80_FR_13410 80 FR 13361 - Pacific Gas and Electric Company; Notice of Availability of Environmental Assessment

80 FR 13361 - Pacific Gas and Electric Company; Notice of Availability of Environmental Assessment

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 80, Issue 49 (March 13, 2015)

Page Range13361-13362
FR Document2015-05688

Federal Register, Volume 80 Issue 49 (Friday, March 13, 2015)
[Federal Register Volume 80, Number 49 (Friday, March 13, 2015)]
[Notices]
[Pages 13361-13362]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-05688]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2678-006-CA]


Pacific Gas and Electric Company; Notice of Availability of 
Environmental Assessment

    In accordance with the National Environmental Policy Act of 1969 
and the Federal Energy Regulatory Commission's (Commission) 
regulations, 18 CFR part 380 (Order No. 486, 52 FR 47897), the Office 
of Energy Projects has reviewed the application for a subsequent 
license for the Narrows No. 2 Transmission Line Project and has 
prepared an Environmental Assessment (EA). The project occupies 1.28 
acres of public land managed by the United States Army Corps of 
Engineers and provides service from the Yuba County Water Agency's 
Narrows No. 2 Powerhouse (a component of FERC Project No. 2246), in 
Yuba County, to PG&E's Narrows No. 2 Substation, in Nevada County.
    The EA contains staff's analysis of the potential environmental 
effects of the project and alternatives and concludes that licensing 
the project, with appropriate environmental protective measures, would 
not constitute a major federal action that would significantly

[[Page 13362]]

affect the quality of the human environment.
    A copy of the EA is available for review at the Commission in the 
Public Reference Room or may be viewed on the Commission's Web site at 
http://www.ferc.gov using the ``eLibrary'' link. Enter the docket 
number excluding the last three digits in the docket number field to 
access the document. For assistance, contact FERC Online Support at 
FERCOnlineSupport@ferc.gov or toll-free at 1-866-208-3676, or for TTY, 
(202) 502-8659.
    You may also register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    For further information, contact Jim Fargo at (202) 502-6095.

     Dated: March 4, 2015.
Kimberly D. Bose,
 Secretary.
[FR Doc. 2015-05688 Filed 3-12-15; 8:45 am]
BILLING CODE 6717-01-P



                                                                                  Federal Register / Vol. 80, No. 49 / Friday, March 13, 2015 / Notices                                                 13361

                                                  DEPARTMENT OF ENERGY                                    Environmental Review. If a Notice of                  and will be notified of meetings
                                                                                                          Schedule for Environmental Review is                  associated with the Commission’s
                                                  Federal Energy Regulatory                               issued, it will indicate, among other                 environmental review process.
                                                  Commission                                              milestones, the anticipated date for the              Environmental commentors will not be
                                                  [Docket No. CP15–89–000]                                Commission staff’s issuance of the EA                 required to serve copies of filed
                                                                                                          for this proposal. The filing of the EA               documents on all other parties.
                                                  Transcontinental Gas Pipe Line                          in the Commission’s public record for                 However, the non-party commentors
                                                  Company, LLC; Notice of Application                     this proceeding or the issuance of a                  will not receive copies of all documents
                                                                                                          Notice of Schedule for Environmental                  filed by other parties or issued by the
                                                     Take notice that on February 18, 2015,               Review will serve to notify federal and               Commission (except for the mailing of
                                                  Transcontinental Gas Pipe Line                          state agencies of the timing for the                  environmental documents issued by the
                                                  Company, LLC (Transco), PO Box 1396,                    completion of all necessary reviews, and              Commission) and will not have the right
                                                  Houston, Texas 77251, filed an                          the subsequent need to complete all                   to seek court review of the
                                                  application pursuant to section 7(c) of                 federal authorizations within 90 days of              Commission’s final order.
                                                  the Natural Gas Act (NGA) for                           the date of issuance of the Commission                   The Commission strongly encourages
                                                  authorization to construct its Garden                   staff’s EA.                                           electronic filings of comments, protests
                                                  State Expansion Project in two phases.                     There are two ways to become                       and interventions in lieu of paper using
                                                  In Phase 1, Transco proposes to: (i)                    involved in the Commission’s review of                the ‘‘eFiling’’ link at http://
                                                  Construct a new meter and regulating                    this project. First, any person wishing to            www.ferc.gov. Persons unable to file
                                                  station in Burlington County, New                       obtain legal status by becoming a party               electronically should submit an original
                                                  Jersey; (ii) uprate an existing electric                to the proceedings for this project                   and five copies of the protest or
                                                  motor drive to 25,000 horsepower (hp)                   should, on or before the comment date                 intervention to the Federal Energy
                                                  at Compressor Station 205 in Mercer                     stated below file with the Federal                    Regulatory Commission, 888 First Street
                                                  County, New Jersey; and (iii) construct                 Energy Regulatory Commission, 888                     NE., Washington, DC 20426.
                                                  related appurtenances. In Phase 2,                      First Street NE., Washington, DC 20426,
                                                  Transco proposes to: (i) Construct a new                                                                         Comment Date: March 25, 2015.
                                                                                                          a motion to intervene in accordance
                                                  30,500 hp, electric-driven compressor                   with the requirements of the                            Dated: March 4, 2015.
                                                  station and appurtenances in Burlington                 Commission’s Rules of Practice and                    Kimberly D. Bose,
                                                  County, New Jersey; (ii) uprate two                     Procedure (18 CFR 385.214 or 385.211)                 Secretary.
                                                  existing electric-driven motors to 16,000               and the Regulations under the NGA (18                 [FR Doc. 2015–05684 Filed 3–12–15; 8:45 am]
                                                  hp each at Compressor Station 205 in                    CFR 157.10). A person obtaining party                 BILLING CODE 6717–01–P
                                                  Mercer County, New Jersey; and (iii)                    status will be placed on the service list
                                                  construct related appurtenances.                        maintained by the Secretary of the
                                                  Transco states that the Garden State                    Commission and will receive copies of                 DEPARTMENT OF ENERGY
                                                  Expansion Project will provide 180,000                  all documents filed by the applicant and
                                                  dekatherms per day of firm capacity to                  by all other parties. A party must submit             Federal Energy Regulatory
                                                  a new delivery point with New Jersey                    seven copies of filings made in the                   Commission
                                                  Natural Gas Company. Transco                            proceeding with the Commission and                    [Project No. 2678–006–CA]
                                                  estimates the cost of the proposed                      must mail a copy to the applicant and
                                                  project to be approximately $116                        to every other party. Only parties to the             Pacific Gas and Electric Company;
                                                  million, all as more fully set forth in the             proceeding can ask for court review of                Notice of Availability of Environmental
                                                  application which is on file with the                   Commission orders in the proceeding.                  Assessment
                                                  Commission and open to public                              However, a person does not have to
                                                  inspection. The filing is available for                 intervene in order to have comments                     In accordance with the National
                                                  review at the Commission in the Public                  considered. The second way to                         Environmental Policy Act of 1969 and
                                                  Reference Room or may be viewed on                      participate is by filing with the                     the Federal Energy Regulatory
                                                  the Commission’s Web site web at                        Secretary of the Commission, as soon as               Commission’s (Commission)
                                                  http://www.ferc.gov using the                           possible, an original and two copies of               regulations, 18 CFR part 380 (Order No.
                                                  ‘‘eLibrary’’ link. Enter the docket                     comments in support of or in opposition               486, 52 FR 47897), the Office of Energy
                                                  number excluding the last three digits in               to this project. The Commission will                  Projects has reviewed the application
                                                  the docket number field to access the                   consider these comments in                            for a subsequent license for the Narrows
                                                  document. For assistance, contact FERC                  determining the appropriate action to be              No. 2 Transmission Line Project and has
                                                  at FERCOnlineSupport@ferc.gov or call                   taken, but the filing of a comment alone              prepared an Environmental Assessment
                                                  toll-free, (886) 208–3676 or TYY, (202)                 will not serve to make the filer a party              (EA). The project occupies 1.28 acres of
                                                  502–8659.                                               to the proceeding. The Commission’s                   public land managed by the United
                                                     Any questions regarding the                          rules require that persons filing                     States Army Corps of Engineers and
                                                  application may be directed to Marg                     comments in opposition to the project                 provides service from the Yuba County
                                                  Camardello, Transcontinental Gas Pipe                   provide copies of their protests only to              Water Agency’s Narrows No. 2
                                                  Line Company, LLC, PO Box 1396,                         the party or parties directly involved in             Powerhouse (a component of FERC
                                                  Houston, Texas 77251, by telephone at                   the protest.                                          Project No. 2246), in Yuba County, to
                                                  (713) 215–3380.                                            Persons who wish to comment only                   PG&E’s Narrows No. 2 Substation, in
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                     Pursuant to section 157.9 of the                     on the environmental review of this                   Nevada County.
                                                  Commission’s rules, 18 CFR 157.9,                       project should submit an original and                   The EA contains staff’s analysis of the
                                                  within 90 days of this Notice, the                      two copies of their comments to the                   potential environmental effects of the
                                                  Commission staff will either: Complete                  Secretary of the Commission.                          project and alternatives and concludes
                                                  its environmental assessment (EA) and                   Environmental commentors will be                      that licensing the project, with
                                                  place it into the Commission’s public                   placed on the Commission’s                            appropriate environmental protective
                                                  record (eLibrary) for this proceeding; or               environmental mailing list, will receive              measures, would not constitute a major
                                                  issue a Notice of Schedule for                          copies of the environmental documents,                federal action that would significantly


                                             VerDate Sep<11>2014   19:27 Mar 12, 2015   Jkt 235001   PO 00000   Frm 00040   Fmt 4703   Sfmt 4703   E:\FR\FM\13MRN1.SGM   13MRN1


                                                  13362                           Federal Register / Vol. 80, No. 49 / Friday, March 13, 2015 / Notices

                                                  affect the quality of the human                         an environmental impact statement is                   Index 129 pipeline in Fort Bend, Harris,
                                                  environment.                                            more appropriate for this Project based                Polk, and Sabine Counties, Texas. The
                                                     A copy of the EA is available for                    upon the potential significance of the                 new pipeline would enable delivery of
                                                  review at the Commission in the Public                  anticipated levels of impact. Please note              1.54 billion cubic feet per day (bcf/d) of
                                                  Reference Room or may be viewed on                      that the scoping period will close on                  natural gas to the proposed Freeport
                                                  the Commission’s Web site at http://                    April 3, 2015. This is not your only                   Liquefied Natural Gas (LNG) Export
                                                  www.ferc.gov using the ‘‘eLibrary’’ link.               public input opportunity; please refer to              Terminal near Freeport, Texas. The
                                                  Enter the docket number excluding the                   the Environmental Review Process flow                  general locations of the planned
                                                  last three digits in the docket number                  chart in Appendix 1.1                                  pipeline facilities are depicted in the
                                                  field to access the document. For                          Further details on how to submit                    figures included in Appendix 2.2
                                                  assistance, contact FERC Online                         written comments are in the Public                        Specifically, the Project would
                                                  Support at FERCOnlineSupport@                           Participation section of this notice. If               include construction and operation of
                                                  ferc.gov or toll-free at 1–866–208–3676,                you sent comments on this project to the               the following facilities:
                                                  or for TTY, (202) 502–8659.                             Commission before the opening of this                     • 64 miles of 36-inch diameter
                                                     You may also register online at                      docket on November 5, 2014, you will                   pipeline, called the Coastal Bend
                                                  http://www.ferc.gov/docs-filing/                        need to file those comments in Docket                  Header, commencing at a new
                                                  esubscription.asp to be notified via                    No. PF15–4–000 to ensure they are                      interconnect with Tennessee Gas
                                                  email of new filings and issuances                      considered as part of this proceeding.                 Pipeline Company, LLC northwest of
                                                  related to this or other pending projects.                 This notice is being sent to the                    Hungerford in Wharton County, Texas
                                                  For assistance, contact FERC Online                     Commission’s current environmental                     and terminating at the existing Freeport
                                                  Support.                                                mailing list for this Project. State and               LNG Stratton Ridge meter site near
                                                     For further information, contact Jim                 local government officials are asked to                Clute in Brazoria County, Texas;
                                                  Fargo at (202) 502–6095.                                notify their constituents of this planned                 • one new 93,500-horsepower (hp)
                                                    Dated: March 4, 2015.                                 Project and encourage them to comment                  gas-fired compressor station, called the
                                                  Kimberly D. Bose,
                                                                                                          on their areas of concern.                             Wilson Compressor Station, in Wharton
                                                                                                             If you are a landowner receiving this               County, Texas;
                                                  Secretary.
                                                                                                          notice, a company representative may                      • one new 26,000-hp electric motor
                                                  [FR Doc. 2015–05688 Filed 3–12–15; 8:45 am]
                                                                                                          contact you about the acquisition of an                driven compressor station, called the
                                                  BILLING CODE 6717–01–P                                  easement to construct, operate, and                    Brazos Compressor Station, in Fort Bend
                                                                                                          maintain the planned facilities. The                   County, Texas;
                                                                                                          company would seek to negotiate a
                                                  DEPARTMENT OF ENERGY                                                                                              • one new 10,000-hp electric motor
                                                                                                          mutually acceptable agreement.
                                                                                                                                                                 driven compressor station, called the
                                                  Federal Energy Regulatory                               However, if the Commission approves
                                                                                                                                                                 North Houston Compressor Station, at
                                                  Commission                                              the Project, that approval conveys with
                                                                                                                                                                 an existing Gulf South property in
                                                                                                          it the right of eminent domain.
                                                  [Docket No. PF15–4–000]                                                                                        Harris County, Texas;
                                                                                                          Therefore, if easement negotiations fail
                                                                                                          to produce an agreement, Gulf South                       • piping modifications within the
                                                  Gulf South Pipeline Company, LP;                        could initiate condemnation                            fence line at Gulf South’s existing
                                                  Notice of Intent To Prepare an                          proceedings where compensation would                   Goodrich Compressor Station along the
                                                  Environmental Assessment for the                        be determined in accordance with state                 Index 129 pipeline in Polk County,
                                                  Planned Coastal Bend Header Project                     law.                                                   Texas;
                                                  and Request for Comments on                                A fact sheet prepared by the FERC                      • piping modifications and a new
                                                  Environmental Issues                                    entitled ‘‘An Interstate Natural Gas                   15,900-hp gas-fired compressor unit
                                                                                                          Facility on My Land? What Do I Need                    within the fence line at Gulf South’s
                                                    The staff of the Federal Energy
                                                                                                          to Know?’’ is available for viewing on                 former Magasco Compressor Station
                                                  Regulatory Commission (FERC or
                                                                                                          the FERC Web site (www.ferc.gov). This                 along the Index 129 pipeline in Sabine
                                                  Commission) will prepare an
                                                                                                          fact sheet addresses a number of                       County, Texas; and
                                                  environmental assessment (EA) that will
                                                  discuss the environmental impacts of                    typically asked questions, including the                  • seven interconnects with various
                                                  the Coastal Bend Header Project                         use of eminent domain and how to                       interstate and intrastate gas pipelines,
                                                  (Project) involving construction and                    participate in the Commission’s                        including an interconnect with Gulf
                                                  operation of facilities by Gulf South                   proceedings.                                           South’s Index 129 pipeline, which Gulf
                                                  Pipeline Company, LP (Gulf South) in                                                                           South plans to construct at a later time
                                                                                                          Summary of the Planned Project                         under its blanket certificate authority.
                                                  southeastern Texas. The Commission
                                                  will use this EA in its decision-making                   Gulf South plans to construct a new                     Gulf South plans to begin Project
                                                  process to determine whether                            gas pipeline in Wharton and Brazoria                   construction in spring 2017 if all
                                                  construction and operation of the                       Counties, Texas, a new compressor                      required permits, certificates, and
                                                  Project is in the public convenience and                station in Wharton County along the                    authorizations are obtained. Gulf
                                                  necessity.                                              new pipeline, and two new compressor                   South’s planned in-service date for
                                                    This notice announces the opening of                  stations and upgrades at two compressor                Project facilities is spring 2018.
                                                  the scoping process the Commission                      stations along Gulf South’s existing
                                                                                                                                                                   2 The appendices referenced in this notice will
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                  will use to gather input from the public                  1 The appendices referenced in this notice are not   not appear in the Federal Register. Copies of the
                                                  and interested agencies on the Project.                 being printed in the Federal Register. Copies of       appendices were sent to all those receiving this
                                                  Your input during the scoping process                   appendices were sent to all those receiving this       notice in the mail and are available at www.ferc.gov
                                                  will help the Commission staff                          notice in the mail and are available at www.ferc.gov   using the link called ‘‘eLibrary’’ or from the
                                                  determine what issues need to be                        using the link called ‘‘eLibrary’’ or from the         Commission’s Public Reference Room, 888 First
                                                                                                          Commission’s Public Reference Room, 888 First          Street NE., Washington, DC 20426, or call (202)
                                                  evaluated in the EA. The Commission                     Street NE., Washington, DC 20426, or call (202)        502–8371. For instructions on connecting to
                                                  staff will also use the scoping process to              502–8371. For instructions on connecting to            eLibrary, refer to the Additional Information section
                                                  help determine whether preparation of                   eLibrary, refer to the last page of this notice.       on page 7 of this notice.



                                             VerDate Sep<11>2014   19:27 Mar 12, 2015   Jkt 235001   PO 00000   Frm 00041   Fmt 4703   Sfmt 4703   E:\FR\FM\13MRN1.SGM   13MRN1



Document Created: 2015-12-18 11:42:11
Document Modified: 2015-12-18 11:42:11
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation80 FR 13361 

2024 Federal Register | Disclaimer | Privacy Policy