Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations
Pursuant to section 189a.(2) of the Atomic Energy Act of 1954, as amended (the Act), the U.S. Nuclear Regulatory Commission (NRC) is publishing this regular biweekly notice. The...
Pursuant to section 189a.(2) of the Atomic Energy Act of 1954, as amended (the Act), the U.S. Nuclear Regulatory Commission (NRC) is publishing this regular biweekly notice. The Act requires the Commission to publish notice of any amendments
( printed page 45834)
issued, or proposed to be issued, and grants the Commission the authority to issue and make immediately effective any amendment to an operating license or combined license, as applicable, upon a determination by the Commission that such amendment involves no significant hazards consideration (NSHC), notwithstanding the pendency before the Commission of a request for a hearing from any person.
DATES:
Comments must be filed by August 20, 2026. A request for a hearing or petitions for leave to intervene must be filed by September 21, 2026. This biweekly notice includes all amendments issued, or proposed to be issued, from June 23, 2026, to July 6, 2026. The last biweekly notice was published on July 7, 2026.
ADDRESSES:
You may submit comments by any of the following methods (unless this document describes a different method for submitting comments on a specific subject); however, the NRC encourages electronic comment submission through the Federal rulemaking website.
Federal rulemaking website:
Go to
https://www.regulations.gov
and search for Docket ID NRC-2026-3433. Address questions about Docket IDs in
Regulations.gov
to Bridget Curran; telephone: 301-415-1003; email:
Bridget.Curran@nrc.gov.
For technical questions, contact the individual(s) listed in the
For Further Information Contact
section of this document.
Mail comments to:
Office of Nuclear Material Safety and Safeguards, Mail Stop: TWFN-5-A85, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, ATTN: Program Management, Announcements and Editing Staff.
For additional direction on obtaining information and submitting comments, see “Obtaining Information and Submitting Comments” in the
SUPPLEMENTARY INFORMATION
section of this document.
FOR FURTHER INFORMATION CONTACT:
Susan Lent, Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; telephone: 301-415-1365; email:
Susan.Lent@nrc.gov.
SUPPLEMENTARY INFORMATION:
I. Obtaining Information and Submitting Comments
A. Obtaining Information
Please refer to Docket ID NRC-2026-3433, facility name, unit number(s), docket number(s), application date, and subject when contacting the NRC about the availability of information for this action. You may obtain publicly available information related to this action by any of the following methods:
NRC's Agencywide Documents Access and Management System (ADAMS):
You may obtain publicly available documents online in the ADAMS Public Documents collection at
https://www.nrc.gov/reading-rm/adams.html.
To begin the search, select “Begin ADAMS Public Search.” For problems with ADAMS, please contact the NRC's Public Document Room (PDR) reference staff at 1-800-397-4209, at 301-415-4737, or by email to
PDR.Resource@nrc.gov.
For the convenience of the reader, instructions about obtaining materials referenced in this document are provided in the “Availability of Documents” section.
NRC's PDR:
The PDR, where you may examine and order copies of publicly available documents, is open by appointment. To make an appointment to visit the PDR, please send an email to
PDR.Resource@nrc.gov
or call 1-800-397-4209 or 301-415-4737, between 8 a.m. and 4 p.m. eastern time (ET), Monday through Friday, except Federal holidays.
B. Submitting Comments
The NRC encourages electronic comment submission through the Federal rulemaking website (
https://www.regulations.gov). Please include Docket ID NRC-2026-3433, facility name, unit number(s), docket number(s), application date, and subject, in your comment submission.
The NRC cautions you not to include identifying or contact information that you do not want to be publicly disclosed in your comment submission. The NRC will post all comment submissions at
https://www.regulations.gov
as well as enter the comment submissions into ADAMS. The NRC does not routinely edit comment submissions to remove identifying or contact information.
If you are requesting or aggregating comments from other persons for submission to the NRC, then you should inform those persons not to include identifying or contact information that they do not want to be publicly disclosed in their comment submission. Your request should state that the NRC does not routinely edit comment submissions to remove such information before making the comment submissions available to the public or entering the comment into ADAMS.
II. Notice of Consideration of Issuance of Amendments to Facility Operating Licenses and Combined Licenses and Proposed No Significant Hazards Consideration Determination
For the facility-specific amendment requests shown in this notice, the Commission finds that the licensees' analyses provided, consistent with section 50.91 of title 10 of
the Code of Federal Regulations
(10 CFR) “Notice for public comment; State consultation,” are sufficient to support the proposed determinations that these amendment requests involve NSHC. Under the Commission's regulations in 10 CFR 50.92, operation of the facilities in accordance with the proposed amendments would not (1) involve a significant increase in the probability or consequences of an accident previously evaluated; or (2) create the possibility of a new or different kind of accident from any accident previously evaluated; or (3) involve a significant reduction in a margin of safety.
The Commission is seeking public comments on these proposed determinations. Any comments received within 30 days after the date of publication of this notice will be considered in making any final determinations.
Normally, the Commission will not issue the amendments until the expiration of 60 days after the date of publication of this notice. The Commission may issue any of these license amendments before expiration of the 60-day period provided that its final determination is that the amendment involves NSHC. In addition, the Commission may issue any of these amendments prior to the expiration of the 30-day comment period if circumstances change during the 30-day comment period such that failure to act in a timely way would result, for example in derating or shutdown of the facility. If the Commission takes action on any of these amendments prior to the expiration of either the comment period or the notice period, it will publish in the
Federal Register
a notice of issuance. If the Commission makes a final NSHC determination for any of these amendments, any hearing will take place after issuance. The Commission expects that the need to take action on any amendment before 60 days have elapsed will occur very infrequently.
A. Opportunity To Request a Hearing and Petition for Leave To Intervene
Within 60 days after the date of publication of this notice, any person (petitioner) whose interest may be
( printed page 45835)
affected by any of these actions may file a request for a hearing and petition for leave to intervene (petition) with respect to that action. Petitions shall be filed in accordance with the Commission's “Agency Rules of Practice and Procedure” in 10 CFR part 2. Interested persons should consult 10 CFR 2.309. If a petition is filed, the Commission or a presiding officer will rule on the petition and, if appropriate, a notice of a hearing will be issued.
Petitions must be filed no later than 60 days from the date of publication of this notice in accordance with the filing instructions in the “Electronic Submissions (E-Filing)” section of this document. Petitions and motions for leave to file new or amended contentions that are filed after the deadline will not be entertained absent a determination by the presiding officer that the filing demonstrates good cause by satisfying the three factors in 10 CFR 2.309(c)(1)(i) through (iii).
If a hearing is requested, and the Commission has not made a final determination on the issue of no significant hazards consideration, the Commission will make a final determination on the issue of no significant hazards consideration, which will serve to establish when the hearing is held. If the final determination is that the license amendment request involves no significant hazards consideration, the Commission may issue the amendment and make it immediately effective, notwithstanding the request for a hearing. Any hearing would take place after issuance of the amendment. If the final determination is that the license amendment request involves a significant hazards consideration, then any hearing held would take place before the issuance of the amendment unless the Commission finds an imminent danger to the health or safety of the public, in which case it will issue an appropriate order or rule under 10 CFR part 2.
A State, local governmental body, Federally recognized Indian Tribe, or designated agency thereof, may submit a petition to the Commission to participate as a party under 10 CFR 2.309(h) no later than 60 days from the date of publication of this notice. Alternatively, a State, local governmental body, Federally recognized Indian Tribe, or designated agency thereof, may participate as a non-party under 10 CFR 2.315(c).
All documents filed in NRC adjudicatory proceedings, including documents filed by an interested State, local governmental body, Federally recognized Indian Tribe, or designated agency thereof that requests to participate under 10 CFR 2.315(c), must be filed in accordance with 10 CFR 2.302. The E-Filing process requires participants to submit and serve all adjudicatory documents over the internet, or in some cases, to mail copies on electronic storage media, unless an exemption permitting an alternative filing method, as further discussed, is granted. Detailed guidance on electronic submissions is located in the “Guidance for Electronic Submissions to the NRC” (ADAMS Accession No. ML13031A056), and on the NRC's public website (
https://www.nrc.gov/site-help/e-submittals.html).
To comply with the procedural requirements of E-Filing, at least 10 days prior to the filing deadline, the participant should contact the Office of the Secretary by email at
Hearing.Docket@nrc.gov,
or by telephone at 301-415-1677, to: (1) request a digital identification (ID) certificate which allows the participant (or their counsel or representative) to digitally sign submissions and access the E-Filing system for any proceeding in which it is participating; and (2) advise the Secretary that the participant will be submitting a petition or other adjudicatory document (even in instances in which the participant, or their counsel or representative, already holds an NRC-issued digital ID certificate). Based upon this information, the Secretary will establish an electronic docket for the proceeding if the Secretary has not already established an electronic docket.
Information about applying for a digital ID certificate is available on the NRC's public website (
https://www.nrc.gov/site-help/e-submittals/getting-started.html). After a digital ID certificate is obtained and a docket is created, the participant must submit adjudicatory documents in the Portable Document Format. Guidance on submissions is available on the NRC's public website (
https://www.nrc.gov/site-help/electronic-sub-ref-mat.html). A filing is considered complete at the time the document is submitted through the NRC's E-Filing system. To be timely, an electronic filing must be submitted to the E-Filing system no later than 11:59 p.m. ET on the due date. Upon receipt of a transmission, the E-Filing system time-stamps the document and sends the submitter an email confirming receipt of the document. The E-Filing system also distributes an email that provides access to the document to the NRC's Office of the General Counsel and any others who have advised the Office of the Secretary that they wish to participate in the proceeding, so that the filer need not serve the document on those participants separately. Therefore, applicants and other participants (or their counsel or representative) must apply for and receive a digital ID certificate before adjudicatory documents are filed in order to obtain access to the documents via the E-Filing system.
A person filing electronically using the NRC's adjudicatory E-Filing system may seek assistance by contacting the NRC's Electronic Filing Help Desk through the “Contact Us” link located on the NRC's public website (
https://www.nrc.gov/site-help/e-submittals.html), by email to
MSHD.Resource@nrc.gov,
or by a toll-free call at 1-866-672-7640. The NRC Electronic Filing Help Desk is available between 9 a.m. and 6 p.m., ET, Monday through Friday, except Federal holidays.
Participants who believe that they have good cause for not submitting documents electronically must file an exemption request, in accordance with 10 CFR 2.302(g), with their initial paper filing stating why there is good cause for not filing electronically and requesting authorization to continue to submit documents in paper format. Such filings must be submitted in accordance with 10 CFR 2.302(b)-(d). Participants filing adjudicatory documents in this manner are responsible for serving their documents on all other participants. Participants granted an exemption under 10 CFR 2.302(g)(2) must still meet the electronic formatting requirement in 10 CFR 2.302(g)(1), unless the participant also seeks and is granted an exemption from 10 CFR 2.302(g)(1).
Documents submitted in adjudicatory proceedings will appear in the NRC's electronic hearing docket, which is publicly available on the NRC's public website (
https://adams.nrc.gov/ehd), unless otherwise excluded pursuant to an order of the presiding officer. If you do not have an NRC-issued digital ID certificate as previously described, click “cancel” when the link requests certificates and you will be automatically directed to the NRC's electronic hearing docket where you will be able to access any publicly available documents in a particular hearing docket. Participants are
( printed page 45836)
requested not to include personal privacy information such as social security numbers, home addresses, or personal phone numbers in their filings unless an NRC regulation or other law requires submission of such information. With respect to copyrighted works, except for limited excerpts that serve the purpose of the adjudicatory filings and would constitute a Fair Use application, participants should not include copyrighted materials in their submission.
The following table provides the plant name, docket number, date of application, ADAMS accession number, and location in the application of the licensees' proposed NSHC determinations. For further details with respect to these license amendment applications, see the applications for amendment, which are available for public inspection in ADAMS. For additional direction on accessing information related to this document, see the “Obtaining Information and Submitting Comments” section of this document.
License Amendment Request(s)
Duke Energy Carolinas, LLC; Oconee Nuclear Station, Units 1, 2, and 3; Oconee County, SC; Duke Energy Progress, LLC; Shearon Harris Nuclear Power Plant, Unit 1; Wake and Chatham Counties, NC
Docket Nos
50-269, 50-270, 50-287, 50-400.
Application date
May 21, 2026.
ADAMS Accession No
ML26141A391.
Location in Application of NSHC
Page E-18-E19 of the Enclosure.
Brief Description of Amendments
The proposed amendments would modify the Shearon Harris Nuclear Power Plant, Unit 1, and Oconee Nuclear Station, Units 1, 2, and 3 technical specifications (TSs) to allow the use of online monitoring (OLM) methodology for determining the calibration frequency of pressure, level, and flow transmitters. The amendments would revise the TS definitions related to channel calibration and add a new administrative program for OLM, thereby transitioning from time-based to condition-based calibration frequencies for affected transmitters. These changes also clarify the scope of transmitters subject to OLM and the associated programmatic controls for calibration activities and dynamic response assessments using noise analysis techniques.
Proposed Determination
NSHC.
Name of Attorney for Licensee, Mailing Address
Tracey Mitchell LeRoy, Deputy General Counsel, Duke Energy Corporation, 525 S Tryon Street, Charlotte, NC 28202.
NRC Project Manager, Telephone Number
Tony Sierra, 301-287-9531.
Entergy Operations, Inc.; Arkansas Nuclear One, Unit 2; Pope County, AR; Entergy Operations, Inc., System Energy Resources, Inc., Cooperative Energy, A Mississippi Electric Cooperative, and Entergy Mississippi, LLC; Grand Gulf Nuclear Station, Unit 1; Claiborne County, MS; Entergy Louisiana, LLC, and Entergy Operations, Inc.; River Bend Station, Unit 1; West Feliciana Parish, LA; Entergy Operations, Inc.; Waterford Steam Electric Station, Unit 3; St. Charles Parish, LA
Docket Nos
50-368, 50-416, 50-458, 50-382.
Application date
March 31, 2026.
ADAMS Accession No
ML26090A114.
Location in Application of NSHC
Pages 4-5 of the Enclosure.
Brief Description of Amendments
The proposed amendments would adopt Technical Specifications Task Force (TSTF) Traveler TSTF-599, “Eliminate Periodic Surveillance Test of Simultaneous Start of Redundant Diesel Generators,” which is an approved change to the Standard Technical Specifications, into the Arkansas Nuclear One, Unit 2; Grand Gulf Nuclear Station, Unit 1; River Bend Station, Unit 1; and Waterford Steam Electric Station, Unit 3 technical specifications.
Proposed Determination
NSHC.
Name of Attorney for Licensee, Mailing Address
Susan Raimo, Associate General Counsel-Nuclear, 101 Constitution Avenue NW, Washington, DC 20001.
NRC Project Manager, Telephone Number
Jason Drake, 301-415-8378.
Northern States Power Company; Prairie Island Nuclear Generating Plant, Units 1 and 2; Goodhue County, MN
Docket Nos
50-282, 50-306.
Application date
June 23, 2026.
ADAMS Accession No
ML26174A386.
Location in Application of NSHC
Pages 4-5 of the Enclosure.
Brief Description of Amendments
The proposed amendments would adopt Technical Specification (TS) Task Force (TSTF) Traveler 585 (TSTF-585), “Revise LCO [Limiting Condition for Operation] 3.0.3 to Require Managing Risk.” TSTF-585 revises LCO 3.0.3 to require assessing and managing plant risk whenever LCO 3.0.3 is entered. If the risk assessment determines that continuing plant operation is acceptable and other conditions are satisfied, 24 hours from entry into LCO 3.0.3 is permitted to initiate a shutdown. Otherwise, initiation of the shutdown is required immediately. The proposed amendments would also revise or add some TS Required Actions to direct a plant shutdown instead of entry into LCO 3.0.3.
Proposed Determination
NSHC.
Name of Attorney for Licensee, Mailing Address
Andrew Van Duzer, Assistant General Counsel; Xcel Energy; 701 Pennsylvania Ave. NW; Suite 250; Washington, DC 20004.
NRC Project Manager, Telephone Number
Robert Kuntz, 301-415-3733.
( printed page 45837)
PSEG Nuclear LLC; Hope Creek Generating Station; Salem County, NJ; PSEG Nuclear LLC; Salem Nuclear Generating Station, Unit Nos. 1 and 2; Salem County, NJ
Docket Nos
50-354, 50-272, 50-311.
Application date
May 27, 2026.
ADAMS Accession No
ML26148A253.
Location in Application of NSHC
Pages 3-4 of the Enclosure.
Brief Description of Amendments
The proposed amendments would revise technical specifications to adopt Technical Specifications Task Force (TSTF) Traveler TSTF-599, Revision 1, “Eliminate Periodic Surveillance Test of Simultaneous Start of Redundant Diesel Generators,” with site-specific variations and editorial changes. The proposed changes would eliminate the periodic surveillance requirement to verify that all required diesel generators achieve rated frequency and voltage within the specified time period when started simultaneously.
Proposed Determination
NSHC.
Name of Attorney for Licensee, Mailing Address
Francis Romano, PSEG-Services Corporation, 80 Park Plaza, T-10, Newark, NJ 07102.
NRC Project Manager, Telephone Number
Audrey Klett, 301-415-0489.
Tennessee Valley Authority; Sequoyah Nuclear Plant, Units 1 and 2; Hamilton County, TN; Tennessee Valley Authority; Watts Bar Nuclear Plant, Units 1 and 2; Rhea County, TN
Docket Nos
50-327, 50-328, 50-390, 50-391.
Application date
June 2, 2026.
ADAMS Accession No
ML26153A303.
Location in Application of NSHC
Pages E8-E9 of the Enclosure.
Brief Description of Amendments
The proposed amendments would revise certain specifications in Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2 to remove the term “CORE ALTERATIONS” and make other changes. The proposed changes are requested in accordance with Technical Specifications Task Force (TSTF) Traveler TSTF-471, Revision 1, “Eliminate use of term CORE ALTERATIONS in ACTIONS and Notes.”
Proposed Determination
NSHC.
Name of Attorney for Licensee, Mailing Address
Edward C. Meade; (Interim) Executive VP and General Counsel; Tennessee Valley Authority; 400 West Summit Hill Drive; WT 6A; Knoxville, TN 37902.
NRC Project Manager, Telephone Number
Kimberly Green, 301-415-1627.
Virginia Electric and Power Company; Surry Power Station, Unit Nos. 1 and 2; Surry County, VA
Docket Nos
50-280, 50-281.
Application date
May 18, 2026.
ADAMS Accession No
ML26138A237.
Location in Application of NSHC
Pages 25-27 of Enclosure 1.
Brief Description of Amendments
The proposed amendments would revise Technical Specification (TS) 2.3, “Limiting Safety System Settings, Protective Instrumentation,” TS 3.7, “Instrumentation Systems,” and TS 4.1, “Operational Safety Review,” to adjust the reactor trip on turbine trip interlock function from P-7 (Low Power Reactor Trip Block) to P-8 (Power Range Neutron Flux).
Proposed Determination
NSHC.
Name of Attorney for Licensee, Mailing Address
W.S. Blair, Senior Counsel, Dominion Energy Services, Inc., 120 Tredegar St., RS-2, Richmond, VA 23219.
NRC Project Manager, Telephone Number
John Klos, 301-415-5136.
Virginia Electric and Power Company; Surry Power Station, Unit Nos. 1 and 2; Surry County, VA
Docket Nos
50-280, 50-281.
Application date
May 27, 2026.
ADAMS Accession No
ML26147A328.
Location in Application of NSHC
Pages 35-37 of Attachment 1.
Brief Description of Amendments
The proposed amendments would add a footnote to Technical Specification (TS) 3.16, “Emergency Power System,” to allow a one-time extension of the Allowed Outage Time in TS 3.16 Action B.1.a.3 from 7 days to 14 days for Surry Power Station, Unit No. 2, supportive of the replacement of feeder cables on the Unit No. 1 Emergency Diesel Generator.
Proposed Determination
NSHC.
Name of Attorney for Licensee, Mailing Address
W.S. Blair, Senior Counsel, Dominion Energy Services, Inc., 120 Tredegar St., RS-2, Richmond, VA 23219.
NRC Project Manager, Telephone Number
John Klos, 301-415-5136.
III. Notice of Issuance of Amendments to Facility Operating Licenses and Combined Licenses
During the period since publication of the last biweekly notice, the Commission has issued the following amendments. The Commission has determined for each of these amendments that the application complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations. The Commission has made appropriate findings as required by the Act and the Commission's rules and regulations in 10 CFR chapter I, which are set forth in the license amendment.
A notice of consideration of issuance of amendment to facility operating license or combined license, as
( printed page 45838)
applicable, proposed NSHC determination, and opportunity for a hearing in connection with these actions, were published in the
Federal Register
as indicated in the safety evaluation for each amendment.
Unless otherwise indicated, the Commission has determined that these amendments satisfy the criteria for categorical exclusion in accordance with 10 CFR 51.22. Therefore, pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared for these amendments. If the Commission has prepared an environmental assessment under the special circumstances provision in 10 CFR 51.22(b) and has made a determination based on that assessment, it is so indicated in the safety evaluation for the amendment.
For further details with respect to each action, see the amendment and associated documents such as the Commission's letter and safety evaluation, which may be obtained using the ADAMS accession numbers indicated in the following table. The safety evaluation will provide the ADAMS accession numbers for the application for amendment and the
Federal Register
citation for any environmental assessment. All of these items can be accessed as described in the “Obtaining Information and Submitting Comments” section of this document.
License Amendment Issuance(s)
Dominion Energy Nuclear Connecticut, Inc.; Millstone Power Station, Unit No. 3; New London County, CT
Docket No
50-423.
Amendment Date
July 1, 2026.
ADAMS Accession No
ML26168A238.
Amendment No
296.
Brief Description of Amendment
The amendment revised the Millstone Power Station, Unit No. 3, technical specification to adopt Technical Specification Task Force (TSTF) Traveler TSTF-601, Revision 1, “Extend Shield Building Completion Time After Refueling.” The amendment permits extension of the completion time when the Unit No. 3 “Secondary Containment” is inoperable while in Hot Standby or Hot Shutdown, and Startup (criticality) has not been entered following refueling.
Public Comments Received as to Proposed NSHC (Yes/No)
No.
Florida Power & Light Company, et al.; St. Lucie Plant, Unit Nos. 1 and 2; St. Lucie County, FL; Florida Power & Light Company; Turkey Point Nuclear Generating Unit Nos. 3 and 4; Miami-Dade County, FL; NextEra Energy Point Beach, LLC; Point Beach Nuclear Plant, Units 1 and 2; Manitowoc County, WI; NextEra Energy Seabrook, LLC; Seabrook Station, Unit No. 1; Rockingham County, NH
Point Beach (Unit 1-280, Unit 2-282); Seabrook (Unit 1-181); St. Lucie (Unit 1-258, Unit 2-215); Turkey Point (Unit 3-306, Unit 4-299).
Brief Description of Amendments
The amendments revised the technical specifications for each license to adopt an online monitoring program to transition from time-based frequency to condition-based frequency for checking the calibrations of some pressure, flow, and level transmitters.
Public Comments Received as to Proposed NSHC (Yes/No)
No.
Florida Power & Light Company; St. Lucie Plant, Unit No. 1; St. Lucie County, FL
Docket No
50-335.
Amendment Date
June 18, 2026.
ADAMS Accession No
ML26163A185.
Amendment No
257.
Brief Description of Amendment
The amendment revised Technical Specification (TS) 3.7.15, “Spent Fuel Pool Storage,” and TS 4.3, “Fuel Storage,” to support updated spent fuel pool and new fuel vault criticality analyses.
Public Comments Received as to Proposed NSHC (Yes/No)
Yes.
PSEG Nuclear LLC; Salem Nuclear Generating Station, Unit Nos. 1 and 2; Salem County, NJ
Docket Nos
50-272, 50-311.
Amendment Date
June 26, 2026.
ADAMS Accession No
ML26149A187.
Amendment Nos
354 (Unit 1) and 336 (Unit 2).
Brief Description of Amendments
The amendments revised the nuclear criticality safety analysis and the technical specifications for fresh and spent fuel storage. The amendments also included minor editorial changes to the technical specifications.
Public Comments Received as to Proposed NSHC (Yes/No)
No.
Southern Nuclear Operating Company, Inc.; Vogtle Electric Generating Plant, Units 3 and 4; Burke County, GA
Docket Nos
52-025, 52-026.
Amendment Date
June 23, 2026.
ADAMS Accession No
ML26163A214.
( printed page 45839)
Amendment Nos
216 (Unit 3) and 213 (Unit 4).
Brief Description of Amendments
The amendments modified Technical Specification 3.5.2, “Core Makeup Tanks (CMTs)—Operating,” to revise the minimum allowable CMT boron concentration and the minimum average CMT boron concentration.
Public Comments Received as to Proposed NSHC (Yes/No)
Yes.
Tennessee Valley Authority; Watts Bar Nuclear Plant, Units 1 and 2; Rhea County, TN
Docket Nos
50-390, 50-391.
Amendment Date
June 25, 2026.
ADAMS Accession No
ML26155A167.
Amendment Nos
181 (Unit 1) and 86 (Unit 2).
Brief Description of Amendments
The amendments revised various technical specifications within Watts Bar Nuclear Plant, Units 1 and 2, Technical Specification Sections 1.4, 3.4, 3.7, and 3.9, by adopting several Technical Specifications Task Force travelers.
Public Comments Received as to Proposed NSHC (Yes/No)
No.
Union Electric Company; Callaway Plant, Unit No. 1; Callaway County, MO
Docket No
50-483.
Amendment Date
June 24, 2026.
ADAMS Accession No
ML26134A082.
Amendment No
242.
Brief Description of Amendment
The amendment revised the Callaway Plant, Unit No. 1 Technical Specifications (TSs) to adopt Technical Specifications Task Force (TSTF)-599, Revision 1, “Eliminate Periodic Surveillance Test of Simultaneous Start of Redundant Diesel Generators,” which is an approved change to the Standard Technical Specifications, into the Callaway TSs. The amendment eliminates the periodic surveillance requirement to verify that all required diesel generators achieve rated frequency and voltage within the specified time period when started simultaneously.
Public Comments Received as to Proposed NSHC (Yes/No)
No.
Vistra Operations Company LLC; Davis-Besse Nuclear Power Station, Unit 1; Ottawa County, OH
Docket No
50-346.
Amendment Date
June 17, 2026.
ADAMS Accession No
ML26149A026.
Amendment No
313.
Brief Description of Amendment
The amendment adopted Technical Specification Task Force Traveler 585, “Revise LCO [Limiting Condition for Operation] 3.0.3 to Require Managing Risk“.
Public Comments Received as to Proposed NSHC (Yes/No)
No.
License Amendment Request(s)—Repeat of Individual Federal Register Notice
Vistra Operations Company LLC; Beaver Valley Power Station, Unit 1; Beaver County, PA
Docket No
50-334.
Application Date
June 26, 2026.
ADAMS Accession No
ML26146A267.
Brief Description of Amendment
The proposed amendment would revise the technical specifications to allow an alternative completion time for restoring equipment to accommodate repairs, specifically to allow a one-time extended Completion Time from 72 hours to 12 days to restore one train of Emergency Core Cooling System to Operable.