[Federal Register Volume 63, Number 226 (Tuesday, November 24, 1998)] [Notices] [Page 64947] From the Federal Register Online via the Government Publishing Office [www.gpo.gov] [FR Doc No: 98-31302] ----------------------------------------------------------------------- DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP99-66-000] Columbia Gas Transmission; Notice of Request Under Blanket Authorization November 18, 1998. Take notice that on November 10, 1998, Columbia Gas Transmission Corporation (Columbia), 12801 Fair Lakes Parkway, Fairfax, Virginia 22030 filed in Docket No. CP99-66-000 a request pursuant to Sections 157.205 and 157.212 of the Commission's Regulations under the Natural Gas Act (18 CFR 157.205, 157.212) is seeking NGA Section 7 certification for an existing point of delivery in Morgan County, Kentucky under Columbia's blanket certificate issued in Docket No. CP83-76-000 pursuant to Section 7 of the Natural Gas Act, all as more fully set forth in the request on file with the Commission and open to public inspection. Columbia requests certification for the existing NGPA Section 311 point of delivery so it can provide both part 284, Subpart B, and Subpart G transportation. The existing point of delivery for which Columbia requests NGA certification under Sections 157.205 and 157.212 is for Jefferson Gas Transmission Company, Inc. (Jefferson Gas), the maximum daily quantity is 600 Dth, the annual quantity is 219,000 Dth and the end use of gas will be commercial. The transportation service to be provided through the existing point of delivery will be interruptible service provided under Columbia's Rate Schedule, Interruptible Transportation Service (ITS). Columbia states that the services to be provided through the interconnection will be provided on an interruptible basis and will not impact Columbia's existing design day and annual obligations to its customers as a result of the establishment of the new point of delivery. Columbia constructed the existing point of delivery to Jefferson Gas in Morgan County, Kentucky, which was placed in service on January 17, 1997. The cost of constructing the existing point of delivery was $2,078. Facilities installed by Columbia included a 2-inch meter setting and a short length of interconnecting 2-inch pipeline. Any person or the Commission's staff may, within 45 days after issuance of the instant notice by the Commission, file pursuant to Rule 214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to intervene or notice of intervention and pursuant to Section 157.205 of the Regulations under the Natural Gas Act (18 CFR 157.205) a protest to the request. If no protest is filed within the time allowed therefor, the proposed activity shall be deemed to be authorized effective the day after the time allowed for filing a protest. If a protest is filed and not withdrawn within 30 days after the time allowed for filing a protest, the instant request shall be treated as an application for authorization pursuant to Section 7 of the Natural Gas Act. Linwood A. Watson, Jr., Acting Secretary. [FR Doc. 98-31302 Filed 11-23-98; 8:45 am] BILLING CODE 6717-01-M
Document
Columbia Gas Transmission; Notice of Request Under Blanket Authorization
[Federal Register Volume 63, Number 226 (Tuesday, November 24, 1998)] [Notices] [Page 64947] From the Federal Register Online via the Government Publishing Office [ www.gpo.gov ...
Legal Citation
Federal Register Citation
Use this for formal legal and research references to the published document.
63 FR 64947
Web Citation
Suggested Web Citation
Use this when citing the archival web version of the document.
“Columbia Gas Transmission; Notice of Request Under Blanket Authorization,” thefederalregister.org (November 24, 1998), https://thefederalregister.org/documents/98-31302/columbia-gas-transmission-notice-of-request-under-blanket-authorization.