The U.S. Nuclear Regulatory Commission (NRC) is granting an exemption to allow a departure from the certification information of Tier 1 of the generic AP1000 design control document (DCD) and is issuing License Amendment Nos. 95 and 94 to Combined Licenses (COL), NPF-91 and NPF-92, respectively. The COLs were issued to Southern Nuclear Operating Company, Inc., and Georgia Power Company, Oglethorpe Power Corporation, MEAG Power SPVM, LLC, MEAG Power SPVJ, LLC, MEAG Power SPVP, LLC, and the City of Dalton, Georgia (the licensee); for construction and operation of the Vogtle Electric Generating Plant (VEGP) Units 3 and 4, located in Burke County, Georgia. The granting of the exemption allows the changes to Tier 1 information that is requested in the amendment. Because the acceptability of the exemption was determined in part by the acceptability of the amendment, the exemption and amendment are being issued concurrently.

Federal Register, Volume 83 Issue 32 (Thursday, February 15, 2018)
[Federal Register Volume 83, Number 32 (Thursday, February 15, 2018)]
[Notices]
[Pages 6888-6890]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-03168]


-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[Docket Nos. 52-025 and 52-026; NRC-2008-0252]


Southern Nuclear Operating Company, Inc.; Vogtle Electric 
Generating Plant, Units 3 and 4; Emergency Planning ITAAC Revisions

AGENCY: Nuclear Regulatory Commission.

ACTION: Exemption and combined license amendment; issuance.

-----------------------------------------------------------------------

SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is granting an 
exemption to allow a departure from the certification information of 
Tier 1 of the generic AP1000 design control document (DCD) and is 
issuing License Amendment Nos. 95 and 94 to Combined Licenses (COL), 
NPF-91 and NPF-92, respectively. The COLs were issued to Southern 
Nuclear Operating Company, Inc., and Georgia Power Company, Oglethorpe 
Power Corporation, MEAG Power SPVM, LLC, MEAG Power SPVJ, LLC, MEAG 
Power SPVP, LLC, and the City of Dalton, Georgia (the licensee); for 
construction and operation of the Vogtle Electric Generating Plant 
(VEGP) Units 3 and 4, located in Burke County, Georgia.
    The granting of the exemption allows the changes to Tier 1 
information that is requested in the amendment. Because the 
acceptability of the exemption was determined in part by the 
acceptability of the amendment, the exemption and amendment are being 
issued concurrently.

ADDRESSES: Please refer to Docket ID NRC-2008-0252 when contacting the 
NRC about the availability of information regarding this document. You 
may access information related to this document, which the NRC 
possesses and is publicly available, using any of the following 
methods:
     Federal Rulemaking Website: Go to http://www.regulations.gov and search for Docket ID NRC-2008-0252. Address 
questions about NRC dockets to Jennifer Borges; telephone: 301-287-
9127; email: [email protected]. For

[[Page 6889]]

technical questions, contact the individual listed in the FOR FURTHER 
INFORMATION CONTACT section of this document.
     NRC's Agencywide Documents Access and Management System 
(ADAMS): You may access publicly available documents online in the NRC 
Library at http://www.nrc.gov/reading-rm/adams.html. To begin the 
search, select ``ADAMS Public Documents'' and then select ``Begin Web-
based ADAMS Search.'' For problems with ADAMS, please contact the NRC's 
Public Document Room (PDR) reference staff at 1-800-397-4209, 301-415-
4737, or by email to [email protected]. The ADAMS accession number 
for each document referenced in this document (if that document is 
available in ADAMS) is provided the first time that a document is 
referenced. The request for the amendment and exemption was submitted 
by letter dated May 5, 2017 (ADAMS Accession No. ML17125A331), and 
supplemented by letter dated August 3, 2017 (ADAMS Accession No. 
ML17215B051).
     NRC's PDR: You may examine and purchase copies of public 
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555 
Rockville Pike, Rockville, Maryland 20852.

FOR FURTHER INFORMATION CONTACT: Paul Kallan, Office of New Reactors, 
U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; 
telephone: 301-415-2809; email: [email protected].

SUPPLEMENTARY INFORMATION:

I. Introduction

    The NRC is granting exemptions from paragraph B of section III, 
``Scope and Contents,'' of appendix D, ``Design Certification Rule for 
the AP1000,'' to part 52 of title 10 of the Code of Federal Regulations 
(10 CFR) and issuing License Amendment Nos. 95 and 94 to COLs, NPF-91 
and NPF-92, respectively, to the licensee. The exemptions are required 
by paragraph A.4 of section VIII, ``Processes for Changes and 
Departures,'' appendix D, to 10 CFR part 52 to allow the licensee to 
depart from Tier 1 information. With the requested amendment, the 
licensee proposes to depart from plant-specific (PS) Tier 1 emergency 
planning (EP) inspections, tests, analyses, and acceptance criteria 
(ITAAC) information and associated COL Appendix C information. The 
requested amendment also proposes to revise plant-specific EP ITAAC in 
Appendix C of the VEGP Units 3 and 4 COLs. The proposed changes do not 
involve changes to the approved emergency plan or the PS Tier 2 DCD. 
Also, the proposed changes to COL Appendix C information also include 
changes to the list of acronyms and abbreviations.
    Part of the justification for granting the exemptions was provided 
by the review of the amendments. Because the exemption is necessary in 
order to issue the requested license amendment, the NRC granted the 
exemption and issued the amendment concurrently, rather than in 
sequence. This included issuing a combined safety evaluation containing 
the NRC staff's review of both the exemption request and the license 
amendment. The exemptions met all applicable regulatory criteria set 
forth in 10 CFR 50.12, 10 CFR 52.7, and section VIII.A.4 of appendix D 
to 10 CFR part 52. The license amendments were found to be acceptable 
as well. The combined safety evaluation is available in ADAMS under 
Accession No. ML17256A034.
    Identical exemption documents (except for referenced unit numbers 
and license numbers) were issued to the licensee for VEGP Units 3 and 4 
(COLs NPF-91 and NPF-92). The exemption documents for VEGP Units 3 and 
4 can be found in ADAMS under Accession Nos. ML17256A030 and 
ML17256A031, respectively. The exemption is reproduced (with the 
exception of abbreviated titles and additional citations) in Section II 
of this document. The amendment documents for COLs NPF-91 and NPF-92 
are available in ADAMS under Accession Nos. ML17256A032 and 
ML17256A033, respectively. A summary of the amendment documents is 
provided in Section III of this document.

II. Exemption

    Reproduced below is the exemption document issued to VEGP Units 3 
and Unit 4. It makes reference to the combined safety evaluation that 
provides the reasoning for the findings made by the NRC (and listed 
under Item 1) in order to grant the exemption:
    1. In a letter dated May 5, 2017, and supplemented by letter dated 
August 3, 2017, the licensee requested from the Commission an exemption 
from the provisions of 10 CFR part 52, appendix D, section III.B, as 
part of license amendment request 17-014, ``Emergency Planning ITAAC 
Revisions.''
    For the reasons set forth in Section 3.1, ``Evaluation of 
Exemption,'' of the NRC staff's Safety Evaluation, which can be found 
in ADAMS under Accession No. ML17256A034, the Commission finds that:
    A. The exemption is authorized by law;
    B. the exemption presents no undue risk to public health and 
safety;
    C. the exemption is consistent with the common defense and 
security;
    D. special circumstances are present in that the application of the 
rule in this circumstance is not necessary to serve the underlying 
purpose of the rule;
    E. the special circumstances outweigh any decrease in safety that 
may result from the reduction in standardization caused by the 
exemption; and
    F. the exemption will not result in a significant decrease in the 
level of safety otherwise provided by the design.
    2. Accordingly, the licensee is granted an exemption from the 
certified DCD Tier 1 information, with corresponding changes to 
Appendix C of the Facility Combined Licenses as described in the 
licensee's request dated May 5, 2017, and supplemented by letter dated 
August 3, 2017. This exemption is related to, and necessary for, the 
granting of License Amendment Nos. 95 or 94, which is being issued 
concurrently with this exemption.
    3. As explained in Section 5.0, ``Environmental Consideration,'' of 
the NRC staff's Safety Evaluation (ADAMS Accession No. ML17256A034), 
these exemptions meets the eligibility criteria for categorical 
exclusion set forth in 10 CFR 51.22(c)(9). Therefore, pursuant to 10 
CFR 51.22(b), no environmental impact statement or environmental 
assessment needs to be prepared in connection with the issuance of the 
exemption.
    4. These exemptions are effective as of the date of its issuance.

III. License Amendment Request

    By letter dated May 5, 2017, and supplemented by letter dated 
August 3, 2017, the licensee requested that the NRC amend the COLs for 
VEGP, Units 3 and 4, COLs NPF-91 and NPF-92. The proposed amendment is 
described in Section I of this Federal Register notice.
    The Commission has determined for these amendments that the 
application complies with the standards and requirements of the Atomic 
Energy Act of 1954, as amended (the Act), and the Commission's rules 
and regulations. The Commission has made appropriate findings as 
required by the Act and the Commission's rules and regulations in 10 
CFR chapter I, which are set forth in the license amendment.
    A notice of consideration of issuance of amendment to facility 
operating license or combined license, as applicable, proposed no 
significant hazards consideration determination, and opportunity for a 
hearing in connection with these actions, was published in the Federal 
Register on

[[Page 6890]]

July 5, 2017 (82 FR 31089). No comments were received during the 30-day 
comment period.
    The Commission has determined that these amendments satisfy the 
criteria for categorical exclusion in accordance with 10 CFR 51.22. 
Therefore, pursuant to 10 CFR 51.22(b), no environmental impact 
statement or environmental assessment need be prepared for these 
amendments.

IV. Conclusion

    Using the reasons set forth in the combined safety evaluation, the 
staff granted the exemptions and issued the amendments that the 
licensee requested on May 5, 2017, and supplemented by letter dated 
August 3, 2017.
    The exemptions and amendments were issued on November 3, 2017, as 
part of a combined package to the licensee (ADAMS Accession No. 
ML17256A028).

    Dated at Rockville, Maryland, this 12th day of February, 2018.

    For the Nuclear Regulatory Commission.
Jennifer L. Dixon-Herrity,
Chief, Licensing Branch 4, Division of New Reactor Licensing, Office of 
New Reactors.
[FR Doc. 2018-03168 Filed 2-14-18; 8:45 am]
BILLING CODE 7590-01-P


Current View
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionExemption and combined license amendment; issuance.
ContactPaul Kallan, Office of New Reactors, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; telephone: 301-415-2809; email: [email protected]
FR Citation83 FR 6888 