Secesh United, LLC; Notice of Application for Conduit Exemption Amendment Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests

Department of Energy Federal Energy Regulatory Commission [Project No. 10939-003] Take notice that the following hydroelectric application has been filed with the Commission and...

Department of Energy
Federal Energy Regulatory Commission
  1. [Project No. 10939-003]

Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection:

a. Application Type: Amendment of Conduit Exemption.

b. Project No.: 10939-003.

c. Date filed: April 14, 2025 and supplemented on March 10, 2026.

d. Applicant: Secesh United, LLC.

e. Name of Project: Zena Creek Ranch Hydroelectric Project.

f. Location: The project is located on an existing diversion of water from Zena Creek in Valley County, Idaho.

g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.

h. Applicant Contact: James B. Adkins, P.O. Box 16, Yellowpine, ID 83677, phone (208) 382-4336.

i. FERC Contact: Selina Sumi, (202) 502-6892 or .

j. Cooperating agencies: With this notice, the Commission is inviting federal, state, local, and Tribal agencies with jurisdiction and/or special expertise with respect to environmental issues affected by the proposal, that wish to cooperate in the preparation of any environmental document, if applicable, to follow the instructions for filing such requests described in item k below. Cooperating agencies should note the Commission's policy that agencies that cooperate in the preparation of any environmental document cannot also intervene. See 94 FERC ¶ 61,076 (2001).

k. Deadline for filing responsive documents: Due to the small size of the proposed project, as well as the resource agency consultation letters filed as supplements to the application, the 60-day timeframe specified in 18 CFR 4.34(b) for filing all comments, motions to intervene, protests, recommendations, terms and conditions, and prescriptions is shortened to 30 days from the issuance date of this notice. All reply comments must be filed with the Commission within 45 days from the issuance date of this notice. Deadline for filing comments, motions to intervene, and protests: June 15, 2026 5:00 p.m. Eastern Time.

The Commission strongly encourages electronic filing. Please file comments, motions to intervene, and protests using the Commission's eFiling system at http://www.ferc.gov/​docs-filing/​efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at http://www.ferc.gov/​doc-sfiling/​ecomment.asp. For assistance, please contact FERC Online Support at , (866) 208-3676 (toll free), or (202) 502-8659 (TTY). In lieu of electronic filing, you may submit a paper copy. Submissions sent via the U.S. Postal Service must be addressed to: Debbie-Anne A. Reese, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent via any other carrier must be addressed to: Debbie-Anne A. Reese, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, MD 20852. The first page of any filing should include the docket number P-10939-003. Comments emailed to Commission staff are not considered part of the Commission record.

The Commission's Rules of Practice and Procedure require all intervenors filing documents with the Commission to serve a copy of that document on each person whose name appears on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency.

l. Description of Request: The exemptee proposes to replace the existing penstock and upgrade the generating unit. The following modifications to the project are proposed: (1) a connection to a 6-inch diameter water supply pipeline; (2) a new 6-foot wide, 12-foot long powerhouse constructed adjacent to the old powerhouse and containing two Scott Hydro Turbines rated at 1,500 watts each and producing an average annual output of 2 megawatt-hours; and (3) a tailrace connecting to the existing tailrace and a pipeline for irrigation use. The proposed changes are due to the exemptee modernizing their irrigation ( printed page 29123) system, which is outside the Commission's jurisdiction.

m. Locations of the Application: This filing may be viewed on the Commission's website at http://www.ferc.gov using the “eLibrary” link. Enter the docket number excluding the last three digits in the docket number field to access the document. You may also register online at http://www.ferc.gov/​docs-filing/​esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call 1-866-208-3676 or email , for TTY, call (202) 502-8659. Agencies may obtain copies of the application directly from the applicant.

n. Individuals desiring to be included on the Commission's mailing list should so indicate by writing to the Secretary of the Commission.

o. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, and .214, respectively. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission's Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application.

p. Filing and Service of Documents: Any filing must (1) bear in all capital letters the title “COMMENTS”, “PROTEST”, or “MOTION TO INTERVENE” as applicable; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; and (3) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, motions to intervene, or protests must set forth their evidentiary basis. Any filing made by an intervenor must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.

q. For public inquiries and assistance with making filings such as interventions, comments, or requests for rehearing, contact the Office of Public Participation at (202) 502-6595 or .

(Authority: 18 CFR 2.1)

Dated: May 14, 2026.

Carlos D. Clay,

Deputy Secretary.

[FR Doc. 2026-09996 Filed 5-18-26; 8:45 am]

BILLING CODE 6717-01-P

Legal Citation

Federal Register Citation

Use this for formal legal and research references to the published document.

91 FR 29122

Web Citation

Suggested Web Citation

Use this when citing the archival web version of the document.

“Secesh United, LLC; Notice of Application for Conduit Exemption Amendment Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests,” thefederalregister.org (May 19, 2026), https://thefederalregister.org/documents/2026-09996/secesh-united-llc-notice-of-application-for-conduit-exemption-amendment-accepted-for-filing-soliciting-comments-motions-.