DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 83, Issue 45 (March 7, 2018)

Page Range9732-9732
FR Document2018-04603

Federal Register, Volume 83 Issue 45 (Wednesday, March 7, 2018)
[Federal Register Volume 83, Number 45 (Wednesday, March 7, 2018)]
[Notices]
[Page 9732]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-04603]



[[Page 9732]]

-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 10482-118]


Eagle Creek Hydro Power, LLC, Eagle Creek Water Resources, LLC, 
Eagle Creek Land Resources, LLC; Notice of Application Accepted for 
Filing, Soliciting Comments, Motions To Intervene, and Protests

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection:
    a. Type of Application: Non-capacity amendment of license.
    b. Project No.: 10482-118.
    c. Date Filed: January 26, 2018.
    d. Applicants: Eagle Creek Hydro Power, LLC, Eagle Creek Water 
Resources, LLC, and Eagle Creek Land Resources, LLC.
    e. Name of Project: Swinging Bridge Hydroelectric Project.
    f. Location: Mongaup River in Sullivan County, New York.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
    h. Applicant Contact: Mr. Robert Gates, Executive Vice President 
Operations, Eagle Creek Renewable Energy, LLC, 65 Madison Avenue, Suite 
500, Morristown, NJ 07960, (973) 998-8400, [email protected].
    i. FERC Contact: Mr. Jeremy Jessup, (202) 502-6779, 
[email protected].
    j. Deadline for filing comments, motions to intervene, and protests 
is 30 days from the issuance of this notice by the Commission.
    The Commission strongly encourages electronic filing. Please file 
comments, motions to intervene, and protests using the Commission's 
eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. 
Commenters can submit brief comments up to 6,000 characters, without 
prior registration, using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact 
information at the end of your comments. For assistance, please contact 
FERC Online Support at [email protected], (866) 208-3676 (toll 
free), or (202) 502-8659 (TTY). In lieu of electronic filing, please 
send a paper copy to: Secretary, Federal Energy Regulatory Commission, 
888 First Street NE, Washington, DC 20426. The first page of any filing 
should include docket number P-10482-118.
    The Commission's Rules of Practice and Procedure require all 
intervenors filing documents with the Commission to serve a copy of 
that document on each person on the official service list for the 
project. Further, if an intervenor files comments or documents with the 
Commission relating to the merits of an issue that may affect the 
responsibilities of a particular resource agency, they must also serve 
a copy of the document on that resource agency.
    k. Description of Request: The applicant proposes to install a new 
minimum base flow turbine-generator unit (Unit No. 3) in a new 
approximately 30-foot-long by 30-foot-wide powerhouse directly adjacent 
to the existing powerhouse for Unit No. 2 at the Swinging Bridge 
Development. The installed capacity of Unit No. 3 will replace the 
inoperable turbine-generator unit (Unit No. 1). The authorized 
installed capacity of the project will decrease from 11.75 MW to 7.85 
MW with the proposed amendment and the licensee does not propose any 
modifications to reservoir elevations or flows.
    l. Locations of the Application: A copy of the application is 
available for inspection and reproduction at the Commission's Public 
Reference Room, located at 888 First Street NE, Room 2A, Washington, DC 
20426, or by calling (202) 502-8371. This filing may also be viewed on 
the Commission's website at http://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number excluding the last three digits 
in the docket number field to access the document. You may also 
register online at http://www.ferc.gov/docs-filing/esubscription.asp to 
be notified via email of new filings and issuances related to this or 
other pending projects. For assistance, call 1-866-208-3676 or email 
[email protected], for TTY, call (202) 502-8659. A copy is 
also available for inspection and reproduction at the address in item 
(h) above.
    m. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    n. Comments, Motions to Intervene, or Protests: Anyone may submit 
comments, a motion to intervene, or a protest in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
.214. In determining the appropriate action to take, the Commission 
will consider all protests or other comments filed, but only those who 
file a motion to intervene in accordance with the Commission's Rules 
may become a party to the proceeding. Any comments, motions to 
intervene, or protests must be received on or before the specified 
comment date for the particular application.
    o. Filing and Service of Responsive Documents: Any filing must (1) 
bear in all capital letters the title ``COMMENTS'', ``PROTEST'', or 
``MOTION TO INTERVENE,'' (2) set forth in the heading, the name of the 
applicant and the project number of the application to which the filing 
responds; (3) furnish the name, address, and telephone number of the 
person protesting or intervening; and (4) otherwise comply with the 
requirements of 18 CFR 385.2001 through 385.2005. All comments, motions 
to intervene, or protests must set forth their evidentiary basis and 
otherwise comply with the requirements of 18 CFR 4.34(b). Agencies may 
obtain copies of the application directly from the applicant. A copy of 
any protest or motion to intervene must be served upon each 
representative of the applicant specified in the particular 
application. If an intervener files comments or documents with the 
Commission relating to the merits of an issue that may affect the 
responsibilities of a particular resource agency, they must also serve 
a copy of the document on that resource agency. A copy of all other 
filings in reference to this application must be accompanied by proof 
of service on all persons listed in the service list prepared by the 
Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 
385.2010.

    Dated: March 1, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-04603 Filed 3-6-18; 8:45 am]
BILLING CODE 6717-01-P



                                               9732                         Federal Register / Vol. 83, No. 45 / Wednesday, March 7, 2018 / Notices

                                               DEPARTMENT OF ENERGY                                    each person on the official service list                 o. Filing and Service of Responsive
                                                                                                       for the project. Further, if an intervenor            Documents: Any filing must (1) bear in
                                               Federal Energy Regulatory                               files comments or documents with the                  all capital letters the title
                                               Commission                                              Commission relating to the merits of an               ‘‘COMMENTS’’, ‘‘PROTEST’’, or
                                               [Project No. 10482–118]                                 issue that may affect the responsibilities            ‘‘MOTION TO INTERVENE,’’ (2) set
                                                                                                       of a particular resource agency, they                 forth in the heading, the name of the
                                               Eagle Creek Hydro Power, LLC, Eagle                     must also serve a copy of the document                applicant and the project number of the
                                               Creek Water Resources, LLC, Eagle                       on that resource agency.                              application to which the filing
                                               Creek Land Resources, LLC; Notice of                       k. Description of Request: The                     responds; (3) furnish the name, address,
                                               Application Accepted for Filing,                        applicant proposes to install a new                   and telephone number of the person
                                               Soliciting Comments, Motions To                         minimum base flow turbine-generator                   protesting or intervening; and (4)
                                               Intervene, and Protests                                 unit (Unit No. 3) in a new                            otherwise comply with the requirements
                                                                                                       approximately 30-foot-long by 30-foot-                of 18 CFR 385.2001 through 385.2005.
                                                  Take notice that the following                       wide powerhouse directly adjacent to                  All comments, motions to intervene, or
                                               hydroelectric application has been filed                the existing powerhouse for Unit No. 2                protests must set forth their evidentiary
                                               with the Commission and is available                    at the Swinging Bridge Development.                   basis and otherwise comply with the
                                               for public inspection:                                  The installed capacity of Unit No. 3 will             requirements of 18 CFR 4.34(b).
                                                  a. Type of Application: Non-capacity                 replace the inoperable turbine-generator              Agencies may obtain copies of the
                                               amendment of license.                                   unit (Unit No. 1). The authorized                     application directly from the applicant.
                                                  b. Project No.: 10482–118.                           installed capacity of the project will                A copy of any protest or motion to
                                                  c. Date Filed: January 26, 2018.                     decrease from 11.75 MW to 7.85 MW                     intervene must be served upon each
                                                  d. Applicants: Eagle Creek Hydro                     with the proposed amendment and the                   representative of the applicant specified
                                               Power, LLC, Eagle Creek Water                           licensee does not propose any                         in the particular application. If an
                                               Resources, LLC, and Eagle Creek Land                    modifications to reservoir elevations or              intervener files comments or documents
                                               Resources, LLC.                                         flows.                                                with the Commission relating to the
                                                  e. Name of Project: Swinging Bridge                     l. Locations of the Application: A                 merits of an issue that may affect the
                                               Hydroelectric Project.                                  copy of the application is available for
                                                  f. Location: Mongaup River in                                                                              responsibilities of a particular resource
                                                                                                       inspection and reproduction at the                    agency, they must also serve a copy of
                                               Sullivan County, New York.                              Commission’s Public Reference Room,
                                                  g. Filed Pursuant to: Federal Power                                                                        the document on that resource agency.
                                                                                                       located at 888 First Street NE, Room 2A,              A copy of all other filings in reference
                                               Act, 16 U.S.C. 791a–825r.                               Washington, DC 20426, or by calling
                                                  h. Applicant Contact: Mr. Robert                                                                           to this application must be accompanied
                                                                                                       (202) 502–8371. This filing may also be               by proof of service on all persons listed
                                               Gates, Executive Vice President                         viewed on the Commission’s website at
                                               Operations, Eagle Creek Renewable                                                                             in the service list prepared by the
                                                                                                       http://www.ferc.gov/docs-filing/
                                               Energy, LLC, 65 Madison Avenue, Suite                                                                         Commission in this proceeding, in
                                                                                                       elibrary.asp. Enter the docket number
                                               500, Morristown, NJ 07960, (973) 998–                                                                         accordance with 18 CFR 4.34(b) and
                                                                                                       excluding the last three digits in the
                                               8400, bob.gates@eaglecreekre.com.                                                                             385.2010.
                                                                                                       docket number field to access the
                                                  i. FERC Contact: Mr. Jeremy Jessup,                  document. You may also register online                  Dated: March 1, 2018.
                                               (202) 502–6779, Jeremy.Jessup@ferc.gov.                 at http://www.ferc.gov/docs-filing/                   Kimberly D. Bose,
                                                  j. Deadline for filing comments,                     esubscription.asp to be notified via                  Secretary.
                                               motions to intervene, and protests is 30                email of new filings and issuances                    [FR Doc. 2018–04603 Filed 3–6–18; 8:45 am]
                                               days from the issuance of this notice by                related to this or other pending projects.            BILLING CODE 6717–01–P
                                               the Commission.                                         For assistance, call 1–866–208–3676 or
                                                  The Commission strongly encourages                   email FERCOnlineSupport@ferc.gov, for
                                               electronic filing. Please file comments,                TTY, call (202) 502–8659. A copy is also              DEPARTMENT OF ENERGY
                                               motions to intervene, and protests using                available for inspection and
                                               the Commission’s eFiling system at                      reproduction at the address in item (h)               Federal Energy Regulatory
                                               http://www.ferc.gov/docs-filing/                        above.                                                Commission
                                               efiling.asp. Commenters can submit                         m. Individuals desiring to be included
                                                                                                                                                             [Project No. 2685–029]
                                               brief comments up to 6,000 characters,                  on the Commission’s mailing list should
                                               without prior registration, using the                   so indicate by writing to the Secretary               New York Power Authority; Notice of
                                               eComment system at http://                              of the Commission.                                    Settlement Agreement, Soliciting
                                               www.ferc.gov/docs-filing/                                  n. Comments, Motions to Intervene, or              Comments, and Modification of
                                               ecomment.asp. You must include your                     Protests: Anyone may submit                           Procedural Schedule
                                               name and contact information at the end                 comments, a motion to intervene, or a
                                               of your comments. For assistance,                       protest in accordance with the                          Take notice that the following
                                               please contact FERC Online Support at                   requirements of Rules of Practice and                 settlement agreement has been filed
                                               FERCOnlineSupport@ferc.gov, (866)                       Procedure, 18 CFR 385.210, .211, .214.                with the Commission and is available
                                               208–3676 (toll free), or (202) 502–8659                 In determining the appropriate action to              for public inspection.
                                               (TTY). In lieu of electronic filing, please             take, the Commission will consider all                  a. Type of Application: Settlement
                                               send a paper copy to: Secretary, Federal                protests or other comments filed, but                 Agreement.
                                               Energy Regulatory Commission, 888                       only those who file a motion to                         b. Project No.: 2685–029.
daltland on DSKBBV9HB2PROD with NOTICES




                                               First Street NE, Washington, DC 20426.                  intervene in accordance with the                        c. Date filed: February 23, 2018.
                                               The first page of any filing should                     Commission’s Rules may become a                         d. Applicant: New York Power
                                               include docket number P–10482–118.                      party to the proceeding. Any comments,                Authority (NYPA).
                                                  The Commission’s Rules of Practice                   motions to intervene, or protests must                  e. Name of Project: Blenheim-Gilboa
                                               and Procedure require all intervenors                   be received on or before the specified                Pumped Storage Project.
                                               filing documents with the Commission                    comment date for the particular                         f. Location: On Schoharie Creek, in
                                               to serve a copy of that document on                     application.                                          the Towns of Blenheim and Gilboa in


                                          VerDate Sep<11>2014   17:30 Mar 06, 2018   Jkt 244001   PO 00000   Frm 00009   Fmt 4703   Sfmt 4703   E:\FR\FM\07MRN1.SGM   07MRN1



Document Created: 2018-03-07 01:27:28
Document Modified: 2018-03-07 01:27:28
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation83 FR 9732 

2024 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR