Department of Transportation
Federal Railroad Administration
- [Docket Number FRA-2010-0030]
AGENCY:
Federal Railroad Administration (FRA), Department of Transportation (DOT).
ACTION:
Notice of availability and request for comments.
SUMMARY:
This document provides the public with notice that, on March 15, 2024, the Massachusetts Bay Transportation Authority (MBTA) submitted a request for amendment (RFA) to its FRA-certified positive train control (PTC) system to install Automatic Train Control (ATC) on the final segment of MBTA's Needham Line. The construction zone will cover ATC implementation from the Need Interlocking at Milepost (MP) 11.9 to Control Point (CP) Land at MP 13.8, and is planned to occur from June 20, 2024, to July 22, 2024. FRA is publishing this notice and inviting public comment on MBTA's RFA to its PTC system.
DATES:
FRA will consider comments received by April 15, 2024. FRA may consider comments received after that date to the extent practicable and without delaying implementation of valuable or necessary modifications to a PTC system.
ADDRESSES:
Comments: Comments may be submitted by going to https://www.regulations.gov and following the online instructions for submitting comments.
Instructions: All submissions must include the agency name and the applicable docket number. The relevant PTC docket number for this host railroad is Docket No. FRA-2010-0030. For convenience, all active PTC dockets are hyperlinked on FRA's website at https://railroads.dot.gov/research-development/program-areas/train-control/ptc/railroads-ptc-dockets. All comments received will be posted without change to https://www.regulations.gov; this includes any personal information.
FOR FURTHER INFORMATION CONTACT:
Gabe Neal, Staff Director, Signal, Train Control, and Crossings Division, telephone: 816-516-7168, email: Gabe.Neal@dot.gov.