Department of Defense
Department of the Army, Army Corps of Engineers
AGENCY:
Department of the Army, U.S. Army Corps of Engineers, DoD.
ACTION:
Notice of intent.
SUMMARY:
The U.S. Army Corps of Engineers (USACE), Sacramento District, the State of California, and Central Valley Flood Protection Board (CVFPB) are preparing a Draft Supplemental Environmental Impact Statement/Environmental Impact Report (Draft Supplemental EIS/EIR) for the American River Contract 2 (Proposed Action) of the American River Common Features (ARCF) Levee Improvement Project authorized by the Water Resources Development Act of 2016. This Draft Supplemental EIS/EIR supplements the ARCF General Reevaluation Report (GRR) Final EIS/EIR (May 2016). The Proposed Action includes constructing erosion protection measures at Lower American River (LAR) sites 2-2 (river mile 7.5 right bank), and 2-3 (river mile 5.9 right bank), transporting excavated materials from site 2-3 to the Arden Pond mitigation site for construction of shallow water fish habitat for juvenile salmon, construction of a berm to separate the restored Arden Pond from the adjacent bass pond, and planting of emergent and riparian vegetation to provide Shaded Riverine Aquatic (SRA) habitat. The Proposed Action is necessary to protect the levee from erosion damage that could reduce its reliability to protect against flooding, and to mitigate loss of fish and riparian habitat for the American River Common Features Project Endangered Species Act consultation requirements. Conceptual components of the Proposed Action were analyzed (erosion protection measures) in the ARCF GRR Final EIS/EIR, but some elements of the Proposed Action (Arden Pond and SRA habitat mitigation) were not analyzed in the ARCF GRR Final EIS/EIR because habitat mitigation locations and designs were still in formulation at the time the Final EIS/EIR was completed. The USACE has now developed levee erosion protection and habitat mitigation designs in sufficient detail to analyze their environmental effects.
DATES:
Written comments regarding the scope of the environmental analysis should be received by August 31, 2020.
ADDRESSES:
Written comments and suggestions concerning this Project and requests to be included on the Project mailing list may be submitted to Ms. Andrea Meier, U.S. Army Corps of Engineers, Sacramento District, Attn: Planning Division (CESPK-PDR), 1325 J Street, Sacramento, CA 95814.
FOR FURTHER INFORMATION CONTACT:
Questions about the Proposed Action and draft Supplemental EIS/EIR may be addressed to Ms. Andrea Meier at (916) 557-7206, email at Andrea.J.Meier@usace.army.mil, or by mail at 1325 J Street, Sacramento, CA 95814 (see ADDRESS ). Additional information will also be posted periodically on the internet under the American River Contract 2 web page at: www.sacleveeupgrades.com.