This notice announces the availability of the ROD to implement the Hooper Springs Transmission Project in Caribou County, Idaho. BPA has decided to implement the South Alternative's Option 3A (Option 3A) identified in the Hooper Springs Transmission Project Final Environmental Impact Statement (DOE/EIS-0451, January 2015). Option 3A consists of: (1) A new 138/115-kilovolt (kV) Hooper Springs Substation located near the city of Soda Springs, Idaho; (2) a new, approximately 24-mile-long, double-circuit 115-kV transmission line extending generally north then east from the Hooper Springs Substation to a new BPA connection facility that will connect the new line to Lower Valley Energy's (LVE) existing transmission system in northeastern Caribou County; (3) a new, approximately 0.2-mile-long, single-circuit 138-kV transmission line extending generally south from the Hooper Springs Substation to PacifiCorp's existing Threemile Knoll Substation to connect the new line to the regional transmission grid; and (4) required ancillary facilities such as access roads. The new Hooper Springs Substation will be constructed as a 138/115- kV substation, meaning that it will include a transformer capable of converting 138-kV electricity to 115-kV electricity. BPA will acquire 100-foot-wide right-of-way for the length of the 115-kV line. Approximately 174 new double-circuit 115-kV steel structures, ranging in height from 55 to 120 feet with an average span length between structures of 730 feet, will be installed in this new right-of-way. The BPA connection facility will be located about two miles southeast of the intersection of Blackfoot River Road and Diamond Creek Road and will consist of overhead line disconnect switches to connect the new 115-kV line to the existing LVE line. For the single-circuit 138-kV transmission line, two wood, H-frame structures approximately 80 to 85 feet tall will be installed within a new 125-foot-wide right-of-way. A fiber optic cable also will be installed along the 138-kV transmission line. About 14 miles of new access roads will be constructed and about 2.4 miles of existing access roads will be improved or reconstructed. All mitigation measures identified in the EIS are adopted.

Federal Register, Volume 80 Issue 60 (Monday, March 30, 2015)
[Federal Register Volume 80, Number 60 (Monday, March 30, 2015)]
[Notices]
[Pages 16666-16667]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-07199]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Bonneville Power Administration


Hooper Springs Transmission Project

AGENCY: Bonneville Power Administration (BPA), Department of Energy 
(DOE).

ACTION: Notice of availability of Record of Decision (ROD).

-----------------------------------------------------------------------

SUMMARY: This notice announces the availability of the ROD to implement 
the Hooper Springs Transmission Project in Caribou County, Idaho. BPA 
has decided to implement the South Alternative's Option 3A (Option 3A) 
identified in the Hooper Springs Transmission Project Final 
Environmental Impact Statement (DOE/EIS-0451, January 2015). Option 3A 
consists of: (1) A new 138/115-kilovolt (kV) Hooper Springs Substation 
located near the city of Soda Springs, Idaho; (2) a new, approximately 
24-mile-long, double-circuit 115-kV transmission line extending 
generally north then east from the Hooper Springs Substation to a new 
BPA connection facility that will connect the new line to Lower Valley 
Energy's (LVE) existing transmission system in northeastern Caribou 
County; (3) a new, approximately 0.2-mile-long, single-circuit 138-kV 
transmission line extending generally south from the Hooper Springs 
Substation to

[[Page 16667]]

PacifiCorp's existing Threemile Knoll Substation to connect the new 
line to the regional transmission grid; and (4) required ancillary 
facilities such as access roads.
    The new Hooper Springs Substation will be constructed as a 138/115-
kV substation, meaning that it will include a transformer capable of 
converting 138-kV electricity to 115-kV electricity. BPA will acquire 
100-foot-wide right-of-way for the length of the 115-kV line. 
Approximately 174 new double-circuit 115-kV steel structures, ranging 
in height from 55 to 120 feet with an average span length between 
structures of 730 feet, will be installed in this new right-of-way. The 
BPA connection facility will be located about two miles southeast of 
the intersection of Blackfoot River Road and Diamond Creek Road and 
will consist of overhead line disconnect switches to connect the new 
115-kV line to the existing LVE line. For the single-circuit 138-kV 
transmission line, two wood, H-frame structures approximately 80 to 85 
feet tall will be installed within a new 125-foot-wide right-of-way. A 
fiber optic cable also will be installed along the 138-kV transmission 
line. About 14 miles of new access roads will be constructed and about 
2.4 miles of existing access roads will be improved or reconstructed. 
All mitigation measures identified in the EIS are adopted.

ADDRESSES: Copies of the ROD and EIS may be obtained by calling BPA's 
toll-free document request line, 1-800-622-4520. The ROD and EIS are 
also available on our Web site, http://efw.bpa.gov/environmental_services/Document_Library/HooperSprings/.

FOR FURTHER INFORMATION CONTACT:  Tish Eaton, Bonneville Power 
Administration--KEC-4, P.O. Box 3621, Portland, Oregon 97208-3621; 
toll-free telephone number 1-800-622-4519; fax number 503-230-5699; or 
email [email protected].

    Issued in Portland, Oregon on March 16, 2015.
Elliot E. Mainzer,
Administrator and Chief Executive Officer.
[FR Doc. 2015-07199 Filed 3-27-15; 8:45 am]
 BILLING CODE 6450-01-P



                                                  16666                           Federal Register / Vol. 80, No. 60 / Monday, March 30, 2015 / Notices

                                                  potential effects on historic properties. 4                 (3) You can file a paper copy of your              selected an appropriate date range. For
                                                  We will define the project-specific Area                  comments by mailing them to the                      assistance, please contact FERC Online
                                                  of Potential Effects (APE) in                             following address: Kimberly D. Bose,                 Support at FercOnlineSupport@ferc.gov
                                                  consultation with the SHPO as the                         Secretary, Federal Energy Regulatory                 or toll free at (866) 208–3676, or for
                                                  project develops. On natural gas facility                 Commission, 888 First Street NE., Room               TTY, contact (202) 502–8659. The
                                                  projects, the APE at a minimum                            1A, Washington, DC 20426.                            eLibrary link also provides access to the
                                                  encompasses all areas subject to ground                                                                        texts of formal documents issued by the
                                                                                                            Environmental Mailing List
                                                  disturbance (examples include                                                                                  Commission, such as orders, notices,
                                                  construction right-of-way, contractor/                       The environmental mailing list                    and rulemakings.
                                                  pipe storage yards, compressor stations,                  includes federal, state, and local                     In addition, the Commission now
                                                  and access roads). Our EA for this                        government representatives and                       offers a free service called eSubscription
                                                  project will document our findings on                     agencies; elected officials;                         which allows you to keep track of all
                                                  the impacts on historic properties and                    environmental and public interest                    formal issuances and submittals in
                                                  summarize the status of consultations                     groups; Native American Tribes; other                specific dockets. This can reduce the
                                                  under Section 106.                                        interested parties; and local libraries              amount of time you spend researching
                                                                                                            and newspapers. This list also includes              proceedings by automatically providing
                                                  Public Participation                                      all affected landowners (as defined in               you with notification of these filings,
                                                     You can make a difference by                           the Commission’s regulations) who are                document summaries, and direct links
                                                  providing us with your specific                           potential right-of-way grantors, whose               to the documents. Go to www.ferc.gov/
                                                  comments or concerns about the project.                   property may be used temporarily for                 docs-filing/esubscription.asp.
                                                  Your comments should focus on the                         project purposes, or who own homes                     Finally, public meetings or site visits
                                                  potential environmental effects,                          within certain distances of aboveground              will be posted on the Commission’s
                                                  reasonable alternatives, and measures to                  facilities, and anyone who submits                   calendar located at www.ferc.gov/
                                                  avoid or lessen environmental impacts.                    comments on the project. We will                     EventCalendar/EventsList.aspx along
                                                  The more specific your comments, the                      update the environmental mailing list as             with other related information.
                                                  more useful they will be. To ensure that                  the analysis proceeds to ensure that we
                                                                                                                                                                   Dated: March 20, 2015.
                                                  your comments are timely and properly                     send the information related to this
                                                                                                                                                                 Kimberly D. Bose,
                                                  recorded, please send your comments so                    environmental review to all individuals,
                                                  that the Commission receives them in                      organizations, and government entities               Secretary.
                                                  Washington, DC on or before April 20,                     interested in and/or potentially affected            [FR Doc. 2015–07143 Filed 3–27–15; 8:45 am]
                                                  2015.                                                     by the proposed project.                             BILLING CODE 6717–01–P
                                                     For your convenience, there are three                     If we publish and distribute the EA,
                                                  methods which you can use to submit                       copies will be sent to the environmental
                                                  your comments to the Commission. In                       mailing list for public review and                   DEPARTMENT OF ENERGY
                                                  all instances please reference the project                comment. If you would prefer to receive
                                                                                                                                                                 Bonneville Power Administration
                                                  docket number (CP15–87–000) with                          a paper copy of the document instead of
                                                  your submission. The Commission                           the CD version or would like to remove               Hooper Springs Transmission Project
                                                  encourages electronic filing of                           your name from the mailing list, please
                                                  comments and has expert staff available                   return the attached Information Request              AGENCY:  Bonneville Power
                                                  to assist you at (202) 502–8258 or                        (appendix 2).                                        Administration (BPA), Department of
                                                  efiling@ferc.gov.                                                                                              Energy (DOE).
                                                                                                            Becoming an Intervenor
                                                     (1) You can file your comments                                                                              ACTION: Notice of availability of Record
                                                  electronically using the eComment                           In addition to involvement in the EA               of Decision (ROD).
                                                  feature on the Commission’s Web site                      scoping process, you may want to
                                                  (www.ferc.gov) under the link to                          become an ‘‘intervenor’’ which is an                 SUMMARY:   This notice announces the
                                                  Documents and Filings. This is an easy                    official party to the Commission’s                   availability of the ROD to implement the
                                                  method for interested persons to submit                   proceeding. Intervenors play a more                  Hooper Springs Transmission Project in
                                                  brief, text-only comments on a project;                   formal role in the process and are able              Caribou County, Idaho. BPA has
                                                     (2) You can file your comments                         to file briefs, appear at hearings, and be           decided to implement the South
                                                  electronically using the eFiling feature                  heard by the courts if they choose to                Alternative’s Option 3A (Option 3A)
                                                  on the Commission’s Web site                              appeal the Commission’s final ruling.                identified in the Hooper Springs
                                                  (www.ferc.gov) under the link to                          An intervenor formally participates in               Transmission Project Final
                                                  Documents and Filings. With eFiling,                      the proceeding by filing a request to                Environmental Impact Statement (DOE/
                                                  you can provide comments in a variety                     intervene. Instructions for becoming an              EIS–0451, January 2015). Option 3A
                                                  of formats by attaching them as a file                    intervenor are in the User’s Guide under             consists of: (1) A new 138/115-kilovolt
                                                  with your submission. New eFiling                         the ‘‘e-filing’’ link on the Commission’s            (kV) Hooper Springs Substation located
                                                  users must first create an account by                     Web site.                                            near the city of Soda Springs, Idaho; (2)
                                                  clicking on ‘‘eRegister.’’ You must select                                                                     a new, approximately 24-mile-long,
                                                                                                            Additional Information                               double-circuit 115-kV transmission line
                                                  the type of filing you are making. If you
                                                  are filing a comment on a particular                         Additional information about the                  extending generally north then east from
                                                  project, please select ‘‘Comment on a                     project is available from the                        the Hooper Springs Substation to a new
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                  Filing’’; or                                              Commission’s Office of External Affairs,             BPA connection facility that will
                                                                                                            at (866) 208–FERC, or on the FERC Web                connect the new line to Lower Valley
                                                    4 The Advisory Council on Historic Preservation’s       site at www.ferc.gov using the                       Energy’s (LVE) existing transmission
                                                  regulations are at Title 36, Code of Federal              ‘‘eLibrary’’ link. Click on the eLibrary             system in northeastern Caribou County;
                                                  Regulations, Part 800. Those regulations define           link, click on ‘‘General Search’’ and                (3) a new, approximately 0.2-mile-long,
                                                  historic properties as any prehistoric or historic
                                                  district, site, building, structure, or object included
                                                                                                            enter the docket number, excluding the               single-circuit 138-kV transmission line
                                                  in or eligible for inclusion in the National Register     last three digits in the Docket Number               extending generally south from the
                                                  of Historic Places.                                       field (i.e., CP15–87). Be sure you have              Hooper Springs Substation to


                                             VerDate Sep<11>2014    19:57 Mar 27, 2015   Jkt 235001   PO 00000   Frm 00051   Fmt 4703   Sfmt 4703   E:\FR\FM\30MRN1.SGM   30MRN1


                                                                                Federal Register / Vol. 80, No. 60 / Monday, March 30, 2015 / Notices                                           16667

                                                  PacifiCorp’s existing Threemile Knoll                   DEPARTMENT OF ENERGY                                    Accession Number: 20150320–5117.
                                                  Substation to connect the new line to                                                                           Comments Due: 5 p.m. ET 4/1/15.
                                                  the regional transmission grid; and (4)                 Federal Energy Regulatory                               Docket Numbers: RP15–662–000.
                                                  required ancillary facilities such as                   Commission                                              Applicants: Leaf River Energy Center
                                                  access roads.                                                                                                 LLC.
                                                                                                          Combined Notice of Filings                              Description: Compliance filing per
                                                     The new Hooper Springs Substation
                                                                                                            Take notice that the Commission has                 154.203: Leaf River Energy Center
                                                  will be constructed as a 138/115-kV
                                                                                                          received the following Natural Gas                    LLC—Order No. 801 Compliance Filing
                                                  substation, meaning that it will include
                                                                                                          Pipeline Rate and Refund Report filings:              to be effective 4/1/2015.
                                                  a transformer capable of converting 138-                                                                        Filed Date: 3/20/15.
                                                  kV electricity to 115-kV electricity. BPA               Filings Instituting Proceedings                         Accession Number: 20150320–5154.
                                                  will acquire 100-foot-wide right-of-way                                                                         Comments Due: 5 p.m. ET 4/1/15.
                                                                                                             Docket Numbers: RP15–656–000.
                                                  for the length of the 115-kV line.                                                                              Docket Numbers: RP15–663–000.
                                                                                                             Applicants: Transcontinental Gas
                                                  Approximately 174 new double-circuit                    Pipe Line Company.                                      Applicants: ANR Storage Company.
                                                  115-kV steel structures, ranging in                        Description: Section 4(d) rate filing                Description: Compliance filing per
                                                  height from 55 to 120 feet with an                      per 154.403: LSS and SS–2 Fuel Tracker                154.203: Compliance to Order 801—
                                                  average span length between structures                  Filing 2015 to be effective 4/1/2015.                 Docket No. RM14–21–000 to be effective
                                                  of 730 feet, will be installed in this new                 Filed Date: 3/18/15.                               6/1/2015.
                                                  right-of-way. The BPA connection                           Accession Number: 20150318–5147.                     Filed Date: 3/23/15.
                                                  facility will be located about two miles                   Comments Due: 5 p.m. ET 3/30/15.                     Accession Number: 20150323–5052.
                                                  southeast of the intersection of                                                                                Comments Due: 5 p.m. ET 4/6/15.
                                                                                                             Docket Numbers: RP15–657–000.
                                                  Blackfoot River Road and Diamond                           Applicants: Equitrans, L.P.                          Docket Numbers: RP15–664–000.
                                                  Creek Road and will consist of overhead                    Description: Section 4(d) rate filing                Applicants: Blue Lake Gas Storage
                                                  line disconnect switches to connect the                 per 154.204: Negotiated Capacity                      Company.
                                                  new 115-kV line to the existing LVE                     Release Agreement—3/19/2015 to be                       Description: Compliance filing per
                                                  line. For the single-circuit 138-kV                     effective 3/19/2015.                                  154.203: Compliance to Order 801—
                                                  transmission line, two wood, H-frame                       Filed Date: 3/19/15.                               Docket No. RM14–21–000 to be effective
                                                  structures approximately 80 to 85 feet                     Accession Number: 20150319–5025.                   6/1/2015.
                                                  tall will be installed within a new 125-                   Comments Due: 5 p.m. ET 3/31/15.                     Filed Date: 3/23/15.
                                                  foot-wide right-of-way. A fiber optic                                                                           Accession Number: 20150323–5053.
                                                                                                             Docket Numbers: RP15–658–000.                        Comments Due: 5 p.m. ET 4/6/15.
                                                  cable also will be installed along the                     Applicants: Enable Gas Transmission,
                                                  138-kV transmission line. About 14                                                                              Docket Numbers: RP15–665–000.
                                                                                                          LLC.
                                                  miles of new access roads will be                                                                               Applicants: Bison Pipeline LLC.
                                                                                                             Description: Section 4(d) rate filing
                                                                                                                                                                  Description: Compliance filing per
                                                  constructed and about 2.4 miles of                      per 154.204: Negotiated Rate Filing—
                                                                                                                                                                154.203: Compliance to Order 801—
                                                  existing access roads will be improved                  SND Non-Conforming 0414 (RS FT) to
                                                                                                                                                                Docket No. RM14–21–000 to be effective
                                                  or reconstructed. All mitigation                        be effective 2/1/2015.
                                                                                                                                                                6/1/2015.
                                                  measures identified in the EIS are                         Filed Date: 3/19/15.                                 Filed Date: 3/23/15.
                                                  adopted.                                                   Accession Number: 20150319–5132.                     Accession Number: 20150323–5054.
                                                                                                             Comments Due: 5 p.m. ET 3/31/15.                     Comments Due: 5 p.m. ET 4/6/15.
                                                  ADDRESSES:  Copies of the ROD and EIS                      Docket Numbers: RP15–659–000.
                                                  may be obtained by calling BPA’s toll-                                                                          Docket Numbers: RP15–666–000.
                                                                                                             Applicants: Portland Natural Gas                     Applicants: Horizon Pipeline
                                                  free document request line, 1–800–622–                  Transmission System.
                                                  4520. The ROD and EIS are also                                                                                Company, L.L.C.
                                                                                                             Description: Compliance filing per                   Description: Penalty Revenue
                                                  available on our Web site, http://                      154.203: Compliance to Order 801—                     Crediting Report of Horizon Pipeline
                                                  efw.bpa.gov/environmental_services/                     Docket No. RM14–21–000 to be effective                Company, L.L.C.
                                                  Document_Library/HooperSprings/.                        6/1/2015.                                               Filed Date: 3/20/15.
                                                  FOR FURTHER INFORMATION CONTACT:   Tish                    Filed Date: 3/20/15.                                 Accession Number: 20150320–5266.
                                                  Eaton, Bonneville Power                                    Accession Number: 20150320–5022.                     Comments Due: 5 p.m. ET 4/1/15.
                                                                                                             Comments Due: 5 p.m. ET 4/1/15.                      Docket Numbers: RP15–667–000.
                                                  Administration—KEC–4, P.O. Box 3621,
                                                  Portland, Oregon 97208–3621; toll-free                     Docket Numbers: RP15–660–000.                        Applicants: Midcontinent Express
                                                  telephone number 1–800–622–4519; fax                       Applicants: Gulf South Pipeline                    Pipeline LLC.
                                                  number 503–230–5699; or email                           Company, LP.                                            Description: Penalty Revenue
                                                  tkeaton@bpa.gov.                                           Description: Section 4(d) rate filing              Crediting Report of Midcontinent
                                                                                                          per 154.204: Amendments to Neg Rate                   Express Pipeline LLC.
                                                    Issued in Portland, Oregon on March 16,               Agmts (QEP 37657–137, 36601–40) to be                   Filed Date: 3/20/15.
                                                  2015.                                                   effective 3/20/2015.                                    Accession Number: 20150320–5267.
                                                  Elliot E. Mainzer,                                         Filed Date: 3/20/15.                                 Comments Due: 5 p.m. ET 4/1/15.
                                                  Administrator and Chief Executive Officer.                 Accession Number: 20150320–5023.                     Any person desiring to intervene or
                                                  [FR Doc. 2015–07199 Filed 3–27–15; 8:45 am]                Comments Due: 5 p.m. ET 4/1/15.                    protest in any of the above proceedings
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                  BILLING CODE 6450–01–P                                     Docket Numbers: RP15–661–000.                      must file in accordance with Rules 211
                                                                                                             Applicants: Natural Gas Pipeline                   and 214 of the Commission’s
                                                                                                          Company of America.                                   Regulations (18 CFR 385.211 and
                                                                                                             Description: Section 4(d) rate filing              385.214) on or before 5:00 p.m. Eastern
                                                                                                          per 154.204: Negotiated Rate—                         time on the specified comment date.
                                                                                                          Occidental Energy to be effective                     Protests may be considered, but
                                                                                                          4/1/2015.                                             intervention is necessary to become a
                                                                                                             Filed Date: 3/20/15.                               party to the proceeding.


                                             VerDate Sep<11>2014   19:57 Mar 27, 2015   Jkt 235001   PO 00000   Frm 00052   Fmt 4703   Sfmt 4703   E:\FR\FM\30MRN1.SGM   30MRN1



Document Created: 2015-12-18 11:32:51
Document Modified: 2015-12-18 11:32:51
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice of availability of Record of Decision (ROD).
ContactTish Eaton, Bonneville Power Administration--KEC-4, P.O. Box 3621, Portland, Oregon 97208-3621; toll-free telephone number 1-800-622-4519; fax number 503-230-5699; or email [email protected]
FR Citation80 FR 16666 