80_FR_15264 80 FR 15209 - FFP Missouri 2, LLC; Notice of Application Ready for Environmental Analysis, and Soliciting Comments, Recommendations, Terms and Conditions, and Prescriptions

80 FR 15209 - FFP Missouri 2, LLC; Notice of Application Ready for Environmental Analysis, and Soliciting Comments, Recommendations, Terms and Conditions, and Prescriptions

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 80, Issue 55 (March 23, 2015)

Page Range15209-15210
FR Document2015-06525

Federal Register, Volume 80 Issue 55 (Monday, March 23, 2015)
[Federal Register Volume 80, Number 55 (Monday, March 23, 2015)]
[Notices]
[Pages 15209-15210]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-06525]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 13703-002]


FFP Missouri 2, LLC; Notice of Application Ready for 
Environmental Analysis, and Soliciting Comments, Recommendations, Terms 
and Conditions, and Prescriptions

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: Original Major License--Existing Dam.
    b. Project No.: 13703-002.
    c. Date filed: November 13, 2013.
    d. Applicant: FFP Missouri 2, LLC.
    e. Name of Project: Enid Lake Hydroelectric Project.
    f. Location: The proposed project would be located at the U.S. Army 
Corps of Engineers' (Corps) existing Enid Lake Dam, on the Yocona 
River, near the town of Oakland, in Yalobusha County, Mississippi. The 
proposed project would occupy approximately 30 acres of federal land 
administered by the Corps.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791 (a)--825(r).
    h. Applicant Contact: Ramya Swaminathan, Rye Development, 745 
Atlantic Avenue, 8th Floor, Boston, MA 02111; telephone (617) 804-1326.
    i. FERC Contact: Jeanne Edwards, telephone (202) 502-6181 and email 
[email protected]; or Patti Leppert, telephone (202) 502-6034 and 
email [email protected].

[[Page 15210]]

    j. Deadline for filing comments, recommendations, preliminary terms 
and conditions, and prescriptions: 60 days from the issuance date of 
this notice; reply comments are due 105 days from the issuance date of 
this notice.
    The Commission strongly encourages electronic filing. Please file 
comments, recommendations, terms and conditions, and prescriptions 
using the Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 
characters, without prior registration, using the eComment system at 
http://www.ferc.gov/docs-filing/ecomment.asp. You must include your 
name and contact information at the end of your comments. For 
assistance, please contact FERC Online Support at 
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE., 
Washington, DC 20426. The first page of any filing should include 
docket number P-13703-002.
    The Commission's Rules of Practice require all intervenors filing 
documents with the Commission to serve a copy of that document on each 
person on the official service list for the project. Further, if an 
intervenor files comments or documents with the Commission relating to 
the merits of an issue that may affect the responsibilities of a 
particular resource agency, they must also serve a copy of the document 
on that resource agency.
    k. This application has been accepted for filing and is now ready 
for environmental analysis.
    l. The proposed Enid Lake Project would utilize the following 
existing Corps' Enid Lake Dam facilities: (1) An 8,400-foot-long, 85-
foot-high earth fill embankment dam; (2) a reservoir; and (3) outlet 
works consisting of a concrete intake tower, two gated inlets that 
combine to direct flow through two 370-foot-long, 11-foot-diameter 
concrete outlet conduits, and a stilling basin.
    The proposed Enid Lake Project would consist of the following new 
facilities: (1) A 320-foot-long, 10.25-foot-diameter steel liner 
installed within one of the two existing outlet conduits; (2) a 50-
foot-long, 20-foot-wide (varies) steel-lined, concrete bifurcation 
chamber containing two hydraulically-operated gates used to control the 
amount of flow diverted from the existing stilling basin to the 
powerhouse; (3) a 240-foot-long, 10-foot-diameter steel penstock; (4) a 
55-foot wide, 50-foot-long, 100-foot-high steel and reinforced concrete 
forebay housing trashracks and a fish bypass gate; (5) an 80-foot-long, 
50-foot-wide concrete powerhouse containing two vertical Kaplan 
turbine-generator units having a combined installed capacity of 4.6 
megawatts; (6) a 150-foot-long, 75-foot-wide tailrace; (7) a 181-foot-
long, 4.16-kilovolt (kV) buried cable; (8) a substation; and (9) a 
2,036-foot-long, 12.5-kV overhead transmission line extending from the 
substation to a utility-owned distribution line. The average annual 
generation would be 17,700 megawatt-hours.
    m. A copy of the application is available for review at the 
Commission in the Public Reference Room, or may be viewed on the 
Commission's Web site at http://www.ferc.gov, using the ``eLibrary'' 
link. Enter the docket number, excluding the last three digits in the 
docket number field, to access the document. For assistance, contact 
FERC Online Support. A copy is available for inspection and 
reproduction at the address in item h above.
    Register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    All filings must: (1) Bear in all capital letters the title 
``COMMENTS,'' ``REPLY COMMENTS,'' ``RECOMMENDATIONS,'' ``TERMS AND 
CONDITIONS,'' or ``PRESCRIPTIONS''; (2) set forth in the heading the 
name of the applicant and the project number of the application to 
which the filing responds; (3) furnish the name, address, and telephone 
number of the person submitting the filing; and (4) otherwise comply 
with the requirements of 18 CFR 385.2001 through 385.2005. All 
comments, recommendations, terms and conditions or prescriptions must 
set forth their evidentiary basis and otherwise comply with the 
requirements of 18 CFR 4.34(b). Agencies may obtain copies of the 
application directly from the applicant. Each filing must be 
accompanied by proof of service on all persons listed on the service 
list prepared by the Commission in this proceeding, in accordance with 
18 CFR 4.34(b) and 385.2010.
    n. Procedural Schedule:
    The application will be processed according to the following 
revised hydro licensing schedule. Revisions to the schedule may be made 
as appropriate.

------------------------------------------------------------------------
                 Milestone                           Target date
------------------------------------------------------------------------
Filing of recommendations, terms and        May 2015.
 conditions, and prescriptions.
Commission issues Draft EA................  December 2015.
Comments on Draft EA Due..................  January 2016.
Commission Issues Final EA................  May 2016.
------------------------------------------------------------------------

    o. Public notice of the filing of the initial development 
application, which has already been given, established the due date for 
filing competing applications or notices of intent. Under the 
Commission's regulations, any competing development application must be 
filed in response to and in compliance with public notice of the 
initial development application. No competing applications or notices 
of intent may be filed in response to this notice.

    Dated: March 16, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-06525 Filed 3-20-15; 8:45 am]
 BILLING CODE 6717-01-P



                                                                                Federal Register / Vol. 80, No. 55 / Monday, March 23, 2015 / Notices                                                   15209

                                                     Filed Date: 3/13/15.                                    Applicants: Transource Missouri,                      Any person desiring to intervene or
                                                     Accession Number: 20150313–5213.                     LLC.                                                  protest in any of the above proceedings
                                                     Comments Due: 5 p.m. ET 4/3/15.                         Description: Tariff Amendment per                  must file in accordance with Rules 211
                                                     Docket Numbers: EC15–95–000.                         35.17(b): TMO Facilities Sharing                      and 214 of the Commission’s
                                                     Applicants: American Transmission                    Agreement Concurrence Amendment to                    Regulations (18 CFR 385.211 and
                                                  Company LLC (ATC).                                      be effective 12/31/9998.                              385.214) on or before 5:00 p.m. Eastern
                                                     Description: Application for                            Filed Date: 3/13/15.                               time on the specified comment date.
                                                  Authority to Acquire Transmission                          Accession Number: 20150313–5180.                   Protests may be considered, but
                                                  Facilities Under Section 203 of the FPA                    Comments Due: 5 p.m. ET 4/3/15.                    intervention is necessary to become a
                                                  of American Transmission Company                           Docket Numbers: ER15–1185–000.                     party to the proceeding.
                                                  LLC.                                                       Applicants: Midcontinent                              eFiling is encouraged. More detailed
                                                     Filed Date: 3/13/15.                                 Independent System Operator, Inc.,                    information relating to filing
                                                     Accession Number: 20150313–5214.                     American Transmission Systems,                        requirements, interventions, protests,
                                                     Comments Due: 5 p.m. ET 4/3/15.                      Incorporated.                                         service, and qualifying facilities filings
                                                     Docket Numbers: EC15–96–000.                            Description: § 205(d) rate filing per              can be found at: http://www.ferc.gov/
                                                     Applicants: Osprey Energy Center,                    35.13(a)(2)(iii): 2015–03–06_SA 766                   docs-filing/efiling/filing-req.pdf. For
                                                  LLC, Duke Energy Florida, Inc.                          Amended ATC–WPSC Bills of Sale to be                  other information, call (866) 208–3676
                                                     Description: Joint Application for                   effective 5/6/2015.                                   (toll free). For TTY, call (202) 502–8659.
                                                  Approval Under Section 203 of the                          Filed Date: 3/6/15.                                  Dated: March 16, 2015.
                                                  Federal Power Act and Request for                          Accession Number: 20150306–5392.
                                                                                                                                                                Nathaniel J. Davis, Sr.,
                                                  Shortened Comment Period of Osprey                         Comments Due: 5 p.m. ET 3/27/15.
                                                                                                                                                                Deputy Secretary.
                                                  Energy Center, LLC and Duke Energy                         Docket Numbers: ER15–1275–000.
                                                                                                                                                                [FR Doc. 2015–06553 Filed 3–20–15; 8:45 am]
                                                  Florida, Inc.                                              Applicants: New York State Electric &
                                                                                                                                                                BILLING CODE 6717–01–P
                                                     Filed Date: 3/13/15.                                 Gas Corporation.
                                                     Accession Number: 20150313–5217.                        Description: Informational Filing
                                                     Comments Due: 5 p.m. ET 4/3/15.                      Detailing Refunds Paid in connection
                                                                                                                                                                DEPARTMENT OF ENERGY
                                                     Take notice that the Commission                      with Engineering and Procurement
                                                  received the following electric rate                    Agreements of New York State Electric                 Federal Energy Regulatory
                                                  filings:                                                & Gas Corporation.                                    Commission
                                                                                                             Filed Date: 3/12/15.
                                                     Docket Numbers: ER10–2543–003;                          Accession Number: 20150312–5156.                   [Project No. 13703–002]
                                                  ER14–1153–002; ER11–2159–004; ER10–                        Comments Due: 5 p.m. ET 4/2/15.
                                                  2609–010; ER10–2606–010; ER10–2604–                                                                           FFP Missouri 2, LLC; Notice of
                                                                                                             Docket Numbers: ER15–1279–000.
                                                  008; ER10–2602–011.                                                                                           Application Ready for Environmental
                                                                                                             Applicants: PJM Interconnection,
                                                     Applicants: Verso Androscoggin LLC,                                                                        Analysis, and Soliciting Comments,
                                                                                                          L.L.C., Monongahela Power Company.
                                                  Verso Androscoggin Power LLC, Verso                        Description: § 205(d) rate filing per              Recommendations, Terms and
                                                  Maine Energy LLC, Luke Paper                            35.13(a)(2)(iii): Monongahela Power                   Conditions, and Prescriptions
                                                  Company, New Page Energy Services,                      submits Service Agreement Nos. 4090
                                                  Inc., Consolidated Water Power                                                                                  Take notice that the following
                                                                                                          and 4098—HREA/Mon Power to be                         hydroelectric application has been filed
                                                  Company, Escanaba Paper Company.                        effective 5/12/2015.
                                                     Description: Supplement to February                                                                        with the Commission and is available
                                                                                                             Filed Date: 3/13/15.                               for public inspection.
                                                  2, 2015 Notice of Non-Material Change                      Accession Number: 20150313–5181.
                                                  in Status of the Verso MBR and                                                                                  a. Type of Application: Original Major
                                                                                                             Comments Due: 5 p.m. ET 4/3/15.                    License—Existing Dam.
                                                  NewPage MBR Entities.
                                                                                                             Docket Numbers: ER15–1280–000.                       b. Project No.: 13703–002.
                                                     Filed Date: 3/13/15.
                                                                                                             Applicants: Midcontinent                             c. Date filed: November 13, 2013.
                                                     Accession Number: 20150313–5206.
                                                                                                          Independent System Operator, Inc.                       d. Applicant: FFP Missouri 2, LLC.
                                                     Comments Due: 5 p.m. ET 4/3/15.
                                                                                                             Description: § 205(d) rate filing per                e. Name of Project: Enid Lake
                                                     Docket Numbers: ER15–1046–005.                       35.13(a)(2)(iii): 2015–03–13_SA 2696                  Hydroelectric Project.
                                                     Applicants: Kansas City Power &                      ITC–IPL Amended E&P (J233) to be                        f. Location: The proposed project
                                                  Light Company.                                          effective 3/5/2015.                                   would be located at the U.S. Army
                                                     Description: Tariff Amendment per                       Filed Date: 3/13/15.                               Corps of Engineers’ (Corps) existing
                                                  35.17(b): KCP&L Supplemental Rate                          Accession Number: 20150313–5182.                   Enid Lake Dam, on the Yocona River,
                                                  Schedule 140 Filing to be effective                        Comments Due: 5 p.m. ET 4/3/15.                    near the town of Oakland, in Yalobusha
                                                  12/31/9998.                                                Docket Numbers: ER15–1281–000.                     County, Mississippi. The proposed
                                                     Filed Date: 3/13/15.                                    Applicants: New York Independent                   project would occupy approximately 30
                                                     Accession Number: 20150313–5185.                     System Operator, Inc.                                 acres of federal land administered by
                                                     Comments Due: 5 p.m. ET 4/3/15.                         Description: § 205(d) rate filing per              the Corps.
                                                     Docket Numbers: ER15–1048–004.                       35.13(a)(2)(iii): NYISO 205 filing re:                  g. Filed Pursuant to: Federal Power
                                                     Applicants: KCP&L Greater Missouri                   additional capacity resource                          Act, 16 U.S.C. 791 (a)—825(r).
                                                  Operations Company.                                     interconnection service to be effective 5/              h. Applicant Contact: Ramya
                                                     Description: Tariff Amendment per                    12/2015.
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                                                                                                                                Swaminathan, Rye Development, 745
                                                  35.17(b): KCP&L–GMO Supplemental                           Filed Date: 3/13/15.                               Atlantic Avenue, 8th Floor, Boston, MA
                                                  Rate Schedule 136 Filing to be effective                   Accession Number: 20150313–5184.                   02111; telephone (617) 804–1326.
                                                  12/31/9998.                                                Comments Due: 5 p.m. ET 4/3/15.                      i. FERC Contact: Jeanne Edwards,
                                                     Filed Date: 3/13/15.                                    The filings are accessible in the                  telephone (202) 502–6181 and email
                                                     Accession Number: 20150313–5177.                     Commission’s eLibrary system by                       jeanne.edwards@ferc.gov; or Patti
                                                     Comments Due: 5 p.m. ET 4/3/15.                      clicking on the links or querying the                 Leppert, telephone (202) 502–6034 and
                                                     Docket Numbers: ER15–1052–001.                       docket number.                                        email patricia.leppert@ferc.gov.


                                             VerDate Sep<11>2014   16:51 Mar 20, 2015   Jkt 235001   PO 00000   Frm 00024   Fmt 4703   Sfmt 4703   E:\FR\FM\23MRN1.SGM   23MRN1


                                                  15210                         Federal Register / Vol. 80, No. 55 / Monday, March 23, 2015 / Notices

                                                     j. Deadline for filing comments,                     trashracks and a fish bypass gate; (5) an                       Milestone                Target date
                                                  recommendations, preliminary terms                      80-foot-long, 50-foot-wide concrete
                                                  and conditions, and prescriptions: 60                   powerhouse containing two vertical                    Filing of recommendations,       May 2015.
                                                  days from the issuance date of this                     Kaplan turbine-generator units having a                  terms and conditions, and
                                                  notice; reply comments are due 105                                                                               prescriptions.
                                                                                                          combined installed capacity of 4.6
                                                  days from the issuance date of this                                                                           Commission issues Draft EA       December
                                                                                                          megawatts; (6) a 150-foot-long, 75-foot-                                                 2015.
                                                  notice.                                                 wide tailrace; (7) a 181-foot-long, 4.16-             Comments on Draft EA Due         January 2016.
                                                     The Commission strongly encourages                   kilovolt (kV) buried cable; (8) a                     Commission Issues Final EA       May 2016.
                                                  electronic filing. Please file comments,
                                                                                                          substation; and (9) a 2,036-foot-long,
                                                  recommendations, terms and                                                                                      o. Public notice of the filing of the
                                                                                                          12.5-kV overhead transmission line
                                                  conditions, and prescriptions using the                                                                       initial development application, which
                                                  Commission’s eFiling system at http://                  extending from the substation to a
                                                                                                          utility-owned distribution line. The                  has already been given, established the
                                                  www.ferc.gov/docs-filing/efiling.asp.                                                                         due date for filing competing
                                                  Commenters can submit brief comments                    average annual generation would be
                                                                                                          17,700 megawatt-hours.                                applications or notices of intent. Under
                                                  up to 6,000 characters, without prior                                                                         the Commission’s regulations, any
                                                  registration, using the eComment system                    m. A copy of the application is                    competing development application
                                                  at http://www.ferc.gov/docs-filing/                     available for review at the Commission                must be filed in response to and in
                                                  ecomment.asp. You must include your                     in the Public Reference Room, or may be               compliance with public notice of the
                                                  name and contact information at the end                 viewed on the Commission’s Web site at                initial development application. No
                                                  of your comments. For assistance,                       http://www.ferc.gov, using the                        competing applications or notices of
                                                  please contact FERC Online Support at                   ‘‘eLibrary’’ link. Enter the docket                   intent may be filed in response to this
                                                  FERCOnlineSupport@ferc.gov, (866)                       number, excluding the last three digits               notice.
                                                  208–3676 (toll free), or (202) 502–8659                 in the docket number field, to access the
                                                  (TTY). In lieu of electronic filing, please                                                                     Dated: March 16, 2015.
                                                                                                          document. For assistance, contact FERC                Kimberly D. Bose,
                                                  send a paper copy to: Secretary, Federal
                                                                                                          Online Support. A copy is available for
                                                  Energy Regulatory Commission, 888                                                                             Secretary.
                                                  First Street NE., Washington, DC 20426.                 inspection and reproduction at the
                                                                                                                                                                [FR Doc. 2015–06525 Filed 3–20–15; 8:45 am]
                                                  The first page of any filing should                     address in item h above.
                                                                                                                                                                BILLING CODE 6717–01–P
                                                  include docket number P–13703–002.                         Register online at http://
                                                     The Commission’s Rules of Practice                   www.ferc.gov/docs-filing/
                                                  require all intervenors filing documents                esubscription.asp to be notified via                  ENVIRONMENTAL PROTECTION
                                                  with the Commission to serve a copy of                  email of new filings and issuances                    AGENCY
                                                  that document on each person on the                     related to this or other pending projects.
                                                  official service list for the project.                                                                        [EPA–HQ–OARM–2015–0210; FRL 9924–95–
                                                                                                          For assistance, contact FERC Online                   OARM]
                                                  Further, if an intervenor files comments                Support.
                                                  or documents with the Commission                                                                              National and Governmental Advisory
                                                  relating to the merits of an issue that                    All filings must: (1) Bear in all capital
                                                                                                          letters the title ‘‘COMMENTS,’’ ‘‘REPLY               Committees to the U.S. Representative
                                                  may affect the responsibilities of a                                                                          to the Commission for Environmental
                                                  particular resource agency, they must                   COMMENTS,’’
                                                                                                          ‘‘RECOMMENDATIONS,’’ ‘‘TERMS                          Cooperation
                                                  also serve a copy of the document on
                                                  that resource agency.                                   AND CONDITIONS,’’ or                                  AGENCY:  Environmental Protection
                                                     k. This application has been accepted                ‘‘PRESCRIPTIONS’’; (2) set forth in the               Agency (EPA).
                                                  for filing and is now ready for                         heading the name of the applicant and                 ACTION: Notice of Advisory Committee
                                                  environmental analysis.                                 the project number of the application to              meeting.
                                                     l. The proposed Enid Lake Project                    which the filing responds; (3) furnish
                                                  would utilize the following existing                    the name, address, and telephone                      SUMMARY:    Under the Federal Advisory
                                                  Corps’ Enid Lake Dam facilities: (1) An                 number of the person submitting the                   Committee Act, Public Law 92–463, the
                                                  8,400-foot-long, 85-foot-high earth fill                                                                      Environmental Protection Agency (EPA)
                                                                                                          filing; and (4) otherwise comply with
                                                  embankment dam; (2) a reservoir; and                                                                          gives notice of a meeting of the National
                                                                                                          the requirements of 18 CFR 385.2001
                                                  (3) outlet works consisting of a concrete                                                                     Advisory Committee (NAC) and
                                                                                                          through 385.2005. All comments,
                                                  intake tower, two gated inlets that                                                                           Governmental Advisory Committee
                                                                                                          recommendations, terms and conditions                 (GAC) to the U.S. Representative to the
                                                  combine to direct flow through two 370-
                                                                                                          or prescriptions must set forth their                 North American Commission for
                                                  foot-long, 11-foot-diameter concrete
                                                                                                          evidentiary basis and otherwise comply                Environmental Cooperation (CEC). The
                                                  outlet conduits, and a stilling basin.
                                                     The proposed Enid Lake Project                       with the requirements of 18 CFR 4.34(b).              National and Governmental Advisory
                                                  would consist of the following new                      Agencies may obtain copies of the                     Committees advise the EPA
                                                  facilities: (1) A 320-foot-long, 10.25-foot-            application directly from the applicant.              Administrator in her capacity as the
                                                  diameter steel liner installed within one               Each filing must be accompanied by                    U.S. Representative to the CEC Council.
                                                  of the two existing outlet conduits; (2)                proof of service on all persons listed on             The committees are authorized under
                                                  a 50-foot-long, 20-foot-wide (varies)                   the service list prepared by the                      Articles 17 and 18 of the North
                                                  steel-lined, concrete bifurcation                       Commission in this proceeding, in                     American Agreement on Environmental
                                                                                                          accordance with 18 CFR 4.34(b) and
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                  chamber containing two hydraulically-                                                                         Cooperation (NAAEC), North American
                                                  operated gates used to control the                      385.2010.                                             Free Trade Agreement Implementation
                                                  amount of flow diverted from the                           n. Procedural Schedule:                            Act, Public Law 103–182, and as
                                                  existing stilling basin to the                                                                                directed by Executive Order 12915,
                                                  powerhouse; (3) a 240-foot-long, 10-foot-                  The application will be processed                  entitled ‘‘Federal Implementation of the
                                                  diameter steel penstock; (4) a 55-foot                  according to the following revised hydro              North American Agreement on
                                                  wide, 50-foot-long, 100-foot-high steel                 licensing schedule. Revisions to the                  Environmental Cooperation.’’ The NAC
                                                  and reinforced concrete forebay housing                 schedule may be made as appropriate.                  is composed of 15 members


                                             VerDate Sep<11>2014   16:51 Mar 20, 2015   Jkt 235001   PO 00000   Frm 00025   Fmt 4703   Sfmt 4703   E:\FR\FM\23MRN1.SGM   23MRN1



Document Created: 2018-02-21 09:47:34
Document Modified: 2018-02-21 09:47:34
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation80 FR 15209 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR