Department of Homeland Security
Coast Guard
- 33 CFR Part 117
- [Docket No. USCG-2018-0452]
AGENCY:
Coast Guard, DHS.
ACTION:
Notice of deviation from drawbridge regulation.
SUMMARY:
The Coast Guard has issued a temporary deviation from the operating schedule that governs the Burnside Bridge across the Willamette River, mile 12.4, at Portland, OR. The deviation is necessary to accommodate a city parade event. This deviation allows the double bascule bridge to remain in the closed-to-navigation position.
DATES:
This deviation is effective from 7 a.m. to 2 p.m. on June 9, 2018.
ADDRESSES:
The docket for this deviation, USCG-2018-0452 is available at http://www.regulations.gov. Type the docket number in the “SEARCH” box and click “SEARCH.” Click on Open Docket Folder on the line associated with this deviation.
FOR FURTHER INFORMATION CONTACT:
If you have questions on this temporary deviation, call or email Mr. Steven Fischer, Bridge Administrator, Thirteenth Coast Guard District; telephone 206-220-7282, email d13-pf-d13bridges@uscg.mil.