Notice of Final Federal Agency Actions on Proposed Highway in Georgia
This notice announces actions taken by FHWA that are final. The actions relate to a proposed highway project, Interstate 75 (I-75), from I-475 to State Route (SR) 155 in Butts, ...
Federal Highway Administration (FHWA), Department of Transportation (DOT).
ACTION:
Notice of limitation on claims for judicial review of actions by FHWA.
SUMMARY:
This notice announces actions taken by FHWA that are final. The actions relate to a proposed highway project, Interstate 75 (I-75), from I-475 to State Route (SR) 155 in Butts, Henry, Lamar, Monroe, and Spalding Counties in Georgia, and includes auxiliary lanes from SR 155 up to the I-75/SR 20 interchange in Butts, Henry, Lamar, Monroe, and Spalding Counties, Georgia, for a total project length of approximately 41 miles. Those actions grant licenses, permits, and approvals for the project. The FHWA's Finding of No Significant Impact (FONSI) provides details on the Selected Alternative for the proposed improvements.
DATES:
By this notice, FHWA is advising the public of the final agency actions subject to 23 U.S.C. 139(
l)(1). A claim seeking judicial review of the Federal agency actions on the listed highway project will be barred unless the claim is filed on or before February 16, 2027. If the Federal law that authorizes judicial review of a claim provides a time period of less than 150 days for filing such claim, then that shorter time period still applies.
FOR FURTHER INFORMATION CONTACT:
For FHWA: Ms. Sabrina David, Division Administrator, FHWA, Georgia Division Office; 75 Ted Turner Drive, Suite 1000, Atlanta, Georgia 30303; (404) 562-3630;
Sabrina.David@dot.gov.
The FHWA Georgia Division's normal business hours are 7:30 a.m. to 4:00 p.m. (eastern time) Monday through Friday. For the Georgia Department of Transportation (GDOT): Mr. Russell McMurry, Commissioner, GDOT; 600 West Peachtree Street, 22nd Floor, Atlanta, Georgia 30308; (404) 631-1990;
RMcMurry@dot.ga.gov.
The GDOT normal business hours are 8:00 a.m. to 5:00 p.m. (eastern time) Monday through Friday.
SUPPLEMENTARY INFORMATION:
Notice is hereby given that FHWA has taken final agency actions subject to 23 U.S.C. 139(
l)(1) by issuing licenses, permits, and approvals for the following highway project in the State of Georgia: I-75 Commercial Vehicle Lanes Project, Project Identification Number 0014203. GDOT is proposing improvements to approximately 41 miles of I-75 between I-475 and SR 155 in Butts, Henry, Lamar, Monroe, and Spalding Counties, Georgia. The project will construct two barrier-separated northbound CVLs beginning at the I-75/I-475 interchange in Monroe County and extend northward on the east side of the I-75 northbound corridor for approximately 38 miles, which then transitions to a single auxiliary lane for an additional two miles up to the I-75/SR 155 interchange. A single auxiliary lane will also be added to the I-75 general purpose lanes to accommodate merging trucks beginning at SR 155 and extending up to the I-75/SR 20 interchange. The purpose of the proposed project is to improve travel time reliability, reduce the above average crash rate, and improve freight movement on the I-75 northbound corridor.
The FHWA's actions and the laws under which such actions were taken, are described in the Environmental Assessment (EA) for the project, approved on March 31, 2026, and the FONSI issued on September 15, 2026, and in other documents in the project file. The EA, FONSI, and other project records are available by contacting FHWA or GDOT at the addresses provided above. The EA and FONSI can be viewed and downloaded from the project website at:
0014203-gdot.hub.arcgis.com/.
This notice applies to all Federal agency decisions that are final as of the issuance date of this notice and all laws under which such actions were taken, including but not limited to:
6.
Historic and Cultural Resources:
Section 106 of the National Historic Preservation Act of 1966, as amended [54 U.S.C. 306108et seq.]; Archeological Resources Protection Act of 1979 (ARPA) [16 U.S.C. 470(aa)-470(mm)]; Archaeological and Historic Preservation Act [54 U.S.C. 312501-312508]; Native American Grave Protection and Repatriation Act (NAGPRA) [25 U.S.C. 3001-3013].
7.
Social and Economic:
American Indian Religious Freedom Act [42 U.S.C. 1996]; Farmland Protection Policy Act (FPPA) [7 U.S.C. 4201-4209].
9.
Hazardous Materials:
Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA), as amended by the Superfund Amendments and Reauthorization Act of 1986 (SARA) [42 U.S.C. 9601et seq.]; Resource Conservation and Recovery Act (RCRA) [42 U.S.C. 6901-6992(k)].
10.
Executive Orders:E.O. 11990 Protection of Wetlands; E.O. 11988 Floodplain Management; E.O. 11593 Protection and Enhancement of the Cultural Environment; E.O. 13007 Indian Sacred Sites; E.O. 13287 Preserve America; E.O. 13175 Consultation and Coordination with Indian Tribal Governments; E.O. 13112 Invasive Species, as amended by E.O. 13751.
(Catalog of Federal Domestic Assistance Program Number 20.205, Highway Planning and Construction. The regulations implementing Executive Order 12372 regarding intergovernmental consultation on Federal programs and activities apply to this program.)
Use this for formal legal and research references to the published document.
91 FR 59296
Web Citation
Suggested Web Citation
Use this when citing the archival web version of the document.
“Notice of Final Federal Agency Actions on Proposed Highway in Georgia,” thefederalregister.org (September 18, 2026), https://thefederalregister.org/documents/2026-19140/notice-of-final-federal-agency-actions-on-proposed-highway-in-georgia.