80_FR_18456 80 FR 18391 - Minneapolis Leased Housing Associates IV Limited Partnership; Notice of Application Tendered for Filing With the Commission

80 FR 18391 - Minneapolis Leased Housing Associates IV Limited Partnership; Notice of Application Tendered for Filing With the Commission

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 80, Issue 65 (April 6, 2015)

Page Range18391-18391
FR Document2015-07797

Federal Register, Volume 80 Issue 65 (Monday, April 6, 2015)
[Federal Register Volume 80, Number 65 (Monday, April 6, 2015)]
[Notices]
[Page 18391]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-07797]



[[Page 18391]]

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 14628-001]


Minneapolis Leased Housing Associates IV Limited Partnership; 
Notice of Application Tendered for Filing With the Commission

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: Minor License.
    b. Project No.: 14628-001.
    c. Date filed: March 20, 2015.
    d. Applicant: Minneapolis Leased Housing Associates IV, Limited 
Partnership (Minneapolis Housing Associates).
    e. Name of Project: A-Mill Artist Lofts Hydroelectric Project (A-
Mill Project).
    f. Location: On the Mississippi River, in the City of Minneapolis, 
Hennepin County, Minnesota. No federal lands are occupied by the 
project works or located within the project boundary.
    g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
    h. Applicant Contact: Owen Metz, 2905 Northwest Blvd., Suite 150, 
Plymouth, MN 55441; (763) 354-5618; email ometz@dominiuminc.com.
    i. FERC Contact: Shana Murray at (202) 502-8333; or email at 
shana.murray@ferc.gov.
    j. The application is not ready for environmental analysis at this 
time.
    k. The A-Mill Project consists of: (1) Removal of an existing 
concrete bulkhead blocking the existing intake structure; (2) an 
existing headrace tunnel rehabilitated and sleeved with a new 616-foot-
long, 5-foot-diameter steel penstock; (3) a new vertical steel pipe 
installed in the existing downstream drop-shaft; (4) a new 600-kilowatt 
turbine generator; (5) a new 6-foot-wide by 4-foot-tall concrete outlet 
structure at the existing downstream tailrace; and (6) appurtenant 
facilities. The average annual generation is estimated to be 3,400 
megawatt-hours.
    l. A copy of the application is available for review at the 
Commission in the Public Reference Room or may be viewed on the 
Commission's Web site at http://www.ferc.gov using the ``eLibrary'' 
link. Enter the docket number excluding the last three digits in the 
docket number field to access the document. For assistance, contact 
FERC Online Support. A copy is also available for inspection and 
reproduction at the address in item h above.
    You may also register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    m. Procedural schedule: The application will be processed according 
to the following preliminary Hydro Licensing Schedule. Revisions to the 
schedule will be made as appropriate.
    Issue Notice of Acceptance: April 2015.
    Issue notice soliciting final terms and conditions: May 2015.
    Commission issues EA: July 2015.

    Dated: March 31, 2015.
Kimberly D. Bose,
 Secretary.
[FR Doc. 2015-07797 Filed 4-3-15; 8:45 am]
BILLING CODE 6717-01-P



                                                                              Federal Register / Vol. 80, No. 65 / Monday, April 6, 2015 / Notices                                            18391

                                              DEPARTMENT OF ENERGY                                    esubscription.asp to be notified via                  wells (Dora Hubbs 1–33, Burnett 1–4,
                                                                                                      email of new filings and issuances                    B.J. Stenemeyer 1–22, and Wheeler 1–
                                              Federal Energy Regulatory                               related to this or other pending projects.            22). Southwest states that the working
                                              Commission                                              For assistance, contact FERC Online                   gas at the Waverly Storage Field has
                                              [Project No. 14628–001]                                 Support.                                              been reduced, leaving a number of wells
                                                                                                        m. Procedural schedule: The                         too far from the gas bubble to provide
                                              Minneapolis Leased Housing                              application will be processed according               useful service. Also, Southwest asserts
                                              Associates IV Limited Partnership;                      to the following preliminary Hydro                    that there have been integrity problems
                                              Notice of Application Tendered for                      Licensing Schedule. Revisions to the                  in the lateral pipelines, well site
                                              Filing With the Commission                              schedule will be made as appropriate.                 facilities, and wellheads due to
                                                                                                        Issue Notice of Acceptance: April                   corrosion. Southwest states that it does
                                                 Take notice that the following                       2015.                                                 not anticipate storage field operation to
                                              hydroelectric application has been filed                  Issue notice soliciting final terms and             change to where the subject wells would
                                              with the Commission and is available                    conditions: May 2015.                                 be needed for injection/withdrawal
                                              for public inspection.                                    Commission issues EA: July 2015.                    service. Southwest avers that the
                                                 a. Type of Application: Minor                                                                              proposed abandonment project will
                                              License.                                                  Dated: March 31, 2015.
                                                                                                                                                            have no effect on the certificated
                                                 b. Project No.: 14628–001.                           Kimberly D. Bose,
                                                                                                                                                            physical parameters of the Waverly
                                                 c. Date filed: March 20, 2015.                       Secretary.
                                                 d. Applicant: Minneapolis Leased                                                                           Storage Field, including total inventory,
                                                                                                      [FR Doc. 2015–07797 Filed 4–3–15; 8:45 am]            reservoir pressure, reservoir and buffer
                                              Housing Associates IV, Limited
                                              Partnership (Minneapolis Housing
                                                                                                      BILLING CODE 6717–01–P                                boundaries, and certificated capacity.
                                              Associates).                                                                                                  Southwest estimates the cost of the
                                                 e. Name of Project: A-Mill Artist Lofts                                                                    proposed abandonment to be
                                                                                                      DEPARTMENT OF ENERGY                                  approximately $853,000.
                                              Hydroelectric Project (A-Mill Project).
                                                 f. Location: On the Mississippi River,                                                                        Any questions concerning this
                                                                                                      Federal Energy Regulatory                             application may be directed to Stephen
                                              in the City of Minneapolis, Hennepin                    Commission
                                              County, Minnesota. No federal lands are                                                                       Veatch, Sr. Director of Certificates,
                                              occupied by the project works or located                [Docket No. CP15–116–000]                             Southwest Gas Storage Company, 1300
                                              within the project boundary.                                                                                  Main Street, Houston, Texas 77002, by
                                                 g. Filed Pursuant to: Federal Power                  Southwest Gas Storage Company;                        telephone at (713) 989–2024, by
                                              Act 16 U.S.C. 791(a)–825(r).                            Notice of Request Under Blanket                       facsimile at (713) 989–1205, or by email
                                                 h. Applicant Contact: Owen Metz,                     Authorization                                         at stephen_veatch@energytransfer.com.
                                              2905 Northwest Blvd., Suite 150,                                                                                 Any person or the Commission’s staff
                                                                                                         Take notice that on March 18, 2015,                may, within 60 days after issuance of
                                              Plymouth, MN 55441; (763) 354–5618;                     Southwest Gas Storage Company
                                              email ometz@dominiuminc.com.                                                                                  the instant notice by the Commission,
                                                                                                      (Southwest), 1300 Main Street, Houston,               file pursuant to Rule 214 of the
                                                 i. FERC Contact: Shana Murray at
                                                                                                      Texas 77002, filed in Docket No. CP15–                Commission’s Procedural Rules (18 CFR
                                              (202) 502–8333; or email at
                                                                                                      116–000 a prior notice request pursuant               385.214) a motion to intervene or notice
                                              shana.murray@ferc.gov.
                                                 j. The application is not ready for                  to sections 157.205 and 157.216(b) of                 of intervention and pursuant to section
                                              environmental analysis at this time.                    the Commission’s regulations under the                157.205 of the regulations under the
                                                 k. The A-Mill Project consists of: (1)               Natural Gas Act (NGA), as amended,                    NGA (18 CFR 157.205), a protest to the
                                              Removal of an existing concrete                         requesting authorization to plug and                  request. If no protest is filed within the
                                              bulkhead blocking the existing intake                   abandon 11 wells, associated lateral                  time allowed therefore, the proposed
                                              structure; (2) an existing headrace                     pipelines, and appurtenances at its                   activity shall be deemed to be
                                              tunnel rehabilitated and sleeved with a                 Waverly Storage Field in Morgan                       authorized effective the day after the
                                              new 616-foot-long, 5-foot-diameter steel                County, Illinois, all as more fully set               time allowed for filing a protest. If a
                                              penstock; (3) a new vertical steel pipe                 forth in the application which is on file             protest is filed and not withdrawn
                                              installed in the existing downstream                    with the Commission and open to                       within 30 days after the allowed time
                                              drop-shaft; (4) a new 600-kilowatt                      public inspection. The filing may also                for filing a protest, the instant request
                                              turbine generator; (5) a new 6-foot-wide                be viewed on the web at http://                       shall be treated as an application for
                                              by 4-foot-tall concrete outlet structure at             www.ferc.gov using the ‘‘eLibrary’’ link.             authorization pursuant to section 7 of
                                              the existing downstream tailrace; and                   Enter the docket number excluding the                 the NGA.
                                              (6) appurtenant facilities. The average                 last three digits in the docket number                   Pursuant to section 157.9 of the
                                              annual generation is estimated to be                    field to access the document. For                     Commission’s rules, 18 CFR 157.9,
                                              3,400 megawatt-hours.                                   assistance, please contact FERC Online                within 90 days of this Notice the
                                                 l. A copy of the application is                      Support at FERCOnlineSupport@                         Commission staff will either: Complete
                                              available for review at the Commission                  ferc.gov or toll free at (866) 208–3676, or           its environmental assessment (EA) and
                                              in the Public Reference Room or may be                  TTY, contact (202) 502–8659.                          place it into the Commission’s public
                                              viewed on the Commission’s Web site at                     Specifically, Southwest proposes to                record (eLibrary) for this proceeding, or
                                              http://www.ferc.gov using the                           plug and abandon seven inactive                       issue a Notice of Schedule for
                                              ‘‘eLibrary’’ link. Enter the docket                     injection/withdrawal wells (Carr 2–9,                 Environmental Review. If a Notice of
                                              number excluding the last three digits in               Staton 2–15, Mosley 2–16, Rogers 1–16,                Schedule for Environmental Review is
tkelley on DSK4VPTVN1PROD with NOTICES




                                              the docket number field to access the                   Stenemeyer 2–15, Edwards 1–16, and                    issued, it will indicate, among other
                                              document. For assistance, contact FERC                  Wheeler 2–15). Southwest further                      milestones, the anticipated date for the
                                              Online Support. A copy is also available                proposes to abandon the related laterals,             Commission staff’s issuance of the EA
                                              for inspection and reproduction at the                  totaling 5,362 feet of 4-, 6-, and 8-inch             for this proposal. The filing of the EA
                                              address in item h above.                                diameter pipeline, with appurtenances.                in the Commission’s public record for
                                                 You may also register online at                      Additionally, Southwest proposes to                   this proceeding or the issuance of a
                                              http://www.ferc.gov/docs-filing/                        plug and abandon four observation                     Notice of Schedule for Environmental


                                         VerDate Sep<11>2014   18:14 Apr 03, 2015   Jkt 235001   PO 00000   Frm 00040   Fmt 4703   Sfmt 4703   E:\FR\FM\06APN1.SGM   06APN1



Document Created: 2015-12-18 11:18:37
Document Modified: 2015-12-18 11:18:37
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation80 FR 18391 

2024 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR