Document

Pipeline Safety: Project-Specific Waiver of the Build America, Buy America Act Requirements for Certain Products Used by Philadelphia Gas Works Under the Natural Gas Distribution Infrastructure Safety and Modernization Grant Program

The Pipeline and Hazardous Materials Safety Administration (PHMSA) is waiving the Build America, Buy America (BABA) Act's domestic preference requirements for certain products t...

Department of Transportation
Pipeline and Hazardous Materials Safety Administration
  1. [Docket No. PHMSA-2024-0152]

AGENCY:

Pipeline and Hazardous Materials Safety Administration (PHMSA), Department of Transportation (DOT).

ACTION:

Notice.

SUMMARY:

The Pipeline and Hazardous Materials Safety Administration (PHMSA) is waiving the Build America, Buy America (BABA) Act's domestic preference requirements for certain products that Philadelphia Gas Works (PGW) needs for its Natural Gas Distribution Infrastructure Safety and Modernization (NGDISM) grant project due to lack of availability, unreasonable cost, or public good. The waiver would exempt the following products used in PGW's project from BABA requirements on the basis of nonavailability: electro-fusion tapping tees, anodeless risers, transition fittings, lockwing valves, magnesium anodes, service adapters, curb valves, caps, couplings, and stiffeners.

DATES:

The effective date of the waiver is January 22, 2025.

FOR FURTHER INFORMATION CONTACT:

For questions about this notice, please contact Mr. Louis Cardenas, Office of Pipeline Safety, by phone at 832-208-0132 or by email at .

SUPPLEMENTARY INFORMATION:

Electronic Access and Filing

A copy of this notice and all background material may be viewed online at https://www.regulations.gov using the docket number listed above. Electronic retrieval help and guidelines are also available at https://www.regulations.gov. An electronic copy of this document also may be downloaded from the Office of the Federal Register's website at www.FederalRegister.gov or the Government Publishing Office's website at www.GovInfo.gov.

Background

The NGDISM grant program was authorized by the Infrastructure Investment and Jobs Act (“IIJA”) (Pub. L. 117-58). The program provides federal funding to municipal- or community-owned natural gas utilities (not including for-profit entities) to repair, rehabilitate, or replace their natural gas distribution pipeline systems or portions thereof, or to acquire equipment to (1) reduce incidents and fatalities, and (2) avoid economic losses. The IIJA appropriates $200 million per year for each of Fiscal Years (“FY”) 2022 through 2026 for the NGDISM grant program ($1 billion in total). The IIJA provides that two percent of this amount shall be used to pay the administrative expenses of the NGDISM grant program. Accordingly, the total amount expected to be awarded as grant funding over the five-year period is $980,000,000.

Congress also enacted the BABA Act, providing that “none of the funds made available for a Federal financial assistance program for infrastructure . . . may be obligated for a project unless all of the iron, steel, manufactured products, and construction materials used in the project are produced in the United States.” IIJA, Public Law 117-58, sec. 70914(a). Under IIJA section 70914(b), PHMSA has authority to waive the requirements of BABA (1) if a domestic product is unavailable; (2) if using a domestic product would present an unreasonable cost; or (3) if application of BABA would not be in the public interest.

Across three fiscal years (FY2022, FY2023, and FY2024) PGW has been awarded $125 million in NGDISM grant funding to help fund the replacement of “at-risk” natural gas cast iron pipe within the city of Philadelphia as part ( printed page 7244) of its “Citywide Neighborhood Safety and Modernization” project. Of the $125 million awarded for this project the materials covered by the waiver only represent an estimated 0.11% or $140,201. The project, which will be located entirely within Philadelphia's historically disadvantaged neighborhoods, will replace approximately 67 miles of aging cast iron, ductile iron, and unprotected steel pipelines with modern polyethylene plastic pipe that is less susceptible to breakage due to earth movement—the biggest threat to PGW's existing cast iron pipelines, especially during the winter months.

Proposed Waiver and Request for Comments

On September 27, 2024, PHMSA published a Notice of Proposed Project-Specific Waiver of the BABA Act Requirements for Certain Products Used by Philadelphia Gas Works and Request for Comment (89 FR 79360) for certain products on the basis of nonavailability. The specific essential products PGW sought a waiver for are listed below:

To conduct market research, PGW initially engaged with its normal suppliers of gas distribution pipeline parts. Eight of PGW's normal suppliers indicated that they could provide BABA-compliant products but were not willing to certify to BABA compliance. One of PGW's alternate suppliers indicated it could provide BABA-compliant caps, couplings, and stiffeners, albeit at an increased cost and a long lead time, causing an estimated 36-week delay in PGW's construction schedule that is untenable for this project. PGW also reached out to neighboring gas utilities to inquire about their sources but was likewise unable to locate a domestic source.

On April 10, 2024, in an effort to locate additional alternative suppliers, PGW issued a Request for Quotation (“RFQ”) titled “One Time Purchase of BABA Compliant Alternatives.” The RFQ was publicly posted to PGW's Procureware website, and was open from April 10, 2024, until April 29, 2024. PGW invited 80 suppliers and manufacturers to submit bids. As a result of the RFQ, PGW identified BABA-compliant alternatives for eight products for which PGW was not previously able to find domestic sources. However, PGW still was not able to find suitable or readily available alternatives for the 10 products proposed to be waived herein.

Discussion of Public Comments

PHMSA has reviewed the single supportive comment received in the initial 15-day comment period during our consideration of the proposed waiver, as required by section 70914(c)(2) of the IIJA. The public comment regarding the PGW project specific NGDISM waiver was received by October 15, 2024. The commenter noted the potential need for the same products and that the commentor “fully support[s] the granting of this waiver to Philadelphia Gas Works.”

Summary of Changes in the Proposed Waiver

There are no changes to the proposed Waiver. As there was a single public comment in support of this waiver, there are no public comments that require changes in the proposed waiver.

Final Waiver

Based on its review of the waiver request, and in consideration of the supportive comment received on the proposed waiver, PHMSA is waiving the requirements of BABA for the above listed products for PGW's “Citywide Neighborhood Safety and Modernization” project funded by NGDISM grant funds. The waiver is applicable only to PGW's project; it is not applicable to any other NGDISM grant recipient's projects. The waiver is effective from the date of the final waiver through the period of performance and closeout of PHMSA's financial assistance for the project, which is estimated to be June 30, 2029.

Issued in Washington, DC, under authority delegated in 49 CFR 1.97.

Tristan H. Brown,

Deputy Administrator.

[FR Doc. 2025-01365 Filed 1-17-25; 8:45 am]

BILLING CODE 4910-60-P

Legal Citation

Federal Register Citation

Use this for formal legal and research references to the published document.

90 FR 7243

Web Citation

Suggested Web Citation

Use this when citing the archival web version of the document.

“Pipeline Safety: Project-Specific Waiver of the Build America, Buy America Act Requirements for Certain Products Used by Philadelphia Gas Works Under the Natural Gas Distribution Infrastructure Safety and Modernization Grant Program,” thefederalregister.org (January 21, 2025), https://thefederalregister.org/documents/2025-01365/pipeline-safety-project-specific-waiver-of-the-build-america-buy-america-act-requirements-for-certain-products-used-by-p.