80_FR_10765 80 FR 10726 - North Anna Power Station Independent Spent Fuel Storage Installation

80 FR 10726 - North Anna Power Station Independent Spent Fuel Storage Installation

NUCLEAR REGULATORY COMMISSION

Federal Register Volume 80, Issue 39 (February 27, 2015)

Page Range10726-10727
FR Document2015-04133

The U.S. Nuclear Regulatory Commission (NRC) is considering a license amendment request for the Special Nuclear Materials (SNM) License SNM-2507 for the North Anna Power Station (NA) independent spent fuel storage installation (ISFSI) located in Louisa County, Virginia.

Federal Register, Volume 80 Issue 39 (Friday, February 27, 2015)
[Federal Register Volume 80, Number 39 (Friday, February 27, 2015)]
[Notices]
[Pages 10726-10727]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-04133]


=======================================================================
-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[Docket No. 72-16; NRC-2014-0154]


North Anna Power Station Independent Spent Fuel Storage 
Installation

AGENCY: Nuclear Regulatory Commission.

ACTION: Environmental assessment and finding of no significant impact; 
issuance.

-----------------------------------------------------------------------

SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is considering a 
license amendment request for the Special Nuclear Materials (SNM) 
License SNM-2507 for the North Anna Power Station (NA) independent 
spent fuel storage installation (ISFSI) located in Louisa County, 
Virginia.

DATES: The environmental assessment and finding of no significant 
impact referenced in this document are available on February 27, 2015.

ADDRESSES: Please refer to Docket ID NRC-2014-0154 when contacting the 
NRC about the availability of information regarding this document. You 
may obtain publicly-available information related to this document 
using any of the following methods:
     Federal Rulemaking Web site: Go to http://www.regulations.gov and search for Docket ID NRC-2014-0154. Address 
questions about NRC dockets to Carol Gallagher; telephone: 301-415-
3463; email: [email protected]. For technical questions, contact 
the individual listed in the FOR FURTHER INFORMATION CONTACT section of 
this document.
     NRC's Agencywide Documents Access and Management System 
(ADAMS): You may obtain publicly-available documents online in the 
ADAMS Public Documents collection at http://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``ADAMS Public Documents'' and 
then select ``Begin Web-based ADAMS Search.'' For problems with ADAMS, 
please contact the NRC's Public Document Room (PDR) reference staff at 
1-800-397-4209, 301-415-4737, or by email to [email protected]. The 
ADAMS accession number for each document referenced in this document 
(if that document is available in ADAMS) is provided the first time 
that a document is referenced.
     NRC's PDR: You may examine and purchase copies of public 
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555 
Rockville Pike, Rockville, Maryland 20852.

FOR FURTHER INFORMATION CONTACT: Jean Trefethen, Office of Nuclear 
Material Safety and Safeguards, U.S. Nuclear Regulatory Commission, 
Washington, DC 20555-0001; telephone: 301-415-5137, email: 
[email protected].

SUPPLEMENTARY INFORMATION:

I. Introduction

    The NRC is considering a license amendment request for Special 
Nuclear Materials License Number SNM-2507 for the NA ISFSI located in 
Louisa County, Virginia (ADAMS Accession No. ML14160A707). The 
applicant, Virginia Electric and Power Company (Dominion), is proposing 
to amend Technical Specifications (TS) 4.2.3, ``Storage Pad,'' to 
define the minimum center-to-center spacing for Transnuclear-32 spent 
nuclear fuel storage casks, with heat loads no greater than 27.1 
kilowatts (kW), from 16 feet (feet) to 14 feet. The NRC staff has 
prepared a final environmental assessment (EA) as part of its review of 
this proposed license amendment in accordance with the requirements in 
part 51 of Title 10 of the Code of Federal Regulations (10 CFR). Based 
on the final EA, the NRC has determined that a Finding of No 
Significant Impact (FONSI) is appropriate. The NRC is also conducting a 
safety evaluation of the proposed license amendment pursuant to 10 CFR 
part 72, and the results will be documented in a separate Safety 
Evaluation Report (SER). If Dominion's request is approved, the NRC 
will issue the license amendment following publication of this final EA 
and FONSI and the SER.

II. Final Environmental Assessment Summary

    On August 23, 2011, during an earthquake centered in Mineral, 
Virginia, 25 of 27 of the Transnuclear-32 casks on NA ISFSI Pad I 
shifted from their original positions. The shifting changed the center-
to-center spacing of the casks from 16 feet to a range of 15 feet 2.25 
inches to 16 feet 11.25 inches. Dominion is proposing to amend SNM-2507 
TS 4.2.3, which would change the allowable distance between individual 
casks (center-to-center) from a nominal 16 feet to a minimum of 14 feet 
for those casks with heat loads no greater than 27.1 kW. Dominion is 
requesting this license amendment in lieu of moving

[[Page 10727]]

the 25 casks back to their original, pre-earthquake positions and 
spacing. If approved, the proposed license amendment would allow the 
casks to remain in their current positions.
    The NRC has assessed the potential environmental impacts associated 
with the proposed action of amending SNM-2507 TS 4.2.3, as well as the 
no-action alternative, and has documented the results in the final EA 
(ADAMS Accession No. ML15022A575). The NRC staff performed its 
environmental review in accordance with the requirements in 10 CFR part 
51. In conducting the environmental review, the NRC considered 
information in the license amendment application; information in the 
responses to the NRC's requests for additional information (RAIs); 
communications with Dominion, the Virginia State Historic Preservation 
Office, the Virginia Department of Game and Inland Fisheries and the 
Virginia Department of Health; information from the NRC inspections; 
and the NRC's independent analysis.
    Approval of Dominion's proposed license amendment would allow the 
casks to remain in place at their current post-earthquake positions and 
spacing, and no changes to Dominion's operation and maintenance of the 
NA ISFSI are associated with the proposed action. Because the proposed 
action would authorize Dominion to leave the casks in their current 
positions, rather than taking action to return the casks to their pre-
earthquake positions, no significant radiological or non-radiological 
impacts are expected to result from approval of the license amendment 
request, and the proposed action would not significantly contribute to 
cumulative impacts at the NA site. There would be no disproportionally 
high and adverse impacts on minority and low-income populations. The 
Virginia State Historic Preservation Office concurred with the NRC's 
determination that the proposed action would not affect historic 
properties, and the U.S. Fish and Wildlife Service concurred with the 
NRC's determination that the proposed action would not affect listed 
species or critical habitats. Furthermore, the NRC determined that the 
proposed action is more favorable than the no-action alternative 
(denial of the license amendment request), which would require movement 
of the casks back to their pre-earthquake positions and spacing. Thus, 
the NRC concludes that the proposed action will not result in a 
significant effect on the quality of the human environment.

III. Finding of No Significant Impact

    Based on its review of the proposed action, in accordance with the 
requirements in 10 CFR part 51, the NRC has concluded that the proposed 
action, amendment of NRC Special Nuclear Materials License No. SNM-2507 
for the NA ISFSI located in Louisa County, Virginia, will not 
significantly affect the quality of the human environment. Therefore, 
the NRC has determined, pursuant to 10 CFR 51.31, that preparation of 
an environmental impact statement is not required for the proposed 
action and a FONSI is appropriate.

    Dated at Rockville, Maryland, this 20th day of February, 2015.

    For the Nuclear Regulatory Commission.
Marissa G. Bailey,
Director, Division of Fuel Cycle Safety, Safeguards, and Environmental 
Review, Office of Nuclear Material Safety and Safeguards.
[FR Doc. 2015-04133 Filed 2-26-15; 8:45 am]
BILLING CODE 7590-01-P



                                                  10726                                    Federal Register / Vol. 80, No. 39 / Friday, February 27, 2015 / Notices

                                                                                                           TABLE 1—POTENTIAL IMPROVEMENT PROJECTS—Continued
                                                                                                                                                                                                                                     Number of
                                                                                                                    Improvement project type                                                                                                       Hours
                                                                                                                                                                                                                                   respondents 2

                                                  Additional surveys not specified ..............................................................................................................................                         35,000     100,000
                                                        Total ..................................................................................................................................................................          76,000     171,000



                                                    Respondents: The respondents are                                          ACTION: Environmental assessment and                                          Safety and Safeguards, U.S. Nuclear
                                                  PIs, program coordinators, or                                               finding of no significant impact;                                             Regulatory Commission, Washington,
                                                  participants in NSF activities.                                             issuance.                                                                     DC 20555–0001; telephone: 301–415–
                                                                                                                                                                                                            5137, email: Jean.Trefethen@nrc.gov.
                                                  Estimates of Annualized Cost to                                             SUMMARY:   The U.S. Nuclear Regulatory
                                                  Respondents for the Hour Burdens                                                                                                                          SUPPLEMENTARY INFORMATION:
                                                                                                                              Commission (NRC) is considering a
                                                                                                                              license amendment request for the                                             I. Introduction
                                                     The cost to respondents generated by
                                                                                                                              Special Nuclear Materials (SNM)                                                  The NRC is considering a license
                                                  the list of potential projects is estimated
                                                                                                                              License SNM–2507 for the North Anna                                           amendment request for Special Nuclear
                                                  to be $3,205,680 over the three years of
                                                                                                                              Power Station (NA) independent spent                                          Materials License Number SNM–2507
                                                  the clearance. No one year’s cost would
                                                                                                                              fuel storage installation (ISFSI) located                                     for the NA ISFSI located in Louisa
                                                  exceed $3,205,680. In other words, if all
                                                                                                                              in Louisa County, Virginia.                                                   County, Virginia (ADAMS Accession
                                                  work were done in one year, costs in
                                                                                                                              DATES: The environmental assessment                                           No. ML14160A707). The applicant,
                                                  that one year would be $3,205,680 and
                                                  the costs in each of the other 2 years                                      and finding of no significant impact                                          Virginia Electric and Power Company
                                                  would be zero. As in previous requests                                      referenced in this document are                                               (Dominion), is proposing to amend
                                                  for generic clearance authority, the total                                  available on February 27, 2015.                                               Technical Specifications (TS) 4.2.3,
                                                  cost was estimated by summing all the                                       ADDRESSES: Please refer to Docket ID                                          ‘‘Storage Pad,’’ to define the minimum
                                                  hours that might be used on all projects                                    NRC–2014–0154 when contacting the                                             center-to-center spacing for
                                                  over the three years (76,000) and                                           NRC about the availability of                                                 Transnuclear-32 spent nuclear fuel
                                                  multiplying that figure by the hourly                                       information regarding this document.                                          storage casks, with heat loads no greater
                                                  wage ($42.18) of the level of employee                                      You may obtain publicly-available                                             than 27.1 kilowatts (kW), from 16 feet
                                                  who typically answers NSF                                                   information related to this document                                          (feet) to 14 feet. The NRC staff has
                                                  questionnaires or attends NSF                                               using any of the following methods:                                           prepared a final environmental
                                                  workshops. This wage amount is the                                             • Federal Rulemaking Web site: Go to                                       assessment (EA) as part of its review of
                                                  May 2011 national cross-industry                                            http://www.regulations.gov and search                                         this proposed license amendment in
                                                  estimate of the mean hourly wage for a                                      for Docket ID NRC–2014–0154. Address                                          accordance with the requirements in
                                                  financial analyst, or Job Category 13–                                      questions about NRC dockets to Carol                                          part 51 of Title 10 of the Code of Federal
                                                  2051, by the Bureau of Statistics.                                          Gallagher; telephone: 301–415–3463;                                           Regulations (10 CFR). Based on the final
                                                  http://www.bls.gov/oes/#data. The total                                     email: Carol.Gallagher@nrc.gov. For                                           EA, the NRC has determined that a
                                                  hours are based on similar NSF projects                                     technical questions, contact the                                              Finding of No Significant Impact
                                                  over the past few years.                                                    individual listed in the FOR FURTHER                                          (FONSI) is appropriate. The NRC is also
                                                                                                                              INFORMATION CONTACT section of this                                           conducting a safety evaluation of the
                                                     There are no capital, startup,                                           document.
                                                  operation or maintenance costs to the                                                                                                                     proposed license amendment pursuant
                                                                                                                                 • NRC’s Agencywide Documents                                               to 10 CFR part 72, and the results will
                                                  respondents. The costs generated by                                         Access and Management System
                                                  future data collections will be described                                                                                                                 be documented in a separate Safety
                                                                                                                              (ADAMS): You may obtain publicly-                                             Evaluation Report (SER). If Dominion’s
                                                  in the clearance request for each specific                                  available documents online in the
                                                  data collection. NSF does not anticipate                                                                                                                  request is approved, the NRC will issue
                                                                                                                              ADAMS Public Documents collection at                                          the license amendment following
                                                  any capital, startup, operation, or                                         http://www.nrc.gov/reading-rm/
                                                  maintenance costs for future surveys.                                                                                                                     publication of this final EA and FONSI
                                                                                                                              adams.html. To begin the search, select                                       and the SER.
                                                    Dated: February 23, 2015.                                                 ‘‘ADAMS Public Documents’’ and then
                                                  Suzanne H. Plimpton,                                                        select ‘‘Begin Web-based ADAMS                                                II. Final Environmental Assessment
                                                                                                                              Search.’’ For problems with ADAMS,                                            Summary
                                                  Reports Clearance Officer, National Science
                                                  Foundation.                                                                 please contact the NRC’s Public                                                  On August 23, 2011, during an
                                                  [FR Doc. 2015–04097 Filed 2–26–15; 8:45 am]                                 Document Room (PDR) reference staff at                                        earthquake centered in Mineral,
                                                  BILLING CODE 7555–01–P                                                      1–800–397–4209, 301–415–4737, or by                                           Virginia, 25 of 27 of the Transnuclear-
                                                                                                                              email to pdr.resource@nrc.gov. The                                            32 casks on NA ISFSI Pad I shifted from
                                                                                                                              ADAMS accession number for each                                               their original positions. The shifting
                                                                                                                              document referenced in this document                                          changed the center-to-center spacing of
                                                  NUCLEAR REGULATORY                                                          (if that document is available in                                             the casks from 16 feet to a range of 15
                                                  COMMISSION                                                                  ADAMS) is provided the first time that                                        feet 2.25 inches to 16 feet 11.25 inches.
                                                                                                                              a document is referenced.
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                                                                                                                                                                            Dominion is proposing to amend SNM–
                                                  [Docket No. 72–16; NRC–2014–0154]
                                                                                                                                 • NRC’s PDR: You may examine and                                           2507 TS 4.2.3, which would change the
                                                                                                                              purchase copies of public documents at                                        allowable distance between individual
                                                  North Anna Power Station Independent                                        the NRC’s PDR, Room O1–F21, One                                               casks (center-to-center) from a nominal
                                                  Spent Fuel Storage Installation                                             White Flint North, 11555 Rockville                                            16 feet to a minimum of 14 feet for those
                                                                                                                              Pike, Rockville, Maryland 20852.                                              casks with heat loads no greater than
                                                  AGENCY:Nuclear Regulatory                                                   FOR FURTHER INFORMATION CONTACT: Jean                                         27.1 kW. Dominion is requesting this
                                                  Commission.                                                                 Trefethen, Office of Nuclear Material                                         license amendment in lieu of moving


                                             VerDate Sep<11>2014         18:05 Feb 26, 2015          Jkt 235001       PO 00000        Frm 00067        Fmt 4703       Sfmt 4703       E:\FR\FM\27FEN1.SGM               27FEN1


                                                                                Federal Register / Vol. 80, No. 39 / Friday, February 27, 2015 / Notices                                                10727

                                                  the 25 casks back to their original, pre-               III. Finding of No Significant Impact                 Dr. Gary S. Arnold, Atomic Safety and
                                                  earthquake positions and spacing. If                       Based on its review of the proposed                  Licensing Board Panel, U.S. Nuclear
                                                  approved, the proposed license                          action, in accordance with the                          Regulatory Commission, Washington,
                                                  amendment would allow the casks to                                                                              DC 20555–0001.
                                                                                                          requirements in 10 CFR part 51, the
                                                  remain in their current positions.                      NRC has concluded that the proposed                   Dr. Richard E. Wardwell, Atomic Safety
                                                     The NRC has assessed the potential                   action, amendment of NRC Special                        and Licensing Board Panel, U.S.
                                                  environmental impacts associated with                   Nuclear Materials License No. SNM–                      Nuclear Regulatory Commission,
                                                  the proposed action of amending SNM–                    2507 for the NA ISFSI located in Louisa                 Washington, DC 20555–0001.
                                                  2507 TS 4.2.3, as well as the no-action                 County, Virginia, will not significantly                All correspondence, documents, and
                                                  alternative, and has documented the                     affect the quality of the human                       other materials shall be filed in
                                                  results in the final EA (ADAMS                          environment. Therefore, the NRC has                   accordance with the NRC E-Filing rule.
                                                  Accession No. ML15022A575). The NRC                     determined, pursuant to 10 CFR 51.31,                 See 10 CFR. 2.302.
                                                  staff performed its environmental                       that preparation of an environmental                  Rockville, Maryland.
                                                  review in accordance with the                           impact statement is not required for the                Dated: February 23, 2015.
                                                  requirements in 10 CFR part 51. In                      proposed action and a FONSI is                        E. Roy Hawkens,
                                                  conducting the environmental review,                    appropriate.                                          Chief Administrative Judge, Atomic Safety
                                                  the NRC considered information in the                     Dated at Rockville, Maryland, this 20th day         and Licensing Board Panel.
                                                  license amendment application;                          of February, 2015.                                    [FR Doc. 2015–04130 Filed 2–26–15; 8:45 am]
                                                  information in the responses to the                       For the Nuclear Regulatory Commission.              BILLING CODE 7590–01–P
                                                  NRC’s requests for additional                           Marissa G. Bailey,
                                                  information (RAIs); communications                      Director, Division of Fuel Cycle Safety,
                                                  with Dominion, the Virginia State                       Safeguards, and Environmental Review,                 NUCLEAR REGULATORY
                                                  Historic Preservation Office, the                       Office of Nuclear Material Safety and                 COMMISSION
                                                  Virginia Department of Game and                         Safeguards.                                           [Docket No. 70–1151; NRC–2015–0039]
                                                  Inland Fisheries and the Virginia                       [FR Doc. 2015–04133 Filed 2–26–15; 8:45 am]
                                                  Department of Health; information from                  BILLING CODE 7590–01–P                                Westinghouse Electric Company, LLC
                                                  the NRC inspections; and the NRC’s
                                                  independent analysis.                                                                                         AGENCY:  Nuclear Regulatory
                                                                                                          NUCLEAR REGULATORY                                    Commission.
                                                     Approval of Dominion’s proposed
                                                                                                          COMMISSION                                            ACTION: License amendment application;
                                                  license amendment would allow the
                                                                                                                                                                opportunity to request a hearing and to
                                                  casks to remain in place at their current
                                                                                                          TENNESSEE VALLEY AUTHORITY                            petition for leave to intervene.
                                                  post-earthquake positions and spacing,
                                                  and no changes to Dominion’s operation                                                                        SUMMARY:    The U.S. Nuclear Regulatory
                                                  and maintenance of the NA ISFSI are                     [Docket No. 50–391–OL; ASLBP No. 15–                  Commission (NRC) has received an
                                                  associated with the proposed action.                    938–01–0L–BD01]
                                                                                                                                                                application from the Westinghouse
                                                  Because the proposed action would                       Establishment of Atomic Safety and                    Electric Company, LLC (Westinghouse
                                                  authorize Dominion to leave the casks                   Licensing Board                                       or the licensee) to renew special nuclear
                                                  in their current positions, rather than                                                                       material (SNM) license number SNM–
                                                  taking action to return the casks to their                Pursuant to delegation by the                       1107 that authorizes Westinghouse to
                                                  pre-earthquake positions, no significant                Commission, see 37 FR 28,710 (Dec. 29,                manufacture nuclear fuel assemblies at
                                                  radiological or non-radiological impacts                1972), and the Commission’s                           the Columbia Fuel Fabrication Facility
                                                  are expected to result from approval of                 regulations, see e.g., 10 CFR 2.104,                  (CFFF) in Hopkins, SC, for use in
                                                  the license amendment request, and the                  2.105, 2.300, 2.309, 2.313, 2.318, 2.321,             commercial nuclear power plants. The
                                                  proposed action would not significantly                 notice is hereby given that an Atomic                 license renewal would allow
                                                  contribute to cumulative impacts at the                 Safety and Licensing Board (Board) is                 Westinghouse to continue licensed
                                                  NA site. There would be no                              being established to preside over the                 activities for 40 years from the date that
                                                  disproportionally high and adverse                      following proceeding:                                 a renewed license is issued.
                                                  impacts on minority and low-income                      Tennessee Valley Authority (Watts Bar                 DATES: A request for a hearing or
                                                  populations. The Virginia State Historic                Nuclear Plant, Unit 2)                                petition for leave to intervene must be
                                                  Preservation Office concurred with the                                                                        filed by April 28, 2015.
                                                  NRC’s determination that the proposed                      This proceeding concerns motions,                  ADDRESSES: Please refer to Docket ID
                                                  action would not affect historic                        dated February 5, 2015 and filed                      NRC–2015–0039 when contacting the
                                                  properties, and the U.S. Fish and                       February 6, 2015, by Southern Alliance                NRC about the availability of
                                                  Wildlife Service concurred with the                     for Clean Energy to (1) reopen the                    information regarding this document.
                                                  NRC’s determination that the proposed                   record; and (2) admit a new contention                You may obtain publicly-available
                                                  action would not affect listed species or               in the captioned matter regarding the                 information related to this document
                                                  critical habitats. Furthermore, the NRC                 updated application by Tennessee                      using any of the following methods:
                                                  determined that the proposed action is                  Valley Authority for a facility operating                • Federal Rulemaking Web site: Go to
                                                  more favorable than the no-action                       license for Watts Bar Nuclear Plant, Unit             http://www.regulations.gov and search
                                                                                                          2, to be located in Rhea County,
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                  alternative (denial of the license                                                                            for Docket ID NRC–2015–0039. Address
                                                  amendment request), which would                         Tennessee.                                            questions about NRC dockets to Carol
                                                  require movement of the casks back to                      The Board is comprised of the                      Gallagher; telephone: 301–415–3463;
                                                  their pre-earthquake positions and                      following administrative judges:                      email: Carol.Gallagher@nrc.gov. For
                                                  spacing. Thus, the NRC concludes that                   Paul S. Ryerson, Chairman, Atomic                     technical questions, contact the
                                                  the proposed action will not result in a                   Safety and Licensing Board Panel,                  individual listed in the FOR FURTHER
                                                  significant effect on the quality of the                   U.S. Nuclear Regulatory Commission,                INFORMATION CONTACT section of this
                                                  human environment.                                         Washington, DC 20555–0001.                         document.


                                             VerDate Sep<11>2014   18:05 Feb 26, 2015   Jkt 235001   PO 00000   Frm 00068   Fmt 4703   Sfmt 4703   E:\FR\FM\27FEN1.SGM   27FEN1



Document Created: 2015-12-18 13:14:20
Document Modified: 2015-12-18 13:14:20
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionEnvironmental assessment and finding of no significant impact; issuance.
DatesThe environmental assessment and finding of no significant impact referenced in this document are available on February 27, 2015.
ContactJean Trefethen, Office of Nuclear Material Safety and Safeguards, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; telephone: 301-415-5137, email: [email protected]
FR Citation80 FR 10726 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR