Document

Golden Field Office; Notice of Time Variance

The Department of Energy's Golden Field Office is reducing the standard 14 day review and comment period for Notice Of Scoping and Review of Predecisional Draft Environmental As...

[Federal Register Volume 63, Number 37 (Wednesday, February 25, 1998)]
[Notices]
[Pages 9507-9508]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 98-4775]


=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF ENERGY


Golden Field Office; Notice of Time Variance

Agency

Golden Field Office, DOE.

Action

Notice of time variance.

-----------------------------------------------------------------------

Summary

The Department of Energy's Golden Field Office is reducing the standard 14 day review and comment period for Notice Of Scoping and Review of Predecisional Draft Environmental Assessment in connection with the proposed granting of a Right-Of-Way Easement to the Public Service Company of Colorado. In accordance with 10 CFR 1021.343(b) Reduction of Time Periods, DOE is reducing the time period for review and comment from 14 days to 7 days.

Dates

Comments to the notice of Scoping and Predecisional Draft will be due to DOE 7 days after the date of issuance.

Addresses

Comments should be addressed to Deborah A. Turner, U.S. Department of Energy, 1617 Cole Boulevard, Golden CO, 80401, Phone (303) 275-4746, Fax (303) 275-4788.

FOR FURTHER INFORMATION ON GENERAL DOE NEPA REQUIREMENTS, CONTACT: Carol M. Borgstrom, Director, Office of NEPA Policy and Assistance, EH- 42, U.S. Department of Energy, 1000 Independence Avenue, SW, Washington, D.C. 20585, Phone (202) 586-4600 or 1-800-472-2756, Fax (202) 586-7031.

Supplementary Information

The Public Service Company of Colorado has conducted extensive public and state agency outreach and coordination regarding the installation of a 26 mile high pressure natural gas line in the state of Colorado. The outreach and coordination activities have been ongoing since August 1996 and all other Federal, State, and local approvals have been obtained. A 0.25 mile portion of this pipeline is proposed to cross the South Table Mountain (STM) Site located in Golden, Colorado. The Golden Field Office is preparing an Environmental Assessment in relation to the potential granting of the Right-of-Way Easement that will allow the 0.25 mile portion of pipeline to be installed across our STM site. Construction and installation of the pipeline has already

commenced on both boundaries to the STM site under Right-of-Way easements from other parties.

Issued in Golden, Colorado, on February 13, 1998. Frank M. Stewart, Manager, Golden Field Office. [FR Doc. 98-4775 Filed 2-24-98; 8:45 am] BILLING CODE 6450-01-P

Legal Citation

Federal Register Citation

Use this for formal legal and research references to the published document.

63 FR 9507

Web Citation

Suggested Web Citation

Use this when citing the archival web version of the document.

“Golden Field Office; Notice of Time Variance,” thefederalregister.org (February 25, 1998), https://thefederalregister.org/documents/98-4775/golden-field-office-notice-of-time-variance.