| Eni U.S. Operating Company Inc |
Oil and gas drilling and production within the Nikaitchuq and Oooguruk Units on Alaska's North Slope |
23-01. |
| ASRC Consulting and Environmental Services |
Well drilling and production test facility construction and operation for a methane hydrate project on the Kuparuk State 7-11-12 gravel pad within the Prudhoe Bay Unit on the North Slope of Alaska |
23-02. |
| Alyeska Pipeline Service Company |
Operation and maintenance of the Trans Alaska Pipeline System, which extends from Pump Station 1 in the Prudhoe Bay Oilfield to the Valdez Marine Terminal |
23-03. |
| Oil Search Alaska, LLC |
Oil and gas exploration and development within and adjacent to the Pikka Unit area and oil and gas exploration on Oil Search Alaska operated leaseholds on Alaska's North Slope |
23-04. |
| Hilcorp Alaska, LLC |
Year-round oil and gas exploration, production, development, and support activities in the Milne Point, Duck Island (Endicott), Northstar Island, Prudhoe Bay, and Point Thomson operation areas located in the Beaufort Sea incidental take regulations area of the North Slope of Alaska |
23-05. |
| Hilcorp Alaska, LLC |
An amendment request dated November 2, 2023, for 23-INC-05 to include three additional pad expansions, two additional road expansions, repair of the Northstar bench, and construction and use of an ice road from Niakuk to Endicott's main drilling island in the Mine Point, Duck Island (Endicott), and Northstar Island operational areas. Original LOA (23-INC-05) for year-round oil and gas exploration, production, development, and support activities in the Milne Point, Duck Island (Endicott), Northstar Island, Prudhoe Bay, and Point Thomson operation areas located in the Beaufort Sea incidental take regulations area of the North Slope of Alaska |
23-05 [Amended in Dec. 2023 from July 2023]. |
| Hilcorp Alaska, LLC |
A letter from the Service dated December 19, 2023, outlining additional monitoring and mitigation measures to reduce disturbance of a putative den identified through aerial infrared surveys and located within the 1-mile buffer zone of operations and infrastructure |
23-05 [Amended in Dec. 2023 from July 2023]. |
| Conoco Philips Alaska Inc |
Incidental take of polar bears during oil and gas activities associated with the Willow Development (Project) work in 2023-2024. Represents an extension of Willow LOA 22-INC-10, which expires August 6, 2023 |
23-06. |
| Conoco Philips Alaska Inc |
Renewal request of 22-INC-09: Incidental take of polar bears and Pacific walrus that may occur during ConocoPhillips Alaska Inc.'s field-wide operations in the Kuparuk River, Western North Slope, Colville River, Greater Moose's Tooth, and Bear Tooth Units on the North Slope of Alaska |
23-07. |
| Glacier Oil and Gas |
Incidental harassment of polar bears and Pacific walrus that may occur during Glacier Oil and Gas Corporation's oil production, facilities and pipeline maintenance, workovers of existing wells, and construction and maintenance of ice roads associated with the Badami oilfield near Mikkelsen Bay in the North Slope |
23-08. |
| Conoco Philips Alaska Inc |
Incidental take of polar bears that may occur during CPAI's Ptarmigan Seismic Survey in the Greater Mooses Tooth, Bear Tooth, and non-unitized land on the North Slope of Alaska |
23-09. |
| ASRC Consulting and Environmental Services |
Incidental take of polar bears associated with Lagniappe drilling program activities, including ice road and ice pad construction, ice road transportation, well drilling, and aircraft-supported cleanup for an oil and gas exploration well drilling project. Drilling located south of the Badami Unit |
23-10. |
| Oil Search Alaska, LLC |
Amendment submitted on Jan. 18, 2023, to LOA 22-INC-04. Amendment pertains to the incidental take of polar bears that may occur during activities associated with oil and gas exploration and development within and adjacent to the Pikka Unit area and oil and gas exploration on OSA-operated leaseholds on Alaska's North Slope. Amendment allows for additional tundra travel to survey a pipeline route between Oliktok Point and the Kuparuk area and the construction of a 10-acre gravel pad alongside the NDA gravel road |
22-04 [Amended in 2023 from 2022]. |