80_FR_15260 80 FR 15205 - Notice of Filing of Self-Certification of Coal Capability Under the Powerplant and Industrial Fuel Use Act

80 FR 15205 - Notice of Filing of Self-Certification of Coal Capability Under the Powerplant and Industrial Fuel Use Act

DEPARTMENT OF ENERGY

Federal Register Volume 80, Issue 55 (March 23, 2015)

Page Range15205-15206
FR Document2015-06552

On March 2, 2015, NTE Carolinas, LLC, as owner and operator of a new base load electric powerplant, submitted a coal capability self- certification to the Department of Energy (DOE) pursuant to Sec. 201(d) of the Powerplant and Industrial Fuel Use Act of 1978 (FUA), as amended, and DOE regulations in 10 CFR 501.60, 61. FUA and regulations thereunder require DOE to publish a notice of filing of self- certification in the Federal Register. 42 U.S.C. 8311(d) and 10 CFR 501.61(c).

Federal Register, Volume 80 Issue 55 (Monday, March 23, 2015)
[Federal Register Volume 80, Number 55 (Monday, March 23, 2015)]
[Notices]
[Pages 15205-15206]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-06552]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

[Certification Notice--233]


Notice of Filing of Self-Certification of Coal Capability Under 
the Powerplant and Industrial Fuel Use Act

AGENCY: Office of Electricity Delivery and Energy Reliability, DOE.

ACTION: Notice of Filing.

-----------------------------------------------------------------------

SUMMARY: On March 2, 2015, NTE Carolinas, LLC, as owner and operator of 
a new base load electric powerplant, submitted a coal capability self-
certification to the Department of Energy (DOE) pursuant to Sec.  
201(d) of the Powerplant and Industrial Fuel Use Act of 1978 (FUA), as 
amended, and DOE regulations in 10 CFR 501.60, 61. FUA and regulations 
thereunder require DOE to publish a notice of filing of self-
certification in the Federal Register. 42 U.S.C. 8311(d) and 10 CFR 
501.61(c).

ADDRESSES: Copies of coal capability self-certification filings are 
available for public inspection, upon request, in the Office of 
Electricity Delivery and Energy Reliability, Mail Code OE-20, Room

[[Page 15206]]

8G-024, Forrestal Building, 1000 Independence Avenue SW., Washington, 
DC 20585.

FOR FURTHER INFORMATION CONTACT: Christopher Lawrence at (202) 586-
5260.

SUPPLEMENTARY INFORMATION: Title II of FUA, as amended (42 U.S.C. 8301 
et seq.), provides that no new base load electric powerplant may be 
constructed or operated without the capability to use coal or another 
alternate fuel as a primary energy source. Pursuant to FUA in order to 
meet the requirement of coal capability, the owner or operator of such 
a facility proposing to use natural gas or petroleum as its primary 
energy source shall certify to the Secretary of Energy (Secretary) 
prior to construction, or prior to operation as a base load electric 
powerplant, that such powerplant has the capability to use coal or 
another alternate fuel. Such certification establishes compliance with 
FUA section 201(a) as of the date it is filed with the Secretary. 42 U. 
S. C. 8311.
    The following owner of a proposed new base load electric powerplant 
has filed a self-certification of coal-capability with DOE pursuant to 
FUA section 201(d) and in accordance with DOE regulations in 10 CFR 
501.60, 61:
    Owner: NTE Carolinas, LLC.
    Capacity: 475 megawatts (MW).
    Plant Location: Gage Road, Kings Mountain, NC 28086.
    In-Service Date: As early as January 2018.

    Issued in Washington, DC on March 17, 2015.
 Brian Mills,
 Director, Permitting and Siting, Office of Electricity Delivery and 
Energy Reliability.
[FR Doc. 2015-06552 Filed 3-20-15; 8:45 am]
 BILLING CODE 6450-01-P



                                                                                Federal Register / Vol. 80, No. 55 / Monday, March 23, 2015 / Notices                                                   15205

                                                  Grenada County, Mississippi. The                           The proposed Grenada Lake Project                  the service list prepared by the
                                                  proposed project would occupy                           would consist of the following new                    Commission in this proceeding, in
                                                  approximately 35.5 acres of federal land                facilities: (1) A 327.5-foot-long, 16-foot-           accordance with 18 CFR 4.34(b) and
                                                  administered by the Corps.                              diameter steel liner installed within the             385.2010.
                                                     g. Filed Pursuant to: Federal Power                  existing outlet conduit; (2) a 50-foot-                  n. Procedural Schedule:
                                                  Act, 16 U.S.C. 791 (a)–825(r).                          long, variable width steel-lined,                        The application will be processed
                                                     h. Applicant Contact: Ramya                          concrete bifurcation chamber containing               according to the following revised hydro
                                                  Swaminathan, Rye Development, 745                       two hydraulically-operated gates used to              licensing schedule. Revisions to the
                                                  Atlantic Avenue, 8th Floor, Boston, MA                  control the amount of flow diverted                   schedule may be made as appropriate.
                                                  02111; telephone (617) 804–1326.                        from the existing stilling basin to the
                                                     i. FERC Contact: Jeanne Edwards,                     powerhouse; (3) a 260-foot-long, 14-foot-                       Milestone                Target date
                                                  telephone (202) 502–6181 and email                      diameter steel penstock; (4) a 78-foot
                                                  jeanne.edwards@ferc.gov; or Patti                       wide, 50-foot-long, 86-foot-high steel                Filing of recommendations,       May 2015.
                                                  Leppert, telephone (202) 502–6034 and                                                                            terms and conditions, and
                                                                                                          and reinforced concrete forebay housing
                                                  email patricia.leppert@ferc.gov.                                                                                 prescriptions.
                                                                                                          trashracks and a fish bypass outlet gate;             Commission issues Draft EA       December
                                                     j. Deadline for filing comments,                     (5) a 120-foot-long, 60-foot-wide                                                        2015.
                                                  recommendations, terms and                              concrete powerhouse containing two                    Comments on Draft EA Due         January 2016.
                                                  conditions, and prescriptions: 60 days                  vertical Kaplan turbine-generator units               Commission Issues Final EA       May 2016.
                                                  from the issuance date of this notice;                  having a combined installed capacity of
                                                  reply comments are due 105 days from                    9.0 megawatts; (6) a 150-foot-long, 70-                 o. Public notice of the filing of the
                                                  the issuance date of this notice.                       foot-wide tailrace; (7) a 670-foot-long,              initial development application, which
                                                     The Commission strongly encourages                   4.16-kilovolt (kV) buried cable; (8) a                has already been given, established the
                                                  electronic filing. Please file comments,                substation; and (9) a 1,980-foot-long,                due date for filing competing
                                                  recommendations, terms and                              12.5–kV overhead transmission line                    applications or notices of intent. Under
                                                  conditions, and prescriptions using the                 extending from the substation to a                    the Commission’s regulations, any
                                                  Commission’s eFiling system at http://                  utility-owned distribution line. The                  competing development application
                                                  www.ferc.gov/docs-filing/efiling.asp.                   average annual generation would be                    must be filed in response to and in
                                                  Commenters can submit brief comments                    31,000 megawatt-hours.                                compliance with public notice of the
                                                  up to 6,000 characters, without prior                      m. A copy of the application is                    initial development application. No
                                                  registration, using the eComment system                 available for review at the Commission                competing applications or notices of
                                                  at http://www.ferc.gov/docs-filing/                     in the Public Reference Room, or may be               intent may be filed in response to this
                                                  ecomment.asp. You must include your                     viewed on the Commission’s Web site at                notice.
                                                  name and contact information at the end                 http://www.ferc.gov, using the
                                                  of your comments. For assistance,                                                                               Dated: March 16, 2015.
                                                                                                          ‘‘eLibrary’’ link. Enter the docket
                                                  please contact FERC Online Support at                   number, excluding the last three digits               Kimberly D. Bose,
                                                  FERCOnlineSupport@ferc.gov, (866)                       in the docket number field, to access the             Secretary.
                                                  208–3676 (toll free), or (202) 502–8659                 document. For assistance, contact FERC                [FR Doc. 2015–06524 Filed 3–20–15; 8:45 am]
                                                  (TTY). In lieu of electronic filing, please             Online Support. A copy is available for               BILLING CODE 6717–01P
                                                  send a paper copy to: Secretary, Federal                inspection and reproduction at the
                                                  Energy Regulatory Commission, 888                       address in item h above.
                                                  First Street NE., Washington, DC 20426.                    Register online at http://                         DEPARTMENT OF ENERGY
                                                  The first page of any filing should                     www.ferc.gov/docs-filing/                             [Certification Notice—233]
                                                  include docket number P–13702–002.                      esubscription.asp to be notified via
                                                     The Commission’s Rules of Practice                   email of new filings and issuances                    Notice of Filing of Self-Certification of
                                                  require all intervenors filing documents                related to this or other pending projects.            Coal Capability Under the Powerplant
                                                  with the Commission to serve a copy of                  For assistance, contact FERC Online                   and Industrial Fuel Use Act
                                                  that document on each person on the                     Support.
                                                  official service list for the project.                     All filings must: (1) Bear in all capital          AGENCY: Office of Electricity Delivery
                                                  Further, if an intervenor files comments                letters the title ‘‘COMMENTS,’’ ‘‘REPLY               and Energy Reliability, DOE.
                                                  or documents with the Commission                        COMMENTS,’’                                           ACTION: Notice of Filing.
                                                  relating to the merits of an issue that                 ‘‘RECOMMENDATIONS,’’ ‘‘TERMS
                                                  may affect the responsibilities of a                    AND CONDITIONS,’’ or                                  SUMMARY:    On March 2, 2015, NTE
                                                  particular resource agency, they must                   ‘‘PRESCRIPTIONS’’; (2) set forth in the               Carolinas, LLC, as owner and operator
                                                  also serve a copy of the document on                    heading the name of the applicant and                 of a new base load electric powerplant,
                                                  that resource agency.                                   the project number of the application to              submitted a coal capability self-
                                                     k. This application has been accepted                which the filing responds; (3) furnish                certification to the Department of
                                                  for filing and is now ready for                         the name, address, and telephone                      Energy (DOE) pursuant to § 201(d) of the
                                                  environmental analysis.                                 number of the person submitting the                   Powerplant and Industrial Fuel Use Act
                                                     l. The proposed Grenada Lake Project                 filing; and (4) otherwise comply with                 of 1978 (FUA), as amended, and DOE
                                                  would utilize the following existing                    the requirements of 18 CFR 385.2001                   regulations in 10 CFR 501.60, 61. FUA
                                                  Corps’ Grenada Lake Dam facilities: (1)                 through 385.2005. All comments,                       and regulations thereunder require DOE
                                                                                                                                                                to publish a notice of filing of self-
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                  A 13,900-foot-long, 80-foot-high earth                  recommendations, terms and conditions
                                                  fill embankment dam; (2) a reservoir;                   or prescriptions must set forth their                 certification in the Federal Register. 42
                                                  and (3) outlet works consisting of a                    evidentiary basis and otherwise comply                U.S.C. 8311(d) and 10 CFR 501.61(c).
                                                  concrete intake tower, three gated inlets               with the requirements of 18 CFR 4.34(b).              ADDRESSES: Copies of coal capability
                                                  that combine to direct flow through a                   Agencies may obtain copies of the                     self-certification filings are available for
                                                  377.5-foot-long, 17-foot-diameter                       application directly from the applicant.              public inspection, upon request, in the
                                                  concrete outlet conduit, and a stilling                 Each filing must be accompanied by                    Office of Electricity Delivery and Energy
                                                  basin.                                                  proof of service on all persons listed on             Reliability, Mail Code OE–20, Room


                                             VerDate Sep<11>2014   16:51 Mar 20, 2015   Jkt 235001   PO 00000   Frm 00020   Fmt 4703   Sfmt 4703   E:\FR\FM\23MRN1.SGM   23MRN1


                                                  15206                         Federal Register / Vol. 80, No. 55 / Monday, March 23, 2015 / Notices

                                                  8G–024, Forrestal Building, 1000                           e. Name of Project: Sardis Lake                    embankment dam; (2) a reservoir; and
                                                  Independence Avenue SW.,                                Hydroelectric Project.                                (3) outlet works consisting of a concrete
                                                  Washington, DC 20585.                                      f. Location: The proposed project                  intake tower, four gated inlets that
                                                  FOR FURTHER INFORMATION CONTACT:                        would be located at the U.S. Army                     combine to direct flow through a 560-
                                                  Christopher Lawrence at (202) 586–                      Corps of Engineers’ (Corps) existing                  foot-long, 16.0-foot by 18.25-foot ovoid
                                                  5260.                                                   Sardis Lake Dam, on the Little                        concrete outlet conduit, and a stilling
                                                                                                          Tallahatchie River, near the Town of                  basin.
                                                  SUPPLEMENTARY INFORMATION:       Title II of            Sardis, Panola County, Mississippi. The                  The proposed Sardis Lake Project
                                                  FUA, as amended (42 U.S.C. 8301 et                      proposed project would occupy                         would consist of the following new
                                                  seq.), provides that no new base load                   approximately 59 acres of federal land                facilities: (1) A 510-foot-long, 15.5-foot-
                                                  electric powerplant may be constructed                  administered by the Corps.                            diameter steel liner installed within the
                                                  or operated without the capability to use                  g. Filed Pursuant to: Federal Power                existing outlet conduit; (2) a 50-foot-
                                                  coal or another alternate fuel as a                     Act, 16 U.S.C. 791 (a)–825(r).                        long, 30-foot-wide (varies) steel-lined,
                                                  primary energy source. Pursuant to FUA                     h. Applicant Contact: Ramya                        concrete bifurcation chamber containing
                                                  in order to meet the requirement of coal                Swaminathan, Rye Development, 745                     two hydraulically-operated gates used to
                                                  capability, the owner or operator of such               Atlantic Avenue, 8th Floor, Boston, MA                control the amount of flow diverted
                                                  a facility proposing to use natural gas or              02111; telephone (617) 804–1326.                      from the existing stilling basin to the
                                                  petroleum as its primary energy source                     i. FERC Contact: Jeanne Edwards,                   powerhouse; (3) a 250-foot-long, 15.5-
                                                  shall certify to the Secretary of Energy                telephone (202) 502–6181 and email                    foot-diameter steel penstock; (4) a 78-
                                                  (Secretary) prior to construction, or                   jeanne.edwards@ferc.gov; or Patti                     foot-wide, 50-foot-long, 102.6-foot-high
                                                  prior to operation as a base load electric              Leppert, telephone (202) 502–6034 and                 steel and reinforced concrete forebay
                                                  powerplant, that such powerplant has                    email patricia.leppert@ferc.gov.                      housing trashracks and a fish bypass
                                                  the capability to use coal or another                      j. Deadline for filing comments,                   gate; (5) a 120-foot-long, 85-foot-wide
                                                  alternate fuel. Such certification                      recommendations, terms and                            concrete powerhouse containing two
                                                  establishes compliance with FUA                         conditions, and prescriptions: 60 days                vertical Kaplan turbine-generator units
                                                  section 201(a) as of the date it is filed               from the issuance date of this notice;                having a combined installed capacity of
                                                  with the Secretary. 42 U. S. C. 8311.                   reply comments are due 105 days from                  14.6 megawatts; (6) a 200-foot-long, 100-
                                                     The following owner of a proposed                    the issuance date of this notice.                     foot-wide tailrace; (7) an 887-foot-long,
                                                  new base load electric powerplant has                      The Commission strongly encourages                 4.16-kilovolt (kV) buried cable; (8) a
                                                  filed a self-certification of coal-                     electronic filing. Please file comments,              substation; and (9) a 6,210-foot-long,
                                                  capability with DOE pursuant to FUA                     recommendations, terms and                            161-kV overhead transmission line
                                                  section 201(d) and in accordance with                   conditions, and prescriptions using the               extending from the substation to a
                                                  DOE regulations in 10 CFR 501.60, 61:                   Commission’s eFiling system at http://                utility-owned distribution line. The
                                                     Owner: NTE Carolinas, LLC.                           www.ferc.gov/docs-filing/efiling.asp.                 average annual generation would be
                                                     Capacity: 475 megawatts (MW).                        Commenters can submit brief comments                  52,000 megawatt-hours.
                                                     Plant Location: Gage Road, Kings                     up to 6,000 characters, without prior                    m. A copy of the application is
                                                  Mountain, NC 28086.                                     registration, using the eComment system               available for review at the Commission
                                                     In-Service Date: As early as January                 at http://www.ferc.gov/docs-filing/                   in the Public Reference Room, or may be
                                                  2018.                                                   ecomment.asp. You must include your                   viewed on the Commission’s Web site at
                                                    Issued in Washington, DC on March 17,                 name and contact information at the end               http://www.ferc.gov, using the
                                                  2015.                                                   of your comments. For assistance,                     ‘‘eLibrary’’ link. Enter the docket
                                                  Brian Mills,                                            please contact FERC Online Support at                 number, excluding the last three digits
                                                  Director, Permitting and Siting, Office of              FERCOnlineSupport@ferc.gov, (866)                     in the docket number field, to access the
                                                  Electricity Delivery and Energy Reliability.            208–3676 (toll free), or (202) 502–8659               document. For assistance, contact FERC
                                                  [FR Doc. 2015–06552 Filed 3–20–15; 8:45 am]             (TTY). In lieu of electronic filing, please           Online Support. A copy is available for
                                                                                                          send a paper copy to: Secretary, Federal              inspection and reproduction at the
                                                  BILLING CODE 6450–01–P
                                                                                                          Energy Regulatory Commission, 888                     address in item h above.
                                                                                                          First Street NE., Washington, DC 20426.                  Register online at http://
                                                  DEPARTMENT OF ENERGY                                    The first page of any filing should                   www.ferc.gov/docs-filing/
                                                                                                          include docket number P–13701–002.                    esubscription.asp to be notified via
                                                  Federal Energy Regulatory                                  The Commission’s Rules of Practice                 email of new filings and issuances
                                                  Commission                                              require all intervenors filing documents              related to this or other pending projects.
                                                                                                          with the Commission to serve a copy of                For assistance, contact FERC Online
                                                  [Project No. 13701–002]                                                                                       Support.
                                                                                                          that document on each person on the
                                                                                                          official service list for the project.                   All filings must: (1) Bear in all capital
                                                  FFP Missouri 2, LLC; Notice of                                                                                letters the title ‘‘COMMENTS,’’ ‘‘REPLY
                                                  Application Ready for Environmental                     Further, if an intervenor files comments
                                                                                                          or documents with the Commission                      COMMENTS,’’
                                                  Analysis, and Soliciting Comments,                                                                            ‘‘RECOMMENDATIONS,’’ ‘‘TERMS
                                                  Recommendations, Terms and                              relating to the merits of an issue that
                                                                                                          may affect the responsibilities of a                  AND CONDITIONS,’’ or
                                                  Conditions, and Prescriptions                                                                                 ‘‘PRESCRIPTIONS’’; (2) set forth in the
                                                                                                          particular resource agency, they must
                                                    Take notice that the following                        also serve a copy of the document on                  heading the name of the applicant and
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                  hydroelectric application has been filed                that resource agency.                                 the project number of the application to
                                                  with the Commission and is available                       k. This application has been accepted              which the filing responds; (3) furnish
                                                  for public inspection.                                  for filing and is now ready for                       the name, address, and telephone
                                                    a. Type of Application: Original Major                environmental analysis.                               number of the person submitting the
                                                  License—Existing Dam.                                      l. The proposed Sardis Lake Project                filing; and (4) otherwise comply with
                                                    b. Project No.: 13701–002.                            would utilize the following existing                  the requirements of 18 CFR 385.2001
                                                    c. Date filed: November 13, 2013.                     Corps’ Sardis Lake Dam facilities: (1) A              through 385.2005. All comments,
                                                    d. Applicant: FFP Missouri 2, LLC.                    15,300-foot-long, 97-foot-high earth fill             recommendations, terms and conditions


                                             VerDate Sep<11>2014   16:51 Mar 20, 2015   Jkt 235001   PO 00000   Frm 00021   Fmt 4703   Sfmt 4703   E:\FR\FM\23MRN1.SGM   23MRN1



Document Created: 2018-02-21 09:47:45
Document Modified: 2018-02-21 09:47:45
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice of Filing.
DatesAs early as January 2018.
ContactChristopher Lawrence at (202) 586- 5260.
FR Citation80 FR 15205 

2024 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR