Department of Defense
Department of the Navy
AGENCY:
Department of the Navy (DoN), Department of Defense (DoD)
ACTION:
Notice of public meeting.
SUMMARY:
Pursuant to the National Environmental Policy Act (NEPA) of 1969, as implemented by the Council on Environmental Quality Regulations, the DoN has prepared and filed with the United States Environmental Protection Agency (U.S. EPA) a Draft Environmental Impact Statement (EIS) that evaluates the potential environmental effects associated with constructing and operating a graving dry dock (DD) and waterfront production facility (WPF) at the Pearl Harbor Naval Shipyard and Intermediate Maintenance Facility (PHNSY & IMF) at Joint Base Pearl Harbor‐Hickam (JBPHH), Oahu, Hawaii. A graving dry dock is a narrow basin constructed near the shoreline that can be flooded to allow watercraft to be floated in, then drained to allow the watercraft to come to rest on a dry platform. Dry docks are used for the maintenance and repair of ships, boats, submarines, and other watercraft. A WPF is a facility situated at the waterfront that is used to support maintenance of these vessels.
DATES:
With the filing of the Draft EIS, the DoN is initiating a 45-day public comment period beginning on February 4, 2022, and extending through March 21, 2022. Comments submitted during the public comment period will become part of the public record, and substantive comments will be considered in the Final EIS. All comments must be postmarked or received electronically by 11:59 p.m. Hawaii Standard Time (HST) on March 21, 2022, for consideration in the Final EIS.
Due to current Federal and State guidance on social distancing in response to the COVID-19 pandemic, the DoN is providing virtual and web-based opportunities for the public to learn about the proposed action and action alternatives, and provide comments on the Draft EIS. The virtual and web-based opportunities are:
1. Virtual Open House: A Virtual Open House will be available at https://www.pearlharbordrydockeis.org from February 4, 2022, to March 21, 2022.
2. Project Website: The Project website is available at https://www.pearlharbordrydockeis.org throughout the EIS preparation. The Project website provides information on the proposed action, NEPA process, and schedule, and includes a document library. The public can use this website to submit comments on the Draft EIS electronically between February 4, 2022, and March 21, 2022.
3. Virtual Public Meeting: February 24, 2022, 4:30-6:30 p.m. HST. There are two options to access the meeting:
a. Go to Zoom.us/join or join by phone at: 669-900-6833; Meeting ID: 881 8171 0022.
b. Visit the Project Website at: https://www.pearlharbordrydockeis.org to access the Virtual Public Meeting link and phone number.
Concurrent with the NEPA public involvement process, the DoN is conducting National Historic Preservation Act Section 106 consultations regarding potential effects of the Proposed Action on historic properties. Historic properties include districts, sites, buildings, structures, or objects listed or eligible for listing in the National Register of Historic Places. The public will have the opportunity to participate in the Section 106 process by reviewing the Draft EIS and providing comments using one of the various virtual and web-based platforms identified above.
ADDRESSES:
Written comments on the Draft EIS or the project's potential to affect historic properties pursuant to Section 106 of the National Historic Preservation Act may be mailed to Naval Facilities Engineering Systems Command, Attention: PHNSY & IMF DD/WPF EIS Project Manager, 258 Makalapa Drive, Suite 100, Joint Base Pearl Harbor-Hickam, HI 96860, or submitted electronically via the project website at https://www.pearlharbordrydockeis.org.
FOR FURTHER INFORMATION CONTACT:
Andréa M. Von Burg Hall, DON PHNSY & IMF DD/WPF EIS Project Manager, at andrea.vonburg-hall@navy.mil, or 808-472-1425, or 258 Makalapa Drive, Suite 100, Joint Base Pearl Harbor-Hickam, HI 96860.