80_FR_13419 80 FR 13370 - Columbia Gas Transmission, LLC; Notice of Application

80 FR 13370 - Columbia Gas Transmission, LLC; Notice of Application

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 80, Issue 49 (March 13, 2015)

Page Range13370-13371
FR Document2015-05686

Federal Register, Volume 80 Issue 49 (Friday, March 13, 2015)
[Federal Register Volume 80, Number 49 (Friday, March 13, 2015)]
[Notices]
[Pages 13370-13371]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-05686]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP15-95-000]


Columbia Gas Transmission, LLC; Notice of Application

    Take notice that on February 20, 2015, Columbia Gas Transmission, 
LLC (Columbia) 5151 San Felipe, Suite 2500, Houston, Texas 77056, filed 
an application pursuant to sections 7(b) and 7(c) of the Natural Gas 
Act (NGA) and the Federal Energy Regulatory Commission's (Commission) 
regulations seeking authorization to replace approximately 34 miles of 
existing 20-inch diameter pipeline with like size pipeline in Greene, 
Washington, and Allegheny counties, Pennsylvania, and install necessary 
appurtenant facilities associated with the replacement pipeline (Tri-
County Project), all as more fully described in the application which 
is on file with the Commission and open to public inspection. The 
filing may also be viewed on the web at http://www.ferc.gov using the 
``eLibrary'' link. Enter the docket number excluding the last three 
digits in the docket number field to access the document. For 
assistance, contact FERC at [email protected] or call toll-
free, (866) 208-3676 or TTY, (202) 502-8659.
    Any questions regarding this application should be directed to 
Tyler R. Brown, Senior Counsel, Columbia Gas Transmission, LLC, 5151 
San Felipe Suite 2500, Houston, TX 77056, or call (713) 386-3797.
    On May 27, 2014, Commission staff granted Columbia's request to use 
the pre-filing process and assigned Docket No. PF14-11-000 to staff 
activities involving the Tri-County Project. Now, as of the filing of 
this application on February 20, 2015, the NEPA Pre-Filing Process for 
this project has ended. From this time forward, this proceeding will be 
conducted in Docket No. CP15-95-000 as noted in the caption of this 
Notice.
    Specifically, Columbia will replace pipe in three segments. Segment 
1 begins at Columbia's Hero-Jollytown regulator station in Greene 
County, and continues 15 miles north to Columbia's existing Waynesburg 
Compressor Station. Segment 2 begins at a point near Columbia's 
existing Redd Farm Compressor Station 4 in Washington County, and 
continues approximately 11 miles in a northerly direction to the 
existing Sharp Farm station. Segment 3 begins at Columbia's Sharp Farm 
station, and continues 12 miles north to the terminus of Line 1570 
where it intersects with 20-inch Line 1485 in Allegheny County. 
Columbia states that the total cost of the replacement project is 
approximately 136 million dollars. Additionally, Columbia is requesting 
a pre-determination for rolled-in rate treatment since the primary 
purpose of the Tri-County Project is to replace existing bare steel 
pipeline due to the age and condition of the facilities.
    Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9, 
within 90 days of this Notice the Commission staff will either: 
Complete its environmental assessment (EA) and place it into the 
Commission's public record (eLibrary) for this proceeding; or issue a 
Notice of Schedule for Environmental Review. If a Notice of Schedule 
for Environmental Review is issued, it will indicate, among other 
milestones, the anticipated date for the Commission staff's issuance of 
the final environmental impact statement (FEIS) or EA for this 
proposal. The filing of the EA in the Commission's public record for 
this proceeding or the issuance of a Notice of Schedule for 
Environmental Review will serve to notify federal and state agencies of 
the timing for the completion of all necessary reviews, and the 
subsequent need to complete all federal authorizations within 90 days 
of the date of issuance of the Commission staff's FEIS or EA.
    There are two ways to become involved in the Commission's review of 
this project. First, any person wishing to obtain legal status by 
becoming a party to the proceedings for this project should, on or 
before the comment date stated below file with the Federal Energy 
Regulatory Commission, 888 First Street NE., Washington, DC 20426, a 
motion to intervene in accordance with the requirements of the 
Commission's Rules of Practice and Procedure (18 CFR 385.214 or 
385.211) and the Regulations under the NGA (18 CFR 157.10). A person 
obtaining party status will be placed on the service list maintained by 
the Secretary of the Commission and will receive copies of all 
documents filed by the applicant and by all other parties. A party must 
submit 7 copies of filings made in the proceeding with the Commission 
and must mail a copy to the applicant and to every other party. Only 
parties to the proceeding can ask for court review of Commission orders 
in the proceeding.
    However, a person does not have to intervene in order to have 
comments considered. The second way to participate is by filing with 
the Secretary of the Commission, as soon as possible, an original and 
two copies of comments in support of or in opposition to this project. 
The Commission will consider these comments in determining the 
appropriate action to be taken, but the filing of a comment alone will 
not serve to make the filer a party to the proceeding. The Commission's 
rules require that persons filing comments in opposition to the project 
provide copies of their protests only to the party or parties directly 
involved in the protest.
    Persons who wish to comment only on the environmental review of 
this project should submit an original and two copies of their comments 
to the Secretary of the Commission. Environmental commentors will be 
placed on the Commission's environmental mailing list, will receive 
copies of the environmental documents, and will be notified of meetings 
associated with the Commission's environmental review process. 
Environmental commentors will not be required to serve copies of filed 
documents on all other parties. However, the non-party commentors will 
not receive copies of all documents filed by other parties or issued by 
the Commission (except for the mailing of environmental documents 
issued by the Commission) and will not have the right to seek court 
review of the Commission's final order.
    The Commission strongly encourages electronic filings of comments, 
protests and interventions in lieu of paper using the ``eFiling'' link 
at http://www.ferc.gov. Persons unable to file electronically should 
submit an original and 5 copies of the protest or intervention to the 
Federal Energy regulatory Commission, 888 First Street NE., Washington, 
DC 20426.
    Comment Date: March 25, 2015.


[[Page 13371]]


    Dated: March 4, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-05686 Filed 3-12-15; 8:45 am]
BILLING CODE 6717-01-P



                                                  13370                           Federal Register / Vol. 80, No. 49 / Friday, March 13, 2015 / Notices

                                                  ‘‘eLibrary’’ link and is available for                  involving the Tri-County Project. Now,                Commission’s Rules of Practice and
                                                  review in the Commission’s Public                       as of the filing of this application on               Procedure (18 CFR 385.214 or 385.211)
                                                  Reference Room in Washington, DC.                       February 20, 2015, the NEPA Pre-Filing                and the Regulations under the NGA (18
                                                  There is an ‘‘eSubscription’’ link on the               Process for this project has ended. From              CFR 157.10). A person obtaining party
                                                  Web site that enables subscribers to                    this time forward, this proceeding will               status will be placed on the service list
                                                  receive email notification when a                       be conducted in Docket No. CP15–95–                   maintained by the Secretary of the
                                                  document is added to a subscribed                       000 as noted in the caption of this                   Commission and will receive copies of
                                                  docket(s). For assistance with any FERC                 Notice.                                               all documents filed by the applicant and
                                                  Online service, please email                               Specifically, Columbia will replace                by all other parties. A party must submit
                                                  FERCOnlineSupport@ferc.gov, or call                     pipe in three segments. Segment 1                     7 copies of filings made in the
                                                  (866) 208–3676 (toll free). For TTY, call               begins at Columbia’s Hero-Jollytown                   proceeding with the Commission and
                                                  (202) 502–8659.                                         regulator station in Greene County, and               must mail a copy to the applicant and
                                                     Comment Date: 5:00 p.m. Eastern time                 continues 15 miles north to Columbia’s                to every other party. Only parties to the
                                                  on March 20, 2015.                                      existing Waynesburg Compressor                        proceeding can ask for court review of
                                                                                                          Station. Segment 2 begins at a point                  Commission orders in the proceeding.
                                                    Dated: March 4, 2015.
                                                                                                          near Columbia’s existing Redd Farm
                                                  Kimberly D. Bose,                                                                                                However, a person does not have to
                                                                                                          Compressor Station 4 in Washington
                                                  Secretary.                                                                                                    intervene in order to have comments
                                                                                                          County, and continues approximately
                                                  [FR Doc. 2015–05687 Filed 3–12–15; 8:45 am]                                                                   considered. The second way to
                                                                                                          11 miles in a northerly direction to the
                                                  BILLING CODE 6717–01–P                                  existing Sharp Farm station. Segment 3                participate is by filing with the
                                                                                                          begins at Columbia’s Sharp Farm                       Secretary of the Commission, as soon as
                                                                                                          station, and continues 12 miles north to              possible, an original and two copies of
                                                  DEPARTMENT OF ENERGY                                    the terminus of Line 1570 where it                    comments in support of or in opposition
                                                                                                          intersects with 20-inch Line 1485 in                  to this project. The Commission will
                                                  Federal Energy Regulatory                               Allegheny County. Columbia states that                consider these comments in
                                                  Commission                                              the total cost of the replacement project             determining the appropriate action to be
                                                  [Docket No. CP15–95–000]                                is approximately 136 million dollars.                 taken, but the filing of a comment alone
                                                                                                          Additionally, Columbia is requesting a                will not serve to make the filer a party
                                                  Columbia Gas Transmission, LLC;                         pre-determination for rolled-in rate                  to the proceeding. The Commission’s
                                                  Notice of Application                                   treatment since the primary purpose of                rules require that persons filing
                                                                                                          the Tri-County Project is to replace                  comments in opposition to the project
                                                     Take notice that on February 20, 2015,               existing bare steel pipeline due to the               provide copies of their protests only to
                                                  Columbia Gas Transmission, LLC                          age and condition of the facilities.                  the party or parties directly involved in
                                                  (Columbia) 5151 San Felipe, Suite 2500,                    Pursuant to section 157.9 of the                   the protest.
                                                  Houston, Texas 77056, filed an                          Commission’s rules, 18 CFR 157.9,                        Persons who wish to comment only
                                                  application pursuant to sections 7(b)                   within 90 days of this Notice the                     on the environmental review of this
                                                  and 7(c) of the Natural Gas Act (NGA)                   Commission staff will either: Complete                project should submit an original and
                                                  and the Federal Energy Regulatory                       its environmental assessment (EA) and                 two copies of their comments to the
                                                  Commission’s (Commission) regulations                   place it into the Commission’s public                 Secretary of the Commission.
                                                  seeking authorization to replace                        record (eLibrary) for this proceeding; or             Environmental commentors will be
                                                  approximately 34 miles of existing 20-                  issue a Notice of Schedule for                        placed on the Commission’s
                                                  inch diameter pipeline with like size                   Environmental Review. If a Notice of                  environmental mailing list, will receive
                                                  pipeline in Greene, Washington, and                     Schedule for Environmental Review is                  copies of the environmental documents,
                                                  Allegheny counties, Pennsylvania, and                   issued, it will indicate, among other                 and will be notified of meetings
                                                  install necessary appurtenant facilities                milestones, the anticipated date for the              associated with the Commission’s
                                                  associated with the replacement                         Commission staff’s issuance of the final              environmental review process.
                                                  pipeline (Tri-County Project), all as                   environmental impact statement (FEIS)                 Environmental commentors will not be
                                                  more fully described in the application                 or EA for this proposal. The filing of the            required to serve copies of filed
                                                  which is on file with the Commission                    EA in the Commission’s public record                  documents on all other parties.
                                                  and open to public inspection. The                      for this proceeding or the issuance of a              However, the non-party commentors
                                                  filing may also be viewed on the web at                 Notice of Schedule for Environmental                  will not receive copies of all documents
                                                  http://www.ferc.gov using the                           Review will serve to notify federal and               filed by other parties or issued by the
                                                  ‘‘eLibrary’’ link. Enter the docket                     state agencies of the timing for the                  Commission (except for the mailing of
                                                  number excluding the last three digits in               completion of all necessary reviews, and              environmental documents issued by the
                                                  the docket number field to access the                   the subsequent need to complete all                   Commission) and will not have the right
                                                  document. For assistance, contact FERC                  federal authorizations within 90 days of              to seek court review of the
                                                  at FERCOnlineSupport@ferc.gov or call                   the date of issuance of the Commission                Commission’s final order.
                                                  toll-free, (866) 208–3676 or TTY, (202)                 staff’s FEIS or EA.
                                                  502–8659.                                                  There are two ways to become                          The Commission strongly encourages
                                                     Any questions regarding this                         involved in the Commission’s review of                electronic filings of comments, protests
                                                  application should be directed to Tyler                 this project. First, any person wishing to            and interventions in lieu of paper using
                                                                                                                                                                the ‘‘eFiling’’ link at http://
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                  R. Brown, Senior Counsel, Columbia                      obtain legal status by becoming a party
                                                  Gas Transmission, LLC, 5151 San Felipe                  to the proceedings for this project                   www.ferc.gov. Persons unable to file
                                                  Suite 2500, Houston, TX 77056, or call                  should, on or before the comment date                 electronically should submit an original
                                                  (713) 386–3797.                                         stated below file with the Federal                    and 5 copies of the protest or
                                                     On May 27, 2014, Commission staff                    Energy Regulatory Commission, 888                     intervention to the Federal Energy
                                                  granted Columbia’s request to use the                   First Street NE., Washington, DC 20426,               regulatory Commission, 888 First Street
                                                  pre-filing process and assigned Docket                  a motion to intervene in accordance                   NE., Washington, DC 20426.
                                                  No. PF14–11–000 to staff activities                     with the requirements of the                             Comment Date: March 25, 2015.


                                             VerDate Sep<11>2014   19:27 Mar 12, 2015   Jkt 235001   PO 00000   Frm 00049   Fmt 4703   Sfmt 4703   E:\FR\FM\13MRN1.SGM   13MRN1


                                                                                  Federal Register / Vol. 80, No. 49 / Friday, March 13, 2015 / Notices                                                 13371

                                                    Dated: March 4, 2015.                                 ‘‘eLibrary’’ link and is available for                a subsequent license, then it may be
                                                  Kimberly D. Bose,                                       review in the Commission’s Public                     required, pursuant to 18 CFR 16.21(b),
                                                  Secretary.                                              Reference Room in Washington, DC.                     to continue project operations until the
                                                  [FR Doc. 2015–05686 Filed 3–12–15; 8:45 am]             There is an ‘‘eSubscription’’ link on the             Commission issues someone else a
                                                  BILLING CODE 6717–01–P
                                                                                                          Web site that enables subscribers to                  license for the project or otherwise
                                                                                                          receive email notification when a                     orders disposition of the project.
                                                                                                          document is added to a subscribed                        If the project is subject to section 15
                                                  DEPARTMENT OF ENERGY                                    docket(s). For assistance with any FERC               of the FPA, notice is hereby given that
                                                                                                          Online service, please email                          an annual license for Project No. 2744
                                                  Federal Energy Regulatory                               FERCOnlineSupport@ferc.gov, or call                   is issued to the licensee for a period
                                                  Commission                                              (866) 208–3676 (toll free). For TTY, call             effective March 1, 2015 through
                                                                                                          (202) 502–8659.                                       February 29, 2016 or until the issuance
                                                  [Docket No. AC15–60–000]
                                                                                                             Comment Date: 5:00 p.m. Eastern                    of a new license for the project or other
                                                  National Grid USA; Notice of Request                    Time on March 25, 2015.                               disposition under the FPA, whichever
                                                  for Waiver                                                Dated: March 4, 2015.                               comes first. If issuance of a new license
                                                                                                          Kimberly D. Bose,
                                                                                                                                                                (or other disposition) does not take
                                                     Take notice that on March 4, 2015,                                                                         place on or before February 29, 2016,
                                                  National Grid USA, on behalf of certain                 Secretary.
                                                                                                                                                                notice is hereby given that, pursuant to
                                                  of its subsidiary operating companies 1                 [FR Doc. 2015–05683 Filed 3–12–15; 8:45 am]
                                                                                                                                                                18 CFR 16.18(c), an annual license
                                                  submitted a request for a waiver                        BILLING CODE 6717–01–P                                under section 15(a)(1) of the FPA is
                                                  granting a permanent standing                                                                                 renewed automatically without further
                                                  extension, until 150 days after its fiscal                                                                    order or notice by the Commission,
                                                  year end of March 31 each year, to                      DEPARTMENT OF ENERGY
                                                                                                                                                                unless the Commission orders
                                                  submit the Federal Energy Regulatory                                                                          otherwise.
                                                                                                          Federal Energy Regulatory
                                                  Commission (Commission) Form 1,                                                                                  If the project is not subject to section
                                                                                                          Commission
                                                  Form 1–F, and Form 2–A Supplemental                                                                           15 of the FPA, notice is hereby given
                                                  Statements with CPA Certifications as                   [Project No. 2744–000]                                that the licensee, North East Wisconsin
                                                  well as the first quarter Form 3–Qs that                                                                      Hydro, LLC, is authorized to continue
                                                  would otherwise be due earlier in the                   North East Wisconsin Hydro, LLC;                      operation of Menominee-Park Mill
                                                  year.                                                   Notice of Authorization for Continued                 Hydroelectric Project, until such time as
                                                     Any person desiring to intervene or to               Project Operation                                     the Commission acts on its application
                                                  protest this filing must file in                           On February 28, 2013 the North East                for a subsequent license.
                                                  accordance with Rules 211 and 214 of                    Wisconsin Hydro, LLC, licensee for the                  Dated: March 4, 2015.
                                                  the Commission’s Rules of Practice and                  Menominee-Park Mill Hydroelectric                     Kimberly D. Bose,
                                                  Procedure (18 CFR 385.211 or 385.214).                  Project, filed an Application for a New
                                                  Protests will be considered by the                                                                            Secretary.
                                                                                                          License pursuant to the Federal Power                 [FR Doc. 2015–05690 Filed 3–12–15; 8:45 am]
                                                  Commission in determining the                           Act (FPA) and the Commission’s
                                                  appropriate action to be taken, but will                regulations thereunder. The
                                                                                                                                                                BILLING CODE 6717–01–P
                                                  not serve to make protestants parties to                Menominee-Park Mill Hydroelectric
                                                  the proceeding. Any person wishing to                   Project is located on Menominee River
                                                  become a party must file a notice of                    in Marinette County, Wisconsin and in                 ENVIRONMENTAL PROTECTION
                                                  intervention or motion to intervene, as                 Menominee County, Michigan.                           AGENCY
                                                  appropriate. Such notices, motions, or                     The license for Project No. 2744 was
                                                  protests must be filed on or before the                                                                       [EPA–HQ–OPP–2008–0850; FRL–9922–40]
                                                                                                          issued for a period ending February 28,
                                                  comment date. On or before the                          2015. Section 15(a)(1) of the FPA, 16                 Chlorpyrifos Registration Review;
                                                  comment date, it is not necessary to                    U.S.C. 808(a)(1), requires the                        Revised Human Health Risk
                                                  serve motions to intervene or protests                  Commission, at the expiration of a                    Assessment; Extension of Comment
                                                  on persons other than the Applicant.                    license term, to issue from year-to-year              Period
                                                     The Commission encourages                            an annual license to the then licensee
                                                  electronic submission of protests and                   under the terms and conditions of the                 AGENCY: Environmental Protection
                                                  interventions in lieu of paper using the                prior license until a new license is                  Agency.
                                                  ‘‘eFiling’’ link at http://www.ferc.gov.                issued, or the project is otherwise                   ACTION: Notice; Extension of comment
                                                  Persons unable to file electronically                   disposed of as provided in section 15 or              period.
                                                  should submit an original and 5 copies                  any other applicable section of the FPA.
                                                  of the protest or intervention to the                   If the project’s prior license waived the             SUMMARY:   EPA issued a notice in the
                                                  Federal Energy Regulatory Commission,                   applicability of section 15 of the FPA,               Federal Register of January 14, 2015,
                                                  888 First Street NE., Washington, DC                    then, based on section 9(b) of the                    concerning the availability of the
                                                  20426.                                                  Administrative Procedure Act, 5 U.S.C.                chlorpyrifos registration review; revised
                                                     This filing is accessible on-line at                 558(c), and as set forth at 18 CFR                    human health risk assessment. This
                                                  http://www.ferc.gov, using the                          16.21(a), if the licensee of such project             document extends the comment period
                                                                                                                                                                for 45 days, from March 16, 2015 to
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                                                                          has filed an application for a subsequent
                                                    1 These companies include Massachusetts Electric
                                                                                                          license, the licensee may continue to                 April 30, 2015.
                                                  Company, Nantucket Electric Company, New
                                                                                                          operate the project in accordance with                DATES: Comments, identified by docket
                                                  England Hydro-Transmission Corporation, New
                                                  England Hydro-Transmission Electric Company,            the terms and conditions of the license               identification (ID) number EPA–HQ–
                                                  Inc., New England Power Company, The                    after the minor or minor part license                 OPP–2008–0850, must be received on or
                                                  Narragansett Electric Company, Niagara Mohawk                                                                 before: April 30, 2015.
                                                  Power Corporation, National Grid LNG, LP, New
                                                                                                          expires, until the Commission acts on
                                                  England Electric Transmission Corporation, and          its application. If the licensee of such a            ADDRESSES: Follow the detailed
                                                  National Grid Generation, LLC.                          project has not filed an application for              instructions provided under ADDRESSES


                                             VerDate Sep<11>2014   19:27 Mar 12, 2015   Jkt 235001   PO 00000   Frm 00050   Fmt 4703   Sfmt 4703   E:\FR\FM\13MRN1.SGM   13MRN1



Document Created: 2015-12-18 11:42:15
Document Modified: 2015-12-18 11:42:15
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
DatesMarch 25, 2015.
FR Citation80 FR 13370 

2024 Federal Register | Disclaimer | Privacy Policy