Department of Defense
Department of the Navy
AGENCY:
Department of the Navy (DoN), Department of Defense (DoD).
ACTION:
Notice.
SUMMARY:
Pursuant to the National Environmental Policy Act (NEPA), the U.S. Department of the Navy (DoN), as the lead agency, has prepared and filed with the U.S. Environmental Protection Agency (EPA) a Draft Environmental Impact Statement (DEIS) which evaluates the potential environmental impacts of constructing and operating a new multi-mission dry dock (M2D2) and associated waterfront infrastructure improvements at Puget Sound Naval Shipyard and Intermediate Maintenance Facility (PSNS & IMF) on Naval Base Kitsap-Bremerton. The Proposed Action also includes dredging to create adequate water depth at wharves and piers and as required for construction of new structures. Some existing upland shipyard functions affected by construction at PSNS & IMF would be moved to Naval Base Kitsap-Bangor. The U.S. Army Corps of Engineers, Seattle District and the EPA, Region 10 are cooperating agencies with the DoN in the preparation of the EIS. The DoN also worked closely with the Suquamish Indian Tribe of the Port Madison Reservation, Skokomish Indian Tribe, Port Gamble S'Klallam Tribe, Jamestown S'Klallam Tribe, and Lower Elwha Tribal Community to develop the DEIS. The DoN published a Notice of Intent to prepare an EIS in the Federal Register on June 8, 2022 (Volume 87, number 110) that initiated a 30-day scoping period ending on July 11, 2022. The Notice of Intent discussed several projects that are no longer part of the Proposed Action. Three potential future actions—Pier 5 demolition, Pier 6 replacement, and Dry Dock 6 (DD6) seismic upgrades—are not currently funded or programmed for implementation, and a future construction schedule has not yet been determined. If the DoN decides to proceed with these potential projects at a later date, the DoN will analyze potential environmental impacts in accordance with NEPA requirements and Navy implementation policies.
DATES:
With the filing of the DEIS, the DoN is initiating a 45-day public review and comment period on the DEIS beginning on July 18, 2025 and ending on September 3, 2025. The public can submit comments during the DEIS public review and comment period, during the in-person public meeting, online at the project website, by email, or by U.S. mail. All comments must be postmarked or submitted electronically by 11:59 p.m. Pacific Time on September 3, 2025 to be considered in the development of the Final EIS. Concurrently, the Navy is conducting a Section 106 process under the National Historic Preservation Act, or NHPA that requires federal agencies to consider the effects projects may have on historic properties. The public can submit written comments for the Section 106 process during this public review and comment period.
One public meeting will be held in the form of an open house session to allow interested individuals to review information presented in the DEIS. DoN representatives will be available during the open house session to provide information and answer questions about the Proposed Action and environmental analysis. There will not be a formal presentation. The public meeting is scheduled for the following date, time and location:
1. Thursday, August 7, 2025, from 5:00 p.m. to 8:00 p.m. Pacific Time at the Marvin Williams Recreation Center; 725 Park Avenue, Bremerton, WA 98337.
ADDRESSES:
The DoN invites all interested parties to submit comments on the Bremerton Waterfront Infrastructure Improvements DEIS during the public review and comment period ending on September 3, 2025. Comments may be received:
- at the in-person public meeting;
- electronically through the project website:BremertonWaterfrontImprovementsEIS.com;
- electronically through email:info@BremertonWaterfrontImprovementsEIS.com; or
- by mail to Naval Facilities Engineering Systems Command Northwest; Attention: EIS Project Manager, 1101 Tautog Circle, Room 210, Silverdale, Washington 98315.
FOR FURTHER INFORMATION CONTACT:
Navy Region Northwest, 1100 Ramirez de Arellano Road, Room 213, Silverdale, WA 98315, Attention: Ms. Julianne Leinenveber, Public Affairs Specialist, 360-867-8525, julianne.e.leinenveber.civ@us.navy.mil, or visit the project website at https:// ( printed page 33931) BremertonWaterfrontimprovementseis.com .