Air Plan Approval; Illinois; Removal of Infrastructure SIP Requirements for the 2012 PM2.5 and 2015 Ozone NAAQS
Due to the receipt of an adverse comment on a direct final rule published on September 29, 2021, the Environmental Protection Agency (EPA) is revising its regulations approving ...
Due to the receipt of an adverse comment on a direct final rule published on September 29, 2021, the Environmental Protection Agency (EPA) is revising its regulations approving elements of a State Implementation Plan revision submitted by the Illinois Environmental Protection Agency on September 29, 2017, May 16, 2019, and September 22, 2020. The submitted revisions were intended to address the infrastructure requirements of section 110 of the Clean Air Act for the 2012 annual fine particulate matter (PM2.5) and 2015 ozone National Ambient Air Quality Standards (NAAQS).
DATES:
This final rule is effective January 18, 2022.
FOR FURTHER INFORMATION CONTACT:
Olivia Davidson, Environmental Scientist, Attainment Planning and Maintenance Section, Air Programs Branch (AR-18J), EPA, Region 5, 77 West Jackson Boulevard, Chicago, Illinois 60604, (312) 886-0266.
davidson.olivia@epa.gov.
The EPA Region 5 office is open from 8:30 a.m. to 4:30 p.m., Monday through Friday, excluding Federal holidays and facility closures due to COVID-19.
SUPPLEMENTARY INFORMATION:
EPA published a direct final rule on September 29, 2021 (86 FR 53872), approving elements of a State Implementation Plan (SIP) revision submitted by the State of Illinois regarding the infrastructure requirements of section 110 of the Clean Air Act (CAA) for the 2012 PM2.5
and 2015 ozone NAAQS and approving the infrastructure requirements related to Prevention of Significant Deterioration (PSD) for previous NAAQS. In the direct final rule, EPA stated that if adverse comments were received by October 29, 2021, the rule would be withdrawn and not take effect. On October 27, 2021, EPA received a comment. EPA believes this comment is adverse and, therefore, EPA is revising its regulations because EPA was unable to withdraw the direct final rule before it took effect. EPA will address the comment in a subsequent final action based upon the proposed action also published on September 29, 2021.
See86 FR 53915. EPA will not institute a second comment period on this action.
CAA elements 110(a)(2)(A), (B), (C) with respect to enforcement, (D)(ii), (E) through (H), (J) except for prevention of significant deterioration (PSD), and (K) through (M) have been approved. CAA elements 110(a)(2)(C) and (J) with respect to PSD have been disapproved.
CAA elements 110(a)(2)(A), (B), (C) with respect to enforcement, (D)(ii), (E) through (H), (J) except for prevention of significant deterioration (PSD), and (K) through (M) have been approved. CAA elements 110(a)(2)(C) and (J) with respect to PSD have been disapproved.
All CAA infrastructure elements under 110(a)(2) have been approved except (D)(i)(I) [Prongs 1 and 2], (D)(ii), and the PSD portions of (C), (D)(i)(II) [Prong 3], and (J), which have been disapproved. The disapproved elements have Federal Implementation Plans (FIP) in place and no further action is needed.
All CAA infrastructure elements under 110(a)(2) have been approved except (D)(ii), and the PSD portions of (C), (D)(i)(II) [Prong 3], and (J), which have been disapproved. The disapproved elements have Federal Implementation Plans (FIP) in place and no further action is needed.
All CAA infrastructure elements under 110(a)(2) have been approved except (D)(i)(I) [Prongs 1 and 2], (D)(ii), and the PSD portions of (C), (D)(i)(II) [Prong 3], and (J), which have been disapproved. The disapproved elements have Federal Implementation Plans (FIP) in place and no further action is needed.
All CAA infrastructure elements under 110(a)(2) have been approved except (D)(ii), and the PSD portions of (C), (D)(i)(II) [Prong 3], and (J), which have been disapproved. The disapproved elements have Federal Implementation Plans (FIP) in place and no further action is needed.
All CAA infrastructure elements under 110(a)(2) have been approved except (D)(ii), and the PSD portions of (C), (D)(i)(II) [Prong 3], and (J), which have been disapproved, and (D)(i)(I) [Prongs 1 and 2], which have not yet been submitted. The disapproved elements have Federal Implementation Plans (FIP) in place and no further action is needed.
Use this for formal legal and research references to the published document.
87 FR 2554
Web Citation
Suggested Web Citation
Use this when citing the archival web version of the document.
“Air Plan Approval; Illinois; Removal of Infrastructure SIP Requirements for the 2012 PM2.5 and 2015 Ozone NAAQS,” thefederalregister.org (January 18, 2022), https://thefederalregister.org/documents/2022-00785/air-plan-approval-illinois-removal-of-infrastructure-sip-requirements-for-the-2012-pm2-5-and-2015-ozone-naaqs.