Massachusetts Bay Transportation Authority's Request To Amend Its Positive Train Control Safety Plan and Positive Train Control System
This document provides the public with notice that, on July 22, 2026, the Massachusetts Bay Transportation Authority (MBTA) submitted a request for amendment (RFA) to its FRA-ap...
Federal Railroad Administration (FRA), Department of Transportation (DOT).
ACTION:
Notice of availability and request for comments.
SUMMARY:
This document provides the public with notice that, on July 22, 2026, the Massachusetts Bay Transportation Authority (MBTA) submitted a request for amendment (RFA) to its FRA-approved Positive Train Control Safety Plan (PTCSP).
DATES:
FRA will consider comments received by August 24, 2026. FRA may consider comments received after that date to the extent practicable and without delaying implementation of valuable or necessary modifications to a PTC system.
ADDRESSES:
Comments:
Comments may be submitted by going to
https://www.regulations.gov
and following the online instructions for submitting comments.
Gabe Neal, Staff Director, Signal, Train Control, and Crossings Division, telephone: 816-516-7168, email:
Gabe.Neal@dot.gov.
SUPPLEMENTARY INFORMATION:
In general, title 49 United States Code (U.S.C.) section 20157(h) requires FRA to certify that a host railroad's PTC system complies with title 49 Code of Federal Regulations (CFR) part 236, subpart I, before the technology may be operated in revenue service. Before making certain changes to an FRA-certified PTC system, or the associated FRA-approved PTCSP, a host railroad must submit, and obtain FRA's approval of, an RFA to its PTCSP under 49 CFR 236.1021.
Under 49 CFR 236.1021(e), FRA's regulations provide that FRA will publish a notice in the
Federal Register
and invite public comment, in accordance with 49 CFR part 211, if an RFA includes a request for approval of a material modification of a signal or train control system. This notice informs the public that, on July 22, 2026, MBTA submitted an RFA to its PTCSP for its Advanced Civil Speed Enforcement System II, which seeks FRA's approval to implement a separate PTC system, Interoperable Train Control (ITC), on MBTA's North Side Fitchburg and Haverhill lines for a tenant railroad, CSX Transportation, Inc. That RFA is available in Docket No. FRA-2010-0030.
Interested parties are invited to comment on MBTA's RFA to its PTCSP by submitting written comments or data. During FRA's review of this railroad's RFA, FRA will consider any comments or data submitted within the timeline specified in this notice and to the extent practicable, without delaying implementation of valuable or necessary modifications to a PTC system.
See49 CFR 236.1021;
see also49 CFR 236.1011(e). Under 49 CFR 236.1021, FRA maintains the authority to approve, approve with conditions, or deny a railroad's RFA to its PTCSP at FRA's sole discretion.
Privacy Act Notice
In accordance with 49 CFR 211.3, FRA solicits comments from the public to better inform its decisions. DOT posts these comments, without edit, including any personal information the commenter provides, to
https://www.regulations.gov,
as described in the system of records notice (DOT/ALL-14 FDMS), which can be reviewed at
https://www.transportation.gov/privacy.
See
https://www.regulations.gov/privacy-notice
for the privacy notice of regulations.gov. To facilitate comment tracking, we encourage commenters to provide their name, or the name of their organization; however, submission of names is completely optional. If you wish to provide comments containing proprietary or confidential information, please contact FRA for alternate submission instructions.
Issued in Washington, DC.
John Karl Alexy,
Associate Administrator for Railroad Safety, Chief Safety Officer.
Use this for formal legal and research references to the published document.
91 FR 48970
Web Citation
Suggested Web Citation
Use this when citing the archival web version of the document.
“Massachusetts Bay Transportation Authority's Request To Amend Its Positive Train Control Safety Plan and Positive Train Control System,” thefederalregister.org (August 3, 2026), https://thefederalregister.org/documents/2026-15674/massachusetts-bay-transportation-authority-s-request-to-amend-its-positive-train-control-safety-plan-and-positive-train-.