AGENCY:
Federal Railroad Administration (FRA), U.S. Department of Transportation (DOT).
ACTION:
Notice of availability and request for comments.
SUMMARY:
This document provides the public with notice that on December 2, 2021, the Peninsula Corridor Joint Powers Board (Caltrain) submitted a document entitled, “Crossing Optimization Project: Test Request,” Revision 1, dated November 29, 2021, to FRA. Caltrain asks FRA to approve its request so that Caltrain may field test its Crossing Optimization on track that has been equipped with positive train control (PTC) technology.
DATES:
FRA will consider comments received by February 14, 2022. FRA may consider comments received after that date to the extent practicable and without delaying implementation of valuable or necessary modifications to a PTC system.
ADDRESSES:
All comments should identify the agency name and Docket Number FRA-2010-0051, and may be submitted on https:// ( printed page 71317) www.regulations.gov. Follow the online instructions for submitting comments. All comments received will be posted without change to https://www.regulations.gov; this includes any personal information.
FOR FURTHER INFORMATION CONTACT:
Gabe Neal, Staff Director, Signal, Train Control, and Crossings Division, telephone: 816-516-7168, email: Gabe.Neal@dot.gov.