DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 80, Issue 72 (April 15, 2015)

Page Range20212-20213
FR Document2015-08649

Federal Register, Volume 80 Issue 72 (Wednesday, April 15, 2015)
[Federal Register Volume 80, Number 72 (Wednesday, April 15, 2015)]
[Notices]
[Pages 20212-20213]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-08649]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 14660-000]


Cascade Water Alliance: Notice of Preliminary Permit Application 
Accepted for Filing and Soliciting Comments, Motions To Intervene, and 
Competing Applications

    On February 4, 2015, the Cascade Water Alliance filed an 
application for a preliminary permit, pursuant to section 4(f) of the 
Federal Power Act (FPA), proposing to study the feasibility of the 
White River-Lake Tapps Reservoir Ancillary Hydroelectric Project (White 
River Project or project) to be located on the White River, in Pierce 
County, Washington. The sole purpose of a preliminary permit, if 
issued, is to grant the permit holder priority to file a license 
application during the permit term. A preliminary permit does not 
authorize the permit holder to perform any land-disturbing activities 
or

[[Page 20213]]

otherwise enter upon lands or waters owned by others without the 
owners' express permission.
    The proposed project would consist of the following existing 
facilities from a previously licensed project: (1) A 352-foot-long, 4-
foot-high rock-filled, timber crib barrier structure with 7-foot-high 
flashboards; (2) headworks consisting of two slide gates; (3) a 7.75-
mile-long flowline from the headworks to Lake Tapps which consists of a 
concrete flume, five settling basins, a concrete canal, an unlined 
earthen canal, and two concrete pipes; (4) a fish recovery pond and a 
fish screen facility along the flowline; (5) a valve house with a new 5 
megawatts (MW) turbine/generating unit; (6) a new transmission line 
from the valve house to a new substation near the valve house; (7) Lake 
Tapps with a surface area of 2,740 acres and storage capacity of 46,700 
acre-feet at elevation 542.5 feet above mean sea level; (8) an intake 
structure on Lake Tapps; (9) a 12-foot-diamter, 2,842-foot-long 
concrete lined tunnel; (10) a concrete and steel forebay; (11) four 
riveted steel penstocks with varying diameters up to 8 feet and lengths 
up to 1,619 feet; (12) a 225-foot-long, 85-foot-wide, 55-foot-high 
concrete-framed powerhouse containing an existing 27 MW Francis 
generating unit and a new 5 MW unit with a total installed capacity of 
32 MW; (13) a concrete and timber tailbay; (14) a 3,250-foot-long open 
channel tailrace; (15) a new 4,181-foot-long, 115-kilovolt transmission 
line connecting to a nearby substation; and (16) appurtenant 
facilities. The estimated annual generation of the project would be 50 
gigawatt-hours.
    Applicant Contact: Chuck Clark, Chief Executive Officer, Cascade 
Water Alliance, 520 112th Avenue NE., Suite 400, Bellevue, Washington 
98004; phone: (425) 453-0930.
    FERC Contact: John Matkowski; phone: (202) 502-8576.
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Competing applications and notices of intent must meet the requirements 
of 18 CFR 4.36.
    The Commission strongly encourages electronic filing. Please file 
comments, motions to intervene, notices of intent, and competing 
applications using the Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief 
comments up to 6,000 characters, without prior registration, using the 
eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You 
must include your name and contact information at the end of your 
comments. For assistance, please contact FERC Online Support at 
FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE., 
Washington, DC 20426. The first page of any filing should include 
docket number P-14660-000.
    More information about this project, including a copy of the 
application, can be viewed or printed on the ``eLibrary'' link of 
Commission's Web site at http://www.ferc.gov/docs-filing/elibrary.asp. 
Enter the docket number (P-14660) in the docket number field to access 
the document. For assistance, contact FERC Online Support.

     Dated: April 9, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-08649 Filed 4-14-15; 8:45 am]
 BILLING CODE 6717-01-P



                                              20212                        Federal Register / Vol. 80, No. 72 / Wednesday, April 15, 2015 / Notices

                                              Orders, 13514 (Federal Leadership in                    issued, it will indicate, among other                 associated with the Commission’s
                                              Environmental, Energy and Economic                      milestones, the anticipated date for the              environmental review process.
                                              Performance) and 13653 (Preparing the                   Commission staff’s issuance of the final              Environmental commentors will not be
                                              United States for the Impacts of Climate                environmental impact statement (FEIS)                 required to serve copies of filed
                                              Change) also set forth a number of                      or EA for this proposal. The filing of the            documents on all other parties.
                                              activities that would be supported by                   EA in the Commission’s public record                  However, the non-party commentors
                                              the information collected under this                    for this proceeding or the issuance of a              will not receive copies of all documents
                                              request.                                                Notice of Schedule for Environmental                  filed by other parties or issued by the
                                                Issued in Washington, DC, on April 8,                 Review will serve to notify federal and               Commission (except for the mailing of
                                              2015.                                                   state agencies of the timing for the                  environmental documents issued by the
                                              Judith M. Greenwald,                                    completion of all necessary reviews, and              Commission) and will not have the right
                                              Deputy Director, Office of Climate,                     the subsequent need to complete all                   to seek court review of the
                                              Environment and Efficiency, Office of Energy            federal authorizations within 90 days of              Commission’s final order.
                                              Policy and Systems Analysis, U.S.                       the date of issuance of the Commission                   The Commission strongly encourages
                                              Department of Energy.                                   staff’s FEIS or EA.                                   electronic filings of comments, protests
                                              [FR Doc. 2015–08643 Filed 4–14–15; 8:45 am]                There are two ways to become                       and interventions in lieu of paper using
                                              BILLING CODE 6450–01–P
                                                                                                      involved in the Commission’s review of                the ‘‘eFiling’’ link at http://
                                                                                                      this project. First, any person wishing to            www.ferc.gov. Persons unable to file
                                                                                                      obtain legal status by becoming a party               electronically should submit an original
                                              DEPARTMENT OF ENERGY                                    to the proceedings for this project                   and five copies of the protest or
                                                                                                      should, on or before the comment date                 intervention to the Federal Energy
                                              Federal Energy Regulatory                               stated below, file with the Federal                   regulatory Commission, 888 First Street
                                              Commission                                              Energy Regulatory Commission, 888                     NE., Washington, DC 20426.
                                              [Docket No. CP15–132–000]
                                                                                                      First Street NE., Washington, DC 20426,                  There is an ‘‘eSubscription’’ link on
                                                                                                      a motion to intervene in accordance                   the Web site that enables subscribers to
                                              Kern River Gas Transmission                             with the requirements of the                          receive email notification when a
                                              Company; Notice of Application                          Commission’s Rules of Practice and                    document is added to a subscribed
                                                                                                      Procedure (18 CFR 385.214 or 385.211)                 docket(s). For assistance with any FERC
                                                 Take notice that on March 26, 2015,                  and the Regulations under the NGA (18
                                              Kern River Gas Transmission Company                                                                           Online service, please email
                                                                                                      CFR 157.10). A person obtaining party                 FERCOnlineSupport@ferc.gov, or call
                                              (Kern River), 2755 E. Cottonwood                        status will be placed on the service list
                                              Parkway, Suite 300, Salt Lake City, Utah                                                                      (866) 208–3676 (toll free). For TTY, call
                                                                                                      maintained by the Secretary of the                    (202) 502–8659.
                                              84121, filed an application pursuant to                 Commission and will receive copies of
                                              section 7(c) of the Natural Gas Act                                                                              Comment Date: April 29, 2015.
                                                                                                      all documents filed by the applicant and
                                              (NGA) and Part 157 of the Commission’s                  by all other parties. A party must submit               Dated: April 8, 2015.
                                              regulations, requesting authorization to                seven copies of filings made with the                 Kimberly D. Bose,
                                              replace 1.56-miles of its 36-inch                       Commission and must mail a copy to                    Secretary.
                                              diameter A-line in Clark County,                        the applicant and to every other party in             [FR Doc. 2015–08551 Filed 4–14–15; 8:45 am]
                                              Nevada with thicker walled pipe to                      the proceeding. Only parties to the                   BILLING CODE 6717–01–P
                                              comply with a U.S. Department of                        proceeding can ask for court review of
                                              Transportation class location change, all               Commission orders in the proceeding.
                                              as more fully set forth in the application                 However, a person does not have to                 DEPARTMENT OF ENERGY
                                              which is on file with the Commission                    intervene in order to have comments
                                              and open to public inspection. The                      considered. The second way to                         Federal Energy Regulatory
                                              filing may also be viewed on the web at                 participate is by filing with the                     Commission
                                              http://www.ferc.gov using the                           Secretary of the Commission, as soon as               [Project No. 14660–000]
                                              ‘‘eLibrary’’ link. Enter the docket                     possible, an original and two copies of
                                              number excluding the last three digits in               comments in support of or in opposition               Cascade Water Alliance: Notice of
                                              the docket number field to access the                   to this project. The Commission will                  Preliminary Permit Application
                                              document.                                               consider these comments in                            Accepted for Filing and Soliciting
                                                 Any questions regarding this                         determining the appropriate action to be              Comments, Motions To Intervene, and
                                              application should be directed to                       taken, but the filing of a comment alone              Competing Applications
                                              Michael T. Loeffler, Senior Director,                   will not serve to make the filer a party
                                              Certificates, phone: (402) 398–7103,                    to the proceeding. The Commission’s                      On February 4, 2015, the Cascade
                                              facsimile: (402) 398–7592, or by email                  rules require that persons filing                     Water Alliance filed an application for
                                              at: mike.loeffler@nngco.com located at                  comments in opposition to the project                 a preliminary permit, pursuant to
                                              Kern River Gas Transmission Company,                    provide copies of their protests only to              section 4(f) of the Federal Power Act
                                              P.O. Box 3330, Omaha, Nebraska                          the party or parties directly involved in             (FPA), proposing to study the feasibility
                                              68103–0330.                                             the protest.                                          of the White River-Lake Tapps Reservoir
                                                 Pursuant to section 157.9 of the                        Persons who wish to comment only                   Ancillary Hydroelectric Project (White
                                              Commission’s rules, 18 CFR 157.9,                       on the environmental review of this                   River Project or project) to be located on
                                              within 90 days of this Notice the                       project should submit an original and                 the White River, in Pierce County,
tkelley on DSK3SPTVN1PROD with NOTICES




                                              Commission staff will either: complete                  two copies of their comments to the                   Washington. The sole purpose of a
                                              its environmental assessment (EA) and                   Secretary of the Commission.                          preliminary permit, if issued, is to grant
                                              place it into the Commission’s public                   Environmental commentors will be                      the permit holder priority to file a
                                              record (eLibrary) for this proceeding; or               placed on the Commission’s                            license application during the permit
                                              issue a Notice of Schedule for                          environmental mailing list, will receive              term. A preliminary permit does not
                                              Environmental Review. If a Notice of                    copies of the environmental documents,                authorize the permit holder to perform
                                              Schedule for Environmental Review is                    and will be notified of meetings                      any land-disturbing activities or


                                         VerDate Sep<11>2014   17:29 Apr 14, 2015   Jkt 235001   PO 00000   Frm 00016   Fmt 4703   Sfmt 4703   E:\FR\FM\15APN1.SGM   15APN1


                                                                           Federal Register / Vol. 80, No. 72 / Wednesday, April 15, 2015 / Notices                                           20213

                                              otherwise enter upon lands or waters                    name and contact information at the end               notification when a document is added
                                              owned by others without the owners’                     of your comments. For assistance,                     to a subscribed docket(s). For assistance,
                                              express permission.                                     please contact FERC Online Support at                 please contact FERC Online Support at
                                                 The proposed project would consist of                FERCOnlineSupport@ferc.gov, (866)                     FERCOnlineSupport@ferc.gov or toll
                                              the following existing facilities from a                208–3676 (toll free), or (202) 502–8659               free at (866) 208–3676, or for TTY,
                                              previously licensed project: (1) A 352-                 (TTY). In lieu of electronic filing, please           contact (202) 502–8659.
                                              foot-long, 4-foot-high rock-filled, timber              send a paper copy to: Secretary, Federal                 Any questions regarding the proposed
                                              crib barrier structure with 7-foot-high                 Energy Regulatory Commission, 888                     project should be directed to Bill
                                              flashboards; (2) headworks consisting of                First Street NE., Washington, DC 20426.               Hammons at Transcontinental Gas Pipe
                                              two slide gates; (3) a 7.75-mile-long                   The first page of any filing should                   Line Company, LLC, Post Office Box
                                              flowline from the headworks to Lake                     include docket number P–14660–000.                    1396, Houston, TX 77251 or at (713)
                                              Tapps which consists of a concrete                         More information about this project,               215–2130 or Scott Turkington, Director,
                                              flume, five settling basins, a concrete                 including a copy of the application, can              Rates & Regulatory, Transcontinental
                                              canal, an unlined earthen canal, and                    be viewed or printed on the ‘‘eLibrary’’              Gas Pipe Line Company, LLC, Post
                                              two concrete pipes; (4) a fish recovery                 link of Commission’s Web site at http://              Office Box 1396, Houston, TX 77251–
                                              pond and a fish screen facility along the               www.ferc.gov/docs-filing/elibrary.asp.                1396 or at (713) 215–3391(phone), or
                                              flowline; (5) a valve house with a new                  Enter the docket number (P–14660) in                  scott.c.turkington@williams.com.
                                              5 megawatts (MW) turbine/generating                     the docket number field to access the                    On April 4, 2014, the Commission
                                              unit; (6) a new transmission line from                  document. For assistance, contact FERC                staff granted Transco’s request to utilize
                                              the valve house to a new substation near                Online Support.                                       the National Environmental Policy Act
                                              the valve house; (7) Lake Tapps with a                                                                        (NEPA) Pre-Filing Process and assigned
                                                                                                        Dated: April 9, 2015.                               Docket No. PF14–8–000 to staff
                                              surface area of 2,740 acres and storage
                                              capacity of 46,700 acre-feet at elevation               Kimberly D. Bose,                                     activities involving the project. Now, as
                                              542.5 feet above mean sea level; (8) an                 Secretary.                                            of the filing of this application on March
                                              intake structure on Lake Tapps; (9) a 12-               [FR Doc. 2015–08649 Filed 4–14–15; 8:45 am]           31, 2015, the NEPA Pre-Filing Process
                                              foot-diamter, 2,842-foot-long concrete                  BILLING CODE 6717–01–P                                for this project has ended. From this
                                              lined tunnel; (10) a concrete and steel                                                                       time forward, this proceeding will be
                                              forebay; (11) four riveted steel penstocks                                                                    conducted in Docket No. CP15–138–
                                              with varying diameters up to 8 feet and                 DEPARTMENT OF ENERGY                                  000, as noted in the caption of this
                                              lengths up to 1,619 feet; (12) a 225-foot-                                                                    Notice.
                                              long, 85-foot-wide, 55-foot-high                        Federal Energy Regulatory                                Pursuant to section 157.9 of the
                                              concrete-framed powerhouse containing                   Commission                                            Commission’s rules (18 CFR 157.9),
                                              an existing 27 MW Francis generating                    [Docket No. CP15–138–000; PF14–8–000]                 within 90 days of this Notice, the
                                              unit and a new 5 MW unit with a total                                                                         Commission staff will either: Complete
                                              installed capacity of 32 MW; (13) a                     Transcontinental Gas Pipe Line                        its environmental impact statement
                                              concrete and timber tailbay; (14) a                     Company, LLC; Notice of Application                   (EIS) and place it into the Commission’s
                                              3,250-foot-long open channel tailrace;                                                                        public record (eLibrary) for this
                                              (15) a new 4,181-foot-long, 115-kilovolt                   Take notice that on March 31, 2015,                proceeding; or issue a Notice of
                                              transmission line connecting to a nearby                Transcontinental Gas Pipe Line                        Schedule for Environmental Review. If
                                              substation; and (16) appurtenant                        Company, LLC (Transco), P.O. Box                      a Notice of Schedule for Environmental
                                              facilities. The estimated annual                        1396, Houston, TX 77251–1396 filed an                 Review is issued, it will indicate, among
                                              generation of the project would be 50                   application pursuant to section 7 (c) of              other milestones, the anticipated date
                                              gigawatt-hours.                                         the Natural Gas Act requesting                        for the Commission staff’s issuance of
                                                 Applicant Contact: Chuck Clark, Chief                authorization to construct and operate                the EIS for this proposal. The filing of
                                              Executive Officer, Cascade Water                        its Atlantic Sunrise Project to provide               the EIS in the Commission’s public
                                              Alliance, 520 112th Avenue NE., Suite                   1,700,002 dekatherms per day of                       record for this proceeding or the
                                              400, Bellevue, Washington 98004;                        capacity from northern Pennsylvania to                issuance of a Notice of Schedule for
                                              phone: (425) 453–0930.                                  Alabama. Specifically, Transco requests               Environmental Review will serve to
                                                 FERC Contact: John Matkowski;                        authorization to construct (i) 57.3 miles             notify federal and state agencies of the
                                              phone: (202) 502–8576.                                  of 30-inch diameter pipeline and 125.2                timing for the completion of all
                                                 Deadline for filing comments, motions                miles of 42-inch diameter pipeline in                 necessary reviews, and the subsequent
                                              to intervene, competing applications                    Pennsylvania; (ii) two new compressor                 need to complete all federal
                                              (without notices of intent), or notices of              stations totaling 70,000 horsepower (hp)              authorizations within 90 days of the
                                              intent to file competing applications: 60               in Pennsylvania; (iii) the addition of                date of issuance of the Commission
                                              days from the issuance of this notice.                  62,000 hp at three existing compressor                staff’s EIS.
                                              Competing applications and notices of                   stations in Pennsylvania and Maryland;                   There are two ways to become
                                              intent must meet the requirements of 18                 and (iv) to modify its existing system to             involved in the Commission’s review of
                                              CFR 4.36.                                               enable north-to-south flow, all as more               this project. First, any person wishing to
                                                 The Commission strongly encourages                   fully set forth in the application. The               obtain legal status by becoming a party
                                              electronic filing. Please file comments,                filing is available for review at the                 to the proceedings for this project
                                              motions to intervene, notices of intent,                Commission in the Public Reference                    should, on or before the comment date
                                              and competing applications using the                    Room or may be viewed on the                          stated below, file with the Federal
tkelley on DSK3SPTVN1PROD with NOTICES




                                              Commission’s eFiling system at http://                  Commission’s Web site at http://                      Energy Regulatory Commission, 888
                                              www.ferc.gov/docs-filing/efiling.asp.                   www.ferc.gov using the ‘‘eLibrary’’ link.             First Street NE., Washington, DC 20426,
                                              Commenters can submit brief comments                    Enter the docket number excluding the                 a motion to intervene in accordance
                                              up to 6,000 characters, without prior                   last three digits in the docket number                with the requirements of the
                                              registration, using the eComment system                 field to access the document. There is                Commission’s Rules of Practice and
                                              at http://www.ferc.gov/docs-filing/                     an ‘‘eSubscription’’ link on the Web site             Procedure (18 CFR 385.214 or 385.211)
                                              ecomment.asp. You must include your                     that enables subscribers to receive email             and the Regulations under the NGA (18


                                         VerDate Sep<11>2014   17:29 Apr 14, 2015   Jkt 235001   PO 00000   Frm 00017   Fmt 4703   Sfmt 4703   E:\FR\FM\15APN1.SGM   15APN1



Document Created: 2015-12-18 11:13:03
Document Modified: 2015-12-18 11:13:03
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation80 FR 20212 

2024 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR