80_FR_22863 80 FR 22785 - Union Pacific Railroad Company-Lease Exemption-BNSF Railway Company

80 FR 22785 - Union Pacific Railroad Company-Lease Exemption-BNSF Railway Company

DEPARTMENT OF TRANSPORTATION
Surface Transportation Board
BNSF Railway Company-Lease Exemption-Union Pacific Railroad Company

Federal Register Volume 80, Issue 78 (April 23, 2015)

Page Range22785-22785
FR Document2015-09484

The Board grants separate exemptions under 49 U.S.C. 10502 from the prior approval requirements of 49 U.S.C. 11323-25 for BNSF to lease from UP approximately 54.12 miles of main line track for both track and signal maintenance and 7.80 miles of right of way for signal maintenance; and for UP to lease from BNSF approximately 14.85 miles of main line track for track and signal maintenance and 1.77 miles of right of way for track maintenance only. The proposed lease transactions involve lines located between South Denver and Bragdon, Colo. (the Joint Corridor) and between Prospect Junction and South Denver, Colo. (the Consolidated Corridor). The exemptions are subject to employee protective conditions.

Federal Register, Volume 80 Issue 78 (Thursday, April 23, 2015)
[Federal Register Volume 80, Number 78 (Thursday, April 23, 2015)]
[Notices]
[Page 22785]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-09484]


-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION

Surface Transportation Board

[Docket No. FD 35895]

BNSF Railway Company--Lease Exemption--Union Pacific Railroad 
Company

[Docket No. FD 35896]


Union Pacific Railroad Company--Lease Exemption--BNSF Railway 
Company

AGENCY: Surface Transportation Board, DOT.

ACTION: Notice of exemption.

-----------------------------------------------------------------------

SUMMARY: The Board grants separate exemptions under 49 U.S.C. 10502 
from the prior approval requirements of 49 U.S.C. 11323-25 for BNSF to 
lease from UP approximately 54.12 miles of main line track for both 
track and signal maintenance and 7.80 miles of right of way for signal 
maintenance; and for UP to lease from BNSF approximately 14.85 miles of 
main line track for track and signal maintenance and 1.77 miles of 
right of way for track maintenance only. The proposed lease 
transactions involve lines located between South Denver and Bragdon, 
Colo. (the Joint Corridor) and between Prospect Junction and South 
Denver, Colo. (the Consolidated Corridor). The exemptions are subject 
to employee protective conditions.

DATES: The exemptions will be effective on April 30, 2015. Petitions to 
stay, petitions for reconsideration, and petitions to reopen are due by 
April 27, 2015.

ADDRESSES: An original and 10 copies of all pleadings, referring to 
Docket No. FD 35895 or Docket No. FD 35896, must be filed with the 
Surface Transportation Board, 395 E Street SW., Washington, DC 20423-
0001. In addition, a copy of each pleading must be served on Karl 
Morell, Karl Morell & Associates, 655 Fifteenth Street, Suite 225, 
Washington, DC 20005.

FOR FURTHER INFORMATION CONTACT: Valerie Quinn at (202) 245-0382. 
Assistance for the hearing impaired is available through the Federal 
Information Relay Service (FIRS) at (800) 877-8339.

SUPPLEMENTARY INFORMATION: Under the proposed transaction, BNSF would 
grant UP a non-exclusive lease for the following segments of BNSF-owned 
trackage: (i) On the Joint Corridor, main track 2, BNSF milepost 12.41, 
at or near Littleton, to BNSF milepost 25.21, at or near Sedalia; (ii) 
on the Joint Corridor, main track 2, BNSF milepost 49.79, at or near 
Spruce, to BNSF milepost 51.84, at or near Palmer Lake; and (iii) on 
the Joint Corridor, main track 2, BNSF milepost 84.36, at or near 
Crews, to BNSF milepost 86.13, south of Crews, excluding the signal 
system and grade crossing warning devices. UP would grant BNSF a non-
exclusive lease for the following segments of UP-owned trackage: (i) On 
the Consolidated Corridor in Denver, main track 1, BNSF milepost 0.0 to 
BNSF milepost 0.85; (ii) on the Joint Corridor, main track 1, BNSF 
milepost 3.92, at or near South Denver, to BNSF milepost 25.21, at or 
near Sedalia (excluding Dupont Spur at approximately UP milepost 20.6, 
Fort Logan Spur at approximately UP milepost 9.1, and Iowa Spur No. 3 
at approximately UP milepost 5.3); (iii) on the Joint Corridor, main 
track 1, BNSF milepost 48.97, at or near Spruce, to BNSF milepost 
51.99, at or near Palmer Lake; (iv) on the Joint Corridor, main track 
1, BNSF milepost 51.84 to BNSF milepost 51.99, at or near Palmer Lake; 
(v) on the Joint Corridor, the single track, BNSF milepost 51.99, at or 
near Palmer Lake, to BNSF milepost 78.75, at or near Kelker (excluding 
UP's yard in Colorado Springs between UP milepost 74.4 and UP milepost 
75.4, the Templeton Gap Spur at approximately UP milepost 72.79, and 
the Russina Spur at approximately UP milepost 70.7); and (vi) on the 
Joint Corridor, main track 1, BNSF milepost 84.49, at or near Crews, to 
BNSF milepost 86.54, south of Crews. UP would also grant BNSF a non-
exclusive lease of UP's signal system and grade crossing warning 
devices on the Joint Corridor, main track 2, BNSF milepost 86.13, south 
of Crews, to BNSF milepost 93.9, at or near Nixon.
    Additional information is contained in the Board's decision. Board 
decisions and notices are available on our Web site at www.stb.dot.gov.

    Decided: April 20, 2015.

    By the Board, Acting Chairman Miller and Vice Chairman Begeman.
Raina S. Contee,
Clearance Clerk.
[FR Doc. 2015-09484 Filed 4-22-15; 8:45 am]
BILLING CODE 4915-01-P



                                                                                     Federal Register / Vol. 80, No. 78 / Thursday, April 23, 2015 / Notices                                                        22785

                                                      Application No.                Docket No.                        Applicant                  Regulation(s) affected             Nature of special permits thereof

                                                  16430–N ....................   ............................   Eniware LLC, Wash-          49 CFR 172.101 Haz-              To authorize the manufacture, mark, sale and
                                                                                                                  ington, DC.                 ardous Materials Table           use of specialized packagings used to
                                                                                                                                              Column (9A), 173.4a(b),          transport sterilization devices containing ni-
                                                                                                                                              (c), (d), and (e)(3), IMDG       tric acid as expected quantities. (modes 1,
                                                                                                                                              Code Sections 3.5.1.1.1,         2, 3, 4, 5)
                                                                                                                                              3.5.1.2, and 3.5.2.1.2,
                                                                                                                                              ICAO T1 Table 3–1 Col-
                                                                                                                                              umns 10 and 11,
                                                                                                                                              3.5.1.1(c), 3.5.1.2, and
                                                                                                                                              3.5.2.1(b).
                                                  16431–N ....................   ............................   Arnold Aviation and         49 CFR 172.101 Haz-              To authorize the transportation in commerce
                                                                                                                  Thunder Mountain            ardous Materials Table           of certain cylinders containing propane
                                                                                                                  Express, Inc., Cas-         Column (9A), 172.200,            aboard passenger-carrying aircraft to re-
                                                                                                                  cade, ID.                   175.33, 175.75(b).               mote locations. (mode 5)
                                                  16432–N ....................   ............................   Panasonic Corporation       49 CFR Subparts C                To authorize the manufacture, mark, sale and
                                                                                                                  of North America,           through H of Part 172.           use of specially-designed combination
                                                                                                                  Newark, NJ.                                                  packagings for damaged or defective lith-
                                                                                                                                                                               ium ion batteries that originally met the re-
                                                                                                                                                                               quirements under 49 CFR 173.185(c).
                                                                                                                                                                               (modes 1, 2)



                                                  [FR Doc. 2015–09352 Filed 4–22–15; 08:45 am]                       ADDRESSES:    An original and 10 copies of             milepost 48.97, at or near Spruce, to
                                                  BILLING CODE 4909–60–M                                             all pleadings, referring to Docket No. FD              BNSF milepost 51.99, at or near Palmer
                                                                                                                     35895 or Docket No. FD 35896, must be                  Lake; (iv) on the Joint Corridor, main
                                                                                                                     filed with the Surface Transportation                  track 1, BNSF milepost 51.84 to BNSF
                                                  DEPARTMENT OF TRANSPORTATION                                       Board, 395 E Street SW., Washington,                   milepost 51.99, at or near Palmer Lake;
                                                                                                                     DC 20423–0001. In addition, a copy of                  (v) on the Joint Corridor, the single
                                                  Surface Transportation Board                                       each pleading must be served on Karl                   track, BNSF milepost 51.99, at or near
                                                  [Docket No. FD 35895]                                              Morell, Karl Morell & Associates, 655                  Palmer Lake, to BNSF milepost 78.75, at
                                                                                                                     Fifteenth Street, Suite 225, Washington,               or near Kelker (excluding UP’s yard in
                                                  BNSF Railway Company—Lease                                         DC 20005.                                              Colorado Springs between UP milepost
                                                  Exemption—Union Pacific Railroad                                   FOR FURTHER INFORMATION CONTACT:                       74.4 and UP milepost 75.4, the
                                                  Company                                                            Valerie Quinn at (202) 245–0382.                       Templeton Gap Spur at approximately
                                                  [Docket No. FD 35896]                                              Assistance for the hearing impaired is                 UP milepost 72.79, and the Russina
                                                                                                                     available through the Federal                          Spur at approximately UP milepost
                                                  Union Pacific Railroad Company—                                    Information Relay Service (FIRS) at                    70.7); and (vi) on the Joint Corridor,
                                                  Lease Exemption—BNSF Railway                                       (800) 877–8339.                                        main track 1, BNSF milepost 84.49, at
                                                  Company                                                            SUPPLEMENTARY INFORMATION: Under the                   or near Crews, to BNSF milepost 86.54,
                                                                                                                     proposed transaction, BNSF would                       south of Crews. UP would also grant
                                                  AGENCY:     Surface Transportation Board,                          grant UP a non-exclusive lease for the
                                                  DOT.                                                                                                                      BNSF a non-exclusive lease of UP’s
                                                                                                                     following segments of BNSF-owned                       signal system and grade crossing
                                                  ACTION:    Notice of exemption.                                    trackage: (i) On the Joint Corridor, main              warning devices on the Joint Corridor,
                                                                                                                     track 2, BNSF milepost 12.41, at or near               main track 2, BNSF milepost 86.13,
                                                  SUMMARY:    The Board grants separate                              Littleton, to BNSF milepost 25.21, at or
                                                  exemptions under 49 U.S.C. 10502 from                                                                                     south of Crews, to BNSF milepost 93.9,
                                                                                                                     near Sedalia; (ii) on the Joint Corridor,
                                                  the prior approval requirements of 49                                                                                     at or near Nixon.
                                                                                                                     main track 2, BNSF milepost 49.79, at
                                                  U.S.C. 11323–25 for BNSF to lease from                             or near Spruce, to BNSF milepost 51.84,                   Additional information is contained
                                                  UP approximately 54.12 miles of main                               at or near Palmer Lake; and (iii) on the               in the Board’s decision. Board decisions
                                                  line track for both track and signal                               Joint Corridor, main track 2, BNSF                     and notices are available on our Web
                                                  maintenance and 7.80 miles of right of                             milepost 84.36, at or near Crews, to                   site at www.stb.dot.gov.
                                                  way for signal maintenance; and for UP                             BNSF milepost 86.13, south of Crews,
                                                  to lease from BNSF approximately 14.85                                                                                      Decided: April 20, 2015.
                                                                                                                     excluding the signal system and grade
                                                  miles of main line track for track and                                                                                      By the Board, Acting Chairman Miller and
                                                                                                                     crossing warning devices. UP would
                                                  signal maintenance and 1.77 miles of                                                                                      Vice Chairman Begeman.
                                                                                                                     grant BNSF a non-exclusive lease for the
                                                  right of way for track maintenance only.                           following segments of UP-owned                         Raina S. Contee,
                                                  The proposed lease transactions involve                            trackage: (i) On the Consolidated                      Clearance Clerk.
                                                  lines located between South Denver and                             Corridor in Denver, main track 1, BNSF                 [FR Doc. 2015–09484 Filed 4–22–15; 8:45 am]
                                                  Bragdon, Colo. (the Joint Corridor) and                            milepost 0.0 to BNSF milepost 0.85; (ii)               BILLING CODE 4915–01–P
                                                  between Prospect Junction and South                                on the Joint Corridor, main track 1,
                                                  Denver, Colo. (the Consolidated
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                                                                                     BNSF milepost 3.92, at or near South
                                                  Corridor). The exemptions are subject to                           Denver, to BNSF milepost 25.21, at or                  DEPARTMENT OF TRANSPORTATION
                                                  employee protective conditions.                                    near Sedalia (excluding Dupont Spur at
                                                  DATES: The exemptions will be effective                            approximately UP milepost 20.6, Fort                   Public Availability of the Department of
                                                  on April 30, 2015. Petitions to stay,                              Logan Spur at approximately UP                         Transportation FY 14 Service Contract
                                                  petitions for reconsideration, and                                 milepost 9.1, and Iowa Spur No. 3 at                   Inventory
                                                  petitions to reopen are due by April 27,                           approximately UP milepost 5.3); (iii) on
                                                  2015.                                                              the Joint Corridor, main track 1, BNSF                 AGENCY:    Department of Transportation.


                                             VerDate Sep<11>2014     18:53 Apr 22, 2015      Jkt 235001         PO 00000   Frm 00085   Fmt 4703    Sfmt 4703   E:\FR\FM\23APN1.SGM   23APN1



Document Created: 2015-12-16 08:41:00
Document Modified: 2015-12-16 08:41:00
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice of exemption.
DatesThe exemptions will be effective on April 30, 2015. Petitions to stay, petitions for reconsideration, and petitions to reopen are due by April 27, 2015.
ContactValerie Quinn at (202) 245-0382. Assistance for the hearing impaired is available through the Federal Information Relay Service (FIRS) at (800) 877-8339.
FR Citation80 FR 22785 

2024 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR