestone date (i.e.,                                                                   Eastern Standard Time (EST), to 4:00
                                               the date 3 years after December 31,                     the 2006 PM2.5 NAAQS by the
                                                                                                                                                              p.m., EST.
                                               2014). The second quantitative                          applicable attainment date, the EPA will
                                                                                                                                                              FOR FURTHER INFORMATION CONTACT: Mr.
                                               milestone date is December 31, 2020,                    begin the MVEB adequacy and approval
                                                                                                       processes for the post-attainment year                 Ken Sandler, Designated Federal
                                               and is also the last milestone date
                                                                                                                                                              Officer, Office of Federal High-
                                               identified in the Plan because it falls                 (2020) budgets. If the EPA finds the
                                                                                                                                                              Performance Buildings, OGP, GSA, 1800
                                               within 3 years after the December 31,                   2020 budgets adequate or approves
                                                                                                                                                              F Street NW, Washington, DC, 20405,
                                               2019 attainment date for the area.4                     them, those budgets will have to be used
                                                                                                                                                              telephone 202–219–1121 (note: this is
                                               Although this post-attainment year                      in subsequent transportation conformity                not a toll-free number). Additional
                                               quantitative milestone is a required                    determinations. The EPA believes that
                                               element of the Serious area plan, it is                                                                        information about the Committee is
                                                                                                       initiating the process to act on the                   available on-line at http://www.gsa.gov/
                                               not necessary to demonstrate                            submitted post-attainment year MVEBs
                                               transportation conformity for 2020 in                                                                          gbac.
                                                                                                       following a determination that the area                SUPPLEMENTARY INFORMATION:
                                               the submitted SIP or to use the 2020                    has failed to attain by the Serious area
                                               budgets in transportation conformity                                                                           Procedures for Attendance: Contact Mr.
                                                                                                       attainment date ensures that                           Ken Sandler at ken.sandler@gsa.gov to
                                               determinations until such time as the
                                                                                                       transportation activities will not cause               register to listen in to the
                                               area fails to attain the 2006 PM2.5
                                                                                                       or contribute to new violations, increase              teleconference. To attend the
                                               NAAQS. Therefore, the EPA is not
                                               taking action at this time on the                       the frequency or severity of any existing              teleconference, submit your full name,
                                               submitted MVEBs for 2020 in the 2016                    violations, or delay timely attainment or              organization, email address, and phone
                                               PM2.5 Plan. Additionally, the EPA has                   any required interim emission                          number. Requests to listen in to the calls
                                               not yet started the adequacy process for                reductions or milestones in the South                  must be received by Monday, January
                                               the 2020 budgets.                                       Coast PM2.5 nonattainment area,                        29, 2018, by 5:00 p.m., EST (GSA will
                                                  If the EPA were to either find                       consistent with the requirements of                    be unable to provide technical
                                               adequate or approve the post-attainment                 CAA section 176(c)(1)(B).                              assistance to any listener experiencing
                                               milestone year MVEBs now, those                           Authority: 42 U.S.C. 7401 et seq.
                                                                                                                                                              technical difficulties. Testing access to
                                               budgets would have to be used in                                                                               the web meeting site in advance of calls
                                               transportation conformity                                 Dated: December 20, 2017.                            is recommended).
                                               determinations that are made after the                  Alexis Strauss,                                           Background: The Administrator of
                                                                                                       Acting Regional Administrator, Region IX.              GSA established the Committee on June
                                                 3 See also 81 FR 58010, 58058 and 58063–58064
                                                                                                       [FR Doc. 2018–00029 Filed 1–4–18; 8:45 am]             20, 2011 (Federal Register/Vol. 76, No.
                                               (August 24, 2016).                                                                                             118) pursuant to Section 494 of the
                                                 4 Under CAA section 188(c)(2), a Serious PM           BILLING CODE 6560–50–P
                                                                                                2.5                                                           Energy Independence and Security Act
daltland on DSKBBV9HB2PROD with NOTICES




                                               nonattainment area must attain the PM2.5 NAAQS
                                               as expeditiously as practicable but no later than the
                                                                                                                                                              of 2007 (EISA, 42 U.S.C. 17123). Under
                                               end of the tenth calendar year after the area is                                                               this authority, the Committee provides
                                               designated as nonattainment. Because the South                                                                 independent policy advice and
                                               Coast area was designated as nonattainment for the                                                             recommendations to GSA to improve
                                               2006 PM2.5 NAAQS effective December 14, 2009 (74
                                               FR 58688, November 13, 2009), the latest                  5 SCAG is the Metropolitan Planning                  federal buildings (assets, operations,
                                               permissible attainment date for the area is             Organization for the South Coast 2006 PM2.5            use, and resilience) to enhance human
                                               December 31, 2019.                                      nonattainment area.                                    health and performance, and safeguard


                                          VerDate Sep<11>2014   16:30 Jan 04, 2018   Jkt 244001   PO 00000   Frm 00027   Fmt 4703   Sfmt 4703   E:\FR\FM\05JAN1.SGM   05JAN1



Document Created: 2018-10-26 09:32:07
Document Modified: 2018-10-26 09:32:07
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice of adequacy.
DatesThis finding is effective January 22, 2018.
ContactWienke Tax, EPA, Region IX, Air Division AIR-2, 75 Hawthorne Street, San Francisco, CA 94105-3901; (415) 947-4192 or [email protected]