FY 2022 and 2023 Competitive Funding Opportunity: Accelerating Advanced Digital Construction Management Systems Program

The Federal Transit Administration (FTA) announces the opportunity to competitively apply for $5,093,000 under the Fiscal Year (FY) 2022 and 2023 Public Transportation Innovatio...

Department of Transportation
Federal Transit Administration

AGENCY:

Federal Transit Administration (FTA), Department of Transportation (DOT).

ACTION:

Notice of funding opportunity (NOFO).

SUMMARY:

The Federal Transit Administration (FTA) announces the opportunity to competitively apply for $5,093,000 under the Fiscal Year (FY) 2022 and 2023 Public Transportation Innovation Program to serve as the Program Lead for the Accelerating Advanced Digital Construction Management Systems (“ADCMS”) program.

DATES:

Complete proposals must be submitted electronically through the Grants.gov “APPLY” function by 11:59 p.m. Eastern time on February 12, 2024.

FOR FURTHER INFORMATION CONTACT:

ADCMS Program Team, FTA Office of Research, Demonstration, and Innovation, by email at or by phone at (202) 366-2182.

Prospective applicants should initiate the process by registering on the Grants.gov website promptly to ensure completion of the application process before the submission deadline. Instructions for applying can be found on FTA's website at https://www.transit.dot.gov/​howtoapply and in the “FIND” module of Grants.gov. The Grants.gov funding opportunity ID is FTA-2023-012-TRI-ADCMS. Mail and fax submissions will not be accepted.

SUPPLEMENTARY INFORMATION:

Table of Contents

A. Program Description

B. Federal Award Information

C. Eligibility Information

D. Application and Submission Information

E. Application Review Information

F. Federal Award Administration Information

G. Federal Awarding Agency Contacts

H. Other Information

A. Program Description

1. Background

FTA's Public Transportation Innovation Program (49 U.S.C. 5312) supports research and demonstrations to develop and deploy ideas, practices, and approaches that improve public transportation. This Notice (Federal Assistance Listing 20.526) will establish a program to plan, deploy, evaluate, and promote ADCMS technologies under 49 U.S.C. 5312(b)(4).

Construction is often the costliest and potentially most disruptive phase of any public transportation infrastructure project. Effective and efficient management of all elements and life cycle phases of infrastructure construction is key to on-time and on-budget project delivery. Project teams must know how and why specific changes or improvements are being made, ideally in real-time, and be aware of variations in methods of construction, delays, and stakeholder inputs. Public transportation infrastructure projects could have delays, cost overruns, avoidable revisions and change orders, worker injuries, or substandard build quality without effective and efficient infrastructure construction management strategies.

The Infrastructure Investment and Jobs Act, Public Law 117-58 (also called the Bipartisan Infrastructure Law (BIL)), prioritizes the modernization of public transportation systems and acknowledges that the successful implementation of the ADCMS program relies on creating a new digital solution for the infrastructure construction industry. BIL codified 49 U.S.C. 5312(b)(4), which requires FTA to accelerate the implementation and deployment of ADCMS in the public transportation industry. ADCMS is broadly defined as empowering more timely and productive information sharing among stakeholders through reduced reliance on outdated pen-and-paper methods. ADCMS potentially makes modern digital technology available to infrastructure construction employees and enables them to perform tasks faster, more safely, smartly, and accurately, and with reduced oversight and supervision.

Section 5312(b)(4) lists nine goals for the accelerated implementation and deployment of ADCMS technologies in the public transportation industry. They are:

1. Accelerated adoption of advanced digital systems applied throughout the lifecycle of transportation infrastructure (including through the planning, design and engineering, construction, operations, and maintenance phases) that maximize interoperability with other systems, products, tools, or applications; boost productivity; manage complexity; reduce project delays and cost overruns; enhance safety and quality; and reduce total costs for the entire lifecycle of transportation infrastructure assets.

2. More timely and productive information sharing among stakeholders through reduced reliance on paper to manage construction processes and deliverables such as blueprints, design drawings, procurement and supply-chain orders, equipment logs, daily progress reports, and punch lists.

3. Deployment of digital management systems that enable and leverage the use of digital technologies on construction sites by contractors, such as state-of-the-art automated and connected machinery and optimized routing software that allows construction workers to perform tasks faster, more safely, more ( printed page 71075) accurately, and with minimal supervision.

4. The development and deployment of best practices for use in digital construction management.

5. Increased technology adoption and deployment by States, local governmental authorities, and designated recipients that enable project sponsors to integrate the adoption of digital management systems and technologies in contracts and to weigh the cost of digitization and technology in setting project budgets.

6. Technology training and workforce development to build the capabilities of project managers and sponsors that enable States, local governmental authorities, or designated recipients to better manage projects using advanced construction management technologies and to properly measure and reward technology adoption across projects.

7. Development of guidance to assist States, local governmental authorities, and designated recipients in updating regulations to allow project sponsors and contractors to report data relating to the project in digital formats and to fully capture the efficiencies and benefits of advanced digital construction management systems and related technologies.

8. Reduction in the environmental footprint of construction projects using advanced digital construction management systems resulting from eliminating congestion through more efficient projects.

9. Enhanced worker and pedestrian safety resulting from increased transparency.

2. Program Goals and Objectives

FTA is soliciting proposals for a Program Lead to carry out demonstrations of ADCMS software on transit construction projects and report on the results and experiences, with the purpose of assisting other transit agencies considering adopting ADCMS on their construction projects.

FTA expects this ADCMS demonstration program to consist of the following basic program elements, which are described in additional detail below: (1) overall program management and coordination; (2) demonstration of ADCMS on public transportation construction projects; (3) an evaluation of the demonstration projects centered on the nine program goals in 49 U.S.C. 5312(b)(4); and (4) development of “lessons learned” documents of project findings and an implementation guide intended to assist public transportation agencies accelerate the deployment of ADCMS programs.

The Program Lead is encouraged to assemble and lead appropriate partnerships to deliver all components of the ADCMS program as described in this Notice.

i. Management and Coordination

The Program Lead will be responsible for overall program management, coordination, and adherence to established project timelines in accordance with available funding. This includes all aspects of resource management, compliance, and reporting, including oversight of sub-recipients, if any. Eligible activities include data collection, feasibility study and analysis, economic analysis, stakeholder engagement, and outreach, obtaining necessary equipment and services, acquiring or developing software and hardware interfaces to implement the project demonstrations, performance measurement and evaluation, planning, engineering, development of technical or financing plans, public engagement, and participant recruitment, capital and operating expenses, technology applications, or similar necessary components to design, select, and carry out demonstrations.

The Program Lead is expected to work closely and have frequent contact with the transit agency owners of the demonstration construction projects to monitor the collection and analysis of data to ensure the validity and consistency of findings, in accordance with the goals and requirements of this Notice, and with input of the Research Stakeholder Committee, as described in Section A.2.iv., Structured Demonstration and National Research, below.

ii. Demonstration Projects

The Program Lead must provide for at least two transit agencies to demonstrate at least two different ADCMS solutions, and the construction projects used for demonstrations must be FTA-funded projects. Accordingly, the Program Lead must have the capability to support the implementation of more than one ADCMS-integrated software solution. The Program Lead must allow a public transportation agency sponsoring a demonstration to choose its own ADCMS software, and cannot be a provider of, or have a financial interest in, a proprietary ADCMS software solution.

In proposing construction projects for demonstrations, the Program Lead should consider, among other factors, the nature and type of construction management processes being proposed for ADCMS demonstrations, each transit agency's ability to implement ADCMS, the ADCMS products to be demonstrated, and each transit agency's ability to manage project data. FTA expects demonstrations to have a duration not to exceed four years from project start date. The Project Lead shall propose demonstration projects to ensure that the customized ADCMS strategies and targeted investments are having a measurable impact at the demonstration sites.

Demonstration activities should include the full lifecycle for planning, implementing, integrating, testing, and final deployment of the solution. For example, (1) gathering and confirming business requirements from the recipients selected for the demonstration, (2) configuring the ADCMS software noted in the application for the respective partner, (3) testing and integrating the software solution with any internal systems already deployed that relate to digital construction management, (4) final deployment, and (5) lessons learned in the process.

Demonstrations will include the collection of data and experiences from participants in the demonstration projects and unique “storytelling” of individual participants in the various demonstrations that will form the basis of the Project Lead's evaluation of the demonstrations and preparation of “lessons learned” materials for dissemination.

Proposals must include a research program “off-ramp plan” to financially support and sustain the ADCMS program for the demonstration recipients at the conclusion of the demonstration and research period. Competitive proposals will also have a deployment timeline and critical milestones with associated roles and responsibilities for demonstration transit agencies.

iii. Demonstration Project Evaluation

A Demonstration Project Evaluation report is required to assess the research project's process, outcomes, and impact. This report should provide an unbiased assessment of the project's strengths, weaknesses, and lessons learned.

iv. Development of Lessons Learned

The Program Lead will facilitate the interaction between the demonstration project transit agencies by bringing demonstration partners together periodically to gather qualitative research and provide feedback on their respective findings regarding the demonstration's implementation and impact. ( printed page 71076)

The Program Lead will develop a structured research framework for the demonstrations. The Program Lead will establish and regularly meet with a Research Stakeholder Committee consisting of representatives from federal agencies involved in research and development initiatives related to the project's domain, experts from relevant industries from non-profit and/or private sector organizations that have a vested interest in the research area; representatives from academia that can contribute their knowledge, research expertise, and academic perspectives to guide the project and ensure its alignment with current scientific understanding; and end users or practitioners from organizations such as public transportation agencies or relevant professionals who will be the direct beneficiaries or users of project outcomes. The Research Stakeholder Committee will review the demonstration framework and methodology, data collection plan, and preliminary and final findings and offer feedback to ensure the demonstration satisfies the nine goals of the ADCMS program in the most valid and impactful ways. The successful applicant will collaborate with FTA on the membership composition of the committee. FTA will also be a member of the committee. The Program Lead will aid the selected demonstration sites in establishing and maintaining the collection of project data and tools, striving for consistency across demonstrations to the greatest extent possible. The Program Lead will also compile and synthesize data and lessons learned from the demonstrations. Project deliverables should include data collection instruments, including surveys, interview guides, observation protocols, or experimental protocols used to collect primary data; copies of oral and/or visual presentations summarizing the project objectives, methodology, findings, and recommendations; copies of all raw and/or processed data collected during the demonstrations that can be used to facilitate replication, further analysis, or meta-analyses; and, a comprehensive demonstration project evaluation report, summarizing the evaluation methodology, findings, and recommendations. The evaluation report should be tailored to different stakeholders' needs and should be easily accessible and understandable. Additionally, opportunities for presenting the findings and engaging stakeholders in discussions should be provided in the report to ensure that the evaluation results are utilized for decision-making and improvement.

Research and demonstration conducted under this Notice will advance the strategic goals of the U.S. Department of Transportation, as outlined in its FY 2022-2026 Strategic Plan, and the Department's Innovation Principles, which can be found at https://www.transportation.gov/​priorities/​transformation/​us-dot-innovation-principles.

B. Federal Award Information

This Notice makes available $5,093,000 to award one competitively selected Program Lead. Funding is available under FTA's Public Transportation Innovation Program (49 U.S.C. 5312). FTA may, at its discretion, provide additional funding for multi-year selections made under this Notice from FTA's Public Transportation Innovation Program (49 U.S.C. 5312), subject to the availability of appropriated funds.

An applicant whose proposal is selected for funding as the Program Lead will receive a cooperative agreement with FTA. FTA will have substantial involvement in the administration of the cooperative agreement. FTA's role includes the right to participate in decisions to redirect and reprioritize project activities, goals, and deliverables. FTA expects to provide the Program Lead with substantive input and direction at each stage of the project. Applicants are encouraged to assemble and secure partnerships necessary to conduct the Program in accordance with the requirements outlined in this Notice.

Only proposals from eligible recipients for eligible activities will be considered for funding.

Pre-award authority is subject to FTA approval and is only available for costs incurred after the announcement of the project selection on FTA's website.

Projects under this Notice are for research efforts and, as such, FTA Circular 6100.1E, “Research, Technical Assistance and Training Program Guidance” (available at https://www.fta.dot.gov/​regulations-and-guidance/​fta-circulars/​research-technical-assistance-and-training-program), will apply in administering the program.

C. Eligibility Information

1. Eligible Applicants

Eligible applicants for the Program Lead under this Notice include the following:

Eligibility is limited to United States entities. Applicants must demonstrate experience conducting comprehensive research demonstrations, including those focused on data- and technology-oriented research and application in the infrastructure construction industry, and related areas.

To be considered eligible, an applicant must be able to demonstrate the requisite legal, financial, and technical capabilities to receive and administer Federal funds under this new program.

2. Cost Sharing or Matching

Per 49 U.S.C. 5312(g), the eligible Federal share will not exceed 80 percent of net project cost. Applicants for Program Lead must provide a minimum 20 percent non-federal cost share. Applicants may also apply with a larger non-federal cost share. The non-federal share of the net project cost may be provided in cash or in kind, and the applicant must document in its application the source of the non-federal match. Eligible sources of non-federal match are detailed in FTA Circular 6100.1E.

3. Conflicts of Interest

It is FTA's intent that the ADCMS program benefits public transportation agencies irrespective of their choice of ADCMS software. Therefore, the Program Lead and its principal staff engaged in this project cannot be a provider of, or have a financial interest in, a proprietary ADCMS software solution or vendor. Each applicant must include a statement to this effect in its application.

D. Application and Submission Information

1. Address To Request Application

Applications must be made using the Standard Form 424 (SF-424), which can be downloaded from Grants.gov.

2. Content and Form of Application Submission

a. Proposal Submission

General information for submitting applications along with specific instructions for the forms and attachments required for submission can be found at Grants.gov. A complete ( printed page 71077) proposal submission must consist of: (1) The SF-424 “Application for Federal Assistance;” (2) the Supplemental Form; and (3) a narrative proposal document in Microsoft Word, PDF, or a compatible file format that addresses the required elements contained in this Notice. The narrative proposal should be in the format outlined in the “Proposal Preparation and Content” section. A narrative proposal submission may contain additional supporting documentation as attachments. Once completed, the Supplemental Form, narrative proposal, and any supporting documents must be placed in the “Attachments” section of the SF-424 in Grants.gov to successfully complete the application process. The applicant must respond to all sections of the SF-424 Application for Federal Assistance and the Supplemental Form. The information in the application will be used to determine applicant and project eligibility for the program and to evaluate the proposal against the selection criteria described in this Notice. Applicants should carefully review the criteria noted in Section E and ensure their proposal addresses the factors listed.

Failure to submit the information as requested can delay review or disqualify the application.

1. Proposal Preparation and Content

Applicants must submit one electronic file for Proposals in a Microsoft Word, PDF, or compatible file format, double-spaced using Times New Roman, 12-point font. The proposal must contain the following components and adhere to the specified maximum lengths:

1. Cover Sheet (not to exceed 1 page): The cover sheet must include the entity submitting the proposal, principal's name, title, and contact information ( e.g., address, office and mobile phone, and email). The cover sheet must also include name and contact information for the entity's point of contact for all cooperative agreement administrative activities (if different from principal).

2. Abstract (not to exceed 2 pages): The Abstract must include background, purpose, methodology, intended outputs, outcomes, impacts, and plan for accomplishing the goals and objectives as outlined in this Notice.

3. Table of Contents (not to exceed 1 page): The Table of Contents shall list each section of the proposal (including Appendices) by title and page number.

4. Project Budget (not to exceed 5 pages): Project budgets should show how different funding sources will share in each activity and present those data in dollars and percentages. The budget should identify other Federal funds the applicant is applying for or has been awarded, if any, that the applicant intends to use. Funding sources should be grouped into three categories: non-Federal, ADCMS, and other Federal, with specific amounts from each funding source. The proposed project budget must account for multiple years and outline the total cost of all services and products, including salaries and fringe benefits, supplies, travel, equipment, and proposed contractual arrangements ( e.g., subcontracts, consultant services) and how these estimated costs are connected to the project scope.

5. Project Work Plan (not to exceed ten pages total): The proposed project work plan must include the following information:

a. Methodology—Provide a methodology for addressing the goals and objectives described above under Section A of this Notice; identify the transit agencies and construction projects proposed as demonstrations and the ADCMS products proposed to be demonstrated, and how the applicant will integrate ADCMS into the construction projects.

b. Statement of Work—Provide proposed work tasks for the project and how the proposed work tasks will be accomplished. Include the tasks for proposed activities, resources, milestones, and a timeline.

i. Staffing Plan—Describe the approach for managing the project team, including the distribution of responsibilities among project partners, and what activities each project team member will perform.

ii. Coordination with FTA—Identify the plan for coordinating the project team's activities and deliverables with the FTA's Research office, as needed and relevant.

iii. Research and Data Collection—Identify activities and the plan for electronic collection, maintenance, storage, and dissemination of data for use by the project team, stakeholders, FTA, and other customers.

iv. Communication Plan—Provide a plan for communications of project results. The plan should identify innovative communication strategies including, but not limited to the following: webinars, in-person presentations at industry events, social media ( e.g., Facebook, Twitter, YouTube), text alerts, email, website publication, and toll-free telephone numbers.

v. Performance Measures—Identify multiple performance measures that FTA should use to assess the Program's overall effectiveness in accordance with the nine stated goals of the ADCMS program.

vi. Deliverables—Provide a proposed list of proposed deliverables ( e.g., guides, plans, reports, services, etc.). Include quarterly reports, financial forms, guidance documents, and final reports to be submitted to FTA.

6. Staff Qualifications (not to exceed 5 pages total):

a. Organizational Capacity—Provide a narrative that briefly describes the structure of the proposer, including its history and experience in performing complex research activities. Include a narrative of the proposer's understanding of the activities in this solicitation and its responsibility for the demonstrations, data collection, and results dissemination called for in this Notice. Include the proposer's organization chart. The applicant must affirm that neither it nor the individual members of its principal staff (see d., below) has a financial interest or affiliation with the vendors whose ADCMS solutions it proposes to demonstrate.

b. Project Team Structure—Provide a narrative that briefly describes the structure and makeup of the project team. Eligible applicants are encouraged to identify in their proposal one or more project partners with a substantial interest and involvement in the project activities or objectives. If an application that involves such a partnership is selected for funding, the competitive selection process will be deemed to satisfy the requirement for a competitive procurement under 49 U.S.C. 5325(a) for the named entities. Applicants are advised that any changes to the proposed partnership after the award will require FTA's written approval, must be consistent with the scope of the approved project, and may require a competitive procurement process. Include the names of all partner organizations, and the legal relationship, if any, between the applicant and each proposed partner. Include the names and functional titles of each project team member. Proposers must also provide documentation of the project team, such as a memorandum of agreement or letter of intent signed by all parties that describes the parties' roles, responsibilities, commitment to the proposed project, and how the applicant will ensure they will have enough time to devote to the project. Include an organizational chart for the entire project team.

c. Technical Capacity of Project Team—Provide a detailed description of the technical capacity of the project team members and what activities each team member will perform. Include ( printed page 71078) project staff qualifications, education, knowledge, and results of prior experience related to the topic called for in this notice. Additionally, applicants should discuss the successful completion of similar or relevant projects.

d. Biographical Summary—In addition to the Staff Qualifications narrative (5 page maximum), include a biographical summary for each staff member proposed to take a principal role or perform significant work on the project.

7. Proposals shall adhere to the specified maximum page lengths. Supplemental materials such as letters of support can be included with the proposal in an appendices section that is beyond the page limit above. Supplemental materials will not be evaluated independently.

The Department may share application information within the Department or with other Federal agencies if the Department determines that sharing is relevant to the respective program's objectives.

Applications submitted in response to this NOFO become the property of FTA and may be subject to Freedom of Information Act requests. Please segregate and clearly mark any portions of the application containing confidential or privileged trade secrets or commercial or financial information.

3. Unique Entity Identifier and System for Award Management (SAM)

Each applicant is required to: (1) be registered in SAM before applying; (2) provide a valid unique entity identifier in its application; and (3) continue to always maintain an active SAM registration with current information during which the applicant has an active Federal award or an application or plan under consideration by FTA. FTA may not make an award until the applicant has complied with all applicable unique entity identifier and SAM requirements. If an applicant has yet to fully comply with the requirements by the time FTA is ready to make an award, FTA may determine that the applicant is not qualified to receive an award and use that determination as a basis for making a federal award to another applicant. These requirements do not apply if the applicant has an exception approved by FTA or the U.S. Office of Management and Budget under 2 CFR 25.110(c) or (d).

SAM registration takes approximately 3-5 business days, but FTA recommends allowing ample time, up to several weeks, to complete all steps. For additional information on obtaining a unique entity identifier, please visit https://www.sam.gov.

4. Submission Dates and Times

Project proposals must be submitted electronically through Grants.gov by 11:59 p.m. Eastern time on February 12, 2024. Proposals submitted after the deadline will only be considered under extraordinary circumstances not under the applicant's control. Mail, fax, and email submissions will not be accepted.

FTA urges applicants to submit applications at least 72 hours prior to the due date to allow time to correct any problems that may have caused either Grants.gov or FTA systems to reject the submission. Grants.gov attaches a time stamp to each application at the time of submission. Proposals submitted after the deadline will be considered only if lateness was due to extraordinary circumstances not under the applicant's control. Grants.gov scheduled maintenance and outage times are announced in advance on the Grants.gov website.

Deadlines will not be extended due to scheduled website maintenance.

Within 48 hours after submitting an electronic application, the applicant should receive an email message from Grants.gov with confirmation of successful transmission to Grants.gov. If a notice of failed validation or incomplete materials is received, the applicant must address the reason for the failed validation, as described in the email notice, and resubmit before the submission deadline. If making a resubmission for any reason, include all original attachments regardless of which attachments were updated, and check the box on the supplemental form indicating this is a resubmission.

Applicants are encouraged to begin the registration process on the Grants.gov site well in advance of the submission deadline. Registration is a multi-step process, which may take several weeks to complete before an application can be submitted. Registered applicants may still be required to take steps to keep their registration up to date before submissions can be made successfully: (1) registration in SAM is renewed annually, and (2) persons making submissions on behalf of the Authorized Organization Representative (AOR) must be authorized in Grants.gov by the AOR to make submissions.

5. Funding Restrictions

Refer to Section C.3., Eligible Projects, for information on allowable activities. Allowable direct and indirect expenses must be consistent with the Governmentwide Uniform Administrative Requirements and Cost Principles (2 CFR part 200) and FTA Circular 5010.1E.

Funds available under this Notice cannot be used to reimburse applicants for otherwise eligible expenses incurred prior to FTA issuing pre-award authority for selected projects.

E. Application Review Information

1. Evaluation Criteria

Projects will be evaluated solely on the materials provided in the Proposal document. FTA will evaluate proposals based on the following criteria:

a. Organizational Capacity and Key Personnel Experience

Applicants should note the structure of the lead organization, including its history and experience in performing complex research and software configuration and deployment activities. Applicants should include a narrative of the applicant's understanding of the activities called for in this funding opportunity and their responsibility for coordinating demonstration activities. Applicants should describe the structure and makeup of the project team to clearly demonstrate the applicant's technical abilities to meet the requirements called for in this funding opportunity.

Applicants should note key project team personnel who will be involved in the project and how the applicant will ensure they have enough time to devote to the project. Additionally, applicants should discuss successful completion of similar or relevant real-world projects—case studies, journal articles, references, etc.

Applicants or proposed partners must demonstrate technical capabilities to:

[FR Doc. 2023-22521 Filed 10-12-23; 8:45 am]

BILLING CODE 4910-57-P

Legal Citation

Federal Register Citation

Use this for formal legal and research references to the published document.

88 FR 71074

Web Citation

Suggested Web Citation

Use this when citing the archival web version of the document.

“FY 2022 and 2023 Competitive Funding Opportunity: Accelerating Advanced Digital Construction Management Systems Program,” thefederalregister.org (October 13, 2023), https://thefederalregister.org/documents/2023-22521/fy-2022-and-2023-competitive-funding-opportunity-accelerating-advanced-digital-construction-management-systems-program.