Department of Energy
Federal Energy Regulatory Commission
  1. 18 CFR Ch. I
( printed page 53150)

AGENCY:

Federal Energy Regulatory Commission, DOE.

ACTION:

Notice of Agenda

SUMMARY:

We are publishing our regulatory agenda (the Agenda) in accordance with Public Law 96-354, “The Regulatory Flexibility Act,” and Executive Order 12866, “Regulatory Planning and Review.” FERC's complete Agenda, available on OMB's website at www.reginfo.gov, is a compilation of all rulemaking activities on which we have recently completed action or have proposed or are considering action. Our last Agenda was provided in May 2025 and in this current agenda, we have listed 42 rulemaking activities. We also note that the Agency has one inactive rulemaking that is not listed in this Agenda. This issuance of our Agenda contains ten (10) Pre-Rules, eleven (11) Notice of Proposed Rules, eight (8) Final Rules, and thirteen (13) Completed activities. Four (4) rulemakings are Section 3(f)(1) Significant; two (2) are Other Significant; one (1) is a routine rulemaking activity; two (2) are administrative, and thirty-two (32) are Substantive, Nonsignificant rulemaking activities.

SUPPLEMENTARY INFORMATION:

FERC's Unified Agenda reports rulemaking activities in three major categories: completed, active, and long-term. Completed rulemaking activities are those that were completed since publication of an agency's last Agenda; active rulemaking activities are those that an agency anticipates to have an Advance Notice of Proposed Rulemaking, a Proposed Rule, or a Final Rule issued within the next 12 months; and long-term rulemaking activities are rulemaking activities under development but for which an agency does not anticipate to have a regulatory action within the 12 months after publication of the current edition of the Unified Agenda. As noted below, all dates provided in this Agenda represent anticipated goals, not commitments.

FERC assigns a “Regulation Identifier Number” (RIN) to a rulemaking activity when our Commission initiates a rulemaking and approves a rulemaking plan, or when the FERC staff begins work on a Commission delegated rulemaking that does not require a rulemaking plan. OMB uses this number to track all relevant documents throughout the entire “lifecycle” of a particular rulemaking activity. FERC reports all rulemaking activities in the Agenda that have been assigned a RIN and meet the definition for a completed, an active, or a long-term rulemaking activity.

The Agenda is intended to provide the public early notice and opportunity to participate in our rulemaking process. However, we may consider or act on any rulemaking activity even though it is not included in the Agenda. The information contained in this Agenda is updated to reflect any action that has occurred on a rulemaking activity since publication of our last Agenda. FERC provides additional information and potentially more updated information on planned rulemakings and petition for rulemaking activities, including priority and schedule, on our website at www.ferc.gov.

As noted previously, all dates provided in this Agenda represent goals, not commitments. The date for the next scheduled action under the heading “Timetable” is the date the next regulatory action for the rulemaking activity is scheduled to be published in the Federal Register . The date is considered tentative and is not binding on the Commission or its staff. These and any dates in the Agenda may be revised due to shifts in workloads, changes in priorities, or extensive public comments.

ADDRESSES: Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426.

FOR FURTHER INFORMATION CONTACT:

Person listed for each specific rulemaking. In addition, the internet is the basic means for disseminating the Unified Agenda. The complete Unified Agenda will be available online at www.reginfo.gov. The submission of comments on rulemakings at this agency can be made using the FERC Online links at www.ferc.gov. You can file your comments electronically by using the eFiling feature, which is also located on the Commission's website ( www.ferc.gov) under the link to FERC Online. With eFiling, you can provide comments in a variety of formats by attaching them as a file with your submission. New eFiling users must first create an account by clicking on “ eRegister.” You will be asked to select the type of filing you are making; a comment on a particular docket is considered a “Comment on a Filing”.

The Commission's Office of Public Participation (OPP) supports meaningful public engagement and participation in Commission proceedings. OPP can help members of the public, including landowners, Tribal members and others, access publicly available information and navigate Commission processes. For public inquiries and assistance with making filings such as interventions, comments, or requests for rehearing, the public is encouraged to contact OPP at (202)502-6595 or .

Additionally, OPP has assisted the public with participating in rulemakings by educating the public on the procedure for submitting comments in rulemaking dockets online. For example, the Commission has prepared explainers and fact sheets and conducted outreach on the following Final Rules: Building for the Future Through Electric Regional Transmission Planning and Cost Allocation (Docket No. RM21-17-000, -001, 003) and Siting of Interstate Transmission Facilities (Docket No. RM22-7-000). General guidance materials, including introductory guides, explainers and primers on significant energy matters, are available on our website at: www.ferc.gov/​OPP/​handouts. Video recordings of OPP workshops are available at: www.ferc.gov/​OPP/​workshopp-videos.

Debbie-Anne A. Reese,

Secretary.

Federal Energy Regulatory Commission—Proposed Rule Stage

Sequence No. Title Regulation Identifier No.
465 Electric Transmission Incentives Policy Under Section 219 of the Federal Power Act 1902-AF70
466 Implementation of Dynamic Line Ratings 1902-AF94
467 Filing Process And Data Collection For The Electric Quarterly Report 1902-AG11
468 Blanket Certificate Cost Limitations 1902-AG32
469 Five-Year Review of the Oil Pipeline Index 1902-AG33
470 Reliability Standard CIP-003-11: Cyber Security—Security Management Controls 1902-AG37
( printed page 53151)
471 Standards for Business Practices of Interstate Natural Gas Pipelines 1902-AG39
472 Interconnection of Large Loads to the Interstate Transmission System 1902-AG47
473 Preliminary Permits for Hydroelectric Power Projects 1902-AG48
474 Revisions to Existing FERC Forms 1902-AG49
475 Expansion of Categorical Exclusion under the National Environmental Policy Act to Include Certain Terminations or Revocations of Water Power Licenses and Exemptions 1902-AG50

Federal Energy Regulatory Commission—Final Rule Stage

Sequence No. Title Regulation Identifier No.
476 Virtualization Reliability Standards 1902-AG36
Federal Energy Regulatory Commission (FERC) Proposed Rule Stage

465. ELECTRIC TRANSMISSION INCENTIVES POLICY UNDER SECTION 219 OF THE FEDERAL POWER ACT

Legal Authority: 16 U.S.C. 791a to 825r; 16 U.S.C. 2601 to 2645; 31 U.S.C. 9701; 41 U.S.C. 7101 to 7352

Relevant Executive Orders: 14267

Abstract: The Commission proposed in the proceeding to revise its existing regulations that implemented section 219 of the Federal Power Act (FPA) in light of the changes in transmission development and planning over the last few years. The supplemental notice of proposed rulemaking proposed to modify the incentive for transmitting and electric utilities that join Transmission Organizations in the March 20, 2020 notice of proposed rulemaking. In addition, pursuant to FPA section 206, the Commission proposed to require each utility that has received an incentive for joining and remaining in a transmission organization for three or more years to submit a compliance filing revising its tariff to remove the incentive from its transmission tariff. The Commission continues to consider the extent to which its regulations implementing section 219 of the FPA have anti-competitive effects and what changes to those regulations could alleviate such effects consistent with Executive Order 14267 (Docket No. RM20-10-000).

Timetable:

Action Date FR Cite
NPRM 04/02/20 85 FR 18784
NPRM Comment Period End 07/01/20
Notice of Workshop 04/21/21 86 FR 20682
Supplemental NPRM 04/26/21 86 FR 21972
Notice Granting Extensions of Time 05/11/21
Supplemental NPRM Comment Period End 05/26/21
Supplemental NPRM Reply Comment Period End 06/10/21
Supplemental NPRM Comment Period Extended 06/25/21
Supplemental NPRM Reply Comment Extended 07/26/21
Notice of Workshop 08/19/21 86 FR 46697
Supplemental Notice of Workshop 09/15/21 86 FR 51347
Notice Inviting Post-Workshop Comments 10/22/21 86 FR 58649
Next Action Undetermined 11/00/26

Regulatory Flexibility Analysis Required: Yes

Agency Contact: Adam Batenhorst, Legal Information, Office of the General Counsel, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426

Phone: 202 502-6150

Email:

Kaitlin Johnson, Technical Information, Office of Technical Reporting and Economics, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426

Phone: 202 502-8542

Email:

RIN: 1902-AF70

466. IMPLEMENTATION OF DYNAMIC LINE RATINGS

Legal Authority: 16 U.S.C. 791a to 825r; 16 U.S.C. 2601 to 2645; 31 U.S.C. 9701; 42 U.S.C. 7101 to 7352

Abstract: The Federal Energy Regulatory Commission (Commission) issued an advance notice of proposed rulemaking presenting potential reforms to implement dynamic line ratings and, thereby, improve the accuracy of transmission line ratings. These potential reforms would require transmission line ratings to reflect solar heating based on the sun's position and forecastable cloud cover and require transmission line ratings to reflect forecasts of wind conditions on certain transmission lines. The potential reforms would also ensure transparency in the development and implementation of dynamic line ratings and enhance data reporting practices related to congestion in non-regional transmission organization/independent system operator regions to identify candidate transmission lines for the requirement to reflect forecasts of wind conditions. The Commission invited all interested persons to submit comments on the potential reforms and in response to specific questions (Docket No. RM24-6-000).

Timetable:

Action Date FR Cite
Notice of Inquiry 02/24/22 87 FR 10349
Notice of Inquiry Initial Comments Period End 04/25/22
Notice of Inquiry Reply Comment Period End 05/25/22
ANPRM 07/15/24 89 FR 57690
ANPRM Comment Period End 10/15/24
ANPRM Reply Comment Period End 11/12/24
( printed page 53152)
Next Action Undetermined 11/00/26

Regulatory Flexibility Analysis Required: Yes

Agency Contact: Elizabeth Topping, Technical Information, Office of Technical Reporting and Economics, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426

Phone: 202 502-6731

Email:

Ryan Stroschein, Legal Information, Office of the General Counsel, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426

Phone: 202 502-8099

Email:

RIN: 1902-AF94

467. FILING PROCESS AND DATA COLLECTION FOR THE ELECTRIC QUARTERLY REPORT

Legal Authority: 16 U.S.C. 791a to 825r; 16 U.S.C. 2601 to 2645; 31 U.S.C. 9701; 42 U.S.C. 7101 to 7352

Abstract: The Federal Energy Regulatory Commission proposed various changes to current Electric Quarterly Report (EQR) filing requirements, including both the method of collection and the data being collected. The proposed changes are designed to update the data collection, improve data quality, increase market transparency, decrease costs, over time, of preparing the necessary data for submission, and streamline compliance with any future filing requirements. Among other things, the Commission proposed to implement a new collection method for EQR reporting based on the eXtensible Business Reporting Language-Comma-Separated Values standard; amend its regulations to require Regional Transmission Organizations and Independent System Operators to produce reports containing market participant transaction data; and modify or clarify EQR reporting requirements (Docket No. RM23-9-000).

Timetable:

Action Date FR Cite
NPRM 10/27/23 88 FR 73784
NPRM Comment Period End 12/26/23
Notice of Extension of Time for Initial Comments Period End 02/26/24
Final Rule 09/00/26

Regulatory Flexibility Analysis Required: Yes

Agency Contact: Marina Fishbein, Technical Information, Office of Enforcement and Regulatory Accounting, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426

Phone: 202 502-6671

Email:

Soheila Mansouri, Technical Information, Office of Enforcement and Regulatory Accounting, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426

Phone: 202 502-6808

Email:

Eric Winterbauer, Legal Information, Office of the General Counsel, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426

Phone: 202 502-8329

Email:

RIN: 1902-AG11

468. BLANKET CERTIFICATE COST LIMITATIONS

Legal Authority: 15 U.S.C. 717 to 717w

Relevant Executive Orders: 14154; 14156

Abstract: The Commission is exploring whether, and if so how, to revise its part 157, subpart F blanket certificate regulations, 18 CFR 157.208(d) and 157.215(a)(5), to increase the cost limitations for projects that interstate natural gas pipelines may construct without a case-specific authorization order (Docket No. RM25-12-000).

Timetable:

Action Date FR Cite
Notice of Inquiry 06/24/25 90 FR 26776
Notice Extending Comment Period 08/14/25
Notice of Inquiry Initial Comment Period End 08/25/25
Comment Period End 09/24/25
NPRM 11/00/26

Regulatory Flexibility Analysis Required: Yes

Agency Contact: Danielle Elefritz, Office of the General Counsel, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426

Phone: 202 502-8767

Email:

Nicole Huang, Technical Information, Office of Energy Projects, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426

Phone: 202 502-8410

Email:

RIN: 1902-AG32

469. FIVE-YEAR REVIEW OF THE OIL PIPELINE INDEX

Legal Authority: 5 U.S.C. 571 to 83; 42 U.S.C. 7101 to 7352; 49 U.S.C. 60502; 49 App. U.S.C. 1 to 85

Abstract: The Federal Energy Regulatory Commission (Commission) invites comments on its proposed index level used to determine annual changes to oil pipeline rate ceilings. The Commission proposes to use the Producer Price Index for Finished Goods (PPI-FG)—1.42% as the index level for the five-year period commencing July 1, 2026. The Commission invites interested persons to submit comments regarding this proposal and any alternative methodologies for calculating the index (Docket No. RM26-6-000).

Timetable:

Action Date FR Cite
NPRM 11/24/25 90 FR 52902
NPRM Initial Comment Period End 12/24/25
NPRM Reply Comment Period End 01/14/26
Next Action Undetermined 09/00/26

Regulatory Flexibility Analysis Required: Yes

Agency Contact: Monil Patel, Technical Information, Office of Energy Market Regulation, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426

Phone: 202 502-8296

Email:

Evan Steiner, Legal Information, Office of the General Counsel, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426

Phone: 202 502-8792

Email:

RIN: 1902-AG33

470. • RELIABILITY STANDARD CIP-003-11: CYBER SECURITY—SECURITY MANAGEMENT CONTROLS

Legal Authority: 16 U.S.C. 824o

Abstract: The Federal Energy Regulatory Commission (Commission) proposes to approve Critical Infrastructure Protection (CIP) Reliability Standard: CIP-003-11 (Cyber Security—Security Management Controls). The North American Electric Reliability Corporation, the Commission-certified electric reliability organization, submitted the proposed Reliability Standard modifications to mitigate risks posed by a coordinated cyberattack on low impact facilities; the ( printed page 53153) aggregate impact of which could be much greater (Docket No. RM25-8-000).

Timetable:

Action Date FR Cite
NPRM 09/23/25 90 FR 45685
NPRM Comment Period End 11/24/25
Final Rule 09/00/26

Regulatory Flexibility Analysis Required: Yes

Agency Contact: Jacob Waxman, Technical Information, Office of Electric Reliability, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426

Phone: 202 502-6879

Email:

Chanel Chasanov, Legal Information, Office of General Counsel, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426

Phone: 202 502-8569

Email:

RIN: 1902-AG37

471. • STANDARDS FOR BUSINESS PRACTICES OF INTERSTATE NATURAL GAS PIPELINES

Legal Authority: 15 U.S.C. 717 to 717z; 15 U.S.C. 3301 to 3432; 42 U.S.C. 7101 to 7352; 43 U.S.C. 1331 to 1356

Abstract: The Federal Energy Regulatory Commission (Commission) proposes to amend its regulations to incorporate by reference certain modifications to the latest version (Version 4.0) of Standards for Business Practices of Interstate Natural Gas Pipelines adopted by the Wholesale Gas Quadrant (WGQ) of the North American Energy Standards Board (NAESB). NAESB's revisions in Version 4.0 of the standards streamline the process for accessing publicly available gas-electric coordination data during extreme cold weather or emergency events (Docket No. RM96-1-044).

Timetable:

Action Date FR Cite
NPRM 11/19/25 90 FR 52012
NPRM Comment Period End 01/20/26
Final Rule 09/00/26

Regulatory Flexibility Analysis Required: Yes

Agency Contact: Jerry Chiang, Technical Issues, Office of Technical Reporting and Economics, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426

Phone: 202 502-8786

Email:

Oscar F. Santillana, Technical Issues, Office of Energy Market Regulation, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426

Phone: 202 502-6392

Email:

David Faerberg, Legal Information, Office of the General Counsel, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426

Phone: 202 502-8275

Email:

RIN: 1902-AG39

472. • INTERCONNECTION OF LARGE LOADS TO THE INTERSTATE TRANSMISSION SYSTEM

Legal Authority: 16 U.S.C. 791a to 825r; 16 U.S.C. 2601 to 2645; 31 U.S.C. 9701; 41 U.S.C. 7101 to 7352; 42 U.S.C. 7173

Abstract: On October 23, 2025, The Secretary of the Department of Energy proposed an Advance Notice of Proposed Rulemaking presenting potential reforms to ensure the timely and orderly interconnection of large loads to the transmission system. As proposed, the potential reforms would standardize interconnection procedures and agreements for such loads, including those seeking to share a point of interconnection with new or existing generation facilities (Docket No. RM26-4-000).

Timetable:

Action Date FR Cite
Notice Inviting Comments 10/27/25
Notice Extending Comment Deadline 11/07/25
Comment Period End 11/21/25
Reply Comment Period End 12/05/25
Next Action Undetermined 11/00/26

Regulatory Flexibility Analysis Required: Yes

Agency Contact: Sarah Ladin, Legal Information, Office of the General Counsel, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426

Phone: 202 502-8935

Email:

Angela Lee, Legal Information, Office of the General Counsel, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426

Phone: 202 502-6717

Email:

Joseph Popely, Legal Information, Office of the General Counsel, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426

Phone: 202 502-8513

Email:

RIN: 1902-AG47

473. • PRELIMINARY PERMITS FOR HYDROELECTRIC POWER PROJECTS

Legal Authority: Not Yet Determined

Abstract: This Docket regards the Department of Energy (DOE) request, pursuant to section 403 of the DOE Organization Act, that the Federal Energy Regulatory Commission initiate a proceeding to end tribal authorities' power to veto preliminary permits for hydroelectric projects on tribal lands (Docket No. RM26-5-000).

Timetable:

Action Date FR Cite
Notice Inviting Comments 10/27/25
Next Action Undetermined 11/00/26

Regulatory Flexibility Analysis Required: Yes

Agency Contact: Michael Haddad, Legal Information, Office of the General Counsel, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426

Phone: 202 502-8088

Email:

RIN: 1902-AG48

474. • REVISIONS TO EXISTING FERC FORMS

Legal Authority: 16 U.S.C. 791a to 825r; 16 U.S.C. 2601 to 2645; 31 U.S.C. 9701; 41 U.S.C. 7101 to 7352; 42 U.S.C. 7173

Abstract: The Commission plans to issue a NOPR to propose non-substantive revisions to certain FERC Forms and regulations, and to propose to modify the existing requirement to submit supplemental quarterly financial reports to reduce the number of schedules required.

Timetable:

Action Date FR Cite
NPRM 07/00/26
Next Action Undetermined 11/00/26

Regulatory Flexibility Analysis Required: Yes

Agency Contact: Jessica Hunt, Technical Information, Office of Enforcement and Regulatory Accounting, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426

Phone: 202 502-6536

Email:

Shanee Sibblies, Technical Information, Office of Enforcement and Regulatory Accounting, Federal Energy ( printed page 53154) Regulatory Commission, 888 First Street NE, Washington, DC 20426

Phone: 202 502-8858

Email:

Laura J. Farkas, Legal Information, Office of the General Counsel, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426

Phone: 202 502-6060

Email:

RIN: 1902-AG49

475. • EXPANSION OF CATEGORICAL EXCLUSION UNDER THE NATIONAL ENVIRONMENTAL POLICY ACT TO INCLUDE CERTAIN TERMINATIONS OR REVOCATIONS OF WATER POWER LICENSES AND EXEMPTIONS

Legal Authority: 16 U.S.C. 825h

Abstract: The Federal Energy Regulatory Commission (Commission) proposes to amend section 380.4 of its regulations implementing the National Environmental Policy Act (NEPA) to expand an existing Categorical Exclusion (CE). A CE describes a category of actions that a Federal agency has determined normally does not significantly affect the quality of the human environment, absent extraordinary circumstances, and so does not trigger NEPA's requirement to prepare an environmental document. The proposed revision would add a category of actions to an existing CE to include terminations or revocations of water power licenses and exemptions that will result in minor or no ground disturbing activity and minor or no changes in reservoir conditions and downstream flows (Docket No. RM26-7-000).

Timetable:

Action Date FR Cite
NPRM 02/24/26 91 FR 8799
NPRM Comment Period End 03/26/26
Next Action Undetermined 11/00/26

Regulatory Flexibility Analysis Required: Yes

Agency Contact: Thomas Chandler, Legal Information, Office of the General Counsel, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426

Phone: 202 502-6699

Email:

CarLisa Linton, Technical Information, Office of Energy Projects, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426

Phone: 202 502-8416

Email:

RIN: 1902-AG50

Federal Energy Regulatory Commission (FERC) Final Rule Stage

476. • VIRTUALIZATION RELIABILITY STANDARDS

Legal Authority: 16 U.S.C. 824o

Abstract: The Federal Energy Regulatory Commission (Commission) proposes to approve four new definitions and 18 modified definitions in the North American Electric Reliability Corporation (NERC) Glossary of Terms Used in Reliability Standards. The Commission also proposes to approve eleven modified Critical Infrastructure Protection (CIP) Reliability Standards. NERC, the Commission-certified electric reliability organization, submitted the proposed modifications to update the CIP Reliability Standards to enable the application of virtualization and other new technologies in a secure manner (Docket No. RM24-8-000).

Timetable:

Action Date FR Cite
NPRM 09/23/25 90 FR 45679
NPRM Comment Period End 11/24/25
Final Rule 09/00/26

Regulatory Flexibility Analysis Required: Yes

Agency Contact: Mayur Manchanda, Technical Information, Office of Electric Reliability, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426

Phone: 202 502-6166

Email:

Chanel Chasanov, Legal Information, Office of General Counsel, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426

Phone: 202 502-8569

Email:

RIN: 1902-AG36

[FR Doc. 2026-16616 Filed 8-13-26; 8:45 am]

BILLING CODE 6717-01-P

Legal Citation

Federal Register Citation

Use this for formal legal and research references to the published document.

91 FR 53150

Web Citation

Suggested Web Citation

Use this when citing the archival web version of the document.

“Regulatory Agenda,” thefederalregister.org (August 14, 2026), https://thefederalregister.org/documents/2026-16616/regulatory-agenda.