The Coast Guard has issued a temporary deviation from the operating schedule that governs the Hood Canal Floating Drawbridge across Hood Canal (Admiralty Inlet), mile 5.0, near Port Gamble, WA. This deviation is necessary to accommodate replacement of the draw span operating equipment. The deviation allows the bridge to open the draw half-way, 300 feet; as opposed to a full opening, which is 600 feet. The deviation also requires the draw to open on signal if at least four hours notice is given.
Document
Drawbridge Operation Regulation; Hood Canal, Port Gamble, WA
The Coast Guard has issued a temporary deviation from the operating schedule that governs the Hood Canal Floating Drawbridge across Hood Canal (Admiralty Inlet), mile 5.0, near ...
Legal Citation
Federal Register Citation
Use this for formal legal and research references to the published document.
82 FR 19321
Web Citation
Suggested Web Citation
Use this when citing the archival web version of the document.
“Drawbridge Operation Regulation; Hood Canal, Port Gamble, WA,” thefederalregister.org (April 27, 2017), https://thefederalregister.org/documents/2017-08502/drawbridge-operation-regulation-hood-canal-port-gamble-wa.