The U.S. Nuclear Regulatory Commission (NRC) is issuing a final revision to the following section in Chapter 3 of NUREG-0800, ``Standard Review Plan (SRP) for the Review of Safety Analysis Reports for Nuclear Power Plants: LWR Edition,'' Section 3.5.1.4, ``Missiles Generated by Extreme Winds.''

Federal Register, Volume 80 Issue 64 (Friday, April 3, 2015)
[Federal Register Volume 80, Number 64 (Friday, April 3, 2015)]
[Notices]
[Pages 18261-18262]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-07709]


=======================================================================
-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[NRC-2013-0161]


Missiles Generated by Extreme Winds

AGENCY: Nuclear Regulatory Commission.

ACTION: Standard review plan- section revision; issuance.

-----------------------------------------------------------------------

SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is issuing a 
final revision to the following section in Chapter 3 of NUREG-0800, 
``Standard Review Plan (SRP) for the Review of Safety Analysis Reports 
for Nuclear Power Plants: LWR Edition,'' Section 3.5.1.4, ``Missiles 
Generated by Extreme Winds.''

DATES: The effective date of this Standard Review Plan revision is May 
4, 2015.

ADDRESSES: Please refer to Docket ID NRC-2013-0161 when contacting the 
NRC about the availability of information regarding this document. You 
may obtain publicly-available information related to this document 
using any of the following methods:
     Federal Rulemaking Web site: Go to http://www.regulations.gov and search for Docket ID NRC-2013-0161. Address 
questions about NRC dockets to Carol Gallagher; telephone: 301-415-
3463; email: [email protected]. For technical questions, contact 
the individual(s) listed in the FOR FURTHER INFORMATION CONTACT section 
of this document.
     NRC's Agencywide Documents Access and Management System 
(ADAMS): You may obtain publicly available documents online in the 
ADAMS Public Documents collection at http://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``ADAMS Public Documents'' and 
then select ``Begin Web-based ADAMS Search.'' For problems with ADAMS, 
please contact the NRC's Public Document Room (PDR) reference staff at 
1-800-397-4209, 301-415-4737, or by email to [email protected]. The 
ADAMS accession number for each document referenced (if it available in 
ADAMS) is provided the first time that a document is referenced. The 
final revision for SRP Section 3.5.1.4, ``Missiles Generated by Extreme 
Winds,'' is available in ADAMS under Accession No. ML14190A180. The 
previously issued draft revision for public comment is available in 
ADAMS under Accession No. ML13043A004.
     The NRC posts its issued staff guidance on the NRC's 
external Web page: http://www.nrc.gov/reading-rm/doc-collections/nuregs/staff/sr0800/.

FOR FURTHER INFORMATION CONTACT: Jonathan DeGange, telephone: 301-415-
6992; email: [email protected], or Nishka Devaser, telephone: 
301-415-5196; email: [email protected], both are staff of the 
Office of New Reactors, U.S. Nuclear Regulatory Commission, Washington, 
DC 20555-0001.

SUPPLEMENTARY INFORMATION: 

I. Background

    On August 8, 2013 (78 FR 48503), the NRC staff published for public 
comment the proposed revision to SRP Section 3.5.1.4, ``Missiles 
Generated by Extreme Winds.'' The staff received no comments on the 
proposed revision. The staff is issuing the guidance in final form for 
use. There have been no changes made to the guidance since it was 
issued in proposed form for public comment. Details of specific changes 
between current SRP guidance and the revised guidance issued here are 
included at the end of each of the revised sections themselves, under 
the ``Description of Changes,'' subsections.

II. Backfitting and Issue Finality

    This SRP section revision provides guidance to the NRC staff for 
reviewing applications for a construction permit and an operating 
license under part 50 of Title 10 of the Code of Federal Regulations 
(10 CFR), with respect to the impacts of external missiles generated by 
tornadoes and extreme winds. The SRP also provides guidance for 
reviewing an application for a standard design approval; a standard 
design certification; a combined license; and a manufacturing license 
under 10 CFR part 52 with respect to those same subject matters.
    Issuance of this final SRP section revision does not constitute 
backfitting as defined in 10 CFR 50.109 (the Backfit Rule) nor is it 
inconsistent with the issue finality provisions in 10 CFR part 52. The 
NRC's position is based upon the following considerations.
    1. The SRP positions would not constitute backfitting, inasmuch as 
the SRP is internal guidance to the NRC staff.
    The SRP provides internal guidance to the NRC staff on how to 
review an application for NRC regulatory approval in the form of 
licensing. Changes in internal staff guidance are not matters for which 
either nuclear power plant applicants or licensees are protected under 
either the Backfit Rule or the issue finality provisions of 10 CFR part 
52.
    2. The NRC staff has no intention to impose the SRP positions on 
existing licensees and regulatory approvals either now or in the 
future.
    The NRC staff does not intend to impose or apply the positions 
described in the SRP to existing licenses and regulatory approvals. 
Hence, the issuance of this SRP--even if considered guidance within the 
purview of the issue finality provisions in 10 CFR part 52--does not 
need to be evaluated as if it were a backfit or as being inconsistent 
with issue finality provisions. If, in the future, the NRC staff seeks 
to impose a position in the SRP on holders of already-issued licenses 
in a manner that does not provide issue finality as described in the 
applicable issue finality provision, then the staff must make the 
showing as set forth in the Backfit Rule or address the criteria for 
avoiding issue finality as described in the applicable issue finality 
provision.
    3. Backfitting and issue finality do not--with limited exceptions 
not applicable here--protect current or future applicants.
    Applicants and potential applicants are not, with certain 
exceptions, protected by either the Backfit Rule or any issue finality 
provisions under 10 CFR part 52. Neither the Backfit Rule nor the issue 
finality provisions under 10 CFR part 52--with certain exclusions--were 
intended to apply to every NRC action that substantially changes the 
expectations of current and future applicants.
    The exceptions to the general principle are applicable whenever an 
applicant references a 10 CFR part 52 license (e.g., an early site 
permit) or NRC regulatory approval (e.g., a design certification rule) 
with specified issue

[[Page 18262]]

finality provisions. The staff does not, at this time, intend to impose 
the positions represented in the SRP in a manner that is inconsistent 
with any issue finality provisions. If, in the future, the staff seeks 
to impose a position in the SRP section in a manner that does not 
provide issue finality as described in the applicable issue finality 
provision, then the staff must address the criteria for avoiding issue 
finality as described in the applicable issue finality provision.

III. Congressional Review Act

    This action is a rule as defined in the Congressional Review Act (5 
U.S.C. 801-808). However, the Office of Management and Budget has not 
found it to be a major rule as defined in the Congressional Review Act.

    Dated at Rockville, Maryland, this 24th day of March, 2015. For 
the Nuclear Regulatory Commission.
Joseph Colaccino,
Chief, New Reactor Rulemaking and Guidance Branch, Division of Advanced 
Reactors and Rulemaking, Office of New Reactors.
[FR Doc. 2015-07709 Filed 4-2-15; 8:45 am]
 BILLING CODE 7590-01-P



                                                                                      Federal Register / Vol. 80, No. 64 / Friday, April 3, 2015 / Notices                                          18261

                                                      Title of Collection: Labor Standards                  ADAMS Public Documents collection at                  CFR part 52 with respect to those same
                                                    for the Registration of Apprenticeship                  http://www.nrc.gov/reading-rm/                        subject matters.
                                                    Programs.                                               adams.html. To begin the search, select                  Issuance of this final SRP section
                                                      OMB Control Number: 1205–0223.                        ‘‘ADAMS Public Documents’’ and then                   revision does not constitute backfitting
                                                      Affected Public: Private Sector—                      select ‘‘Begin Web-based ADAMS                        as defined in 10 CFR 50.109 (the Backfit
                                                    businesses or other for-profits;                        Search.’’ For problems with ADAMS,                    Rule) nor is it inconsistent with the
                                                    Individuals and Households; State,                      please contact the NRC’s Public                       issue finality provisions in 10 CFR part
                                                    Local, and Tribal Governments.                          Document Room (PDR) reference staff at                52. The NRC’s position is based upon
                                                      Total Estimated Number of                             1–800–397–4209, 301–415–4737, or by                   the following considerations.
                                                    Respondents: 141,129.                                   email to pdr.resource@nrc.gov. The                       1. The SRP positions would not
                                                      Total Estimated Number of                             ADAMS accession number for each                       constitute backfitting, inasmuch as the
                                                    Responses: 141,779.                                     document referenced (if it available in               SRP is internal guidance to the NRC
                                                      Total Estimated Annual Time Burden:                   ADAMS) is provided the first time that                staff.
                                                    14,775 hours.                                           a document is referenced. The final                      The SRP provides internal guidance
                                                      Total Estimated Annual Other Costs                    revision for SRP Section 3.5.1.4,                     to the NRC staff on how to review an
                                                    Burden: $0.                                             ‘‘Missiles Generated by Extreme                       application for NRC regulatory approval
                                                                                                            Winds,’’ is available in ADAMS under                  in the form of licensing. Changes in
                                                      Dated: March 30, 2015.                                                                                      internal staff guidance are not matters
                                                    Michel Smyth,
                                                                                                            Accession No. ML14190A180. The
                                                                                                            previously issued draft revision for                  for which either nuclear power plant
                                                    Departmental Clearance Officer.                                                                               applicants or licensees are protected
                                                                                                            public comment is available in ADAMS
                                                    [FR Doc. 2015–07681 Filed 4–2–15; 8:45 am]
                                                                                                            under Accession No. ML13043A004.                      under either the Backfit Rule or the
                                                    BILLING CODE 4510–FR–P                                     • The NRC posts its issued staff                   issue finality provisions of 10 CFR part
                                                                                                            guidance on the NRC’s external Web                    52.
                                                                                                            page: http://www.nrc.gov/reading-rm/                     2. The NRC staff has no intention to
                                                    NUCLEAR REGULATORY                                      doc-collections/nuregs/staff/sr0800/.                 impose the SRP positions on existing
                                                    COMMISSION                                                                                                    licensees and regulatory approvals
                                                                                                            FOR FURTHER INFORMATION CONTACT:
                                                                                                                                                                  either now or in the future.
                                                    [NRC–2013–0161]                                         Jonathan DeGange, telephone: 301–415–                    The NRC staff does not intend to
                                                                                                            6992; email: Jonathan.DeGange@                        impose or apply the positions described
                                                    Missiles Generated by Extreme Winds                     nrc.gov, or Nishka Devaser, telephone:                in the SRP to existing licenses and
                                                                                                            301–415–5196; email: Nishka.Devaser@                  regulatory approvals. Hence, the
                                                    AGENCY:  Nuclear Regulatory                             nrc.gov, both are staff of the Office of
                                                    Commission.                                                                                                   issuance of this SRP—even if
                                                                                                            New Reactors, U.S. Nuclear Regulatory                 considered guidance within the purview
                                                    ACTION: Standard review plan- section                   Commission, Washington, DC 20555–                     of the issue finality provisions in 10
                                                    revision; issuance.                                     0001.                                                 CFR part 52—does not need to be
                                                    SUMMARY:    The U.S. Nuclear Regulatory                 SUPPLEMENTARY INFORMATION:                            evaluated as if it were a backfit or as
                                                    Commission (NRC) is issuing a final                                                                           being inconsistent with issue finality
                                                                                                            I. Background
                                                    revision to the following section in                                                                          provisions. If, in the future, the NRC
                                                                                                               On August 8, 2013 (78 FR 48503), the               staff seeks to impose a position in the
                                                    Chapter 3 of NUREG–0800, ‘‘Standard
                                                                                                            NRC staff published for public comment                SRP on holders of already-issued
                                                    Review Plan (SRP) for the Review of
                                                                                                            the proposed revision to SRP Section                  licenses in a manner that does not
                                                    Safety Analysis Reports for Nuclear
                                                                                                            3.5.1.4, ‘‘Missiles Generated by Extreme              provide issue finality as described in the
                                                    Power Plants: LWR Edition,’’ Section
                                                                                                            Winds.’’ The staff received no                        applicable issue finality provision, then
                                                    3.5.1.4, ‘‘Missiles Generated by Extreme
                                                                                                            comments on the proposed revision.                    the staff must make the showing as set
                                                    Winds.’’
                                                                                                            The staff is issuing the guidance in final            forth in the Backfit Rule or address the
                                                    DATES: The effective date of this                       form for use. There have been no                      criteria for avoiding issue finality as
                                                    Standard Review Plan revision is May 4,                 changes made to the guidance since it                 described in the applicable issue finality
                                                    2015.                                                   was issued in proposed form for public                provision.
                                                    ADDRESSES: Please refer to Docket ID                    comment. Details of specific changes                     3. Backfitting and issue finality do
                                                    NRC–2013–0161 when contacting the                       between current SRP guidance and the                  not—with limited exceptions not
                                                    NRC about the availability of                           revised guidance issued here are                      applicable here—protect current or
                                                    information regarding this document.                    included at the end of each of the                    future applicants.
                                                    You may obtain publicly-available                       revised sections themselves, under the                   Applicants and potential applicants
                                                    information related to this document                    ‘‘Description of Changes,’’ subsections.              are not, with certain exceptions,
                                                    using any of the following methods:                                                                           protected by either the Backfit Rule or
                                                      • Federal Rulemaking Web site: Go to                  II. Backfitting and Issue Finality                    any issue finality provisions under 10
                                                    http://www.regulations.gov and search                     This SRP section revision provides                  CFR part 52. Neither the Backfit Rule
                                                    for Docket ID NRC–2013–0161. Address                    guidance to the NRC staff for reviewing               nor the issue finality provisions under
                                                    questions about NRC dockets to Carol                    applications for a construction permit                10 CFR part 52—with certain
                                                    Gallagher; telephone: 301–415–3463;                     and an operating license under part 50                exclusions—were intended to apply to
                                                    email: Carol.Gallagher@nrc.gov. For                     of Title 10 of the Code of Federal                    every NRC action that substantially
asabaliauskas on DSK5VPTVN1PROD with NOTICES




                                                    technical questions, contact the                        Regulations (10 CFR), with respect to                 changes the expectations of current and
                                                    individual(s) listed in the FOR FURTHER                 the impacts of external missiles                      future applicants.
                                                    INFORMATION CONTACT section of this                     generated by tornadoes and extreme                       The exceptions to the general
                                                    document.                                               winds. The SRP also provides guidance                 principle are applicable whenever an
                                                      • NRC’s Agencywide Documents                          for reviewing an application for a                    applicant references a 10 CFR part 52
                                                    Access and Management System                            standard design approval; a standard                  license (e.g., an early site permit) or
                                                    (ADAMS): You may obtain publicly                        design certification; a combined license;             NRC regulatory approval (e.g., a design
                                                    available documents online in the                       and a manufacturing license under 10                  certification rule) with specified issue


                                               VerDate Sep<11>2014   17:49 Apr 02, 2015   Jkt 235001   PO 00000   Frm 00074   Fmt 4703   Sfmt 4703   E:\FR\FM\03APN1.SGM   03APN1


                                                    18262                             Federal Register / Vol. 80, No. 64 / Friday, April 3, 2015 / Notices

                                                    finality provisions. The staff does not, at             approximately 15 miles east-northeast of              MEAG Power, the Project Companies, and
                                                    this time, intend to impose the positions               Waynesboro, GA, and 26 miles                          DOE. All that remains at this juncture is the
                                                    represented in the SRP in a manner that                 southeast of Augusta, GA.                             receipt of certain promissory notes and other
                                                                                                                                                                  financing documents from the U.S. FFB. At
                                                    is inconsistent with any issue finality                                                                       that point, MEAG Power will be in a position
                                                                                                            II
                                                    provisions. If, in the future, the staff                                                                      to cause judicial proceedings to be instituted
                                                    seeks to impose a position in the SRP                      The U.S. Nuclear Regulatory                        in State court to validate the DOE-guaranteed
                                                    section in a manner that does not                       Commission’s (NRC’s) order, dated                     loans (including the definitive agreements)
                                                    provide issue finality as described in the              April 29, 2014, approved three direct                 and the new offtake arrangements with the
                                                    applicable issue finality provision, then               transfers of portions of MEAG Power’s                 project companies and to re-validate the
                                                    the staff must address the criteria for                 22.7 percent undivided ownership                      existing arrangements (including the bond
                                                    avoiding issue finality as described in                 interest in VEGP, Units 3 and 4. Each of              resolutions and the amended offtake
                                                                                                                                                                  arrangements with the offtakers), all of which
                                                    the applicable issue finality provision.                these three transfers may occur
                                                                                                                                                                  include a validation of the enforceability of
                                                                                                            independently of, or in conjunction                   all of these arrangements in connection with
                                                    III. Congressional Review Act
                                                                                                            with, the others, as follows:                         the planned DOE-guaranteed loans. In
                                                       This action is a rule as defined in the                 (1) Transfer of a 7.6886571 percent                addition to the validation proceedings, DOE
                                                    Congressional Review Act (5 U.S.C.                      undivided interest in VEGP, Units 3 and               must also conclude its internal agency review
                                                    801–808). However, the Office of                        4, from MEAG Power to MEAG Power                      of the definitive agreements, which includes
                                                    Management and Budget has not found                     SPVM, LLC (Project M);                                input from the U.S. Office of Management
                                                    it to be a major rule as defined in the                    (2) transfer of a 9.3466423 percent                and Budget (OMB). While MEAG Power is
                                                    Congressional Review Act.                                                                                     optimistic that the judicial proceedings will
                                                                                                            undivided interest in VEGP, Units 3 and               result in validation of the agreements and
                                                      Dated at Rockville, Maryland, this 24th day           4, from MEAG Power to MEAG Power                      amended bond resolutions, which is a
                                                    of March, 2015. For the Nuclear Regulatory              SPVJ, LLC (Project J); and                            condition of the financial closing of the DOE-
                                                    Commission.                                                (3) transfer of a 5.6647006 percent                guaranteed loans from the U.S. FFB, and that
                                                    Joseph Colaccino,                                       undivided interest in VEGP, Units 3 and               DOE and OMB will favorably review the
                                                    Chief, New Reactor Rulemaking and                       4, from MEAG Power to MEAG Power                      definitive loan agreements, it is difficult to be
                                                    Guidance Branch, Division of Advanced                   SPVP, LCC (Project P).                                certain that the final Federal review will be
                                                    Reactors and Rulemaking, Office of New                     The application for the transfers was              concluded and the required State court order
                                                    Reactors.                                                                                                     will be issued in time to support a closing
                                                                                                            in connection with the finalization of                of the transactions by April 29, 2015.
                                                    [FR Doc. 2015–07709 Filed 4–2–15; 8:45 am]              three loans from the U.S. Federal
                                                    BILLING CODE 7590–01–P                                  Finance Bank (U.S. FFB) or one or more                   SNC further states that there have
                                                                                                            third-party lenders to be guaranteed by               been no changes in the information and
                                                                                                            the U.S. Department of Energy (DOE)                   technical and financial qualifications
                                                    NUCLEAR REGULATORY                                      through its loan guarantee program for                presented in its December 2, 2013,
                                                    COMMISSION                                              the development of advanced nuclear                   request to transfer the licenses.
                                                                                                            energy facilities. By its terms, the April            Moreover, the basis for granting that
                                                    [NRC–2008–0252; Docket Nos. 52–025 & 52–
                                                    026; Combined License Nos. NPF–91 &                     29, 2014, order stated that, ‘‘Should the             request has not changed and remains
                                                    NPF–92]                                                 transfer of the license not be completed              valid. The NRC staff notes that its basis
                                                                                                            within one year of this Order’s date of               for approving the transfers of MEAG
                                                    In the Matter of Municipal Electric                     issue, this Order shall become null and               Power’s licenses for VEGP, Units 3 and
                                                    Authority of Georgia (Vogtle Electric                   void, provided, however, that upon                    4, is documented in its safety evaluation
                                                    Generating Plant, Units 3 & 4); Order                   written application and for good cause                supporting the April 29, 2014, order.
                                                    Extending the Date by Which the Direct                  shown, such date may be extended by                   Based on the foregoing representations
                                                    Transfer of Licenses Is To Be                           order.’’                                              of SNC, the NRC staff concludes that the
                                                    Completed                                                                                                     basis for approval has not changed since
                                                                                                            III                                                   the issuance of the April 29, 2014,
                                                    I
                                                                                                               By letter dated February 12, 2015,                 order.
                                                       Georgia Power Company, Oglethorpe                    SNC on behalf of MEAG Power                              The NRC staff has considered the
                                                    Power Corporation, Municipal Electric                   requested that the April 29, 2014, order              submittal of February 12, 2015, and has
                                                    Authority of Georgia (MEAG Power), the                  be extended by 6 months, to October 29,               determined that good cause has been
                                                    City of Dalton, Georgia, an incorporated                2015. SNC, in its February 12, 2015,                  shown to extend by 6 months, until
                                                    municipality in the State of Georgia                    letter states that:                                   October 29, 2015, the date by which the
                                                    citing by and through its Board of                                                                            license transfers must be completed.
                                                    Water, Light and Sinking Fund                             Diligent efforts have been made to
                                                    Commissioners (City of Dalton), and                     negotiate the definitive financing agreements         IV
                                                                                                            with the DOE. Those negotiations have, for               Accordingly, under Sections 161b,
                                                    Southern Nuclear Operating Co., Inc.
                                                                                                            the most part, concluded. However, certain
                                                    (SNC) (collectively, the owners) are                    provisions in those agreements necessitated
                                                                                                                                                                  161i, and 184 of the Act, 42 U.S.C.
                                                    holders of combined license (COL) Nos.                  amendments to preexisting long term ‘‘cost            Sections 2201(b), 2201(i), and 2234; and
                                                    NPF–91 and NPF–92. These COLs                           passthrough [sic]’’ contracts between MEAG            under Title 10, ‘‘Energy,’’ of the Code of
                                                    authorize SNC to construct, possess,                    Power and the counterparties (offtakers) to           Federal Regulations Part 50.80,
                                                    use, and operate Vogtle Electric                        those contracts. While those negotiations             ‘‘Transfers of Licenses—Creditors’
                                                    Generating Plant (VEGP), Units 3 and 4,                 took much longer than MEAG Power                      Rights—Surrender of Licenses,’’ It Is
asabaliauskas on DSK5VPTVN1PROD with NOTICES




                                                    and the owners to possess but not                       anticipated when the license transfer                 Hereby Ordered that the order granting
                                                    operate VEGP, Units 3 and 4. The                        application was submitted in December 2013,           the direct license transfer, ‘‘Order
                                                                                                            those negotiations have concluded, and                Approving Transfer of License and
                                                    facility, which is currently under
                                                                                                            amended contracts, dated December 31,
                                                    construction, is adjacent to existing                   2014, were executed by MEAG Power and
                                                                                                                                                                  Conforming Amendment,’’ dated April
                                                    VEGP, Units 1 and 2, on a 3,169-acre                    each of the offtakers. In addition, on                29, 2014, be extended by 6 months, to
                                                    coastal plain bluff on the southwest side               December 23, 2014, MEAG Power’s board                 October 29, 2015. If the proposed direct
                                                    of the Savannah River in eastern Burke                  approved, in substantially final form, the            transfer of licenses is not completed by
                                                    County, GA. The facility is                             definitive financing agreements among                 October 29, 2015, this order and the


                                               VerDate Sep<11>2014   17:49 Apr 02, 2015   Jkt 235001   PO 00000   Frm 00075   Fmt 4703   Sfmt 4703   E:\FR\FM\03APN1.SGM   03APN1



Document Created: 2015-12-18 15:29:18
Document Modified: 2015-12-18 15:29:18
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionStandard review plan- section revision; issuance.
DatesThe effective date of this Standard Review Plan revision is May 4, 2015.
ContactJonathan DeGange, telephone: 301-415- 6992; email: [email protected], or Nishka Devaser, telephone: 301-415-5196; email: [email protected], both are staff of the Office of New Reactors, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001.
FR Citation80 FR 18261 