Clean Water Act Hazardous Substance Facility Response Plans: Compliance Date Delay and Changes To Reflect Administration Policy

The Environmental Protection Agency (EPA) is finalizing an extension to the compliance date for Facility Response Plans (FRPs) required by the Clean Water Act (CWA) addressing p...

Environmental Protection Agency
  1. 40 CFR Part 118
  2. [EPA-HQ-OLEM-2021-0585; FRL-7881.1-02-OLEM]
  3. RIN 2050-AH38

AGENCY:

Environmental Protection Agency (EPA).

ACTION:

Final rule.

SUMMARY:

The Environmental Protection Agency (EPA) is finalizing an extension to the compliance date for Facility Response Plans (FRPs) required by the Clean Water Act (CWA) addressing potential worst-case discharges of CWA hazardous substances. These requirements apply to onshore non-transportation-related facilities that could reasonably be expected to cause substantial harm to the environment from a CWA hazardous substance worst-case discharge to navigable waters, adjoining shorelines, or the exclusive economic zone. This action is also finalizing language modifications to remove references to climate change and environmental justice in the FRP requirements to align with Executive Order 14148 of January 20, 2025. EPA is revising the compliance deadlines in light of serious concerns that facilities may be unable to comply with the relevant requirements by the existing deadline. These changes are necessary to allow the Agency to consider implementation and compliance assistance tools that regulated facilities may be able to take advantage of when complying with the new requirements, and to ensure proper planning for all communities while promoting a science-based and risk-based approach to planning. EPA also recognizes that a delay would provide time for EPA to consider whether revisions are necessary before facilities must comply.

DATES:

This final rule is effective on December 14, 2026.

ADDRESSES:

The EPA has established a docket for this action under Docket ID No. EPA-HQ-OLEM-2021-0585. All documents in the docket are listed on the www.regulations.gov website. Although listed in the index, some information is not publicly available, e.g., CBI or other information whose disclosure is restricted by statute. Certain other material, such as copyrighted material, is not placed on the internet and will be publicly available only in hard copy form. Publicly available docket materials are available electronically through www.regulations.gov.

FOR FURTHER INFORMATION CONTACT:

Melissa Kaps, Waste and Chemicals Implementation Division, Office of Resource Conservation and Recovery (5303T), Environmental Protection Agency, 1200 Pennsylvania Avenue NW, Washington, DC 20460; telephone number: (202) 566-0501; email address: .

SUPPLEMENTARY INFORMATION:

Table of Contents

I. General Information

A. Does this action apply to me?

B. What action is the Agency taking?

C. What is the Agency's authority for taking this action?

D. What are the incremental costs and benefits of this action?

II. Background

A. Statutory Authority and Delegation of Authority

B. Clean Water Act Hazardous Substances Facility Response Plans Regulation

C. Summary of the March 2026 Proposed Rule

1. Compliance Date Delay

2. Climate Change Language Recission

3. Environmental Justice Language Recission

III. Discussion of the Final Rule and Public Comments

A. General Comments

B. Provisions in the Final Rule

IV. Supporting Information

A. Children's Environmental Health

V. Statutory and Executive Orders Reviews

A. Executive Order 12866: Regulatory Planning and Review and Executive Order 13563: Improving Regulation and Regulatory Review

B. Executive Order 14192: Unleashing Prosperity Through Deregulation

C. Paperwork Reduction Act (PRA)

D. Regulatory Flexibility Act (RFA)

E. Unfunded Mandates Reform Act (UMRA)

F. Executive Order 13132: Federalism

G. Executive Order 13175: Consultation and Coordination With Indian Tribal Governments

H. Executive Order 13045: Protection of Children From Environmental Health Risks and Safety Risks

I. Executive Order 13211: Actions Concerning Regulations That Significantly Affect Energy Supply, Distribution or Use

J. National Technology Transfer and Advancement Act (NTTAA)

K. Congressional Review Act (CRA)

I. General Information

A. Does this action apply to me?

A list of North American Industry Classification System (NAICS) codes at the three-digit level that could be affected by requirements established under CWA section 311(j)(5) is provided in table 1.

Table 1—Sectors Potentially Affected by the Proposed Rule

NAICS NAICS description
111 Crop Production.
112 Animal Production and Aquaculture.
115 Support Activities for Agriculture and Forestry.
211 Oil and Gas Extraction.
212 Mining (except Oil and Gas).
( printed page 64775)
213 Support Activities for Mining.
221 Utilities.
236 Construction of Buildings.
237 Heavy and Civil Engineering Construction.
238 Specialty Trade Contractors.
311 Food Manufacturing.
312 Beverage and Tobacco Product Manufacturing.
313 Textile Mills.
314 Textile Product Mills.
321 Wood Product Manufacturing.
322 Paper Manufacturing.
323 Printing and Related Support Activities.
324 Petroleum and Coal Products Manufacturing.
325 Chemical Manufacturing.
326 Plastics and Rubber Products Manufacturing.
327 Nonmetallic Mineral Product Manufacturing.
331 Primary Metal Manufacturing.
332 Fabricated Metal Product Manufacturing.
333 Machinery Manufacturing.
334 Computer and Electronic Product Manufacturing.
335 Electrical Equipment, Appliance, and Component Manufacturing.
336 Transportation Equipment Manufacturing.
339 Miscellaneous Manufacturing.
423 Merchant Wholesalers, Durable Goods.
424 Merchant Wholesalers, Nondurable Goods.
441 Motor Vehicle and Parts Dealers.
444 Building Material and Garden Equipment and Supplies Dealers.
447 Gasoline Stations.
453 Miscellaneous Store Retailers.
481 Air Transportation.
486 Rail Transportation.
488 Support Activities for Transportation.
493 Warehousing and Storage.
511 Publishing Industries (except internet).
518 Data Processing, Hosting, and Related Services.
522 Credit Intermediation and Related Activities.
531 Real Estate.
541 Professional, Scientific, and Technical Services.
561 Administrative and Support Services.
562 Waste Management and Remediation Services.
611 Educational Services.
622 Hospitals.
624 Social Assistance.
712 Museums, Historical Sites, and Similar Institutions.
713 Amusement, Gambling, and Recreation Industries.
811 Repair and Maintenance.
812 Personal and Laundry Services.
921 Executive, Legislative, and Other General Government Support.
924 Administration of Environmental Quality Programs.
926 Administration of Economic Programs.
928 National Security and International Affairs.

This table is not intended to be exhaustive but rather provides a guide for readers regarding entities likely to be regulated by this action. This table includes the types of entities that the EPA is now aware could potentially be regulated by this action. Other types of entities not included could also be regulated. To determine whether your entity is regulated by this action, you should carefully examine the applicability criteria found in 40 CFR 118.3. If you have questions regarding the applicability of this action to a particular entity, consult the person listed in the FOR FURTHER INFORMATION CONTACT section.

B. What action is the Agency taking?

The Agency is finalizing a three-year delay of the compliance date by which a regulated facility is required to prepare and submit their CWA hazardous substances FRP, as well as language modifications to 40 CFR part 118 to remove references to climate change and environmental justice to align with Executive Order (E.O.) 14148. Delaying the compliance date to June 1, 2030, is necessary to allow the Agency to consider implementation and compliance assistance tools that regulated parties may be able to take advantage of when complying with the new requirements. EPA also recognizes that a delay would provide time for EPA to consider whether revisions are necessary before facilities must comply. Removal of the provisions related to climate change and environmental justice aligns with E.O. 14148 while ensuring proper planning for all communities and promoting a science-based and risk-based approach to planning. ( printed page 64776)

C. What is the Agency's authority for taking this action?

This final rule is authorized by sections 311(j)(5) and 501(a) of the CWA, (33 U.S.C. 1321(j)(5), 1361(a)).

D. What are the incremental costs and benefits of this action?

EPA has determined that the delay of the compliance date and the language modifications to remove references to climate change and environmental justice will have a deregulatory impact for affected facilities, State and local entities, and/or the Federal Government. Expressed in 2024 dollars, annualized cost savings due to the final rule are $25.97 million and $17.95 million using 7 and 3 percent discount rates, respectively. EPA's 2024 final rule assessed benefits of the CWA hazardous substances FRP program qualitatively, and therefore, there is no quantifiable effect of this final rule on benefits.

More details on the costs and benefits are found in Section 4, “Analysis of Costs,” and Section 5, “Analysis of Benefits,” in the “Regulatory Impact Analysis: Clean Water Act Hazardous Substance Facility Response Plans: Compliance Date Delay and Changes to Reflect Administration Policy,” which is located in the docket.

II. Background

A. Statutory Authority and Delegation of Authority

The CWA section 311(j)(5)(A)(i) states, “[t]he President shall issue regulations which require an owner or operator of a tank vessel or facility . . . to prepare and submit to the President a plan for responding, to the maximum extent practicable, to a worst case discharge, and to a substantial threat of such a discharge, of oil or a hazardous substance.” The EPA Administrator was delegated authority under E.O. 12777 of October 18, 1991, Implementation of section 311 of the Federal Water Pollution Control Act of October 18, 1972, as amended, and the Oil Pollution Act of 1990 (56 FR 54757), for onshore non-transportation related facilities under this statutory provision. The EPA Administrator also has authority under CWA section 501 to prescribe such regulations as are necessary to carry out provisions of the Act.

B. Clean Water Act Hazardous Substances Facility Response Plans Regulation

On March 28, 2022, the EPA proposed the CWA Hazardous Substances Worst-Case Discharge Planning Regulations (87 FR 17890); on March 28, 2024, the EPA issued final CWA Hazardous Substance FRP requirements for worst-case discharges of CWA hazardous substances (89 FR 21924) (2024 final rule). The requirements are for onshore non-transportation-related facilities that could reasonably be expected to cause substantial harm to the environment by a worst-case discharge of a CWA hazardous substance into or on the navigable waters, adjoining shorelines, or exclusive economic zone. The compliance date in the 2024 final rule for facilities to submit their Hazardous Substances FRPs to EPA is June 1, 2027.

C. Summary of the March 2026 Proposed Rule

On March 5, 2026 (91 FR 10787), the EPA proposed three modifications to the CWA Hazardous Substances FRP regulations at 40 CFR part 118: (1) delay the compliance date for regulated facilities to meet the requirements by three years; (2) remove language referencing climate change; and (3) remove language referencing environmental justice.

1. Compliance Date Delay

The EPA proposed a three-year delay in the compliance date in recognition of the complexity in implementing the new CWA Hazardous Substances FRP Regulation. Originally, in the 2022 proposal for the 2024 final rule, the EPA proposed that initially regulated facilities must prepare and submit a CWA hazardous substances FRP within 12 months (87 FR 17890 at 17921, March 28, 2022) of the effective date of the final rule. In the 2024 final rule, the EPA changed the language for plan submission to provide an initial 36-month implementation period (89 FR 21924 at 21941, March 28, 2024). In so doing, the EPA recognized that it was establishing a new program that would require significant compliance assistance. Indeed, the 2024 final rule is replete with statements where the EPA signaled its intent to provide tools and compliance assistance to help the regulated community with these new requirements because of the complexity of the new requirements to make applicability determinations. For example, there are many variables to consider in determining appropriate endpoints for all CWA hazardous substances present in a facility above the threshold quantity. CWA hazardous substances and mixtures can be present onsite in myriad types of containers and configurations. Modeling worst case discharge scenarios and making substantial harm calculations will be needed to determine not only applicability but also to inform the development of the FRPs. At the time, in recognizing both the complexity of implementing a new program and resource constraints, the EPA judged a 36-month implementation period appropriate.

Upon further consideration, on March 5, 2026 (91 FR 10787), EPA proposed extending the compliance date by another three years due in part to the complexity of the existing requirements and extent of compliance assistance that EPA said it would provide in the 2024 final rule. EPA is continuing to consider what compliance assistance and tools are necessary while simultaneously considering changes to the underlying provisions. EPA considered several lengths of delay and, after reviewing public comment, has ultimately determined that it is necessary to delay the compliance date by three years. The three-year delay balances EPA's dual priorities of implementing the FRP program as soon as possible, while also ensuring compliance and consistency across regions. This delay is necessary to allow EPA adequate time to develop tools far enough in advance of the compliance deadline so as to be actionable. Specifically, the Agency proposed delaying the compliance dates in 40 CFR 118.4 (a) for onshore non-transportation related facilities (hereafter, covered facilities or facility) as follows:

  • Covered facilities meeting the applicable criteria in40 CFR 118.3 (a) and (b) but not (c) that are in operation on March 30, 2030, must submit the Substantial Harm Certification Form by June 1, 2030, while covered facilities meeting the applicable criteria in 40 CFR 118.3 (a) and (b) after March 30, 2030, have 60 days to submit their form.
  • Initially, regulated covered facilities (covered facilities in operation on November 30, 2029, and that meet the criteria in40 CFR 118.3 or are notified by a Regional Administrator (RA) as in 40 CFR 118.5(a)) shall prepare and submit an FRP by June 1, 2030.
  • Newly regulated covered facilities (covered facilities that meet the criteria in40 CFR 118.3 or are notified by an RA as in 40 CFR 118.5(a) after November 30, 2029) shall prepare and submit an FRP within six months of meeting the criteria.
  • Newly constructed covered facilities (covered facilities starting operations after June 1, 2030) shall prepare and submit an FRP and Substantial Harm Certification Form prior to the start of operations and including a 60-day start up period adjustment phase.
  • Covered facilities regulated as a result of a planned event or change shall prepare and submit an FRP and ( printed page 64777) Substantial Harm Certification Form prior to the start of operations and including a 60-day start up period adjustment phase, but no sooner than June 1, 2030.
  • Covered facilities regulated as a result of an unplanned event or change shall prepare and submit an FRP and Substantial Harm Certification Form within six months of the unplanned event or change, but no sooner than June 1, 2030.

2. Climate Change Language Recission

The EPA proposed to remove references to climate change from the CWA hazardous substances FRP requirements in 40 CFR part 118 to reflect the January 20, 2025, E.O. 14148— Initial Rescissions of Harmful Executive Orders and Actions.E.O. 14148 specifically orders the rescission of E.O. 13990— Protecting Public Health and the Environment and Restoring Science to Tackle the Climate Crisis. Additionally, disproportionate focus on climate-related hazards may result in uneven applicability determinations, which could skew planning away from a risk-based approach. This unintended consequence could lead to planning based upon highly unlikely events, rather than foreseeable scenarios. Specifically, the Agency proposed modifications consistent with E.O. 14148 as follows:

  • Remove the term “climate change” and the associated examples from the definition of “adverse weather” under40 CFR 118.2.
  • Remove reference to “climate change” from the passive mitigation provision under40 CFR 118.5(b)(7).
  • Remove reference to “climate change” in adverse weather provision under40 CFR 118.5(b)(9).
  • Remove “impacts of climate change” and associated examples from the hazard evaluation provision under40 CFR 118.11(b)(3)(i) and replace with “in adverse weather conditions.”

3. Environmental Justice Language Recission

The EPA proposed to remove references to environmental justice from the CWA hazardous substances FRP requirements in 40 CFR part 118 to reflect E.O. 14148, which specifically orders the rescission of E.O. 14096— Revitalizing Our Nation's Commitment to Environmental Justice for All. The EPA is also concerned that undue focus on particular communities rather than on the risks posed to the community by any CWA hazardous substance release could lead to improper planning. Indeed, comprehensive substantial harm criteria should protect all communities. Specifically, the Agency proposed modifications consistent with E.O. 14148 as follows:

  • Remove “Potential to adversely impact communities with environmental justice concerns” provision under40 CFR 118.5(b)(8) and amend to read “potentially exposed or susceptible populations.”

Remove “impacts to communities with environmental justice concerns” from the hazard evaluation provision under 40 CFR 118.11(b)(3)(i).

D. Severability

EPA intends that the provisions of the rule be severable. In the event that any individual provision or part of the rule is invalidated, EPA intends that this would not render the entire rule invalid, and that any individual provisions that can continue to operate will be left in place. The rule contains many discrete provisions that operate independent of each other.

III. Discussion of the Final Rule and Public Comments

A. General Comments

A total of 30 comments were received on the proposed rule: 18 supporting the proposal, 11 opposing, and one requesting additional information. Fifteen comments were from industry groups, and 10 comments were from citizens, while the remaining five comments were submitted by two environmental and health non-governmental organizations (NGOs), one local government, one Tribal community, and one utility provider.

The comments from industry groups, the utility provider, and the local government were generally in favor of the proposed delay of the compliance deadline from June 1, 2027, to June 1, 2030, citing the complexity of the underlying rule, the cost of compliance, the lack of tools and guidance provided by the EPA, and the EPA's ongoing reconsideration of the underlying rule. Several of the comments encouraged the EPA to delay the compliance deadline by five years or more. Similarly, industry groups were generally in favor of the proposed language changes, arguing that climate change was difficult to predict, all communities should be protected, the rule was confusing as written, the proposed changes simplify compliance and follow Executive Order direction, and questioning the EPA's authority under the CWA to require covered facilities to consider environmental justice and climate change in their FRPs.

The comments from citizens, NGOs, and the Tribal community were generally opposed to the proposed delay of the compliance deadline, arguing that there could be environmental impacts of a discharge in the meantime, implementation is overdue, there is no valid reasoning for delaying compliance, and there is a need to quantify the foregone benefits associated with delaying compliance. Some commenters suggested that the EPA should have already developed the tools and guidance necessary for compliance with 40 CFR part 118, that the tools and guidance should not take three years to develop, and that a shorter delay for compliance, such as 12 months, should be sufficient to develop such tools and guidance. Similarly, many commenters were opposed to the language modifications, asserting that the proposal was arbitrary and not supported by evidence, would weaken protections for groups facing disproportionate impacts, and weaken the rule in general. These commenters stated that the proposed rule contradicts the EPA's own findings in the preamble to 40 CFR part 118, as well as argued that evidence supports climate-related hazards as contributors to severe discharge scenarios and that 40 CFR part 118 was issued under the authority of the CWA and does not need to comply with Executive Orders.

The EPA agrees with commenters that supported the compliance delay due to the complexity of the rule and lack of guidance and tools provided by EPA thus far. However, EPA disagrees with commenters who argued that a five-year extension is needed, given the Agency expects a three-year extension will be adequate time for the Agency to consider implementation and compliance assistance such as tools, guidance, or any additional measures that would best support the regulated community. EPA seeks to implement the FRP program as soon as is feasibly possible and has determined that a delay of five years is not necessary to develop compliance assistance tools and consider necessary revisions, and therefore could unnecessarily delay the eventual implementation of the rule. EPA disagrees with commenters opposed to any delay. EPA needs additional time to consider compliance assistance and tools that regulated facilities may be able to take advantage of when complying with the new and complex requirements in order to promote compliance and maximum effectiveness of the FRP program.

EPA originally proposed a delay of three years based on timeframe expectations for the Agency to consider implementation and compliance assistance tools and approaches that ( printed page 64778) would best support the regulated community and solicited comments for whether a delay was necessary and, if so, supporting rationale and data. Throughout this rulemaking, EPA has continued to assess potential timeframes for developing compliance assistance tools and reconsidering the underlying rule. EPA considered a shorter delay of two years or less but determined that any timeframe shorter than three years would not allow adequate time to develop compliance assistance tools, and allow adequate time for regulated entities to come into compliance. Moreover, it is not clear from the comments on the proposal that a delay longer than three years is necessary to ensure compliance. In finalizing a delay of three years here, EPA seeks to balance timely implementation of the FRP program with the time necessary to carry out essential compliance assistance activities. EPA believes that three years is the correct amount of time to allow for such agency activities, as well as to provide adequate time to regulated entities to come into compliance.

The Agency has repeatedly acknowledged that implementation and compliance with the 2024 rule will be extremely difficult and regulated entities may face potential barriers to compliance because tools and models do not yet exist or have not been identified. Therefore, EPA guidance and compliance assistance may be necessary to enable compliance. For example, the current planning distance approach is very complex and relies on developing modeling assumptions that, by themselves, can be difficult to consistently apply across facilities. Facilities will have to determine how to factor in the flow path, stormwater behavior, stormwater intensity, containment performance, and terrain to avoid unnecessary inconsistencies. In addition, EPA has not been able to identify models or methods that could account for the specific physical and chemical properties of each of the 296 CWA hazardous substances and mixtures thereof that could apply to both overland and in-water transport. Additional calculations are required to assess the ability to cause substantial harm to the environment and perform needed and appropriate calculations to numerous endpoints, as well as guidance and assistance for developing and implementing worst case discharge plans to protect the environment from substantial harm.

Given all the variabilities, EPA is concerned that even if facilities had compliance tools in hand today, determining applicably and submitting compliant FRPs by June of 2027 may not be possible. EPA's efforts to date confirm that the rule cannot be implemented absent a years-long effort to develop modeling and other tools necessary for compliance. Indeed, EPA is considering how to provide the necessary compliance tools far enough in advance of the compliance deadline to be actionable and simultaneously exploring whether changes to the underlying rule are warranted. In either case, EPA has determined that it is necessary to delay the compliance date by three years, to allow for EPA to develop tools far enough in advance of the compliance deadline so as to be actionable.

Guidance and other compliance assistance tools are not only necessary for regulated parties, but for EPA to administer the national CWA Hazardous Substances FRP program effectively and pursuant to the statute and corresponding regulations. EPA must ensure consistency across Regional Administrators and offices and provide regional staff with the tools to review and assess the adequacy and accuracy of CWA Hazardous Substances FRPs. For example, Regional Administrators are responsible for accepting and reviewing submitted FRPs, reviewing petitions from the public or any other party to require an FRP from any given facility, and determining if a facility that submits a substantial harm certification form is required to submit an FRP. Without vital compliance assistance, programs, and guidance, enforcement of the FRP program may vary across regions leading to uneven applications.

EPA agrees with commenters who pointed out that a delay would allow EPA to consider whether revisions to the underlying FRP provisions are necessary in order to facilitate compliance and protectiveness. On February 18, 2026, EPA published an advanced notice of proposed rulemaking to seek feedback on reconsidering the provisions that were promulgated in the 2024 rule. This Advance notice of proposed rulemaking (ANPRM) sought feedback on potential amendments to address implementation challenges and clarify requirements from the 2024 final rule. EPA accepted comments on the ANPRM through May 19, 2026. EPA recognizes that additional corrections, clarifications, and/or revisions to these standards may be needed, and such changes cannot be made without an opportunity for notice and comment. Several commenters expressed concern over incurring significant costs to comply with the 2024 rule that could potentially be wasted if EPA makes revisions to the underlying FRP provisions as contemplated in the ANPRM. Through notice and comment rulemaking on this delay rule and the recent ANPRM, EPA has identified serious barriers to compliance with the 2024 rule. EPA finds that a delay is necessary to provide time to (1) determine if guidance, calculators, outreach, or other tools can address these serious compliance issues and/or (2) determine if revision of the 2024 rule is necessary to ensure compliance with the FRP program, therefore ensuring the most effective protection of human health and the environment.

After reviewing further input from stakeholders, EPA has determined to revise the compliance deadline in order to sufficiently analyze what revisions and/or compliance assistance tools are necessary to address serious concerns that facilities may be unable to comply with the relevant requirements by the existing deadline.

EPA also agrees with commenters who supported the proposed changes to remove references to climate change and environmental justice, stating that the language modifications are needed to align with E.O. 14148, and that the changes will promote consistency without impacting 40 CFR part 118's effectiveness. The EPA disagreed with commenters who suggested the language modifications were not necessary, were arbitrary, and would weaken protections for groups facing disproportionate impacts. In particular, the language modifications will help avoid uneven applicability determinations and improper planning. A disproportionate focus on climate-related hazards may result in uneven applicability determinations, which could skew planning away from a risk-based approach. This unintended consequence could lead to planning based upon highly unlikely events, rather than foreseeable scenarios. Additionally, undue focus on particular communities rather than on the risks posed by any CWA hazardous substance release could lead to improper planning.

B. Provisions in the Final Rule

The EPA is finalizing the rule as proposed on March 5, 2026 (91 FR 10787), to modify the CWA Hazardous Substances FRPs Regulation at 40 CFR part 118. This rule finalizes language modifications to: (1) delay the compliance date by three years for regulated facilities to meet the requirements; (2) remove language on climate change; and (3) remove language on environmental justice. Please refer to section II.C of this preamble for further details. ( printed page 64779)

IV. Supporting Information

A. Children's Environmental Health

This action is not subject to the EPA's Children's Health Policy ( www.epa.gov/​children/​childrens-health-policy-and-plan) because EPA does not believe the action has considerations for human health.

The removal of climate change and environmental justice language will prevent undue focus on climate-related hazards and particular communities rather than on the risks posed by more common scenarios to the community by any CWA hazardous substance release, which could lead to improper planning. Additionally, delaying the compliance date will allow for more thorough, protective, and targeting planning efforts.

V. Statutory and Executive Orders Reviews

Additional information about these statutes and Executive Orders can be found at www.epa.gov/​laws-regulations/​laws-and-executive-orders.

A. Executive Order 12866: Regulatory Planning and Review and Executive Order 13563: Improving Regulation and Regulatory Review

This action is a significant regulatory action as defined under section 3(f)(1) of Executive Order 12866. Accordingly, it was submitted to the Office of Management and Budget (OMB) for review. Any changes made in response to OMB recommendations have been documented in the docket. The EPA prepared an analysis of the potential costs and benefits associated with this action. This analysis, “Regulatory Impact Analysis: Clean Water Act Hazardous Substance Facility Response Plans: Compliance Date Delay and Changes to Reflect Administration Policy,” is available in the docket.

B. Executive Order 14192: Unleashing Prosperity Through Deregulation

This action is considered an Executive Order 14192 deregulatory action. For regulatory accounting purposes, the estimated present value and annualized value of the cost savings of this rule are $348 million and $24 million, respectively (7% discount rate, 2024$, 2024 present value year, perpetuity time horizon). Details on the estimated cost savings of this final rule can be found in EPA's analysis of the potential costs and benefits associated with this action.

C. Paperwork Reduction Act (PRA)

This action does not impose any new information collection burden under the PRA.

D. Regulatory Flexibility Act (RFA)

I certify that this action will not have a significant economic impact on a substantial number of small entities under the RFA. The Agency is certifying that this rule will not have a significant economic impact on a substantial number of small entities because the rule has no net burden on the small entities subject to the rule. This rule will not impose a regulatory burden for small entities because it only proposes to delay the compliance date of the Clean Water Act Hazardous Substances Facility Response Plans Regulation finalized on March 24, 2024 (see 89 FR 21924). Total annualized cost savings for small entities with existing facilities that would require an FRP are estimated to be approximately $3.91-$7.29 million, using 3 and 7 percent discount rates, respectively, expressed in 2024 dollars. Total annualized cost savings for small entities with existing facilities that would not require an FRP are estimated to be approximately $73-$296 thousand, using 3 and 7 percent discount rates, respectively, expressed in 2024 dollars. The vast majority (about 97%) of small entity cost savings would accrue to entities that own or operate facilities that do require an FRP. We have therefore concluded that this action will have no net regulatory burden for all directly regulated small entities.

E. Unfunded Mandates Reform Act (UMRA)

This action does not contain an unfunded mandate as described in UMRA, 2 U.S.C. 1531-1538, and does not significantly or uniquely affect small governments. The action imposes no enforceable duty on any State, local or Tribal governments or the private sector.

F. Executive Order 13132: Federalism

This action does not have federalism implications. It will not have substantial direct effects on the states, on the relationship between the national government and the states, or on the distribution of power and responsibilities among the various levels of government.

G. Executive Order 13175: Consultation and Coordination With Indian Tribal Governments

This action does not have Tribal implications as specified in Executive Order 13175. This rule will only delay the compliance date of the CWA Hazardous Substances Facility Response Plans Regulation finalized on March 24, 2024 (see 89 FR 21924) and does not propose any new regulatory requirements. Thus, Executive Order 13175 does not apply to this action. Consistent with the EPA Policy on Consultation and Coordination with Indian Tribes, the EPA consulted with Tribal officials during the development of this action. A summary of that consultation is provided in “Tribal Consultation Summary-Clean Water Act Hazardous Substance Facility Response Plans: Compliance Date Delay and Changes to Reflect Administration Policy Final Rule,” which is located in the docket.

H. Executive Order 13045: Protection of Children From Environmental Health Risks and Safety Risks

EPA interprets Executive Order 13045 as applying only to those regulatory actions that concern environmental health or safety risks that EPA has reason to believe may disproportionately affect children, per the definition of “covered regulatory action” in section 2-202 of the Executive Order. Therefore, this action is not subject to Executive Order 13045 because it does not concern an environmental health risk or safety risk. Since this action does not concern human health, EPA's Policy on Children's Health also does not apply.

I. Executive Order 13211: Actions Concerning Regulations That Significantly Affect Energy Supply, Distribution or Use

This action is not a “significant energy action” because it is not likely to have a significant adverse effect on the supply, distribution or use of energy. The rule will not cause reductions in the supply or production of oil, fuel, coal, or electricity; nor will it result in increased energy prices, increased cost of energy distribution, or an increased dependence on foreign supplies of energy.

J. National Technology Transfer and Advancement Act (NTTAA)

This rule does not involve technical standards.

K. Congressional Review Act (CRA)

This action is subject to the CRA, and the EPA will submit a rule report to each House of the Congress and to the Comptroller General of the United States. This action meets the criteria set forth in 5 U.S.C. 804(2).

( printed page 64780)

List of Subjects in 40 CFR Part 118

  • Environmental protection
  • Hazardous substances
  • Reporting and recordkeeping requirements
  • Water pollution control

Lee Zeldin,

Administrator.

For the reasons set forth in the preamble, the EPA amends 40 CFR part 118 as follows:

PART 118—CLEAN WATER ACT HAZARDOUS SUBSTANCES FACILITY RESPONSE PLANS

1. The authority citation for part 118 is revised to read as follows:

Authority: 33 U.S.C. 1251 et seq.Executive Order 11735, superseded by Executive Order 12777, 56 FR 54757; and Executive Order 14148, 90 FR 8237.

2. Amend § 118.2 by revising the definition “Adverse weather” to read as follows:

Definitions.
* * * * *

Adverse weather means weather conditions that make it difficult for response equipment and personnel to clean up or respond to discharged CWA hazardous substances, and that must be considered when identifying response systems and equipment in a response plan for the applicable operating environment.

* * * * *

3. Amend § 118.4 by revising paragraphs (a)(1) through (5) to read as follows:

General requirements.

(a) * * *

(1) Initially regulated facilities. The owner or operator of a non-transportation related onshore facility in operation on November 30, 2029, that satisfies the criteria in § 118.3 shall prepare and submit a facility response plan that satisfies the requirements of this section and appendix A: Substantial Harm Certification Form to the Regional Administrator by June 1, 2030.

(2) Newly regulated facilities. The owner or operator of a non-transportation related onshore facility that did not satisfy the criteria in § 118.3 on November 30, 2029, but satisfies the criteria in § 118.3 after November 30, 2029 or that is notified by the Regional Administrator pursuant to § 118.5 shall prepare and submit a facility response plan that satisfies the requirements of this section and appendix A: Substantial Harm Certification Form to the Regional Administrator within six months of meeting the criteria or notification.

(3) Newly constructed facilities. For a newly constructed non-transportation related onshore facility that commences operation after June 1, 2030, and is required to prepare and submit a facility response plan based on the criteria in § 118.3, the owner or operator shall submit the facility response plan and appendix A: Substantial Harm Certification Form to the Regional Administrator prior to the start of operations. Adjustments to the facility response plan to reflect changes that occur during the start-up phase of operations must be submitted to the Regional Administrator after an operational trial period of 60 days.

(4) Facilities regulated as a result of a planned event or change. For a non-transportation related onshore facility required to prepare and submit a facility response plan after June 1, 2030, as a result of a planned change in design, construction, operation, or maintenance so that the non-transportation related onshore facility now meets the criteria in § 118.3 of this part, the owner or operator shall submit the facility response plan and appendix A: Substantial Harm Certification Form to the Regional Administrator before the portion of the non-transportation related onshore facility undergoing the planned change commences operations. Adjustments to the facility response plan to reflect changes that occur during the start-up phase of operations must be submitted to the Regional Administrator after an operational trial period of 60 days.

(5) Facilities regulated as a result of an unplanned event or change. For a non-transportation related onshore facility required to prepare and submit a facility response plan after June 1, 2030, as a result of an unplanned event or change in facility characteristics that renders the non-transportation related onshore facility subject to the criteria in § 118.3, the owner or operator shall submit the facility response plan and appendix A: Substantial Harm Certification Form to the Regional Administrator within six months of the unplanned event or change.

* * * * *

4. Amend § 118.5 by:

a. Revising paragraphs (b)(7) through (10); and

b. Removing paragraphs (b)(11) and (12).

The revisions read as follows:

Regional Administrator determination of substantial harm and significant and substantial harm.
* * * * *

(b) * * *

(7) Lack of passive mitigation measures or systems;

(8) Reportable discharge history; or

(9) Other site-specific characteristics and environmental factors that the Regional Administrator determines to be relevant to recovery, shoreline protection, and cleanup; or

(10) Density of facilities with CWA hazardous substances onsite in the immediate area.

* * * * *

5. Amend § 118.11 by revising paragraph (b)(3)(i) to read as follows:

Facility response plan requirements.
* * * * *

(b) * * *

(3) * * *

(i) Chemical-specific information, including the response considerations, health hazards, fire hazards, chemical reactivity, hazard classifications, and physical and chemical properties; and potential effects of a CWA hazardous substance worst case discharge as per § 118.10 in adverse weather conditions. Illustrative diagrams of the hazard evaluation should be included.

* * * * *

[FR Doc. 2026-20849 Filed 10-9-26; 8:45 am]

BILLING CODE 6560-50-P

Legal Citation

Federal Register Citation

Use this for formal legal and research references to the published document.

91 FR 64774

Web Citation

Suggested Web Citation

Use this when citing the archival web version of the document.

“Clean Water Act Hazardous Substance Facility Response Plans: Compliance Date Delay and Changes To Reflect Administration Policy,” thefederalregister.org (October 13, 2026), https://thefederalregister.org/documents/2026-20849/clean-water-act-hazardous-substance-facility-response-plans-compliance-date-delay-and-changes-to-reflect-administration-.