Department of Energy
Federal Energy Regulatory Commission
- [Project No. 7656-000]
The current license for Buttermilk Falls Hydroelectric Project No. 7656 (Buttermilk Falls Project) was issued to the original licensee, John A. Dodson, on June 24, 1986, for a term of 40 years, ending May 31, 2026.[1] The project became non-operational in 2012 due to damage caused by Hurricanes Sandy and Irene, and has remained non-operational since. The license was transferred to the current licensee, Village of Highland Falls High-Point Utility, LDC (High-Point Utility) on September 21, 2017.[2] The 75-kilowatt (kW) project is located on Buttermilk Falls Brook, a tributary of the Hudson River, in Orange County, New York.
The principal project works consist of: (1) An 18-inch-high, 15-foot-long dam; (2) an 18-inch-diameter, 400-foot-long PVC penstock; (3) a powerhouse containing one 55-kW and one 20-kW generating unit, for a total of installed generating capacity of 75-kW; (4) two 480-volt generator leads; (5) a 300-foot-long, 480-volt transmission line; and (6) a 0.48/13.6-kilovolt cable connecting the transformer to the area distribution system.
At least five years before the expiration of a license for a minor water power project in which sections 14 and 15 of the Federal Power Act were waived, the Commission's regulations require the licensee to file with the Commission a notice of intent (NOI) that contains an unequivocal statement of the licensee's intention to file or not to file an application for a subsequent license, details on the principal project works and installed plant capacity, and other information.[3]
If such a licensee does not inform the Commission that it intends to file an application for, in this case, a subsequent license for the project, the licensee may not file an application for a subsequent license, either individually or in conjunction with an entity or entities that are not currently licensees of the project.[4]
Because the current license expires on May 31, 2026, the NOI was due to be filed no later than the close of business on May 31, 2021.[5] High-Point Utility, the current licensee for the Buttermilk Falls Project, failed to file an NOI by this date.[6]
Any party interested in filing a license application for the Buttermilk Falls Project No. 7656 must first file a NOI [7] and pre-application document (PAD) [8] pursuant to Part 5 of the Commission's regulations. Although the integrated licensing process is the default pre-filing process, section 5.3(b) of the Commission's regulations allows a potential license applicant to request to use alternative licensing procedures when it files its NOI.[9]
This notice sets a deadline of 120 days from the date of this notice for interested applicants, other than the existing licensee, to file NOIs, PADs, and requests to use an alternative licensing process.
Applications for a subsequent license from potential (non-licensee) applicants must be filed with the Commission at least 24 months prior to the expiration of the current license.[10] Because the current license expires on May 31, 2026, applications for license for this project must be filed by May 31, 2024.[11]
Questions concerning this notice should be directed to Samantha Pollak at (202) 502-6419 or samantha.pollak@ferc.gov.
Dated: August 5, 2021.
Kimberly D. Bose,
Secretary.