Document

Kasugamycin; Extension of Time-Limited Tolerance for Emergency Exemption

This regulation extends time-limited tolerances for residues of kasugamycin in or on almond and almond, hulls as identified in this document. This action is in response to EPA's...

Environmental Protection Agency
  1. 40 CFR Part 180
  2. [EPA-HQ-OPP-2023-0624; FRL-11517-02-OCSPP]

AGENCY:

Environmental Protection Agency (EPA).

ACTION:

Final rule.

SUMMARY:

This regulation extends time-limited tolerances for residues of kasugamycin in or on almond and almond, hulls as identified in this document. This action is in response to EPA's granting of an emergency exemption under the Federal Insecticide, Fungicide, and Rodenticide Act (FIFRA) authorizing use of this pesticide. In addition, the Federal Food, Drug, and Cosmetic Act (FFDCA) requires EPA to establish a time-limited tolerance or exemption from the requirement for a tolerance for pesticide chemical residues in food that will result from the use of a pesticide under an emergency exemption granted by EPA. Further, EPA issued a final rule in the Federal Register of November 3, 2023, that extended time-limited tolerances for multiple chemicals on various commodities in response to EPA's granting of emergency exemptions. EPA inadvertently omitted the detailed instructions for the revision of the tolerances for kasugamycin. Therefore, EPA is issuing this final rule to rectify this omission.

DATES:

This regulation is effective December 18, 2023. Objections and requests for hearings must be received on or before February 16, 2024 and must be filed in accordance with the instructions provided in 40 CFR part 178 (see also Unit I.C. of the SUPPLEMENTARY INFORMATION ).

ADDRESSES:

The docket for this action, identified by docket identification (ID) number EPA-HQ-OPP-2023-0624, is available at https://www.regulations.gov or at the Office of Pesticide Programs Regulatory Public Docket (OPP Docket) in the Environmental Protection Agency Docket Center (EPA/DC), West William Jefferson Clinton Bldg., Rm. 3334, 1301 Constitution Ave. NW, Washington, DC 20460-0001. The Public Reading Room is open from 8:30 a.m. to 4:30 p.m., Monday through Friday, excluding legal holidays. The telephone number for the Public Reading Room and the OPP Docket is (202) 566-1744. Please review the visitor instructions and additional information about the docket available at https://www.epa.gov/​dockets.

FOR FURTHER INFORMATION CONTACT:

Charles Smith, Director, Registration Division (7505T), Office of Pesticide Programs, Environmental Protection Agency, 1200 Pennsylvania Ave. NW, Washington, DC 20460-0001; main telephone number: (202) 566-1030; email address: .

SUPPLEMENTARY INFORMATION:

I. General Information

A. Does this action apply to me?

You may be potentially affected by this action if you are an agricultural producer, food manufacturer, or pesticide manufacturer. The following list of North American Industrial Classification System (NAICS) codes is not intended to be exhaustive, but rather provides a guide to help readers determine whether this document applies to them. Potentially affected entities may include:

B. How can I get electronic access to other related information?

You may access a frequently updated electronic version of 40 CFR part 180 through the Office of the Federal Register's e-CFR site at https://www.ecfr.gov/​ccurrent/​title-40.

C. How can I file an objection or hearing request?

Under FFDCA section 408(g), 21 U.S.C. 346a, any person may file an objection to any aspect of this regulation and may also request a hearing on those objections. You must file your objection or request a hearing on this regulation in accordance with the instructions provided in 40 CFR part 178. To ensure proper receipt by EPA, you must identify docket ID number EPA-HQ-OPP-2023-0624 in the subject line on the first page of your submission. All requests must be in writing and must be received by the Hearing Clerk on or before February 16, 2024. Addresses for mail and hand delivery of objections and hearing requests are provided in 40 CFR 178.25(b).

In addition to filing an objection or hearing request with the Hearing Clerk as described in 40 CFR part 178, please submit a copy of the filing (excluding any Confidential Business Information (CBI)) for inclusion in the public docket. Information not marked confidential pursuant to 40 CFR part 2 may be disclosed publicly by EPA without prior notice. Submit the non-CBI copy of your objection or hearing request, identified by docket ID number EPA-HQ-OPP-2023-0624, by one of the following methods:

Additional instructions on commenting or visiting the docket, along with more information about dockets generally, is available at https://www.epa.gov/​dockets.

II. Background and Statutory Findings

EPA issued a final rule, published in the Federal Register of October 8, 2020, (85 FR 63450) (FRL-10013-94), on its own initiative, in accordance with FFDCA sections 408(e) and 408(l)(6), 21 U.S.C. 346a(e) and 346a(1)(6), establishing time-limited tolerances for residues of kasugamycin, (3-O-[2-amino-4-[(carboxyimino-methyl)amino]-2,3,4,6-tetradeoxy-α-D-arabino-hexopyranosyl]-D-chiro-inositol), in or on almond at 0.04 parts per million (ppm); and almond, hulls at 0.4 ppm. These time-limited tolerances expire on December 31, 2023.

EPA received a request to extend the use of kasugamycin for this year's growing season. After having reviewed this submission, EPA concurs that an emergency condition continues to exist. EPA assessed the potential risks presented by residues of kasugamycin in or on the pertinent commodity. In doing so, EPA considered the safety standard in FFDCA section 408(b)(2) and decided that the necessary tolerances under FFDCA section 408(l)(6) would be consistent with the safety standard and with FIRA section 18. Further, EPA issued a final rule in the Federal Register of November 3, 2023 (88 FR 75503) (FRL-11517-01-OCSPP) that extended time-limited tolerances for multiple chemicals on various commodities in response to EPA's granting of emergency exemptions. EPA inadvertently omitted the detailed instructions for the revision of 40 CFR ( printed page 87362) 180.614 Kasugamycin; tolerances for residues. Therefore, EPA is issuing this final rule to correct this omission.

The data and other relevant material have been evaluated and were discussed in the final rule that originally established the time-limited tolerances. Based on those data and information considered, the Agency reaffirms that extension of the time-limited tolerances will continue to meet the requirements of FFDCA section 408(l)(6). Therefore, the time-limited tolerances are extended until December 31, 2026. Although these tolerances will expire and are revoked on December 31, 2026, under FFDCA section 408(l)(5), residues of the pesticide not in excess of the amounts specified in the tolerances remaining in or on the commodities after that date will not be unlawful, provided the residues are present as a result of an application or use of a pesticide at a time and manner that was lawful under FIFRA, the tolerance was in place at the time of the application, and the residues do not exceed the level that was authorized by the tolerance. EPA will take action to revoke the tolerances earlier if any experience with, scientific data on, or other relevant information on this pesticide indicate that the residues are not safe. EPA will publish a document in the Federal Register to remove the revoked tolerances from the Code of Federal Regulations (CFR). Time-limited tolerances for the use of the following pesticide chemical on a specific commodity are being extended:

Kasugamycin. Pursuant to a request by the California Department of Pesticide Regulation, EPA authorized under FIFRA section 18 the use of kasugamycin on almonds for control of bacterial blast in California. This regulation extends time-limited tolerances for residues of the pesticide kasugamycin and its metabolites and degradates in or on almond at 0.04 (ppm); and almond hulls at 0.4 ppm for an additional 3-year period. The tolerances will expire and are revoked on December 31, 2026.

III. International Residue Limits

In making its tolerance decisions, EPA seeks to harmonize U.S. tolerances with international standards whenever possible, consistent with U.S. food safety standards and agricultural practices. EPA considers the international maximum residue limits (MRLs) established by the Codex Alimentarius Commission (Codex), as required by FFDCA section 408(b)(4). The Codex Alimentarius is a joint United Nations Food and Agriculture Organization/World Health Organization food standards program, and it is recognized as an international food safety standards-setting organization in trade agreements to which the United States is a party. EPA may establish a tolerance that is different from a Codex MRL; however, FFDCA section 408(b)(4) requires that EPA explain the reasons for departing from the Codex level.

The Codex has not established a MRL for kasugamycin in or on the commodity listed in this document.

IV. Statutory and Executive Order Reviews

This action establishes tolerances under FFDCA section 408(d). The Office of Management and Budget (OMB) has exempted these types of actions from review under Executive Order 12866, entitled “Regulatory Planning and Review” (58 FR 51735, October 4, 1993). Because this action has been exempted from review under Executive Order 12866, this action is not subject to Executive Order 13211, entitled “Actions Concerning Regulations That Significantly Affect Energy Supply, Distribution, or Use” (66 FR 28355, May 22, 2001) or Executive Order 13045, entitled “Protection of Children from Environmental Health Risks and Safety Risks” (62 FR 19885, April 23, 1997). This action does not contain any information collections subject to OMB approval under the Paperwork Reduction Act (PRA) (44 U.S.C. 3501 et seq.), nor does it require any special considerations under Executive Order 12898, entitled “Federal Actions to Address Environmental Justice in Minority Populations and Low-Income Populations” (59 FR 7629, February 16, 1994).

Since tolerances and exemptions that are established in accordance with FFDCA section 408(1)(6), such as the tolerances in this final rule, do not require the issuance of a proposed rule, the requirements of the Regulatory Flexibility Act (RFA) (5 U.S.C. 601 et seq.), do not apply.

This action directly regulates growers, food processors, food handlers, and food retailers, not States or tribes, nor does this action alter the relationships or distribution of power and responsibilities established by Congress in the preemption provisions of FFDCA section 408(n)(4). As such, the Agency has determined that this action will not have a substantial direct effect on States or tribal governments, on the relationship between the national government and the States or Tribal governments, on the relationship between the National Government and the States or Tribal Governments, or on the distribution of power and responsibilities among the various levels of government or between the Federal Government and Indian tribes. Thus, the Agency has determined that Executive Order 13132, entitled “Federalism” (64 FR 43255, August 10, 1999) and Executive Order 13175, entitled “Consultation and Coordination with Indian Tribal Governments” (65 FR 67249, November 9, 2000) do not apply to this action. In addition, this action does not impose any enforceable duty or contain any unfunded mandate as described under Title II of the Unfunded Mandates Reform Act (UMRA) (2 U.S.C. 1501 et seq.).

This action does not involve any technical standards that would require Agency consideration of voluntary consensus standards pursuant to section 12(d) of the National Technology Transfer and Advancement Act (NTTAA) (15 U.S.C. 272 note).

V. Congressional Review Act

Pursuant to the Congressional Review Act (5 U.S.C. 801 et seq.), EPA will submit a report containing this rule and other required information to the U.S. Senate, the U.S. House of Representatives, and the Comptroller General of the United States prior to publication of the rule in the Federal Register . This action is not a “major rule” as defined by 5 U.S.C. 804(2).

List of Subjects in 40 CFR Part 180

  • Environmental protection
  • Administrative practice and procedure
  • Agricultural commodities
  • Pesticides and pests
  • Reporting and recordkeeping requirements

Dated: December 11, 2023.

Charles Smith,

Director, Registration Division, Office of Pesticide Programs.

Therefore, for the reasons stated in the preamble, EPA is amending 40 CFR chapter I as follows:

PART 180—TOLERANCES AND EXEMPTIONS FOR PESTICIDE CHEMICAL RESIDUES IN FOOD

1. The authority citation for part 180 continues to read as follows:

Authority: 21 U.S.C. 321(q), 346a and 371.

2. Amend § 180.614 in paragraph (b) by designating and revising the table to read as follows:

Kasugamycin; tolerances for residues.
* * * * *

(b) * * * ( printed page 87363)

Table 2 to Paragraph ( b )

Commodity Parts per million Expiration/ revocation date
Almond 0.04 12/31/26
Almond, hulls 0.4 12/31/26
* * * * *

[FR Doc. 2023-27654 Filed 12-15-23; 8:45 am]

BILLING CODE 6560-50-P

Legal Citation

Federal Register Citation

Use this for formal legal and research references to the published document.

88 FR 87361

Web Citation

Suggested Web Citation

Use this when citing the archival web version of the document.

“Kasugamycin; Extension of Time-Limited Tolerance for Emergency Exemption,” thefederalregister.org (December 18, 2023), https://thefederalregister.org/documents/2023-27654/kasugamycin-extension-of-time-limited-tolerance-for-emergency-exemption.