Uranium Enrichment Fuel Cycle Facility Inspection Reports Regarding Louisiana Energy Services LLC, National Enrichment Facility, Eunice, NM, Prior to the Commencement of Operations
The U.S. Nuclear Regulatory Commission (NRC) staff has conducted inspections of the Louisiana Energy Services (LES), LLC, National enrichment Facility in Eunice, New Mexico, and...
The U.S. Nuclear Regulatory Commission (NRC) staff has conducted inspections of the Louisiana Energy Services (LES), LLC, National enrichment Facility in Eunice, New Mexico, and has verified that cascades number 1.5, 1.6, 1.7, 1.8, 2.1, and 2.4 as well as autoclave one of the facility have been constructed in accordance with the requirements of the approved license. The NRC staff has prepared inspection reports documenting its findings in accordance with the requirements of the NRC Inspection Manual.
ADDRESSES:
Please refer to Docket ID NRC-2010-0264 when contacting the NRC about the availability of information regarding this document. You may access information related to this document, which the NRC possesses and is publicly-available, using the following methods:
Federal Rulemaking Web site:
Go to
www.regulations.gov
and search for Docket ID NRC-2010-0264. Address questions about NRC dockets to Carol Gallagher; telephone: 301-492-3668; email:
Carol.Gallagher@nrc.gov.
NRC's Agencywide Documents Access and Management System (ADAMS):
You may access publicly-available documents online in the NRC Library at
www.nrc.gov/reading-rm/adams.html.
To begin the search, select “ADAMS Public Documents” and then select “
Begin Web-based ADAMS Search.”
For problems with ADAMS, please contact the NRC's Public Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737, or by email to
pdr.resource@nrc.gov.
In addition, for the convenience of the reader, the ADAMS accession numbers are provided in a table in the section of this notice entitled,
Availability of Inspection Reports.
NRC's PDR:
You may examine and purchase copies of public documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852.
FOR FURTHER INFORMATION CONTACT:
Michael Raddatz, Office of Nuclear Material Safety and Safeguards, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; telephone: (301) 492-3108; email:
Michael.Raddatz@nrc.gov.
SUPPLEMENTARY INFORMATION:
I. Discussion
The NRC staff has conducted inspections of the Louisiana Energy Services (LES), LLC, National enrichment Facility in Eunice, New Mexico, and has verified that cascades number 1.5, 1.6, 1.7, 1.8, 2.1, and 2.4 as well as autoclave one of the facility have been constructed in accordance with the requirements of the approved license. The NRC staff has prepared inspection reports documenting its findings in accordance with the requirements of the NRC Inspection Manual. As a result of these inspections, on November 15, 2011, the Commission authorized the licensee to start operation of cascade number 1.5. On December 2, 2011, the Commission authorized the licensee to start operation of Autoclave one. On December 21, 2011, the Commission authorized the licensee to start operation of cascade number 1.6. On January 23, 2012, the Commission authorized the licensee to start operation of cascade number 1.7. Finally, on March 1, 2012, the Commission authorized the licensee to start operations of cascades numbered 1.8, 2.1, and 2.4.
The publication of this Notice satisfies the requirements of Title 10 of the Code of Federal Regulations (10 CFR) 70.32 (k) and Section 193(c) of the Atomic Energy Act of 1954, as amended.
The introduction of uranium hexafluoride into any module of the National Enrichment Facility is not permitted until the Commission completes an operational readiness and management measures verification review to verify that management measures that ensure compliance with the performance requirements of 10 CFR 70.61 have been implemented and confirms that the facility has been constructed in accordance with the license and will be operated safely. Subsequent operational readiness and management measures verification reviews will continue throughout the various phases of plant construction and, upon completion of these subsequent phases, additional notices will be posted to verify that the phase in question has been constructed in accordance with the license and to acknowledge licensee readiness for operations.
( printed page 18273)
II. Availability of Inspection Reports
The following table provides the ADAMS accession numbers for the inspection reports prepared by the NRC staff. For information on how to access ADAMS, see the
ADDRESSES
section of this document.
Inspection Report Nos.
Date
ADAMS
Accession No.
70-3103/2012-002
Pending
70-3103/2011-013
January 25, 2012
ML12025A286
70-3103/2011-009
December 8, 2011
ML11342A131
70-3103/2011-007
December 16, 2011
ML11353A102
70-3103/2011-004
October 28, 2011
ML11301A218
70-3103/2011-008
June 15, 2011
ML111660886
70-3103/2011-002
April 29, 2011
ML111190268
70-3103/2010-012
July 21, 2010
ML102020385
70-3103/2010-007
March 31, 2010
ML100900329
70-3103/2010-005
March 26, 2010
ML100850424
70-3103/2009-004
December 17, 2009
ML093511013
70-3103/2009-006
October 8, 2009
ML092820188
70-3103/2009-003
September 30, 2009
ML092730612
70-3103/2009-002
June 26, 2009
ML091770643
70-3103/2009-001
March 26, 2009
ML090850669
70-3103/2008-006
March 20, 2009
ML090790642
70-3103/2008-004
December 19, 2008
ML083540709
70-3103/2008-003
October 30, 2008
ML083040618
70-3103/2008-002
July 10, 2008
ML081930118
70-3103/2008-001
April 24, 2008
ML081160345
70-3103/2007-004
March 7, 2008
ML080670475
70-3103/2007-003
November 2, 2007
ML073060571
70-3103/2007-002
August 16, 2007
ML072280647
70-3103/2007-001
May 24, 2007
ML071440430
70-3103/2006-001
January 19, 2007
ML070190661
Dated at Rockville, Maryland, this 9th day of March 2012.
For the U.S. Nuclear Regulatory Commission.
Brian W. Smith,
Chief, Uranium Enrichment Branch, Division of Fuel Cycle Safety and Safeguards, Office of Nuclear Material Safety and Safeguards.