Proposed Agency Information Collection Activities; Comment Request
Under the Paperwork Reduction Act of 1995 (PRA) and its implementing regulations, FRA seeks approval of the Information Collection Request (ICR) summarized below. Before submitt...
Federal Railroad Administration (FRA), Department of Transportation (DOT).
ACTION:
Notice of information collection; request for comment.
SUMMARY:
Under the Paperwork Reduction Act of 1995 (PRA) and its implementing regulations, FRA seeks approval of the Information Collection Request (ICR) summarized below. Before submitting this ICR to the Office of Management and Budget (OMB) for approval, FRA is soliciting public comment on specific aspects of the activities identified in the ICR.
DATES:
Interested persons are invited to submit comments on or before January 25, 2027.
ADDRESSES:
Written comments and recommendations for the proposed ICR should be submitted on
www.regulations.gov
to Docket No. FRA-2026-2146. All comments received will be posted without change to the docket, including any personal information provided. Please refer to the assigned OMB control number (2130-0553) in any correspondence submitted. FRA will summarize comments received in response to this notice in a subsequent notice, made available to the public, and include them in its information collection submission to OMB for approval.
FOR FURTHER INFORMATION CONTACT:
Ms. Joanne Swafford, Information Collection Clearance Officer, at email:
joanne.swafford@dot.gov
or telephone: (757) 897-9908.
SUPPLEMENTARY INFORMATION:
The PRA, 44 U.S.C. 3501-3520, and its implementing regulations, 5 CFR part 1320, require Federal agencies to provide 60 days' notice to the public to allow comment on information collection activities before seeking OMB approval of the activities.
See44 U.S.C. 3506, 3507; 5 CFR 1320.8 through 1320.12. Specifically, FRA invites interested parties to comment on the following ICR regarding: (1) whether the information collection activities are necessary for FRA to properly execute its functions, including whether the activities will have practical utility; (2) the accuracy of FRA's estimates of the burden of the information collection activities, including the validity of the
( printed page 75974)
methodology and assumptions used to determine the estimates; (3) ways for FRA to enhance the quality, utility, and clarity of the information being collected; and (4) ways for FRA to minimize the burden of information collection activities on the public, including the use of automated collection techniques or other forms of information technology.
See44 U.S.C. 3506(c)(2)(A); 5 CFR 1320.8(d)(1).
FRA finds that soliciting public comment may reduce the administrative and paperwork burdens associated with the collection of information that Federal regulations mandate. In summary, comments received will advance three objectives: (1) reduce reporting burdens; (2) organize information collection requirements in a “user-friendly” format to improve the use of such information; and (3) accurately assess the resources expended to retrieve and produce information requested.
See44 U.S.C. 3501.
The summary below describes the ICR that FRA will submit for OMB clearance as the PRA requires:
Title:
Positive Train Control and Other Signal Systems.
OMB Control Number:
2130-0553.
Abstract:
Since December 31, 2020, by law, positive train control (PTC) systems have generally governed rail operations on PTC-mandated main lines, which encompass approximately 59,000 route miles. Railroads continue to file and update the governing FRA-approved plans, including PTC Implementation Plans, PTC Development Plans, and PTC Safety Plans. The statutory mandate requires railroads to submit to FRA Quarterly Reports on PTC System Performance on Form FRA F 6180.152, under 49 U.S.C. 20157(m). Such reporting enables FRA to oversee the failure rate and reliability of PTC technology.
In addition, among other reporting requirements, FRA's regulations require that both railroads and PTC vendors and suppliers notify FRA of certain PTC system errors and malfunctions. 49 CFR 236.1023. For example, railroads must maintain a database of all safety-relevant hazards identified in their PTC Safety Plans (PTCSP) and those that had not previously been identified in their PTCSPs. 49 CFR 236.1023(e). If the frequency of a safety-relevant hazard exceeds the thresholds in a railroad's PTCSP, or such hazard has not been previously identified in a railroad's risk analysis, then the railroad must notify FRA of the failure, malfunction, or defective condition that decreased or eliminated the safety functionality of the railroad's PTC system. 49 CFR 236.1023(e)(1). In addition, FRA's regulations require PTC vendors and suppliers to notify FRA of any safety-relevant failure, defective condition, or previously unidentified hazard discovered by the vendor or supplier and the identity of each affected and notified railroad.
In this 60-day notice, FRA has made multiple adjustments to the previously approved burden hours. While some reported burdens have decreased, the overall burden hours increased from the previously approved 51,931 hours to 53,174 hours.
FRA identified burden hours that have previously been reported for public comments. The submission of public comments in response to a
Federal Register
notice falls outside the PRA's definition of information under 5 CFR 1320.3(h)(4). Consequently, FRA is removing the burden previously attributed to public comments under §§ 236.913, 236.1011, and 236.1021.
Further, FRA has determined that requirements under § 236.1001, which permits railroads to prescribe more stringent internal rules, and § 236.1017 regarding independent third-party assessments, also fall outside the PRA's definition of information under 5 CFR 1320.3(h). The previously reported burden hours for these sections have been removed.
In addition, the deadlines for certain Class II and III railroads to submit progress reports to FRA concerning the installation of onboard PTC apparatuses have expired. Accordingly, the burden hours previously associated with § 236.1006(b) have been removed from this submission.
Finally, FRA has updated the burden estimate for § 236.587, which requires the retention of departure test records for at least 92 days. This revised estimate is the primary driver for the net increase of 1,243 annual burden hours. FRA calculated this update using data reported by railroads, ensuring the estimate provides a more precise reflection of the actual administrative burden associated with this regulatory requirement.
Type of Request:
Extension without change (with changes in estimates) of a currently approved information collection.
Affected Public:
Businesses.
Form(s):
FRA F 6180.179 and FRA F 6180.152.
Respondent Universe:
742 Railroads and 10 Vendors.
Frequency of Submission:
Quarterly, On Occasion.
Reporting Burden:
CFR section
Respondent
universe
Total annual
responses
Average time per response
Total annual burden hours
Wage rate 1
Total cost
equivalent U.S.D.
(A)
(B)
(C = A * B)
(D = C * wage
rates)
235.6 Expedited application for approval of certain changes:
—(b) Expedited application for approval of certain changes described in this section
42 railroads
10 expedited applications
5 hours
50
$94.50
$4,725.00
—(b)(2) Copy of expedited application to labor union
42 railroads
10 copies
30 minutes
5
94.50
472.50
—(b)(5) Railroad letter rescinding its request for expedited application of certain signal system changes
42 railroads
1 letter
6 hours
6
94.50
567.00
—Revised application for certain signal system changes
42 railroads
1 application
5 hours
5
94.50
472.50
—Copy of railroad revised application to labor union
42 railroads
1 copy
30 minutes
0.50
94.50
47.25
236.1 Plans, where kept:
—Railroad maintained signal plans at all interlockings, automatic signal locations, controlled points, and updates to ensure accuracy
700 railroads
25 plan changes
15 minutes
6.25
94.50
590.63
236.15 Timetable instructions:
( printed page 75975)
—Designation of automatic block, traffic control, train stop, train control, cab signal, and PTC territory in timetable instructions
700 railroads
10.00 timetable instructions
30 minutes
5
94.50
472.50
236.18 Software management control plan:
—Development and adoption of software management control plan for new railroads prior to commencing operations
2 railroads
2 plans
160 hours
320
94.50
30,240.00
236.23 Aspects and indications:
—(e) The names, indications, and aspects of roadway and cab signals shall be defined in the carrier's Operating Rule Book or Special Instructions. Modifications shall be filed with FRA within 30 days after such modifications become effective
700 railroads
2 modifications
1 hour
2
94.50
189.00
236.587 Departure test:
—(d) Certification and departure test results
742 railroads
6,054,538 train departures
5 seconds
8,409
94.50
794,650.50
236.905 Railroad Safety Program Plan (RSPP):
—(a) New railroads RSPP for FRA approval
2 railroads
2 RSPPs
40 hours
80
94.50
7,560.00
236.913 Filing and approval of PSPs:
—(a) Filing and approval of a joint Product Safety Plan (PSP)
742 railroads
1 joint plan
2,000 hours
2,000
127.05
254,100.00
—(c)(1) Informational filing
742 railroads
0.50 informational filings
50 hours
25
94.50
2,362.50
—(c)(2) Response to FRA's request for further data after informational filing
742 railroads
0.25 data calls
5 hours
1.25
94.50
118.13
—(d)(1)(ii) Response to FRA's request for further information within 15 days after receipt of the Notice of Product Development (NOPD)
742 railroads
0.25 data calls
1 hour
0.25
94.50
23.63
—(d)(1)(iii) Technical consultation by FRA with the railroad on the design and planned development of the product
742 railroads
0.25 technical consultations
5 hours
1.25
94.50
118.13
—(d)(1)(v) Railroad petition to FRA for final approval of NOPD
742 railroads
0.25 petitions
1 hour
0.25
94.50
23.63
—(d)(2)(ii) Response to FRA's request for additional info. associated with a petition for approval of PSP or PSP amendment
742 railroads
1.00 request
50 hours
50
94.50
4,725.00
—(h)(3)(i) Railroad amendment to PSP
742 railroads
2 amendments
20 hours
40
94.50
3,780.00
—(j) Railroad field testing/information filing document
742 railroads
1 field test
100 hours
100
94.50
9,450.00
236.917 Retention of records:
—(a)(2) Results of tests and inspections specified in the PSP
13 railroads with PSP
13 PSP safety results
160 hours
2,080
94.50
196,560.00
—(b) Railroad report that frequency of safety-relevant hazards exceeds threshold set forth in PSP
13 railroads
1 report
40 hours
40
94.50
3,780.00
—(b)(3) Railroad final report to FRA on the results of the analysis and countermeasures taken to reduce the frequency of safety-relevant hazards
13 railroads
1 report
10 hours
10
94.50
945.00
236.919 Operations and Maintenance Manual:
—(a) Railroad Operations and Maintenance Manual (OMM)
13 railroads
1 OMM update
40 hours
40
94.50
3,780.00
—(b) Plans for proper maintenance, repair, inspection, and testing of safety-critical products
13 railroads
1 plan update
40 hours
40
94.50
3,780.00
—(c) Documented hardware, software, and firmware revisions in OMM
13 railroads
1 revision
40 hours
40
$94.50
$3,780.00
236.921 Training and qualification program, general:
—(a) Railroad Training and Qualification Program meeting the requirements of §§ 236.923-236.929
13 railroads
1 program
40 hours
40
94.50
3,780.00
236.923 Task analysis and basic requirements:
—(b) Training records retained in a designated location and available to FRA upon request
13 railroads
350 records
10 minutes
58.33
94.50
5,512.19
236.1005 Requirements for PTC systems:
( printed page 75976)
—(b)(4)(i) through (ii) A railroad's submission of estimated traffic projections for the next 5 years, to support a request, in a PTCIP or an RFA, not to implement a PTC system based on reductions in rail traffic
The estimated paperwork burden for this requirement is included under § 236.1009(a) and § 236.1021.
—(b)(4)(iii) A railroad's request for a
de minimis
exception, in a PTCIP or an RFA, based on a minimal quantity of PIH materials traffic
6 Class I railroads
1 exception request
40 hours
40
94.50
3,780.00
—(b)(5) A railroad's request to remove a line from its PTCIP based on the sale of the line to another railroad and any related request for FRA review from the acquiring railroad
The burden for this requirement is included under § 236.1009(a) and § 236.1021.
—(g)(1)(i) A railroad's request to temporarily reroute trains not equipped with a PTC system onto PTC-equipped tracks and vice versa during certain emergencies
38 railroads
45 routing extension requests
8 hours
360
94.50
34,020.00
—(g)(1)(ii) A railroad's written or telephonic notice to the applicable FRA Regional Administrator of the conditions necessitating emergency rerouting and other required information under § 236.1005(i)
38 railroads
45 written or telephonic notices
2 hours
90
94.50
8,505.00
—(g)(2) A railroad's temporary rerouting request due to planned maintenance not exceeding 30 days
38 railroads
720 requests
8 hours
5,760
94.50
544,320.00
—(h)(1) A response to any request for additional information from the FRA Regional Administrator or Associate Administrator, prior to commencing rerouting due to planned maintenance
38 railroads
10 requests
2 hours
20
94.50
1,890.00
—(h)(2) A railroad's request to temporarily reroute trains due to planned maintenance exceeding 30 days
38 railroads
160 requests
8 hours
1,280
94.50
120,960.00
236.1006 Equipping locomotives operating in PTC territory
—(b)(5)(vii) A railroad's request to utilize different yard movement procedures, as part of a freight yard movements exception
The burden for this requirement is included under § 236.1015 and § 236.1021.
236.1007 Additional requirements for high-speed service
—(b)(1) For any high-speed service over 90 mph, a railroad's PTCSP must additionally establish that the PTC system was designed and will be operated to meet the fail-safe operation criteria in Appendix C.
The burden for this requirement is included under § 236.1015 and § 236.1021.
—(c) An HSR-125 document accompanying a host railroad's PTCSP, for operations over 125 mph
38 railroads
1 HSR-125 document
3,200 hours
3,200
127.05
406,560.00
—(c)(1) A railroad's request for approval to use foreign service data, prior to submission of a PTCSP
38 railroads
0.33 request
8,000 hours
2,640
94.50
249,480.00
—(d) A railroad's request in a PTCSP that FRA excuse compliance with one or more of this section's requirements
38 railroads
1 request
1,000 hours
1,000
127.05
127,050.00
236.1009 Procedural requirements:
—(a)(2) A host railroad shall file a PTCIP if it becomes a host railroad of a main line requiring the implementation of a PTC system, including the information under 49 U.S.C. 20157(a)(2) and 49 CFR 236.1011
226 railroads
1 PTCIP
535 hours
535
127.05
67,971.75
—(a)(3) Any new PTCIPs jointly filed by a host railroad and a tenant railroad
226 railroads
1 joint PTCIP
267 hours
267
127.05
33,922.35
—(b)(1) A host railroad's submission, individually or jointly with a tenant railroad or PTC system supplier, of an unmodified Type Approval
226 railroads
1 documents
8 hours
8
94.50
756.00
( printed page 75977)
—(b)(2) A host railroad's submission of a PTC Development Plan (PTCDP) with the info. required under 49 CFR 236.1013, requesting a Type Approval for a PTC system that either does not have a Type Approval or has a Type Approval that requires one or more variances
226 railroads
1 PTCDP
2,000 hours
2,000
94.50
189,000.00
—(d) A host railroad's submission of a PTCSP
The burden for this requirement is included under § 236.1015.
—(e)(3) Any request for full or partial confidentiality of a PTCIP, Notice of Product Intent (NPI), PTCDP, or PTCSP
38 railroads
10 confidentiality requests
8 hours
80
94.50
7,560.00
—(h) Any responses or documents submitted in connection with FRA's use of its authority to monitor, test, and inspect processes, procedures, facilities, documents, records, design and testing materials, artifacts, training materials and programs, and any other info. used in the design, development, manufacture, test, implementation, and operation of the PTC system, including interviews with railroad personnel
38 railroads
36 interviews and documents
4 hours
144
94.50
13,608.00
—(j)(1) Any additional info. provided in response to FRA's consultations or inquiries about a PTCDP or PTCSP
38 railroads
1 set of additional information
400 hours
400
94.50
37,800.00
236.1011 PTC Implementation Plan content requirements (PTCIP):
—PTCIP content requirements
The burden for this requirement is included under § 236.1009(a) and (e) and §§ 236.1021.
236.1013 PTC Development Plan and Notice of Product Intent (NPI) content requirements and Type Approval:
—PTCDP and NPI content requirements
The estimated paperwork burden for this requirement is included under § 236.1009(b), (c), and (e) and § 236.1021
236.1015 PTC Safety Plan content requirements and PTC System Certification:
—Any new host railroad's PTCSP meeting all content requirements under § 236.1015
38 railroads
1 PTCSP
8,000 hours
8,000
94.50
756,000.00
—(g) A PTCSP for a PTC system replacing an existing certified PTC system
38 railroads
0.33 PTCSP
3,200 hours
1,056
94.50
99,792.00
—(h) A quantitative risk assessment, if FRA requires one to be submitted
38 railroads
0.33 assessment
800 hours
264
94.50
24,948.00
236.1017 Independent third party Verification and Validation:
—(b) A railroad's written request to confirm whether a specific entity qualifies as an independent third party
38 railroads
0.33 written request
8 hours
2.64
94.50
249.48
—Further info. provided to FRA upon request
38 railroads
0.33 set of additional information
20 hours
6.60
94.50
623.70
—(d) A request not to provide certain documents otherwise required under Appendix F for an independent, third-party assessment
38 railroads
0.33 request
20 hours
6.60
94.50
623.70
—(e) A request for FRA to accept information certified by a foreign regulatory entity for purposes of §§ 236.1017 and/or 236.1009(i)
38 railroads
0.33 request
32 hours
10.56
94.50
997.92
236.1019 Main line track exception:
—(b) A request for a passenger terminal main line track exception (MTEA)
38 railroads
1 MTEA
160 hours
160
94.50
15,120.00
—(c)(1) A request for a limited operations exception (based on restricted speed, temporal separation, or a risk mitigation plan)
38 railroads
1 request and/or plan
160 hours
160
94.50
15,120.00
—(c)(2) A request for a limited operations exception for a non-Class I, freight railroad's track
10 railroads
1 request
160 hours
160
94.50
15,120.00
—(c)(3) A request for a limited operations exception for a Class I railroad's track
6 railroads
1 request
160 hours
160
94.50
15,120.00
—(d) A railroad's collision hazard analysis in support of an MTEA, if FRA requires one to be conducted and submitted
38 railroads
0.33 collision hazard analysis
50 hours
16.50
94.50
1,559.25
( printed page 75978)
—(e) Any temporal separation procedures utilized under the § 236.1019(c)(1)(ii) exception
The burden for this requirement is included under § 236.1019(c)(1).
236.1021 Discontinuances, material modifications, and amendments:
—(a) through (d) Request for RFA to a railroad's PTCIP or PTCDP
38 railroads
10 RFAs
160 hours
1,600
94.50
151,200.00
—(l) Any jointly filed RFA to a PTCDP or PTCSP
The burden for this requirement is included under § 236.1021(a)-(d) and (m).
—(m) Any RFA to a railroad's PTCSP
38 railroads
15 RFAs
80 hours
1,200
94.50
113,400.00
236.1023 Errors and malfunctions:
—(a) A railroad's PTC Product Vendor List, which must be continually updated
38 railroads
2 updated lists
8 hours
16
94.50
1,512.00
—(b)(1) The railroad shall specify within its PTCSP all contractual arrangements between a railroad and its hardware and software suppliers or vendors for certain immediate notifications
The burden for this requirement is included under § 236.1015 and § 236.1021.
—(b)(2) through (3) A vendor's or supplier's notification, upon receipt of a report of any safety-critical failure of its product, to any railroads using the product
10 vendors or suppliers
10 notifications
8 hours
80
94.50
7,560.00
—(c)(1) through (2) A railroad's process and procedures for taking action upon being notified of a safety-critical failure or a safety-critical upgrade, patch, revision, repair, replacement, or modification, and a railroad's configuration/revision control measures, set forth in its PTCSP
The burden for this requirement is included under § 236.1015 and § 236.1021.
—(d) A railroad's submission, to the applicable vendor or supplier, of the railroad's procedures for action upon notification of a safety-critical failure, upgrade, patch, or revision to the PTC system and actions to be taken until it is adjusted, repaired, or replaced
38 railroads
2.50 notifications
16 hours
40
94.50
3,780.00
—(e) A railroad's database of all safety-relevant hazards, which must be maintained after the PTC system is placed in service
38 railroads
38 database updates
16 hours
608
94.50
57,456.00
—(e)(1) A railroad's notification to the vendor or supplier and FRA if the frequency of a safety-relevant hazard exceeds the threshold set forth in the PTCDP and PTCSP, and about the failure, malfunction, or defective condition that decreased or eliminated the safety functionality, Form FRA F 6180.179—Errors and Malfunctions Notification
38 railroads
8 notifications
8 hours
60
94.50
5,670.00
—(e)(2) Continual updates about any and all subsequent failures
38 railroads
1 update
8 hours
8
94.50
756.00
—(f) Any notifications that must be submitted to FRA under § 236.1023
The burden for this requirement is included under § 236.1023(e)(1), (g), and (h)(1)(2).
—(g) A railroads and vendor's or supplier's report, upon FRA request, about an investigation of an accident or service difficulty due to a manufacturing or design defect and their corrective actions
38 railroads
0.50 reports
40 hours
20
94.50
1,890.00
—(h) A PTC system vendor's or supplier's reports of any safety-relevant failures, defective conditions, previously unidentified hazards, recommended mitigation actions, and any affected railroads, Form FRA F 6180.179—Errors and Malfunctions Notification
10 vendors
20 reports
8 hours
150
94.50
14,175.00
( printed page 75979)
—(k) A report of a failure of a PTC system resulting in a more favorable aspect than intended or other condition hazardous to the movement of a train, including the reports required under part 233
The burden for this requirement is included under § 236.1023 (e)(1), (g), and (h)(1)(2) and § 233.7
236.1029 PTC system use and failures:
—(b)(4) A report of an en route failure, other failure, or cut out to a designated railroad officer of the host railroad
—Form FRA F 6180.152—Quarterly Report of PTC System Performance
38 railroads
146 reports
32 hours
4,672
94.50
441,504.00
236.1031 Previously approved PTC systems:
—(a) through (d) A railroad's Request for Expedited Certification
FRA anticipates that there will be zero requests for expedited certification during this 3-year ICR.
236.1033 Communications and security requirements:
—Prioritized service restoration and mitigation plan for scheduled and unscheduled interruptions of service
The burden for this requirement is included under § 236.1009 and § 236.1015.
236.1035 Field testing requirements:
—(a)-(b) A railroad's request for authorization to field test an uncertified PTC system and any responses to FRA's testing conditions
38 railroads
10 requests
40 hours
400
94.50
37,800.00
236.1037 Records retention:
(a)(1)-(2) Records retention
The burden for this requirement is included under § 236.1009 and § 236.1015.
—(a)(3)-(4) Records retention
The burden for this requirement is included under § 236.1039 and § 236.1043(b).
—(b) Results of inspections and tests specified in a railroad's PTCSP and PTCDP
87 railroads
800 records
1 hour
800
94.50
75,600.00
—(c) A contractor's records related to the testing, maintenance, or operation of a PTC system maintained at a designated office
20 contractors
1,600 records
10 minutes
266.67
94.50
25,200.32
—(d)(3) A railroad's final report of the results of the analysis and countermeasures taken to reduce the frequency of safety-related hazards below the threshold set forth in the PTCSP
38 railroads
8 final reports
160 hours
1,280
94.50
120,960.00
236.1039 Operations and Maintenance Manual:
—(a)-(c), (e) A railroad's PTC Operations and Maintenance Manual (OMM), which must be maintained and available to FRA upon request
38 railroads
2 OMM updates
10 hours
20
94.50
1,890.00
—(d) A railroad's identification of a PTC system's safety-critical components, including spare equipment
38 railroads
1 identified new component
1 hour
1
94.50
94.50
236.1041 Training and qualification program, general:
(a)-(b) A railroad's PTC Training and Qualification Program meeting the requirements of §§ 236.1039 through 236.1045 (
i.e.,
a written plan)
38 railroads
2 programs
10 hours
20
94.50
1,890.00
236.1043 Task analysis and basic requirements:
—(b)—Training records retained in a designated location and available to FRA upon request
150 host and tenant railroads
150 PTC training records
1 hour
150
94.50
14,175.00
Total 2
742 railroads 10 vendors
6,059,845 responses
53,174
5,252,825.03
( printed page 75980)
Total
Estimated Annual Responses:
6,059,845.
Total Estimated Annual Burden:
53,174 hours.
Total Estimated Annual Burden Hour Dollar Cost Equivalent:
$5,252,825.03.
FRA informs all interested parties that it may not conduct or sponsor, and a respondent is not required to respond to, a collection of information that does not display a currently valid OMB control number.
1.
The dollar equivalent cost is derived from the 2025 Surface Transportation Board Full Year Wage A&B data series using employee group 200 (Professional & Administrative) hourly wage rate of $54 and employee group 100 (Executives, Officials, & Staff Assistants) hourly wage rate of $72.60. The total burden wage rate (straight time plus 75%) used in the table is $94.50 ($54 × 1.75 = $94.50) and $127.05 ($72.60 × 1.75 = $127.05).