Approval and Promulgation of State Implementation Plans; CaliforniaVentura County Air Pollution Control District

EPA is taking final action to approve a state implementation plan (SIP) revision submitted by the State of California relating to control measures for attaining the ozone nation...

[Federal Register Volume 63, Number 76 (Tuesday, April 21, 1998)]
[Rules and Regulations]
[Pages 19659-19661]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 98-10398]


-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

40 CFR Part 52

[CA-203-0062; FRL-5996-4]


Approval and Promulgation of State Implementation Plans; 
California--Ventura County Air Pollution Control District

Agency

Environmental Protection Agency (EPA).

Action

Final rule.

-----------------------------------------------------------------------

Summary

EPA is taking final action to approve a state implementation plan (SIP) revision submitted by the State of California relating to control measures for attaining the ozone national ambient air quality standards (NAAQS) in the Ventura County nonattainment area. The submittal revises control measure adoption schedules in the 1994 ozone SIP for Ventura County. EPA is approving the SIP revision under provisions of the Clean Air Act (CAA or the Act) regarding EPA action on SIP submittals, SIPs for national primary and secondary ambient air quality standards, and plan requirements for nonattainment areas.

EFFECTIVE DATE: This action is effective on May 21, 1998.

Addresses

The rulemaking docket for this document may be inspected and copied at the following locations during normal business hours. A reasonable fee may be charged for copying parts of the docket.

Environmental Protection Agency, Region 9, Air Division, Air Planning Office, 75 Hawthorne Street, San Francisco, CA 94105-3901. Air and Radiation Docket and Information Center (6102), Environmental Protection Agency, 401 M Street, SW., Washington, DC 20460.

Copies of the SIP materials are also available for inspection at the addresses listed below:

California Air Resources Board, 2020 L Street, Sacramento, California.

Ventura County Air Pollution Control District, 669 County Square Drive, Ventura, California.

For Further Information Contact

Dave Jesson (415) 744-1288, Air Planning Office (AIR-2), Air Division, U.S. EPA, Region 9, 75 Hawthorne Street, San Francisco, California, 94105-3901.

Supplementary Information

I. Background

EPA is finalizing approval of a revision to the Ventura 1994 ozone SIP. The revision was included in the Ventura County 1997 Air Quality Management Plan Revision, which was adopted on October 21, 1997. The revision updates the adoption and implementation dates for 8 measures in the 1994 ozone SIP. On November 5, 1997, CARB adopted and submitted this update as a SIP revision. On November 19, 1997, EPA found the revision to be complete, pursuant to EPA's completeness criteria that are set forth in 40 CFR part 51, Appendix V.\1\ On December 5, 1997, CARB submitted a technical correction to the November 5, 1997 submittal. ---------------------------------------------------------------------------

\1\ EPA adopted the completeness criteria on February 16, 1990 (55 FR 5830) and, pursuant to section 110(k)(1)(A) of the CAA, revised the criteria on August 26, 1991 (56 FR 42216). ---------------------------------------------------------------------------

This action was proposed on December 24, 1997 (62 FR 67320-23). The reader is referred to that notice for additional detail on the affected area and the SIP submittal, as well as a summary of relevant CAA provisions and EPA interpretations of those provisions.

II. Public Comments

EPA received no comments on the proposal.

III. EPA Final Action

In this document, EPA is taking final action to approve the 1997 update to the 1994 ozone SIP for Ventura under sections 110(k)(3) and 301(a) of the Act. The effect of this approval is to amend the federally enforceable adoption and implementation dates and emission reductions for 8 measures in the Ventura 1994 ozone SIP as shown in the tables in the proposed approval entitled ``Revised Adoption and Implementation Dates for Ventura Measures'' and ``Revised Emission Reductions for Ventura Measures'' (62 FR 67321-22). The amended measures are: R-303 AIM Architectural Coatings, R-322 Painter Certification Program, R-327 Electronic Component Manufacturing, R-410 Marine Tanker Loading, R-420 Pleasure Craft Fuel Transfer, R-421 Utility Engine Refueling Operations, R-425 Enhanced Fugitive I/M Program, N-102 Boilers, Steam Generators, Heaters <1 MMBtu.

IV. Regulatory Process

A. Executive Order 12866

The Office of Management and Budget (OMB) has exempted this regulatory action from E.O. 12866 review.

B. Regulatory Flexibility Act

Under the Regulatory Flexibility Act, 5 U.S.C. 600 et seq., EPA must prepare a regulatory flexibility analysis assessing the impact of any proposed or final rule on small entities. 5 U.S.C. 603 and 604. Alternatively, EPA may certify that the rule will not have a significant impact on a substantial number of small entities. Small entities include small business, small not-for-profit enterprises and government entities with jurisdiction over populations of less than 50,000. SIP approvals under sections 110 and subchapter I, part D of the CAA, do not create any new requirements, but simply approve requirements that the State is already imposing. Therefore, because the Federal SIP approval does not impose any new requirements, the Administrator certifies that it does not have a significant impact on any small entities affected. Moreover, due to the nature of the Federal-State relationship under the CAA, preparation of a regulatory flexibility analysis would constitute Federal inquiry into the economic reasonableness of state action. The CAA forbids EPA to base its actions concerning SIP's on such grounds. Union Electric Co. v. U.S.E.P.A., 427 U.S. 246, 256-66 (S.Ct. 1976); 42 U.S.C. 7410(a)(2).

C. Unfunded Mandates

Under sections 202 of the Unfunded Mandates Reform Act of 1995 (``Unfunded Mandates Act'') signed into law on March 22, 1995, EPA must prepare a budgetary impact statement to accompany any proposed or final rule that includes a Federal mandate that may result in estimated costs to State, local, or tribal governments in the aggregate; or to the private sector, of $100 million or more. Under Section 205, EPA must select the most cost-effective and least burdensome alternative that achieves the objectives of the rule and is consistent with statutory requirements. Section 203 requires EPA to establish a plan for informing and advising any small governments that may be significantly or uniquely impacted by the rule. EPA has also determined that this final action does not include a mandate that may result in estimated costs of $100 million or more to State, local, or tribal governments in the aggregate or to the private sector. This Federal action approves pre-existing requirements under State or local law, and imposes no new Federal requirements. Accordingly, no additional costs to State, local, or tribal governments, or to the private sector, result from this action.

D. Submission to Congress and the General Accounting Office

Under 5 U.S.C. 801(a)(1)(A) as added by the Small Business Regulatory Enforcement Fairness Act of 1996, EPA submitted a report containing this rule and other required information to the U.S. Senate, the U.S. House of Representatives and the Comptroller General of the General Accounting Office prior to publication of the rule in today's Federal Register. This rule is not a ``major'' rule as defined by 5 U.S.C. 804(2).

E. Petitions for Judicial Review

Under section 307(b)(1) of the Clean Air Act, petitions for judicial review of this action must be filed in the United States Court of Appeals for the appropriate circuit by June 22, 1998. Filing a petition for reconsideration by the Administrator of this final rule does not affect the finality of this rule for the purposes of judicial review nor does it extend the time within which a petition for judicial review may be filed, and shall not postpone the effectiveness of such rule or action. This action may not be challenged later in proceedings to enforce its requirements. (See section 307(b)(2).)

List of Subjects in 40 CFR Part 52

Environmental protection, Air pollution control, Hydrocarbons, Incorporation by reference, Intergovernmental relations, Nitrogen oxides, Ozone, Volatile organic compounds.

Note: Incorporation by reference of the State Implementation Plan for the State of California was approved by the Director of the Federal Register on July 1, 1982.

Dated: April 2, 1998. Felicia Marcus, Regional Administrator, Region IX.

Part 52, chapter I, title 40 of the Code of Federal Regulations is amended as follows:

PART 52--[AMENDED]

1. The authority citation for part 52 continues to read as follows:

Authority: 42 U.S.C. 7401 et seq.

Subpart F--California

2. Section 52.220 is amended by adding paragraph (c)(251) to read as follows:

Sec. 52.220 Identification of plan.

* * * * * (c) * * * (251) New and amended plans for the following agency were submitted on November 5, 1997, by the Governor's designee. (i) Incorporation by reference. (A) Ventura County Air Pollution Control District. (1) Commitments to adopt and implement control measures contained in the Ventura 1997 Air Quality Management Plan, adopted on October 21, 1997.

[FR Doc. 98-10398 Filed 4-20-98; 8:45 am] BILLING CODE 6560-50-P

Legal Citation

Federal Register Citation

Use this for formal legal and research references to the published document.

63 FR 19659

Web Citation

Suggested Web Citation

Use this when citing the archival web version of the document.

“Approval and Promulgation of State Implementation Plans; CaliforniaVentura County Air Pollution Control District,” thefederalregister.org (April 21, 1998), https://thefederalregister.org/documents/98-10398/approval-and-promulgation-of-state-implementation-plans-californiaventura-county-air-pollution-control-district.