80_FR_23071 80 FR 22992 - Environmental Impact Statements; Notice of Availability

80 FR 22992 - Environmental Impact Statements; Notice of Availability

ENVIRONMENTAL PROTECTION AGENCY

Federal Register Volume 80, Issue 79 (April 24, 2015)

Page Range22992-22992
FR Document2015-09611

Federal Register, Volume 80 Issue 79 (Friday, April 24, 2015)
[Federal Register Volume 80, Number 79 (Friday, April 24, 2015)]
[Notices]
[Page 22992]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-09611]


-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[ER-FRL-9020-6]


Environmental Impact Statements; Notice of Availability

    Responsible Agency: Office of Federal Activities, General 
Information (202) 564-7146 or http://www.epa.gov/compliance/nepa/.

Weekly receipt of Environmental Impact Statements
Filed 04/13/2015 Through 04/17/2015
Pursuant to 40 CFR 1506.9.

Notice

    Section 309(a) of the Clean Air Act requires that EPA make public 
its comments on EISs issued by other Federal agencies. EPA's comment 
letters on EISs are available at: http://www.epa.gov/compliance/nepa/eisdata.html.

EIS No. 20150107, Draft EIS, BLM, OR, Western Oregon Draft Resource 
Management Plan, Comment Period Ends: 06/08/15, Contact: Mark Brown, 
503-808-6233.
EIS No. 20150108, Draft EIS, USA, HI, Schofield Generating Station 
Project at United States Army Garrison, Comment Period Ends: 06/08/
2015, Contact: Lisa Graham 808-656-3109.
EIS No. 20150109, Draft EIS, STB, MT, Tongue River Railroad, Comment 
Period Ends: 06/23/2015, Contact: Ken Blodgett 1-866-622-4355.
EIS No. 20150110, Final EIS, USFS, OR, Malheur National Forest Site-
Specific Invasive Plants Treatment, Review Period Ends: 06/08/2015, 
Contact: Joseph Rausch 541-575-3141.
EIS No. 20150111, Draft EIS, NRC, PA, Combined License (COL) for the 
Bell Bend Nuclear Power Plant, Comment Period Ends: 07/07/2015, 
Contact: Tomeka Terry 301-415-1488.
EIS No. 20150112, Final EIS, GSA, VA, U.S. Department of State Foreign 
Affairs Security Training Center, Review Period Ends: 05/26/2015, 
Contact: Abby Low 215-446-4585.
EIS No. 20150113, Final EIS, USA, AZ, PROGRAMMATIC--Yuma Proving Ground 
Activities and Operations, Review Period Ends: 05/26/2015, Contact: 
Sergio Obregon 928-328-2015.
EIS No. 20150114, Final EIS, FHWA, CA, Mid County Parkway, Review 
Period Ends: 05/26/2015, Contact: Tay Dam 213-894-5918.
EIS No. 20150115, Final EIS, FAA, 00, ADOPTION--Powder River Training 
Complex, Ellsworth Air Force Base, Contact: William Burris 202-267-
8656.
    The U.S. Department of Transportation's, Federal Aviation 
Administration (FAA) has adopted the U.S. Air Force's FEIS #20140334, 
filed with the USEPA on 11/19/2014. FAA was a cooperating agency on the 
project and recirculation of the document is not necessary under 
Section 1506.3(c) of the CEQ Regulations.
EIS No. 20150116, Final EIS, DOE, TX, ADOPTION--Corpus Christi 
Liquefied Natural Gas (LNG) Project, Contact: John Anderson 202-586-
0521.
    The U.S. Department of Energy (DOE) has adopted the Federal Energy 
Regulatory Commission's FEIS #20140302, filed with the U.S. EPA on 10/
08/2014. DOE was a cooperating agency on the project and recirculation 
of the document is not necessary under Section 1506.3(c) of the CEQ 
Regulations.

    Dated: April 21, 2015.
Cliff Rader,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 2015-09611 Filed 4-23-15; 8:45 am]
 BILLING CODE 6560-50-P



                                              22992                            Federal Register / Vol. 80, No. 79 / Friday, April 24, 2015 / Notices

                                              Administrator of the initial compliance                 Weekly receipt of Environmental Impact                  Contact: John Anderson 202–586–
                                              status of the source. Sources are also                    Statements                                            0521.
                                              required to monitor and maintain                        Filed 04/13/2015 Through 04/17/2015                     The U.S. Department of Energy (DOE)
                                              records of its operations including: (1)                Pursuant to 40 CFR 1506.9.                            has adopted the Federal Energy
                                              Process or control device parameters; (2)               Notice                                                Regulatory Commission’s FEIS
                                              bag leak detention systems; (3)                                                                               #20140302, filed with the U.S. EPA on
                                              maintenance plan for air pollution                        Section 309(a) of the Clean Air Act                 10/08/2014. DOE was a cooperating
                                              control devices (e.g., capture system and               requires that EPA make public its                     agency on the project and recirculation
                                              venturi scrubbers); (4) certification that              comments on EISs issued by other                      of the document is not necessary under
                                              monitoring devices are accurate; and (5)                Federal agencies. EPA’s comment letters               Section 1506.3(c) of the CEQ
                                              the implementation and corrective                       on EISs are available at: http://                     Regulations.
                                              actions taken related to the startup,                   www.epa.gov/compliance/nepa/
                                                                                                                                                               Dated: April 21, 2015.
                                              shutdown and malfunction plan and the                   eisdata.html.
                                                                                                                                                            Cliff Rader,
                                              fugitive dust control plan. The types of                EIS No. 20150107, Draft EIS, BLM, OR,
                                                                                                        Western Oregon Draft Resource                       Director, NEPA Compliance Division, Office
                                              periodic reports required by this
                                                                                                                                                            of Federal Activities.
                                              regulation include: Opacity-related                       Management Plan, Comment Period
                                                                                                                                                            [FR Doc. 2015–09611 Filed 4–23–15; 8:45 am]
                                              reports; performance test results reports;                Ends: 06/08/15, Contact: Mark Brown,
                                              immediate and periodic startup,                           503–808–6233.                                       BILLING CODE 6560–50–P

                                              shutdown, and malfunction reports;                      EIS No. 20150108, Draft EIS, USA, HI,
                                              quarterly emissions reports; capture                      Schofield Generating Station Project
                                              hood inspection reports; fugitive dust                    at United States Army Garrison,                     ENVIRONMENTAL PROTECTION
                                              operations reports; and annual                            Comment Period Ends: 06/08/2015,                    AGENCY
                                              compliance status reports. These                          Contact: Lisa Graham 808–656–3109.                  [EPA–HQ–OECA–2014–0034; FRL 9925–38–
                                              notifications, reports, and records are                 EIS No. 20150109, Draft EIS, STB, MT,                 OEI ]
                                              essential in determining compliance,                      Tongue River Railroad, Comment
                                              and are required of all sources subject                   Period Ends: 06/23/2015, Contact:                   Information Collection Request
                                              to NESHAP standards. This information                     Ken Blodgett 1–866–622–4355.                        Submitted to OMB for Review and
                                              is collected to assure compliance with                  EIS No. 20150110, Final EIS, USFS, OR,                Approval; Comment Request; NSPS
                                              40 CFR part 63, subpart XXX.                              Malheur National Forest Site-Specific               for Kraft Pulp Mills (Renewal)
                                                 Form Numbers: None.                                    Invasive Plants Treatment, Review
                                                                                                                                                            AGENCY: Environmental Protection
                                                 Respondents/affected entities:                         Period Ends: 06/08/2015, Contact:
                                                                                                                                                            Agency (EPA).
                                              Ferroalloy production facilities.                         Joseph Rausch 541–575–3141.
                                                 Respondent’s obligation to respond:                  EIS No. 20150111, Draft EIS, NRC, PA,                 ACTION: Notice.
                                              Mandatory (40 CFR part 63, subpart                        Combined License (COL) for the Bell                 SUMMARY:   The Environmental Protection
                                              XXX).                                                     Bend Nuclear Power Plant, Comment                   Agency has submitted an information
                                                 Estimated number of respondents: 1                     Period Ends: 07/07/2015, Contact:                   collection request (ICR), ‘‘NSPS for Kraft
                                              (total).                                                  Tomeka Terry 301–415–1488.
                                                 Frequency of response: Initially,                                                                          Pulp Mills (40 CFR part 60, subpart BB)
                                                                                                      EIS No. 20150112, Final EIS, GSA, VA,                 (Renewal)’’ (EPA ICR No. 1055.11, OMB
                                              quarterly, semiannually, and annually.                    U.S. Department of State Foreign
                                                 Total estimated burden: 600 hours                                                                          Control No. 2060–0021) to the Office of
                                                                                                        Affairs Security Training Center,                   Management and Budget (OMB) for
                                              (per year). Burden is defined at 5 CFR                    Review Period Ends: 05/26/2015,
                                              1320.3(b).                                                                                                    review and approval in accordance with
                                                                                                        Contact: Abby Low 215–446–4585.                     the Paperwork Reduction Act (44 U.S.C.
                                                 Total estimated cost: $57,000 (per                   EIS No. 20150113, Final EIS, USA, AZ,
                                              year), includes $0 annualized capital or                                                                      3501 et seq.). This is a proposed
                                                                                                        PROGRAMMATIC—Yuma Proving
                                              operation & maintenance costs.                                                                                extension of the ICR, which is currently
                                                                                                        Ground Activities and Operations,
                                                 Changes in the Estimates: There is a                                                                       approved through April 30, 2015. Public
                                                                                                        Review Period Ends: 05/26/2015,
                                              slight increase of 16 hours in the total                                                                      comments were previously requested
                                                                                                        Contact: Sergio Obregon 928–328–
                                              estimated respondent burden compared                                                                          via the Federal Register(79 FR 30117)
                                                                                                        2015.
                                              with the ICR currently approved by                                                                            on May 27, 2014 during a 60-day
                                                                                                      EIS No. 20150114, Final EIS, FHWA,
                                              OMB. This is due to the rounding of                                                                           comment period. This notice allows for
                                                                                                        CA, Mid County Parkway, Review
                                              estimates.                                                                                                    an additional 30 days for public
                                                                                                        Period Ends: 05/26/2015, Contact: Tay
                                                                                                                                                            comments. A fuller description of the
                                              Courtney Kerwin,                                          Dam 213–894–5918.
                                                                                                      EIS No. 20150115, Final EIS, FAA, 00,                 ICR is given below, including its
                                              Acting Director, Collection Strategies                                                                        estimated burden and cost to the public.
                                              Division.                                                 ADOPTION—Powder River Training
                                                                                                        Complex, Ellsworth Air Force Base,                  An Agency may not conduct or sponsor
                                              [FR Doc. 2015–09507 Filed 4–23–15; 8:45 am]                                                                   and a person is not required to respond
                                              BILLING CODE 6560–50–P
                                                                                                        Contact: William Burris 202–267–
                                                                                                        8656.                                               to a collection of information unless it
                                                                                                        The U.S. Department of                              displays a currently valid OMB control
                                                                                                      Transportation’s, Federal Aviation                    number.
                                              ENVIRONMENTAL PROTECTION
                                                                                                      Administration (FAA) has adopted the                  DATES: Additional comments may be
                                              AGENCY
                                                                                                      U.S. Air Force’s FEIS #20140334, filed                submitted on or before May 26, 2015.
                                              [ER–FRL–9020–6]                                         with the USEPA on 11/19/2014. FAA                     ADDRESSES: Submit your comments,
tkelley on DSK3SPTVN1PROD with NOTICES




                                                                                                      was a cooperating agency on the project               referencing Docket ID Number EPA–
                                              Environmental Impact Statements;
                                                                                                      and recirculation of the document is not              HQ–OECA–2014–0034, to (1) EPA
                                              Notice of Availability
                                                                                                      necessary under Section 1506.3(c) of the              online using www.regulations.gov (our
                                                Responsible Agency: Office of Federal                 CEQ Regulations.                                      preferred method), by email to
                                              Activities, General Information (202)                   EIS No. 20150116, Final EIS, DOE, TX,                 docket.oeca@epa.gov, or by mail to: EPA
                                              564–7146 or http://www.epa.gov/                           ADOPTION—Corpus Christi                             Docket Center, Environmental
                                              compliance/nepa/.                                         Liquefied Natural Gas (LNG) Project,                Protection Agency, Mail Code 28221T,


                                         VerDate Sep<11>2014   17:30 Apr 23, 2015   Jkt 235001   PO 00000   Frm 00026   Fmt 4703   Sfmt 4703   E:\FR\FM\24APN1.SGM   24APN1



Document Created: 2015-12-16 08:42:38
Document Modified: 2015-12-16 08:42:38
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation80 FR 22992 

2025 Federal Register | Disclaimer | Privacy Policy