Document

Certification Notice-264; Notice of Filing of Self-Certification of Coal Capability Under the Powerplant and Industrial Fuel Use Act

On August 26, 2025, CPV Basin Ranch, LLC (CPV Basin Ranch), as owner and operator of the CPV Basin Ranch Energy Center, a new baseload electric generating powerplant, submitted ...

Department of Energy
  1. [Certification Notice—264]

AGENCY:

Office of Electricity, Department of Energy.

ACTION:

Notice of filing.

SUMMARY:

On August 26, 2025, CPV Basin Ranch, LLC (CPV Basin Ranch), as owner and operator of the CPV Basin Ranch Energy Center, a new baseload electric generating powerplant, ( printed page 11537) submitted a coal capability self-certification to the Department of Energy (DOE). The Powerplant and Industrial Fuel Use Act of 1978 (FUA), as amended, and regulations thereunder require DOE to publish a notice of filing of self-certification in the Federal Register .

ADDRESSES:

Copies of coal capability self-certification filings are available for public inspection, upon request, by contacting the Office of Electricity by electronic mail to .

FOR FURTHER INFORMATION CONTACT:

Marina Fennel at (240) 702-6156, .

SUPPLEMENTARY INFORMATION:

On August 26, 2025, CPV Basin Ranch, as owner and operator of a new baseload electric generating powerplant, submitted a coal capability self-certification to the DOE pursuant to § 201(d) of the Powerplant and Industrial Fuel Use Act of 1978 (FUA), as amended (42 U.S.C. 8311(d)), and DOE regulations in 10 CFR 501.61(a). The FUA and regulations thereunder require DOE to publish a notice of filing of self-certification in the Federal Register . See42 U.S.C. 8311(d)(1); 10 CFR 501.61(c). Section 201(a) of the FUA provides that “no new base load electric powerplant may be constructed or operated without the capability to use coal or another alternate fuel as a primary energy source.” 42 U.S.C. 8311(a). Pursuant to section 201(d) of the FUA, in order to meet the requirement of coal capability, the owner or operator of such a facility proposing to use natural gas or petroleum as its primary energy source shall certify to the Secretary of Energy (Secretary) prior to construction, or prior to operation as a base load electric powerplant, that such powerplant has the capability to use coal or another alternate fuel. See42 U.S.C. 8311(d)(1). Such certification establishes compliance with FUA section 201(a) as of the date it is filed with the Secretary. Id.;10 CFR 501.61(b). The following owner of a proposed new baseload electric generating powerplant has filed a self-certification of coal-capability with DOE pursuant to FUA section 201(d) and in accordance with DOE regulations at 10 CFR 501.61:

Owner: CPV Basin Ranch, LLC

Design Capacity: Seasonal average capacity of 1,350 megawatts

Fuel To Be Used: Natural gas

Plant Location: 535 Private Road 177, Pecos, TX 79772

In-Service Date: December 2028

Signing Authority

This document of the Department of Energy was signed on February 6. 2026, by Catherine Jereza, Assistant Secretary, Office of Electricity, pursuant to delegated authority from the Secretary of Energy. That document with the original signature and date is maintained by DOE. For administrative purposes only, and in compliance with requirements of the Office of the Federal Register, the undersigned DOE Federal Register Liaison Officer has been authorized to sign and submit the document in electronic format for publication, as an official document of the Department of Energy. This administrative process in no way alters the legal effect of this document upon publication in the Federal Register .

Signed in Washington, DC on March 6, 2026.

Treena V. Garrett,

Federal Register Liaison Officer, U.S. Department of Energy.

[FR Doc. 2026-04642 Filed 3-9-26; 8:45 am]

BILLING CODE 6450-01-P

Legal Citation

Federal Register Citation

Use this for formal legal and research references to the published document.

91 FR 11536

Web Citation

Suggested Web Citation

Use this when citing the archival web version of the document.

“Certification Notice-264; Notice of Filing of Self-Certification of Coal Capability Under the Powerplant and Industrial Fuel Use Act,” thefederalregister.org (March 10, 2026), https://thefederalregister.org/documents/2026-04642/certification-notice-264-notice-of-filing-of-self-certification-of-coal-capability-under-the-powerplant-and-industrial-f.