Deepwater Horizon Oil Spill, Louisiana Trustee Implementation Group; Final Phase 2 Restoration Plan #1.2 and Environmental Assessment: Barataria Basin Ridge and Marsh Creation Project, Spanish Pass Increment and Lake Borgne Marsh Creation Project Increment One; and Finding of No Significant Impact
In accordance with the Oil Pollution Act of 1990 (OPA), the National Environmental Policy Act of 1969 (NEPA), the Final Programmatic Damage Assessment Restoration Plan/Final Pro...
In accordance with the Oil Pollution Act of 1990 (OPA), the National Environmental Policy Act of 1969 (NEPA), the Final Programmatic Damage Assessment Restoration Plan/Final Programmatic Environmental Impact Statement (PDARP/PEIS), and the Consent Decree, the Federal and State natural resource trustee agencies for the Louisiana Trustee Implementation Group (LA TIG) have prepared a
Louisiana Trustee Implementation Group Final Restoration Plan/Environmental Assessment #1.2: Barataria Basin Ridge and Marsh Creation Project Spanish Pass Increment and Lake Borgne Marsh Creation Project Increment One
(Phase 2 RP/EA #1.2), and
Finding of No Significant Impact
(FONSI). The Phase 2 RP/EA #1.2 approves construction activities for the restoration of wetlands, coastal, and nearshore habitats injured in the Louisiana Restoration Area as a result of the
Deepwater Horizon
(DWH) oil spill. The Phase 2 RP/EA #1.2 analyzes restoration project design
( printed page 61967)
alternatives for two projects which are components of larger marsh restoration strategies, and were approved for engineering and design (E&D) in a previous restoration plan. In the final Phase 2 RP/EA #1.2, the LA TIG selected and approved a design alternative for construction of each project, at a total construction cost of approximately $203,182,000. The purpose of this notice is to inform the public of the availability of the final Phase 2 RP/EA #1.2 and FONSI.
ADDRESSES:
Obtaining Documents:
You may download the final Phase 2 RP/EA #1.2 from either of the following websites:
Alternatively, you may request a CD of the final Phase 2 RP/EA #1.2 (see
FOR FURTHER INFORMATION CONTACT
). A hard copy of the final Phase 2 RP/EA #1.2 is also available to view at 16 repositories located across the region. Locations are listed in the following table.
Library
Address
City
Zip
St. Tammany Parish Library
310 W 21st Avenue
Covington
70433
Terrebonne Parish Library
151 Library Drive
Houma
70360
New Orleans Public Library, Louisiana Division
219 Loyola Avenue
New Orleans
70112
East Baton Rouge Parish Library
7711 Goodwood Boulevard
Baton Rouge
70806
Jefferson Parish Library, East Bank Regional Library
4747 W Napoleon Avenue
Metairie
70001
Jefferson Parish Library, West Bank Regional Library
2751 Manhattan Boulevard
Harvey
70058
Plaquemines Parish Library
8442 Highway 23
Belle Chasse
70037
St. Bernard Parish Library
1125 E St. Bernard Highway
Chalmette
70043
St. Martin Parish Library
201 Porter Street
St. Martinville
70582
Alex P. Allain Library
206 Iberia Street
Franklin
70538
Vermilion Parish Library
405 E St. Victor Street
Abbeville
70510
Martha Sowell Utley Memorial Library
314 St. Mary Street
Thibodaux
70301
South Lafourche Public Library
16241 E Main Street
Cut Off
70345
Calcasieu Parish Public Library Central Branch
301 W Claude Street
Lake Charles
70605
Iberia Parish Library
445 E Main Street
New Iberia
70560
Mark Shirley, LSU AgCenter
1105 West Port Street
Abbeville
70510
FOR FURTHER INFORMATION CONTACT:
Nanciann Regalado, via email at
nanciann_regalado@fws.gov, via telephone at 678-296-6805, or via the Federal Relay Service at 800-877-8339.
SUPPLEMENTARY INFORMATION:
Introduction
On April 20, 2010, the mobile offshore drilling unit
Deepwater Horizon,
which was being used to drill a well for BP Exploration and Production, Inc. (BP), in the Macondo prospect (Mississippi Canyon 252—MC252), experienced a significant explosion, fire, and subsequent sinking in the Gulf of Mexico, resulting in an unprecedented volume of oil and other discharges from the rig and from the wellhead on the seabed. The DWH oil spill is the largest offshore oil spill in U.S. history, discharging millions of barrels of oil over a period of 87 days. In addition, well over 1 million gallons of dispersants were applied to the waters of the spill area in an attempt to disperse the spilled oil. An undetermined amount of natural gas was also released into the environment as a result of the spill.
The Trustees conducted the natural resource damage assessment (NRDA) for the DWH oil spill under the Oil Pollution Act 1990 (OPA; 33 U.S.C. 2701et seq.). Pursuant to OPA, Federal and State agencies act as trustees on behalf of the public to assess natural resource injuries and losses and to determine the actions required to compensate the public for those injuries and losses. The OPA further instructs the designated trustees to develop and implement a plan for the restoration, rehabilitation, replacement, or acquisition of the equivalent of the injured natural resources under their trusteeship to baseline (the resource quality and conditions that would exist if the spill had not occurred). This includes the loss of use and services provided by those resources from the time of injury until the completion of restoration.
The DWH Trustees are:
U.S. Department of the Interior (DOI), as represented by the National Park Service, U.S. Fish and Wildlife Service, and Bureau of Land Management;
National Oceanic and Atmospheric Administration (NOAA), on behalf of the U.S. Department of Commerce;
U.S. Department of Agriculture (USDA);
U.S. Environmental Protection Agency (EPA);
State of Louisiana Coastal Protection and Restoration Authority, Oil Spill Coordinator's Office, Department of Environmental Quality, Department of Wildlife and Fisheries, and Department of Natural Resources;
State of Mississippi Department of Environmental Quality;
State of Alabama Department of Conservation and Natural Resources and Geological Survey of Alabama;
State of Florida Department of Environmental Protection and Fish and Wildlife Conservation Commission; and
State of Texas: Texas Parks and Wildlife Department, Texas General Land Office, and Texas Commission on Environmental Quality.
On April 4, 2016, the United States District Court for the Eastern District of Louisiana entered a Consent Decree resolving civil claims by the Trustees against BP arising from the DWH oil spill:
United States
v.
BPXP
et al.,
Civ. No. 10-4536,
centralized in
MDL 2179, In re: Oil Spill by the Oil Rig “Deepwater Horizon” in the Gulf of Mexico,
on April 20, 2010 (E.D. La.) (
www.justice.gov/enrd/deepwater-horizon). Pursuant to the Consent Decree, restoration projects in the Louisiana Restoration Area are chosen and managed by the LA TIG. The LA TIG is composed of the following Trustees: State of Louisiana Coastal Protection and Restoration Authority; Oil Spill Coordinator's Office; Departments of Environmental Quality; Wildlife and Fisheries; and Natural Resources; DOI; NOAA; EPA; and USDA.
Background
The Final PDARP/PEIS provides for TIGs to propose phasing restoration projects across multiple restoration plans. A TIG may propose conceptual projects to fund for an information-gathering and planning phase, such as E&D, in a restoration plan (phase 1).
( printed page 61968)
Approval of a Phase 1 restoration plan and projects within, allows the TIG to develop information needed to fully consider design alternatives in a later restoration plan (phase 2). In the final Phase 1 RP #1, the LA TIG selected six conceptual projects for E&D, using funds as provided for in the DWH Consent Decree. Two of those projects selected to undergo E&D were the Barataria Basin Ridge and Marsh Creation Project Spanish Pass Increment (Spanish Pass project) and the Lake Borgne Marsh Creation Project Increment One (Lake Borgne project). Upon development of E&D alternatives for the two projects, a phase 2 restoration plan was drafted and an OPA and NEPA analysis were conducted on the design alternatives. Notice of availability of the draft Phase 2 RP/EA #1.2 was published in the
Federal Register
on October 18, 2019 (84 FR 55976). Public comment was encouraged and accepted until November 20, 2019. The LA TIG hosted a public webinar on October 28, 2019 to facilitate public review and comment. The LA TIG considered the public comments received and finalized the Phase 2 RP/EA #1.2, selecting construction designs for implementation of both projects. A summary of the public comments received and the LA TIG's responses to those comments are presented in the final Phase 2 RP/EA #1.2.
Overview of the LA TIG Final Phase 2 RP/EA #1.2
The Phase 2 RP/EA #1.2 is being released in accordance with OPA NRDA regulations found in the Code of Federal Regulations (CFR) at 15 CFR part 990, NEPA and its implementing regulations found at 40 CFR parts 1500-1508, the Final PDARP/PEIS, and the Consent Decree. The Phase 2 RP/EA #1.2 provides OPA and NEPA analyses for a reasonable range of design alternatives for the Spanish Pass and Lake Borgne projects, and identifies the LA TIG's selected design alternatives, those which the LA TIG believes best meet the objectives of the Spanish Pass and Lake Borgne projects. In accordance with NEPA, as part of the final Phase 2 RP/EA #1.2, the Trustees issued a FONSI. The FONSI is available in Appendix F of the Phase 2 RP/EA #1.2.
The Spanish Pass project is a component of an overall large-scale restoration strategy for the Barataria Basin that would reestablish, through multiple increments, ridge and intertidal marsh habitats degraded due to sea level rise, land subsidence, diminished sediment supply, and storm events. The total construction cost for the Spanish Pass project is approximately $101,359,000 which will be funded from the Wetlands, Coastal, and Nearshore Habitats restoration type allocation provided for in the Consent Decree.
The Lake Borgne project is a component of an overall large-scale restoration strategy for the southwestern shoreline of Lake Borgne that would reestablish, through multiple increments, the bay rim and intertidal marsh habitat. The estimated total construction cost for this increment is $101,823,000 will be funded also from the Wetlands, Coastal, and Nearshore Habitats restoration type allocation. Additional restoration planning for the Louisiana Restoration Area will continue.
The authority for this action is the Oil Pollution Act of 1990 (33 U.S.C. 2701et seq.), its implementing Natural Resource Damage Assessment regulations found at 15 CFR part 990, and the National Environmental Policy Act of 1969 (42 U.S.C. 4321et seq.) and its implementing regulations found at 40 CFR parts 1500-1508.
Mary Josie Blanchard,
Director of Gulf of Mexico Restoration, Department of Interior.