83_FR_8743 83 FR 8703 - Agency Information Collection Activities; Submission to the Office of Management and Budget for Review and Approval; 30 CFR 551, Geological and Geophysical Explorations of the Outer Continental Shelf

83 FR 8703 - Agency Information Collection Activities; Submission to the Office of Management and Budget for Review and Approval; 30 CFR 551, Geological and Geophysical Explorations of the Outer Continental Shelf

DEPARTMENT OF THE INTERIOR
Bureau of Ocean Energy Management

Federal Register Volume 83, Issue 40 (February 28, 2018)

Page Range8703-8707
FR Document2018-04170

In accordance with the Paperwork Reduction Act of 1995, the Bureau of Ocean Energy Management (BOEM) is proposing to renew an information collection with revisions.

Federal Register, Volume 83 Issue 40 (Wednesday, February 28, 2018)
[Federal Register Volume 83, Number 40 (Wednesday, February 28, 2018)]
[Notices]
[Pages 8703-8707]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-04170]


-----------------------------------------------------------------------

DEPARTMENT OF THE INTERIOR

Bureau of Ocean Energy Management

[MMAA104000; OMB Control Number 1010-0048; Docket ID: BOEM-2018-0016]


Agency Information Collection Activities; Submission to the 
Office of Management and Budget for Review and Approval; 30 CFR 551, 
Geological and Geophysical Explorations of the Outer Continental Shelf

AGENCY: Bureau of Ocean Energy Management, Interior.

ACTION: Notice of information collection; request for comment.

-----------------------------------------------------------------------

SUMMARY: In accordance with the Paperwork Reduction Act of 1995, the 
Bureau of Ocean Energy Management (BOEM) is proposing to renew an 
information collection with revisions.

DATES: Interested persons are invited to submit comments on or before 
March 30, 2018.

ADDRESSES: Send written comments on this information collection request 
(ICR) to the Office of Management and Budget's Desk Officer for the 
Department of the Interior by email at [email protected]; or 
via facsimile to 202-395-5806. Please provide a copy of your comments 
to the BOEM Information Collection Clearance

[[Page 8704]]

Officer, Anna Atkinson, Bureau of Ocean Energy Management, 45600 
Woodland Road, Sterling, Virginia, 20166; or by email to 
[email protected]. Please reference Office of Management and 
Budget (OMB) Control Number 1010-0048 in the subject line of your 
comments.

FOR FURTHER INFORMATION CONTACT: To request additional information 
about this ICR, contact Anna Atkinson by email, or by telephone at 703-
787-1025. You may also view the ICR at http://www.reginfo.gov/public/do/PRAMain.

SUPPLEMENTARY INFORMATION: In accordance with the Paperwork Reduction 
Act of 1995 (PRA), we provide the general public and other Federal 
agencies with an opportunity to comment on new, proposed, revised, and 
continuing collections of information. This helps us assess the impact 
of our information collection requirements and minimize the public's 
reporting burden. It also helps the public understand our information 
collection requirements and provide the requested data in the desired 
format.
    Comments: A Federal Register notice with a 60-day public comment 
period soliciting comments on this collection of information was 
published on August 31, 2017 (82 FR 41424). BOEM received two comment 
letters during the 60-day comment period. One comment from a private 
citizen was not germane to the PRA. The other comments were received 
from the American Petroleum Institute and the International Association 
of Geophysical Contractors (IAGC) on October 30, 2017. Their comments 
include:
    Comment 1: Rather than identifying the specific vessel, may the 
applicant provide information on the type of vessel that will be used 
to conduct the survey? BOEM can then proceed with its review of the 
application. The vessel name can be provided at a later date, and 
assuming it has similar specifications, further analysis by BOEM would 
not be necessary. On occasion application submissions are delayed until 
the contractor/vessel is known, and at other times companies must 
request a modification to the permit as contractors/vessels change.
    BOEM Response: We have added the change to Form BOEM-0327 at A.6 to 
allow details of the vessel (other than ``type'') to be provided at a 
later date. If the vessel information has not been provided when the 
permit is ready to be issued, BOEM will notify the permittee that the 
permit is ready and they will have 30 days to provide the vessel 
information or their permit will be canceled.
    Comment 2: Similarly, may third party notification letters be 
submitted at a later stage in the process after the application is 
submitted? At times the application is held up until these letters are 
completed and distributed.
    BOEM Response: Yes, they may be submitted separately from the 
application, but must be received before the permit will be issued. 
BOEM is open to discussions with IAGC on this topic.
    Comment 3: Can BOEM routinely notify all applicants of form 
updates? Out of date templates have been used in the past, which 
ultimately causes delay.
    BOEM Response: Current fillable forms are available on BOEM's 
website at https://www.boem.gov/BOEM-OCS-Operation-Forms/ and forms 
specific to Geological & Geophysical (G&G) exploration and permitting 
are posted at https://www.boem.gov/Oil-and-Gas-Energy-Program/Resource-Evaluation/Regulation-of-Pre-lease-Exploration/GG-Permit-Applications.aspx. All forms, including both the application and 
permit, are clearly marked with an OMB approval date in the lower left 
hand corner and state that previous editions are obsolete.
    Comment 4: BOEM has requested comments on whether the information 
collected was ``processed and used in a timely manner.'' Currently, 
industry finds the permitting process to be open-ended and uncertain. 
The Associations recommend that BOEM establish a timeline for permit 
review and approval, similar to how drilling permits are approved.
    BOEM Response: There is no regulatory time frame for processing G&G 
permits. Internally, for GOM applications BOEM attempts to issue non-
airgun high resolution permits, on average, within 40 days and for 
bottom disturbing and airgun permits, on average, in 70 days. This may 
vary as a result of work load at the permit processing level and/or at 
the environmental review level. In addition, the time frames above do 
not include any additional time required to obtain additional or 
corrected information from the applicant.
    However, for G&G permits in the Atlantic, the applicant must apply 
and receive an Incidental Harassment Authorization (IHA) from NMFS 
before the permit will be issued. Because NMFS is an independent 
agency, with its own regulatory timelines, BOEM has no control over 
their processes and timelines.
    Comment 5: BOEM acknowledges that an application process for a 
single permit in Alaska or the Atlantic takes 1,000 hours to complete, 
while the same permit application in the Gulf of Mexico (GoM) may take 
300 hours. This is a conservative estimate and the time required may be 
even greater. BOEM explains that this extraordinary burden is related 
to NEPA and the associated mitigation requirements. However, such a 
burden is unjustified, especially considering that surveys are 
routinely conducted without impact in similar environments worldwide. 
Rather than simply requesting approval for these unjustified burdens, 
BOEM should instead assess its permitting process and determine how the 
burdens will be reduced. Such a reduction would be consistent with the 
purpose of the PRA. The high permitting costs are entirely inconsistent 
with the low and effectively managed safety and environmental risks 
from G&G activities.
    BOEM Response: BOEM recognizes the commenter's concern regarding 
the burden hours associated with processing a permit application but 
the commenters did not provide specific estimates or information to 
justify modification of the burden hour estimates. BOEM is interested 
in specific estimates and recommendations to consider modification of 
the burden hours. Comments can be submitted to OMB within 30 days of 
the notice's publication.
    Additionally, in accordance with the Trump Administration's 
executive and secretarial orders, most specifically Executive Order 
13783 and Secretary's Order 3350, BOEM has been working with National 
Marine Fisheries Service (NMFS) to streamline processes and improve 
efficiencies.
    Comment 6: BOEM also should take steps to reduce the estimated 300-
hour burden to apply for G&G permits in the GoM. Thousands of such 
permits have been issued and the environmental effects have been fully 
assessed. Mitigating measures have proved effective and should not be 
changed after a permit is issued. Applying for a GoM permit should be a 
simple matter of identifying the timing, location, vessel and 
equipment, and mitigation. Absent special circumstances, the burden 
could be reduced by 90% without increasing environmental risks.
    BOEM Response: The burden hours are used by the applicants to 
provide BOEM with the appropriate documentation to clearly and 
completely describe their proposed activity. This information is used 
by BOEM to ensure a proper understanding of the currently proposed 
activity and the equipment to be used. This ensures that an appropriate 
site/activity specific environmental analysis is conducted. Without the 
descriptive information

[[Page 8705]]

being provided for each proposed activity (thus the burden hours) BOEM 
cannot ensure it is fulfilling its statutory obligations under OCSLA 
and NEPA.
    Comment 7: We encourage BOEM to explore the creation of an 
electronic permit application process. Efficiencies for permit 
processing and man-hours may be realized through electronic permit 
applications.
    BOEM Response: A web-based process for the electronic submission/
issuance of BOEM G&G permitting is being considered for the future.
    Comment 8: Finally, while this ICR addresses BOEM G&G permitting 
activities, it fails to capture the entire burden needed to conduct G&G 
activities, which in some cases requires (or may require in the future) 
authorizations from the National Marine Fisheries Service (NMFS) for 
incidental take pursuant to the Marine Mammal Protection Act (MMPA) 
and/or the Endangered Species Act (ESA). For example, for G&G 
permitting in the Atlantic this is a required part of the process, and 
the associated burdens should be acknowledged in the ICR. Industry's 
G&G permitting experience in the Atlantic has shown extreme delays on 
the part of NMFS. Often applicants are told that a BOEM G&G permit is 
``ready to be issued'' (or has been issued) long before the applicant 
receives MMPA or ESA authorizations from NMFS upon which the G&G permit 
is contingent.
    BOEM Response: NMFS, not BOEM, has the authority for incidental 
take authorizations under the MMPA and ESA. Accordingly, the associated 
ICR burden hours for these authorizations are under the purview of 
NMFS. As mentioned earlier, BOEM, NMFS, and other Federal agencies are 
working together to determine how the permitting process might be 
expedited and streamlined. However, in the final analysis NMFS is an 
independent agency with its own regulatory timelines and processes.
    We are again soliciting comments on the proposed ICR that is 
described below. We are especially interested in public comment 
addressing the following issues: (1) Is the collection necessary to the 
proper functions of BOEM? (2) will this information be processed and 
used in a timely manner? (3) is the estimate of burden accurate? (4) 
how might BOEM enhance the quality, utility, and clarity of the 
information to be collected? and (5) how might BOEM minimize the burden 
of this collection on the respondents, including through the use of 
information technology?
    Comments that you submit in response to this notice are a matter of 
public record. Before including your address, phone number, email 
address, or other personal identifying information in your comment, you 
should be aware that your entire comment--including your personal 
identifying information--may be made publicly available at any time. 
While you can ask us in your comment to withhold your personal 
identifying information from public review, we cannot guarantee that we 
will be able to do so.
    Abstract: The Outer Continental Shelf (OCS) Lands Act, as amended 
(43 U.S.C. 1331 et seq. and 43 U.S.C. 1801 et seq.), authorizes the 
Secretary of the Interior to prescribe rules and regulations to 
administer leasing of mineral resources on the OCS. The OCS Lands Act 
at 43 U.S.C. 1340 states that ``any person authorized by the Secretary 
may conduct geological and geophysical explorations in the OCS, which 
do not interfere with or endanger actual operations under any lease 
maintained or granted pursuant to this subchapter, and which are not 
unduly harmful to aquatic life in such area.'' The section further 
provides that permits to conduct such activities may only be issued if 
it is determined that the applicant is qualified; the activities will 
not interfere with or endanger operations under any lease issued or 
maintained pursuant to OCSLA; and the activities will not be unduly 
harmful to aquatic life, result in pollution, create hazardous or 
unsafe conditions, unreasonably interfere with other uses of the area, 
or disturb any site, structure, or object of historical or 
archaeological significance.
    Applicants for permits are required to submit Form BOEM-0327 to 
provide the information necessary to evaluate their qualifications, and 
upon approval, respondents are issued a permit.
    The Independent Offices Appropriations Act (31 U.S.C. 9701), the 
Omnibus Appropriations Bill (Pub. L. 104-133, 110 Stat. 1321, April 26, 
1996), and OMB Circular A-25 authorize Federal agencies to recover the 
full cost of services that confer special benefits. All G&G permits are 
subject to cost recovery, and BOEM regulations specify service fees for 
these requests.
    Regulations to carry out these responsibilities are contained in 30 
CFR part 551 and are the subject of this information collection 
renewal. BOEM uses the information to:
     Identify oil, gas, sulfur, and mineral resources in the 
OCS;
     Ensure the receipt of fair value for mineral resources;
     Ensure that the exploration activities do not cause harm 
to the environment or persons, or create unsafe operations and 
conditions, damage historical or archaeological sites, or interfere 
with other uses;
     Analyze and evaluate preliminary or planned drilling 
activities;
     Monitor progress and activities in the OCS;
     Acquire G&G data and information collected under a Federal 
permit offshore; and
     Determine eligibility for reimbursement from the 
government for certain costs.
    In this renewal, BOEM is renewing Form BOEM-0327--Requirements for 
Geological or Geophysical Explorations or Scientific Research on the 
Outer Continental Shelf. This form consists of the requirements for G&G 
activities requiring Permits and Notices, along with the application 
that the respondent submits to BOEM for approval, as well as a 
nonexclusive use agreement for scientific research, if applicable. The 
requirements portion of the form lets the respondents know the 
authority and requirements, along with other relevant information for 
the permit. BOEM is making modifications to this form by adding OCS 
boundary/3-mile limit to plat information requirements.
    To Attachment 1, Section A, BOEM modified item 6 to allow for the 
identification of vessel type in the event that the vessel name is 
unknown. To Attachment 1, Section C, item 2, BOEM added ``e. Submit 
relevant shapefiles needed to recreate the map as part of the required 
digital copy.'' On page 11, Section D, Proprietary Information 
Attachment Required for an Application for Geophysical Permit, item 3, 
BOEM added ``ping duration/cycle''' and ``ping rate'' to the table and 
narrative.
    Upon BOEM approval of the application, respondents are issued a 
permit using Form BOEM-0328, Permit to Conduct Geophysical Exploration 
for Mineral Resources or Scientific Research on the Outer Continental 
Shelf, for conducting geophysical exploration for mineral resources or 
scientific research, or Form BOEM-0329, Permit to Conduct Geological 
Exploration for Mineral Resources or Scientific Research on the Outer 
Continental Shelf, for conducting geological exploration for mineral 
resources or scientific research. These permits are filled in by BOEM 
and do not incur a respondent hour burden.
    The currently approved OMB paperwork burden is 40,954 annual burden 
hours. Due to a reduction of G&G permit applications annually in the 
Gulf of Mexico, BOEM is decreasing the

[[Page 8706]]

number of responses to 688 responses and annual burden hours to 35,254 
burden hours.
    We protect proprietary information in accordance with the Freedom 
of Information Act (5 U.S.C. 522) and the Department of the Interior's 
implementing regulations (43 CFR part 2), and under regulation at 30 
CFR part 551.
    Title of Collection: 30 CFR 551, Geological and Geophysical 
Explorations of the Outer Continental Shelf.
    OMB Control Number: 1010-0048.
    Form Number: BOEM-0327, Requirements for Geological or Geophysical 
Explorations or Scientific Research on the Outer Continental Shelf.
    Type of Review: Revision of a currently approved collection.
    Respondents/Affected Public: Potential respondents comprise Federal 
OCS oil, gas, and sulphur permittees or notice filers.
    Total Estimated Number of Annual Responses: 688 responses.
    Total Estimated Number of Annual Burden Hours: 35,254 hours.
    Respondent's Obligation: Mandatory.
    Frequency of Collection: On occasion, annual, or as specified in 
permits.
    Total Estimated Annual Nonhour Burden Cost: $136,816.

--------------------------------------------------------------------------------------------------------------------------------------------------------
                                           Reporting and                                                  Average  number of annual       Annual  burden
        Citation 30 CFR 551          recordkeeping requirement              Hour burden                           responses                    hours
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                            Non-hour cost burden *
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                               30 CFR 551.1 Through 551.6
--------------------------------------------------------------------------------------------------------------------------------------------------------
551.4(a), (b); 551.5(a), (b), (d);   Apply for permits (Form    1,000 AK **........................  4 Applications.....................           4,000
 551.6; 551.7.                        BOEM-0327) to conduct     1,000 ATL & Pacific **.............  9 Applications.....................           9,000
                                      G&G exploration,          300 GOM............................  55 Applications....................          16,500
                                      including deep
                                      stratigraphic tests/
                                      revisions when
                                      necessary. Submit
                                      required information in
                                      manner specified.
                                                               -----------------------------------------------------------------------------------------
                                                                                           68 applications x $2,012 = $136,816
--------------------------------------------------------------------------------------------------------------------------------------------------------
551.4(b); 551.5(c), (d); 551.6.....  File notices to conduct    1..................................  1 Notice...........................               1
                                      scientific research
                                      activities, including
                                      notice to BOEM prior to
                                      beginning and after
                                      concluding activities.
--------------------------------------------------------------------------------------------------------------------------------------------------------
551.6(b) 551.7(b)(5)...............  Notify BOEM if specific    1..................................  1 Notice...........................               1
                                      actions occur; report
                                      archaeological resources
                                      (no instances reported
                                      since 1982). Consult
                                      with other users.
--------------------------------------------------------------------------------------------------------------------------------------------------------
    Subtotal.......................................................................................  70 responses.......................          29,502
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                      $136,816 non-hour cost burden
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                               30 CFR 551.7 Through 551.9
--------------------------------------------------------------------------------------------------------------------------------------------------------
551.7; 551.8.......................  Submit APD and              Burden included under BSEE regulations at 30 CFR 250, Subpart D (1014-                0
                                      Supplemental APD to BSEE.                                   0018).
--------------------------------------------------------------------------------------------------------------------------------------------------------
551.7; 551.8(b)....................  Submit information on      1..................................  1 Submission.......................               1
                                      test drilling activities
                                      under a permit,
                                      including required
                                      information and plan
                                      revisions (e.g.,
                                      drilling plan and
                                      environmental report).
--------------------------------------------------------------------------------------------------------------------------------------------------------
551.7(c)...........................  Enter into agreement for   1..................................  1 Agreement........................               1
                                      group participation in
                                      test drilling, including
                                      publishing summary
                                      statement; provide BOEM
                                      copy of notice/list of
                                      participants (no
                                      agreements submitted
                                      since 1989).
--------------------------------------------------------------------------------------------------------------------------------------------------------
551.7(d)...........................  Submit bond(s) on deep                       Burden included under 30 CFR Part 556                                0
                                      stratigraphic test.
                                      and required securities.                                (1010-0006).                                ..............
--------------------------------------------------------------------------------------------------------------------------------------------------------
551.8(a)...........................  Request reimbursement for  1..................................  1 Request..........................               1
                                      certain costs associated
                                      with BOEM inspections
                                      (no requests in many
                                      years).
--------------------------------------------------------------------------------------------------------------------------------------------------------
551.8(b), (c)......................  Submit modifications to    38 AK **...........................  4 Respondents x10 Reports = 40.....           1,520
                                      permits, and status/      ...................................  9 Respondents x 10 Reports = 90....  ..............
                                      final reports on,         38 ATL **..........................                                                3,420
                                      activities conducted
                                      under a permit.
                                                                2 GOM..............................  55 Respondents x 3 Reports = 165...             330
--------------------------------------------------------------------------------------------------------------------------------------------------------
551.9(c)...........................  Notify BOEM to relinquish  \1/2\..............................  2 Notices..........................               1
                                      a permit.
--------------------------------------------------------------------------------------------------------------------------------------------------------
    Subtotal.......................................................................................  300 responses......................           5,274
--------------------------------------------------------------------------------------------------------------------------------------------------------

[[Page 8707]]

 
                                                              30 CFR 551.10 Through 551.13
--------------------------------------------------------------------------------------------------------------------------------------------------------
551.10(c)..........................  File appeals.............                    Exempt under 5 CFR 1320.4(a)(2), (c).                                0
--------------------------------------------------------------------------------------------------------------------------------------------------------
551.11; 551.12.....................  Notify BOEM and submit     4..................................  40 Submissions.....................             160
                                      G&G data and/or
                                      information collected
                                      and/or processed by
                                      permittees, bidders, or
                                      3rd parties, etc.,
                                      including reports, logs
                                      or charts, results,
                                      analyses, descriptions,
                                      information as required,
                                      and agreements, in
                                      manner specified.
--------------------------------------------------------------------------------------------------------------------------------------------------------
551.13.............................  Request reimbursement for  2..................................  40 Submissions.....................              80
                                      certain costs associated
                                      with reproducing data/
                                      information.
--------------------------------------------------------------------------------------------------------------------------------------------------------
    Subtotal.......................................................................................  80 responses.......................             240
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                      30 CFR 551.14
--------------------------------------------------------------------------------------------------------------------------------------------------------
551.14(a), (b).....................  Submit comments on BOEM    1..................................  2 Comments.........................               2
                                      intent to disclose data
                                      and/or information to
                                      the public.
--------------------------------------------------------------------------------------------------------------------------------------------------------
551.14(c)(2).......................  Submit comments on BOEM    1..................................  2 Comments.........................               2
                                      intent to disclose data
                                      and/or information to an
                                      independent contractor/
                                      agent.
--------------------------------------------------------------------------------------------------------------------------------------------------------
551.14(c)(4).......................  Contractor/agent submits   1..................................  2 Commitments......................               2
                                      written commitment not
                                      to sell, trade, license,
                                      or disclose data and/or
                                      information without BOEM
                                      consent.
--------------------------------------------------------------------------------------------------------------------------------------------------------
551.1-551.14.......................  General departure and      1..................................  2 Requests.........................               2
                                      alternative compliance
                                      requests not
                                      specifically covered
                                      elsewhere in part 551
                                      regulations.
--------------------------------------------------------------------------------------------------------------------------------------------------------
    Subtotal.......................................................................................  8 responses........................               8
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                        Extension for Permit Form & Recordkeeping
--------------------------------------------------------------------------------------------------------------------------------------------------------
551.14(b) (BOEM-0327)..............  Request extension of       1..................................  100 Extensions.....................             100
                                      permit time period;
                                      enter agreements.
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                     Retain G&G data/           1..................................  130 Recordkeepers..................             130
                                      information for 10 years
                                      and make available to
                                      BOEM upon request.
--------------------------------------------------------------------------------------------------------------------------------------------------------
    Subtotal.......................................................................................  230 responses......................             230
--------------------------------------------------------------------------------------------------------------------------------------------------------
        Total Burden...............................................................................  688 Responses......................          35,254
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                      $136,816 Non-Hour Cost Burden
--------------------------------------------------------------------------------------------------------------------------------------------------------
* Fees are subject to modification per inflation annually.
** Burden hours for the frontier areas of the Alaska Region and Atlantic OCS are significantly higher because of NEPA and mitigation requirements. BOEM
  is accounting for the total time to compile/submit the necessary information to obtain the required authorizations to acquire a BOEM permit.

    An agency may not conduct or sponsor and a person is not required 
to respond to a collection of information unless it displays a 
currently valid OMB control number.
    The authority for this action is the Paperwork Reduction Act of 
1995 (44 U.S.C. 3501 et seq.).

    Dated: February 26, 2018.
Deanna Meyer-Pietruszka,
Chief, Office of Policy, Regulation and Analysis.
[FR Doc. 2018-04170 Filed 2-27-18; 8:45 am]
BILLING CODE 4310-MR-P



                                                                                Federal Register / Vol. 83, No. 40 / Wednesday, February 28, 2018 / Notices                                                                     8703

                                                  TABLE 2—CONCESSION CONTRACTS EXTENDED AS INDICATED OR UNTIL THE EFFECTIVE DATE OF A NEW CONTRACT—
                                                                                             Continued
                                                                         Park unit                                        CONCID                                    Concessioner                                 Extension date

                                                Point Reyes NS ...............................................    PORE005–08                    Steward Ranch, LLC .......................................   March 31, 2019.


                                                                                                           TABLE 3—TEMPORARY CONCESSION CONTRACTS
                                                                         Park unit                                        CONCID                                       Services                                   Effective date

                                                Virgin Islands NP .............................................   VIIS008                       Charter Diving, Charter Snorkeling, Charter                  April 13, 2018.
                                                                                                                                                  Sailing.
                                                Yellowstone NP ...............................................    YELL002                       Retail, Food and Beverage, Groceries ...........             January 1, 2019.



                                                Teresa Austin,                                                    SUMMARY:   Pursuant to the terms of                           provisions of the respective concession
                                                Associate Director, Business Services.                            existing concession contracts, public                         contracts and pending the completion of
                                                [FR Doc. 2018–04028 Filed 2–27–18; 8:45 am]                       notice is hereby given that the National                      the public solicitation of a prospectus
                                                BILLING CODE 4312–53–P                                            Park Service has requested a                                  for a new concession contract, the
                                                                                                                  continuation of visitor services for the                      National Park Service authorizes
                                                                                                                  periods specified below.                                      continuation of visitor services for a
                                                DEPARTMENT OF THE INTERIOR                                        DATES: The continuation commences on                          period not-to-exceed 1 year
                                                                                                                  January 1, 2018.                                              commencing January 1, 2018, under the
                                                National Park Service                                             FOR FURTHER INFORMATION CONTACT:                              terms and conditions of the current
                                                                                                                  Brian Borda, Chief, Commercial                                contract as amended. The continuation
                                                [NPS–WASO–CONC–24212; PPWOBSADC0,                                 Services Program, National Park                               of operations does not affect any rights
                                                PPMVSCS1Y.Y00000]                                                 Service, 1849 C Street NW, Mail Stop                          with respect to selection for award of a
                                                                                                                  2225, Washington, DC 20240,                                   new concession contract. The
                                                Notice of Continuation of Concession                              Telephone: 202–513–7156.                                      publication of this notice merely reflects
                                                Contracts                                                                                                                       the intent of the National Park Service
                                                                                                                  SUPPLEMENTARY INFORMATION: The
                                                AGENCY:      National Park Service, Interior.                     contracts listed below have been                              but does not bind the National Park
                                                                                                                  extended to the maximum allowable                             Service to continue any of the contracts
                                                ACTION:     Public notice.
                                                                                                                  under 36 CFR 51.23. Under the                                 listed below.

                                                                                  Park unit                                              CONCID                                              Concessioner

                                                National Mall and Memorial Parks ........................................           NACC003–86                   Guest Services, Inc.
                                                Independence National Historical Park .................................             INDE001–94                   Concepts by Staib, Ltd.
                                                Blue Ridge Parkway ..............................................................   BLRI001–83                   Southern Highland Handicraft Guild, Inc.
                                                Cape Hatteras National Seashore ........................................            CAHA001–98                   Koru Village Incorporated.
                                                Cape Hatteras National Seashore ........................................            CAHA004–98                   Oregon Inlet Fishing Center, Inc.
                                                Glen Canyon National Recreation Area ................................               GLCA002–88                   ARAMARK Sports and Entertainment Services, Inc.
                                                Glen Canyon National Recreation Area ................................               GLCA003–69                   ARAMARK Leisure Services, Inc.
                                                Lake Mead National Recreation Area ...................................              LAKE001–73                   Rex G. Maughan and Ruth G. Maughan.
                                                Lake Mead National Recreation Area ...................................              LAKE002–82                   Lake Mead R.V. Village, LLC.
                                                Lake Mead National Recreation Area ...................................              LAKE005–97                   Rex G. Maughan and Ruth G. Maughan.
                                                Lake Mead National Recreation Area ...................................              LAKE006–74                   Las Vegas Boat Harbor, Inc.
                                                Lake Mead National Recreation Area ...................................              LAKE007–84                   Seven Resorts, Inc.
                                                Lake Mead National Recreation Area ...................................              LAKE009–88                   Temple Bar Marina, LLC.



                                                Teresa Austin,                                                    DEPARTMENT OF THE INTERIOR                                    SUMMARY:   In accordance with the
                                                Associate Director, Business Services.                                                                                          Paperwork Reduction Act of 1995, the
                                                [FR Doc. 2018–04029 Filed 2–27–18; 8:45 am]                       Bureau of Ocean Energy Management                             Bureau of Ocean Energy Management
                                                BILLING CODE 4312–53–P                                            [MMAA104000; OMB Control Number 1010–                         (BOEM) is proposing to renew an
                                                                                                                  0048; Docket ID: BOEM–2018–0016]                              information collection with revisions.
                                                                                                                                                                                DATES: Interested persons are invited to
                                                                                                                  Agency Information Collection                                 submit comments on or before March
                                                                                                                  Activities; Submission to the Office of                       30, 2018.
                                                                                                                  Management and Budget for Review                              ADDRESSES: Send written comments on
                                                                                                                  and Approval; 30 CFR 551, Geological
sradovich on DSK3GMQ082PROD with NOTICES




                                                                                                                                                                                this information collection request (ICR)
                                                                                                                  and Geophysical Explorations of the                           to the Office of Management and
                                                                                                                  Outer Continental Shelf                                       Budget’s Desk Officer for the
                                                                                                                  AGENCY:  Bureau of Ocean Energy                               Department of the Interior by email at
                                                                                                                  Management, Interior.                                         OIRA_Submission@omb.eop.gov; or via
                                                                                                                                                                                facsimile to 202–395–5806. Please
                                                                                                                  ACTION: Notice of information collection;
                                                                                                                                                                                provide a copy of your comments to the
                                                                                                                  request for comment.
                                                                                                                                                                                BOEM Information Collection Clearance


                                           VerDate Sep<11>2014      17:25 Feb 27, 2018       Jkt 244001    PO 00000      Frm 00055   Fmt 4703    Sfmt 4703    E:\FR\FM\28FEN1.SGM        28FEN1


                                                8704                      Federal Register / Vol. 83, No. 40 / Wednesday, February 28, 2018 / Notices

                                                Officer, Anna Atkinson, Bureau of                          Comment 2: Similarly, may third                    (GoM) may take 300 hours. This is a
                                                Ocean Energy Management, 45600                          party notification letters be submitted at            conservative estimate and the time
                                                Woodland Road, Sterling, Virginia,                      a later stage in the process after the                required may be even greater. BOEM
                                                20166; or by email to anna.atkinson@                    application is submitted? At times the                explains that this extraordinary burden
                                                boem.gov. Please reference Office of                    application is held up until these letters            is related to NEPA and the associated
                                                Management and Budget (OMB) Control                     are completed and distributed.                        mitigation requirements. However, such
                                                Number 1010–0048 in the subject line of                    BOEM Response: Yes, they may be                    a burden is unjustified, especially
                                                your comments.                                          submitted separately from the                         considering that surveys are routinely
                                                FOR FURTHER INFORMATION CONTACT: To                     application, but must be received before              conducted without impact in similar
                                                request additional information about                    the permit will be issued. BOEM is open               environments worldwide. Rather than
                                                this ICR, contact Anna Atkinson by                      to discussions with IAGC on this topic.               simply requesting approval for these
                                                email, or by telephone at 703–787–1025.                    Comment 3: Can BOEM routinely                      unjustified burdens, BOEM should
                                                You may also view the ICR at http://                    notify all applicants of form updates?                instead assess its permitting process and
                                                www.reginfo.gov/public/do/PRAMain.                      Out of date templates have been used in               determine how the burdens will be
                                                                                                        the past, which ultimately causes delay.              reduced. Such a reduction would be
                                                SUPPLEMENTARY INFORMATION: In                              BOEM Response: Current fillable                    consistent with the purpose of the PRA.
                                                accordance with the Paperwork                           forms are available on BOEM’s website                 The high permitting costs are entirely
                                                Reduction Act of 1995 (PRA), we                         at https://www.boem.gov/BOEM-OCS-                     inconsistent with the low and
                                                provide the general public and other                    Operation-Forms/ and forms specific to                effectively managed safety and
                                                Federal agencies with an opportunity to                 Geological & Geophysical (G&G)                        environmental risks from G&G
                                                comment on new, proposed, revised,                      exploration and permitting are posted at              activities.
                                                and continuing collections of                           https://www.boem.gov/Oil-and-Gas-                        BOEM Response: BOEM recognizes
                                                information. This helps us assess the                   Energy-Program/Resource-Evaluation/                   the commenter’s concern regarding the
                                                impact of our information collection                    Regulation-of-Pre-lease-Exploration/GG-               burden hours associated with
                                                requirements and minimize the public’s                  Permit-Applications.aspx. All forms,                  processing a permit application but the
                                                reporting burden. It also helps the                     including both the application and                    commenters did not provide specific
                                                public understand our information                       permit, are clearly marked with an OMB                estimates or information to justify
                                                collection requirements and provide the                 approval date in the lower left hand                  modification of the burden hour
                                                requested data in the desired format.                   corner and state that previous editions               estimates. BOEM is interested in
                                                   Comments: A Federal Register notice                  are obsolete.                                         specific estimates and recommendations
                                                with a 60-day public comment period                        Comment 4: BOEM has requested                      to consider modification of the burden
                                                soliciting comments on this collection                  comments on whether the information                   hours. Comments can be submitted to
                                                of information was published on August                  collected was ‘‘processed and used in a               OMB within 30 days of the notice’s
                                                31, 2017 (82 FR 41424). BOEM received                   timely manner.’’ Currently, industry                  publication.
                                                two comment letters during the 60-day                   finds the permitting process to be open-                 Additionally, in accordance with the
                                                comment period. One comment from a                      ended and uncertain. The Associations                 Trump Administration’s executive and
                                                private citizen was not germane to the                  recommend that BOEM establish a                       secretarial orders, most specifically
                                                PRA. The other comments were                            timeline for permit review and                        Executive Order 13783 and Secretary’s
                                                received from the American Petroleum                    approval, similar to how drilling                     Order 3350, BOEM has been working
                                                Institute and the International                         permits are approved.                                 with National Marine Fisheries Service
                                                Association of Geophysical Contractors                     BOEM Response: There is no                         (NMFS) to streamline processes and
                                                (IAGC) on October 30, 2017. Their                       regulatory time frame for processing                  improve efficiencies.
                                                comments include:                                       G&G permits. Internally, for GOM                         Comment 6: BOEM also should take
                                                   Comment 1: Rather than identifying                   applications BOEM attempts to issue                   steps to reduce the estimated 300-hour
                                                the specific vessel, may the applicant                  non-airgun high resolution permits, on                burden to apply for G&G permits in the
                                                provide information on the type of                      average, within 40 days and for bottom                GoM. Thousands of such permits have
                                                vessel that will be used to conduct the                 disturbing and airgun permits, on                     been issued and the environmental
                                                survey? BOEM can then proceed with                      average, in 70 days. This may vary as a               effects have been fully assessed.
                                                its review of the application. The vessel               result of work load at the permit                     Mitigating measures have proved
                                                name can be provided at a later date,                   processing level and/or at the                        effective and should not be changed
                                                and assuming it has similar                             environmental review level. In addition,              after a permit is issued. Applying for a
                                                specifications, further analysis by                     the time frames above do not include                  GoM permit should be a simple matter
                                                BOEM would not be necessary. On                         any additional time required to obtain                of identifying the timing, location,
                                                occasion application submissions are                    additional or corrected information from              vessel and equipment, and mitigation.
                                                delayed until the contractor/vessel is                  the applicant.                                        Absent special circumstances, the
                                                known, and at other times companies                        However, for G&G permits in the                    burden could be reduced by 90%
                                                must request a modification to the                      Atlantic, the applicant must apply and                without increasing environmental risks.
                                                permit as contractors/vessels change.                   receive an Incidental Harassment                         BOEM Response: The burden hours
                                                   BOEM Response: We have added the                     Authorization (IHA) from NMFS before                  are used by the applicants to provide
                                                change to Form BOEM–0327 at A.6 to                      the permit will be issued. Because                    BOEM with the appropriate
                                                allow details of the vessel (other than                 NMFS is an independent agency, with                   documentation to clearly and
                                                ‘‘type’’) to be provided at a later date. If                                                                  completely describe their proposed
sradovich on DSK3GMQ082PROD with NOTICES




                                                                                                        its own regulatory timelines, BOEM has
                                                the vessel information has not been                     no control over their processes and                   activity. This information is used by
                                                provided when the permit is ready to be                 timelines.                                            BOEM to ensure a proper understanding
                                                issued, BOEM will notify the permittee                     Comment 5: BOEM acknowledges that                  of the currently proposed activity and
                                                that the permit is ready and they will                  an application process for a single                   the equipment to be used. This ensures
                                                have 30 days to provide the vessel                      permit in Alaska or the Atlantic takes                that an appropriate site/activity specific
                                                information or their permit will be                     1,000 hours to complete, while the same               environmental analysis is conducted.
                                                canceled.                                               permit application in the Gulf of Mexico              Without the descriptive information


                                           VerDate Sep<11>2014   17:25 Feb 27, 2018   Jkt 244001   PO 00000   Frm 00056   Fmt 4703   Sfmt 4703   E:\FR\FM\28FEN1.SGM   28FEN1


                                                                          Federal Register / Vol. 83, No. 40 / Wednesday, February 28, 2018 / Notices                                            8705

                                                being provided for each proposed                           Comments that you submit in                           • Ensure that the exploration
                                                activity (thus the burden hours) BOEM                   response to this notice are a matter of               activities do not cause harm to the
                                                cannot ensure it is fulfilling its statutory            public record. Before including your                  environment or persons, or create
                                                obligations under OCSLA and NEPA.                       address, phone number, email address,                 unsafe operations and conditions,
                                                   Comment 7: We encourage BOEM to                      or other personal identifying                         damage historical or archaeological
                                                explore the creation of an electronic                   information in your comment, you                      sites, or interfere with other uses;
                                                permit application process. Efficiencies                should be aware that your entire                         • Analyze and evaluate preliminary
                                                for permit processing and man-hours                     comment—including your personal                       or planned drilling activities;
                                                may be realized through electronic                      identifying information—may be made                      • Monitor progress and activities in
                                                permit applications.                                    publicly available at any time. While                 the OCS;
                                                   BOEM Response: A web-based                           you can ask us in your comment to                        • Acquire G&G data and information
                                                process for the electronic submission/                  withhold your personal identifying                    collected under a Federal permit
                                                issuance of BOEM G&G permitting is                      information from public review, we                    offshore; and
                                                                                                        cannot guarantee that we will be able to                 • Determine eligibility for
                                                being considered for the future.
                                                                                                        do so.                                                reimbursement from the government for
                                                   Comment 8: Finally, while this ICR                                                                         certain costs.
                                                addresses BOEM G&G permitting                              Abstract: The Outer Continental Shelf
                                                                                                        (OCS) Lands Act, as amended (43 U.S.C.                   In this renewal, BOEM is renewing
                                                activities, it fails to capture the entire                                                                    Form BOEM–0327—Requirements for
                                                burden needed to conduct G&G                            1331 et seq. and 43 U.S.C. 1801 et seq.),
                                                                                                        authorizes the Secretary of the Interior              Geological or Geophysical Explorations
                                                activities, which in some cases requires                                                                      or Scientific Research on the Outer
                                                (or may require in the future)                          to prescribe rules and regulations to
                                                                                                        administer leasing of mineral resources               Continental Shelf. This form consists of
                                                authorizations from the National Marine                                                                       the requirements for G&G activities
                                                Fisheries Service (NMFS) for incidental                 on the OCS. The OCS Lands Act at 43
                                                                                                        U.S.C. 1340 states that ‘‘any person                  requiring Permits and Notices, along
                                                take pursuant to the Marine Mammal                                                                            with the application that the respondent
                                                Protection Act (MMPA) and/or the                        authorized by the Secretary may
                                                                                                        conduct geological and geophysical                    submits to BOEM for approval, as well
                                                Endangered Species Act (ESA). For                                                                             as a nonexclusive use agreement for
                                                example, for G&G permitting in the                      explorations in the OCS, which do not
                                                                                                        interfere with or endanger actual                     scientific research, if applicable. The
                                                Atlantic this is a required part of the                                                                       requirements portion of the form lets the
                                                                                                        operations under any lease maintained
                                                process, and the associated burdens                                                                           respondents know the authority and
                                                                                                        or granted pursuant to this subchapter,
                                                should be acknowledged in the ICR.                                                                            requirements, along with other relevant
                                                                                                        and which are not unduly harmful to
                                                Industry’s G&G permitting experience in                                                                       information for the permit. BOEM is
                                                                                                        aquatic life in such area.’’ The section
                                                the Atlantic has shown extreme delays                                                                         making modifications to this form by
                                                                                                        further provides that permits to conduct
                                                on the part of NMFS. Often applicants                                                                         adding OCS boundary/3-mile limit to
                                                                                                        such activities may only be issued if it
                                                are told that a BOEM G&G permit is                                                                            plat information requirements.
                                                                                                        is determined that the applicant is
                                                ‘‘ready to be issued’’ (or has been                                                                              To Attachment 1, Section A, BOEM
                                                                                                        qualified; the activities will not interfere
                                                issued) long before the applicant                                                                             modified item 6 to allow for the
                                                                                                        with or endanger operations under any
                                                receives MMPA or ESA authorizations                                                                           identification of vessel type in the event
                                                                                                        lease issued or maintained pursuant to
                                                from NMFS upon which the G&G permit                                                                           that the vessel name is unknown. To
                                                                                                        OCSLA; and the activities will not be
                                                is contingent.                                                                                                Attachment 1, Section C, item 2, BOEM
                                                                                                        unduly harmful to aquatic life, result in
                                                   BOEM Response: NMFS, not BOEM,                       pollution, create hazardous or unsafe                 added ‘‘e. Submit relevant shapefiles
                                                has the authority for incidental take                   conditions, unreasonably interfere with               needed to recreate the map as part of the
                                                authorizations under the MMPA and                       other uses of the area, or disturb any                required digital copy.’’ On page 11,
                                                ESA. Accordingly, the associated ICR                    site, structure, or object of historical or           Section D, Proprietary Information
                                                burden hours for these authorizations                   archaeological significance.                          Attachment Required for an Application
                                                are under the purview of NMFS. As                          Applicants for permits are required to             for Geophysical Permit, item 3, BOEM
                                                mentioned earlier, BOEM, NMFS, and                      submit Form BOEM–0327 to provide the                  added ‘‘ping duration/cycle’’’ and ‘‘ping
                                                other Federal agencies are working                      information necessary to evaluate their               rate’’ to the table and narrative.
                                                together to determine how the                           qualifications, and upon approval,                       Upon BOEM approval of the
                                                permitting process might be expedited                   respondents are issued a permit.                      application, respondents are issued a
                                                and streamlined. However, in the final                     The Independent Offices                            permit using Form BOEM–0328, Permit
                                                analysis NMFS is an independent                         Appropriations Act (31 U.S.C. 9701), the              to Conduct Geophysical Exploration for
                                                agency with its own regulatory                          Omnibus Appropriations Bill (Pub. L.                  Mineral Resources or Scientific
                                                timelines and processes.                                104–133, 110 Stat. 1321, April 26,                    Research on the Outer Continental
                                                   We are again soliciting comments on                  1996), and OMB Circular A–25                          Shelf, for conducting geophysical
                                                the proposed ICR that is described                      authorize Federal agencies to recover                 exploration for mineral resources or
                                                below. We are especially interested in                  the full cost of services that confer                 scientific research, or Form BOEM–
                                                public comment addressing the                           special benefits. All G&G permits are                 0329, Permit to Conduct Geological
                                                following issues: (1) Is the collection                 subject to cost recovery, and BOEM                    Exploration for Mineral Resources or
                                                necessary to the proper functions of                    regulations specify service fees for these            Scientific Research on the Outer
                                                BOEM? (2) will this information be                      requests.                                             Continental Shelf, for conducting
                                                processed and used in a timely manner?                     Regulations to carry out these                     geological exploration for mineral
                                                (3) is the estimate of burden accurate?
sradovich on DSK3GMQ082PROD with NOTICES




                                                                                                        responsibilities are contained in 30 CFR              resources or scientific research. These
                                                (4) how might BOEM enhance the                          part 551 and are the subject of this                  permits are filled in by BOEM and do
                                                quality, utility, and clarity of the                    information collection renewal. BOEM                  not incur a respondent hour burden.
                                                information to be collected? and (5) how                uses the information to:                                 The currently approved OMB
                                                might BOEM minimize the burden of                          • Identify oil, gas, sulfur, and mineral           paperwork burden is 40,954 annual
                                                this collection on the respondents,                     resources in the OCS;                                 burden hours. Due to a reduction of
                                                including through the use of                               • Ensure the receipt of fair value for             G&G permit applications annually in the
                                                information technology?                                 mineral resources;                                    Gulf of Mexico, BOEM is decreasing the


                                           VerDate Sep<11>2014   17:25 Feb 27, 2018   Jkt 244001   PO 00000   Frm 00057   Fmt 4703   Sfmt 4703   E:\FR\FM\28FEN1.SGM   28FEN1


                                                8706                               Federal Register / Vol. 83, No. 40 / Wednesday, February 28, 2018 / Notices

                                                number of responses to 688 responses                                       Explorations of the Outer Continental                                       OCS oil, gas, and sulphur permittees or
                                                and annual burden hours to 35,254                                          Shelf.                                                                      notice filers.
                                                burden hours.                                                                OMB Control Number: 1010–0048.                                              Total Estimated Number of Annual
                                                  We protect proprietary information in                                      Form Number: BOEM–0327,                                                   Responses: 688 responses.
                                                accordance with the Freedom of                                             Requirements for Geological or                                                Total Estimated Number of Annual
                                                Information Act (5 U.S.C. 522) and the                                     Geophysical Explorations or Scientific                                      Burden Hours: 35,254 hours.
                                                Department of the Interior’s                                               Research on the Outer Continental
                                                implementing regulations (43 CFR part                                      Shelf.                                                                        Respondent’s Obligation: Mandatory.
                                                2), and under regulation at 30 CFR part                                      Type of Review: Revision of a                                               Frequency of Collection: On occasion,
                                                551.                                                                       currently approved collection.                                              annual, or as specified in permits.
                                                  Title of Collection: 30 CFR 551,                                           Respondents/Affected Public:                                                Total Estimated Annual Nonhour
                                                Geological and Geophysical                                                 Potential respondents comprise Federal                                      Burden Cost: $136,816.

                                                                                                                                                                                                                       Average                      Annual
                                                   Citation 30 CFR 551                      Reporting and recordkeeping requirement                                          Hour burden                           number of annual                 burden
                                                                                                                                                                                                                      responses                      hours

                                                                                                                                                                                                        Non-hour cost burden *

                                                                                                                                        30 CFR 551.1 Through 551.6

                                                551.4(a), (b); 551.5(a),                  Apply for permits (Form BOEM–0327) to                                    1,000 AK ** .....................          4 Applications ................           4,000
                                                  (b), (d); 551.6; 551.7.                   conduct G&G exploration, including deep                                1,000 ATL & Pacific ** ...                 9 Applications ................           9,000
                                                                                            stratigraphic tests/revisions when nec-                                300 GOM .......................            55 Applications ..............           16,500
                                                                                            essary. Submit required information in
                                                                                            manner specified.

                                                                                                                                                                                             68 applications × $2,012 = $136,816

                                                551.4(b); 551.5(c), (d);                  File notices to conduct scientific research ac-                          1 .....................................    1 Notice ..........................             1
                                                  551.6.                                     tivities, including notice to BOEM prior to
                                                                                             beginning and after concluding activities.

                                                551.6(b) 551.7(b)(5) .......              Notify BOEM if specific actions occur; report                            1 .....................................    1 Notice ..........................             1
                                                                                            archaeological resources (no instances re-
                                                                                            ported since 1982). Consult with other
                                                                                            users.

                                                      Subtotal ............................................................................................................................................   70 responses .................           29,502

                                                                                                                                                                                                                     $136,816 non-hour cost burden

                                                                                                                                        30 CFR 551.7 Through 551.9

                                                551.7; 551.8 ...................          Submit APD and Supplemental APD to                                        Burden included under BSEE regulations at 30 CFR                                           0
                                                                                            BSEE.                                                                              250, Subpart D (1014–0018).

                                                551.7; 551.8(b) ...............           Submit information on test drilling activities                           1 .....................................    1 Submission .................                  1
                                                                                            under a permit, including required informa-
                                                                                            tion and plan revisions (e.g., drilling plan
                                                                                            and environmental report).

                                                551.7(c) ..........................       Enter into agreement for group participation                             1 .....................................    1 Agreement ..................                  1
                                                                                            in test drilling, including publishing sum-
                                                                                            mary statement; provide BOEM copy of
                                                                                            notice/list of participants (no agreements
                                                                                            submitted since 1989).

                                                551.7(d) ..........................       Submit bond(s) on deep stratigraphic test .....                                    Burden included under 30 CFR Part 556                                            0
                                                                                            and required securities ...............................                                       (1010–0006).

                                                551.8(a) ..........................       Request reimbursement for certain costs as-                              1 .....................................    1 Request ......................                1
                                                                                           sociated with BOEM inspections (no re-
                                                                                           quests in many years).

                                                551.8(b), (c) ...................         Submit modifications to permits, and status/                             38 AK ** ..........................        4 Respondents ×10 Re-                     1,520
                                                                                            final reports on, activities conducted under                                                                        ports = 40.
                                                                                            a permit.                                                              38 ATL ** ........................         9 Respondents × 10 Re-                    3,420
sradovich on DSK3GMQ082PROD with NOTICES




                                                                                                                                                                                                                ports = 90.
                                                                                                                                                                   2 GOM ...........................          55 Respondents × 3 Re-                         330
                                                                                                                                                                                                                ports = 165.

                                                551.9(c) ..........................       Notify BOEM to relinquish a permit ...............                       12⁄ ...................................    2 Notices ........................               1

                                                      Subtotal ............................................................................................................................................   300 responses ...............             5,274




                                           VerDate Sep<11>2014        18:19 Feb 27, 2018          Jkt 244001       PO 00000       Frm 00058        Fmt 4703       Sfmt 4703       E:\FR\FM\28FEN1.SGM             28FEN1


                                                                                   Federal Register / Vol. 83, No. 40 / Wednesday, February 28, 2018 / Notices                                                                                      8707

                                                                                                                                                                                                                      Average                    Annual
                                                   Citation 30 CFR 551                      Reporting and recordkeeping requirement                                          Hour burden                          number of annual               burden
                                                                                                                                                                                                                     responses                    hours

                                                                                                                                                                                                        Non-hour cost burden *

                                                                                                                                      30 CFR 551.10 Through 551.13

                                                551.10(c) ........................        File appeals ....................................................                   Exempt under 5 CFR 1320.4(a)(2), (c).                                         0

                                                551.11; 551.12 ...............            Notify BOEM and submit G&G data and/or                                   4 .....................................    40 Submissions .............                160
                                                                                            information collected and/or processed by
                                                                                            permittees, bidders, or 3rd parties, etc., in-
                                                                                            cluding reports, logs or charts, results,
                                                                                            analyses, descriptions, information as re-
                                                                                            quired, and agreements, in manner speci-
                                                                                            fied.

                                                551.13 ............................       Request reimbursement for certain costs as-                              2 .....................................    40 Submissions .............                 80
                                                                                           sociated with reproducing data/information.

                                                      Subtotal ............................................................................................................................................   80 responses .................              240

                                                                                                                                                   30 CFR 551.14

                                                551.14(a), (b) .................          Submit comments on BOEM intent to dis-                                   1 .....................................    2 Comments ..................                 2
                                                                                            close data and/or information to the public.

                                                551.14(c)(2) ....................         Submit comments on BOEM intent to dis-                                   1 .....................................    2 Comments ..................                 2
                                                                                            close data and/or information to an inde-
                                                                                            pendent contractor/agent.

                                                551.14(c)(4) ....................         Contractor/agent submits written commitment                              1 .....................................    2 Commitments ..............                  2
                                                                                           not to sell, trade, license, or disclose data
                                                                                           and/or information without BOEM consent.

                                                551.1–551.14 .................            General departure and alternative compli-                                1 .....................................    2 Requests .....................              2
                                                                                           ance requests not specifically covered
                                                                                           elsewhere in part 551 regulations.

                                                      Subtotal ............................................................................................................................................   8 responses ...................               8

                                                                                                                          Extension for Permit Form & Recordkeeping

                                                551.14(b) (BOEM–0327)                     Request extension of permit time period;                                 1 .....................................    100 Extensions ..............               100
                                                                                           enter agreements.

                                                                                          Retain G&G data/information for 10 years                                 1 .....................................    130 Recordkeepers .......                   130
                                                                                           and make available to BOEM upon re-
                                                                                           quest.

                                                      Subtotal ............................................................................................................................................   230 responses ...............               230

                                                            Total Burden .............................................................................................................................        688 Responses ..............          35,254

                                                                                                                                                                                                                    $136,816 Non-Hour Cost Burden
                                                 * Fees are subject to modification per inflation annually.
                                                 ** Burden hours for the frontier areas of the Alaska Region and Atlantic OCS are significantly higher because of NEPA and mitigation require-
                                                ments. BOEM is accounting for the total time to compile/submit the necessary information to obtain the required authorizations to acquire a
                                                BOEM permit.


                                                  An agency may not conduct or                                               The authority for this action is the                                        Dated: February 26, 2018.
                                                sponsor and a person is not required to                                    Paperwork Reduction Act of 1995 (44                                         Deanna Meyer-Pietruszka,
                                                respond to a collection of information                                     U.S.C. 3501 et seq.).                                                       Chief, Office of Policy, Regulation and
                                                unless it displays a currently valid OMB                                                                                                               Analysis.
                                                control number.
sradovich on DSK3GMQ082PROD with NOTICES




                                                                                                                                                                                                       [FR Doc. 2018–04170 Filed 2–27–18; 8:45 am]
                                                                                                                                                                                                       BILLING CODE 4310–MR–P




                                           VerDate Sep<11>2014        18:19 Feb 27, 2018          Jkt 244001       PO 00000       Frm 00059        Fmt 4703       Sfmt 4703       E:\FR\FM\28FEN1.SGM            28FEN1



Document Created: 2018-02-28 03:20:19
Document Modified: 2018-02-28 03:20:19
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice of information collection; request for comment.
DatesInterested persons are invited to submit comments on or before March 30, 2018.
ContactTo request additional information about this ICR, contact Anna Atkinson by email, or by telephone at 703- 787-1025. You may also view the ICR at http://www.reginfo.gov/public/ do/PRAMain.
FR Citation83 FR 8703 