80_FR_24994 80 FR 24910 - 5440 Hydro Inc.; Notice of Application Accepted for Filing With the Commission, Intent To Waive Scoping, Soliciting Motions To Intervene and Protests, Ready for Environmental Analysis, and Soliciting Comments, Terms and Conditions, and Recommendations, and Establishing an Expedited Schedule for Processing

80 FR 24910 - 5440 Hydro Inc.; Notice of Application Accepted for Filing With the Commission, Intent To Waive Scoping, Soliciting Motions To Intervene and Protests, Ready for Environmental Analysis, and Soliciting Comments, Terms and Conditions, and Recommendations, and Establishing an Expedited Schedule for Processing

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 80, Issue 84 (May 1, 2015)

Page Range24910-24911
FR Document2015-10220

Federal Register, Volume 80 Issue 84 (Friday, May 1, 2015)
[Federal Register Volume 80, Number 84 (Friday, May 1, 2015)]
[Notices]
[Pages 24910-24911]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-10220]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 13806-004]


5440 Hydro Inc.; Notice of Application Accepted for Filing With 
the Commission, Intent To Waive Scoping, Soliciting Motions To 
Intervene and Protests, Ready for Environmental Analysis, and 
Soliciting Comments, Terms and Conditions, and Recommendations, and 
Establishing an Expedited Schedule for Processing

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: Exemption From Licensing.
    b. Project No.: P-13806-004.
    c. Date filed: July 28, 2014.
    d. Applicant: 5440 Hydro Inc.
    e. Name of Project: Brooklyn Dam Hydroelectric Project.
    f. Location: On the Upper Ammonoosuc River, in the Town of 
Northumberland, Coos County, New Hampshire. The project would not 
occupy lands of the United States.
    g. Filed Pursuant to: Public Utility Regulatory Policies Act of 
1978, 16 U.S.C. 2705, 2708.
    h. Applicant Contact: Lutz Loegters, 5440 Hydro Inc., 717 Atlantic 
Avenue, Suite 1A, Boston, Massachusetts 02111, (416) 643-6615.
    i. FERC Contact: John Ramer, (202) 502-8969, [email protected].
    j. Deadline for filing motions to intervene and protests, comments, 
terms and conditions, and recommendations: Due to the small size and 
location of this project and the close coordination with state and 
federal agencies during preparation of the application, the 60- day 
timeframe in 18 CFR 4.34(b) is shortened. Instead, motions to intervene 
and protests, comments, terms and conditions, and recommendations are 
due 30 days from the issuance date of this notice. All reply comments 
must be filed with the Commission within 45 days from the issuance date 
of this notice.
    The Commission strongly encourages electronic filing. Please file 
motions to intervene, protests, comments, and recommendations using the 
Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 
characters, without prior registration, using the eComment system at 
http://www.ferc.gov/docs-filing/ecomment.asp. You must include your 
name and contact information at the end of your comments. For 
assistance, please contact FERC Online Support at 
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE., 
Washington, DC 20426. The first page of any filing should include 
docket number P-13806-004.
    The Commission's Rules of Practice require all intervenors filing 
documents with the Commission to serve a copy of that document on each 
person on the official service list for the project. Further, if an 
intervenor files comments or documents with the Commission relating to 
the merits of an issue that may affect the responsibilities of a 
particular resource agency, they must also serve a copy of the document 
on that resource agency.
    k. This application has been accepted for filing and is now ready 
for environmental analysis.
    l. The Brooklyn Dam Hydroelectric Project would consist of: (1) An 
existing 163-foot-long and 14-foot-high dam that includes: (a) A 113-
foot-long spillway with a crest elevation 878.69 feet National Geodetic 
Vertical Datum of 1929 (NGVD29); (b) 2.50-foot-high flashboards with a 
crest elevation 881.23 feet NGVD29; and (c) a 50-foot-long floodgate 
structure with four 6.9-foot-wide, 10-foot-high floodgates; (2) an 
existing 100-foot-long, 45-foot-wide forebay with three 15.2-foot-wide, 
15.5-foot-high trashracks with 1.0-inch open bar spacing; (3) an 
existing 40-foot-long, 15.78-foot-high tailrace training wall; (4) an 
existing 9-foot-wide, 9-foot-high side waste gate; (5) an existing 26-
acre impoundment having a gross storage capacity of 52-acre-feet at 
elevation 881.23 feet NGVD29; (6) an existing 45-foot-long, 48-foot-
wide, and 23-foot-high brick and concrete powerhouse that would contain 
two proposed 300-kilowatt (kW), Kaplan turbine-generating units for a 
total installed capacity of 600 kW; (7) an existing 48-foot-long, 45-
foot-wide tailrace; (8) a proposed 400-foot-long 35.4-kilovolt

[[Page 24911]]

above-ground transmission line; (9) three proposed single phased 
transformers; and (10) appurtenant facilities. On average, the project 
would generate approximately 2,800 megawatt-hours annually. The 
applicant proposes to remove a non-operating sluice gate on the 
spillway, rehabilitate the powerhouse, and operate the project in a 
run-of-river mode.
    m. Due to the project works already existing and the limited scope 
of proposed rehabilitation of the project site described above, the 
applicant's close coordination with federal and state agencies during 
the preparation of the application, completed studies during pre-filing 
consultation, and agency recommended preliminary terms and conditions, 
we intend to waive scoping and expedite the exemption process. Based on 
a review of the application, resource agency consultation letters 
including the preliminary 30(c) terms and conditions, and comments 
filed to date, Commission staff intends to prepare a single 
environmental assessment (EA). Commission staff determined that the 
issues that need to be addressed in its EA have been adequately 
identified during the pre-filing period, which included a public 
meeting and site visit, and no new issues are likely to be identified 
through additional scoping. The EA will consider assessing the 
potential effects of project construction and operation on aquatic, 
terrestrial, threatened and endangered species, recreation and land 
use, aesthetic, and cultural and historic resources.
    n. A copy of the application is available for review at the 
Commission in the Public Reference Room or may be viewed on the 
Commission's Web site at http://www.ferc.gov using the ``eLibrary'' 
link. Enter the docket number excluding the last three digits in the 
docket number field to access the document. For assistance, contact 
FERC Online Support. A copy is also available for inspection and 
reproduction at the address in item h above.
    Register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    o. Any qualified applicant desiring to file a competing application 
must submit to the Commission, on or before the specified intervention 
deadline date, a competing development application, or a notice of 
intent to file such an application. Submission of a timely notice of 
intent allows an interested person to file the competing development 
application no later than 120 days after the specified intervention 
deadline date. Applications for preliminary permits will not be 
accepted in response to this notice.
    A notice of intent must specify the exact name, business address, 
and telephone number of the prospective applicant, and must include an 
unequivocal statement of intent to submit a development application. A 
notice of intent must be served on the applicant(s) named in this 
public notice.
    Anyone may submit comments, a protest, or a motion to intervene in 
accordance with the requirements of Rules of Practice and Procedure, 18 
CFR 385.210, .211, .214. In determining the appropriate action to take, 
the Commission will consider all protests or other comments filed, but 
only those who file a motion to intervene in accordance with the 
Commission's Rules may become a party to the proceeding. Any comments, 
protests, or motions to intervene must be received on or before the 
specified comment date for the particular application.
    All filings must (1) bear in all capital letters the title 
``PROTEST'', ``MOTION TO INTERVENE'', ``NOTICE OF INTENT TO FILE 
COMPETING APPLICATION,'' ``COMPETING APPLICATION,'' ``COMMENTS,'' 
``REPLY COMMENTS,'' ``RECOMMENDATIONS,'' or ``TERMS AND CONDITIONS;'' 
(2) set forth in the heading the name of the applicant and the project 
number of the application to which the filing responds; (3) furnish the 
name, address, and telephone number of the person protesting or 
intervening; and (4) otherwise comply with the requirements of 18 CFR 
385.2001 through 385.2005. All comments, recommendations, terms and 
conditions or prescriptions must set forth their evidentiary basis and 
otherwise comply with the requirements of 18 CFR 4.34(b). Agencies may 
obtain copies of the application directly from the applicant. A copy of 
any protest or motion to intervene must be served upon each 
representative of the applicant specified in the particular 
application. A copy of all other filings in reference to this 
application must be accompanied by proof of service on all persons 
listed in the service list prepared by the Commission in this 
proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
    p. Procedural Schedule: The application will be processed according 
to the following procedural schedule. Revisions to the schedule may be 
made as appropriate.
    MILESTONE: Notice of the availability of the EA.
    TARGET DATE: October 1, 2015.

    Dated: April 23, 2015.
Kimberly D. Bose,
 Secretary.
[FR Doc. 2015-10220 Filed 4-30-15; 8:45 am]
BILLING CODE 6717-01-P



                                                  24910                             Federal Register / Vol. 80, No. 84 / Friday, May 1, 2015 / Notices

                                                  document. Agencies who would like to                      r. Register online at http://                       filed with the Commission within 45
                                                  request cooperating status should follow                www.ferc.gov/docs-filing/                             days from the issuance date of this
                                                  the instructions for filing comments                    esubscription.asp to be notified via                  notice.
                                                  described in paragraph ‘‘k’’ above.                     email of new filing and issuances                        The Commission strongly encourages
                                                     n. This notice does not constitute the               related to this or other pending projects.            electronic filing. Please file motions to
                                                  Commission’s approval of Igiugig’s                      For assistance, contact FERC Online                   intervene, protests, comments, and
                                                  request to use the Pilot Project Licensing              Support.                                              recommendations using the
                                                  Procedures. Upon its review of the                        Dated: April 23, 2015.
                                                                                                                                                                Commission’s eFiling system at http://
                                                  project’s overall characteristics relative                                                                    www.ferc.gov/docs-filing/efiling.asp.
                                                                                                          Kimberly D. Bose,
                                                  to the pilot project criteria, the draft                                                                      Commenters can submit brief comments
                                                                                                          Secretary.                                            up to 6,000 characters, without prior
                                                  license application contents, and any
                                                                                                          [FR Doc. 2015–10219 Filed 4–30–15; 8:45 am]           registration, using the eComment system
                                                  comments filed, the Commission will
                                                  determine whether there is adequate                     BILLING CODE 6717–01–P                                at http://www.ferc.gov/docs-filing/
                                                  information to conclude the pre-filing                                                                        ecomment.asp. You must include your
                                                  process.                                                                                                      name and contact information at the end
                                                                                                          DEPARTMENT OF ENERGY                                  of your comments. For assistance,
                                                     o. The proposed Igiugig Hydrokinetic
                                                                                                                                                                please contact FERC Online Support at
                                                  Project would consist of: (1) An in-                    Federal Energy Regulatory                             FERCOnlineSupport@ferc.gov, (866)
                                                  stream 20- kilowatt (kW), 64-foot-long,                 Commission                                            208–3676 (toll free), or (202) 502–8659
                                                  11-foot-high, 43-foot-wide pontoon-
                                                                                                          [Project No. 13806–004]                               (TTY). In lieu of electronic filing, please
                                                  mounted RivGen Power System Turbine
                                                                                                                                                                send a paper copy to: Secretary, Federal
                                                  Generator Unit (TGU) in Phase 1; (2) an                 5440 Hydro Inc.; Notice of Application                Energy Regulatory Commission, 888
                                                  additional in-stream 20-kW pontoon-                     Accepted for Filing With the                          First Street NE., Washington, DC 20426.
                                                  mounted TGU in Phase 2; (3) two                         Commission, Intent To Waive Scoping,                  The first page of any filing should
                                                  anchoring systems consisting of a                       Soliciting Motions To Intervene and                   include docket number P–13806–004.
                                                  13,000-pound anchor, chain, shackles,                   Protests, Ready for Environmental                        The Commission’s Rules of Practice
                                                  and 150 feet of mooring; (4) a 375-foot-                Analysis, and Soliciting Comments,                    require all intervenors filing documents
                                                  long, coated and weighted combined                      Terms and Conditions, and                             with the Commission to serve a copy of
                                                  power, data, and environmental                          Recommendations, and Establishing                     that document on each person on the
                                                  monitoring cable from the TGU for                       an Expedited Schedule for Processing                  official service list for the project.
                                                  Phase 1; and a 675-foot-long cable from                                                                       Further, if an intervenor files comments
                                                  the TGU for Phase 2; (5) an existing 10-                  Take notice that the following                      or documents with the Commission
                                                  foot-long by 8-foot-wide shore station                  hydroelectric application has been filed              relating to the merits of an issue that
                                                  for housing project electronics and                     with the Commission and is available                  may affect the responsibilities of a
                                                  controls; and (6) appurtenant facilities.               for public inspection.                                particular resource agency, they must
                                                  The project is estimated to have an                       a. Type of Application: Exemption                   also serve a copy of the document on
                                                  annual generation of 409,504 kilowatt-                  From Licensing.                                       that resource agency.
                                                  hours per year.                                           b. Project No.: P–13806–004.                           k. This application has been accepted
                                                     p. A copy of the draft license                         c. Date filed: July 28, 2014.                       for filing and is now ready for
                                                  application and all pre-filing materials                  d. Applicant: 5440 Hydro Inc.                       environmental analysis.
                                                  are available for review at the                           e. Name of Project: Brooklyn Dam                       l. The Brooklyn Dam Hydroelectric
                                                  Commission in the Public Reference                      Hydroelectric Project.                                Project would consist of: (1) An existing
                                                  Room or may be viewed on the                              f. Location: On the Upper                           163-foot-long and 14-foot-high dam that
                                                  Commission’s Web site (http://                          Ammonoosuc River, in the Town of                      includes: (a) A 113-foot-long spillway
                                                  www.ferc.gov), using the ‘‘eLibrary’’                   Northumberland, Coos County, New                      with a crest elevation 878.69 feet
                                                  link. Enter the docket number (P–                       Hampshire. The project would not                      National Geodetic Vertical Datum of
                                                  13511), excluding the last three digits in              occupy lands of the United States.                    1929 (NGVD29); (b) 2.50-foot-high
                                                  the docket number field to access the                     g. Filed Pursuant to: Public Utility                flashboards with a crest elevation
                                                  document. For assistance, contact FERC                  Regulatory Policies Act of 1978, 16                   881.23 feet NGVD29; and (c) a 50-foot-
                                                  Online Support at                                       U.S.C. 2705, 2708.                                    long floodgate structure with four 6.9-
                                                  FERCONlineSupport@ferc.gov or toll                        h. Applicant Contact: Lutz Loegters,                foot-wide, 10-foot-high floodgates; (2) an
                                                  free at 1–866–208–3676, or for TTY,                     5440 Hydro Inc., 717 Atlantic Avenue,                 existing 100-foot-long, 45-foot-wide
                                                  (202) 502–8659.                                         Suite 1A, Boston, Massachusetts 02111,                forebay with three 15.2-foot-wide, 15.5-
                                                     q. Pre-filing process schedule. The                  (416) 643–6615.                                       foot-high trashracks with 1.0-inch open
                                                  pre-filing process will be conducted                      i. FERC Contact: John Ramer, (202)                  bar spacing; (3) an existing 40-foot-long,
                                                  pursuant to the following tentative                     502–8969, john.ramer@ferc.gov.                        15.78-foot-high tailrace training wall; (4)
                                                  schedule. Revisions to the schedule                       j. Deadline for filing motions to                   an existing 9-foot-wide, 9-foot-high side
                                                  below may be made based on staff’s                      intervene and protests, comments, terms               waste gate; (5) an existing 26-acre
                                                  review of the draft application and any                 and conditions, and recommendations:                  impoundment having a gross storage
                                                  comments received.                                      Due to the small size and location of                 capacity of 52-acre-feet at elevation
                                                                                                          this project and the close coordination               881.23 feet NGVD29; (6) an existing 45-
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                           Milestone                       Date           with state and federal agencies during                foot-long, 48-foot-wide, and 23-foot-high
                                                                                                          preparation of the application, the 60-               brick and concrete powerhouse that
                                                  Comments on pre-filing           May 23, 2015.          day timeframe in 18 CFR 4.34(b) is                    would contain two proposed 300-
                                                    materials due.                                        shortened. Instead, motions to intervene              kilowatt (kW), Kaplan turbine-
                                                  Issuance of meeting notice       June 7, 2015.          and protests, comments, terms and                     generating units for a total installed
                                                    (if needed).                                          conditions, and recommendations are                   capacity of 600 kW; (7) an existing 48-
                                                  Public meeting/technical         June 22, 2015.
                                                    conference (if needed).
                                                                                                          due 30 days from the issuance date of                 foot-long, 45-foot-wide tailrace; (8) a
                                                                                                          this notice. All reply comments must be               proposed 400-foot-long 35.4-kilovolt


                                             VerDate Sep<11>2014   18:14 Apr 30, 2015   Jkt 235001   PO 00000   Frm 00019   Fmt 4703   Sfmt 4703   E:\FR\FM\01MYN1.SGM   01MYN1


                                                                                    Federal Register / Vol. 80, No. 84 / Friday, May 1, 2015 / Notices                                                  24911

                                                  above-ground transmission line; (9)                     development application no later than                    TARGET DATE: October 1, 2015.
                                                  three proposed single phased                            120 days after the specified intervention               Dated: April 23, 2015.
                                                  transformers; and (10) appurtenant                      deadline date. Applications for                       Kimberly D. Bose,
                                                  facilities. On average, the project would               preliminary permits will not be
                                                                                                                                                                Secretary.
                                                  generate approximately 2,800 megawatt-                  accepted in response to this notice.
                                                                                                             A notice of intent must specify the                [FR Doc. 2015–10220 Filed 4–30–15; 8:45 am]
                                                  hours annually. The applicant proposes
                                                  to remove a non-operating sluice gate on                exact name, business address, and                     BILLING CODE 6717–01–P

                                                  the spillway, rehabilitate the                          telephone number of the prospective
                                                  powerhouse, and operate the project in                  applicant, and must include an
                                                  a run-of-river mode.                                    unequivocal statement of intent to                    DEPARTMENT OF ENERGY
                                                     m. Due to the project works already                  submit a development application. A
                                                                                                                                                                Federal Energy Regulatory
                                                  existing and the limited scope of                       notice of intent must be served on the
                                                                                                                                                                Commission
                                                  proposed rehabilitation of the project                  applicant(s) named in this public notice.
                                                  site described above, the applicant’s                      Anyone may submit comments, a                      [Project No. 14628–001]
                                                  close coordination with federal and                     protest, or a motion to intervene in
                                                  state agencies during the preparation of                accordance with the requirements of                   Minneapolis Leased Housing
                                                  the application, completed studies                      Rules of Practice and Procedure, 18 CFR               Associates IV, Limited Partnership;
                                                  during pre-filing consultation, and                     385.210, .211, .214. In determining the               Notice of Application and Applicant-
                                                  agency recommended preliminary terms                    appropriate action to take, the                       Prepared EA Accepted for Filing,
                                                  and conditions, we intend to waive                      Commission will consider all protests or              Soliciting Motions To Intervene and
                                                  scoping and expedite the exemption                      other comments filed, but only those                  Protests, and Soliciting Comments,
                                                  process. Based on a review of the                       who file a motion to intervene in                     and Final Terms and Conditions,
                                                  application, resource agency                            accordance with the Commission’s                      Recommendations, and Prescriptions
                                                  consultation letters including the                      Rules may become a party to the
                                                                                                          proceeding. Any comments, protests, or                   Take notice that the following
                                                  preliminary 30(c) terms and conditions,
                                                                                                          motions to intervene must be received                 hydroelectric application and applicant-
                                                  and comments filed to date,
                                                                                                          on or before the specified comment date               prepared environmental assessment has
                                                  Commission staff intends to prepare a
                                                                                                          for the particular application.                       been filed with the Commission and is
                                                  single environmental assessment (EA).
                                                                                                             All filings must (1) bear in all capital           available for public inspection.
                                                  Commission staff determined that the
                                                  issues that need to be addressed in its                 letters the title ‘‘PROTEST’’, ‘‘MOTION                  a. Type of Application: Minor
                                                  EA have been adequately identified                      TO INTERVENE’’, ‘‘NOTICE OF                           License.
                                                  during the pre-filing period, which                     INTENT TO FILE COMPETING                                 b. Project No.: 14628–001.
                                                  included a public meeting and site visit,               APPLICATION,’’ ‘‘COMPETING                               c. Date filed: March 20, 2015.
                                                  and no new issues are likely to be                      APPLICATION,’’ ‘‘COMMENTS,’’                             d. Applicant: Minneapolis Leased
                                                  identified through additional scoping.                  ‘‘REPLY COMMENTS,’’                                   Housing Associates IV, Limited
                                                  The EA will consider assessing the                      ‘‘RECOMMENDATIONS,’’ or ‘‘TERMS                       Partnership (Minneapolis Housing
                                                  potential effects of project construction               AND CONDITIONS;’’ (2) set forth in the                Associates).
                                                  and operation on aquatic, terrestrial,                  heading the name of the applicant and                    e. Name of Project: A-Mill Artist Lofts
                                                  threatened and endangered species,                      the project number of the application to              Hydroelectric Project (A-Mill Project).
                                                  recreation and land use, aesthetic, and                 which the filing responds; (3) furnish                   f. Location: On the Mississippi River,
                                                  cultural and historic resources.                        the name, address, and telephone                      in the City of Minneapolis, Hennepin
                                                     n. A copy of the application is                      number of the person protesting or                    County, Minnesota. No federal lands are
                                                  available for review at the Commission                  intervening; and (4) otherwise comply                 occupied by the project works or located
                                                  in the Public Reference Room or may be                  with the requirements of 18 CFR                       within the project boundary.
                                                  viewed on the Commission’s Web site at                  385.2001 through 385.2005. All                           g. Filed Pursuant to: Federal Power
                                                  http://www.ferc.gov using the                           comments, recommendations, terms and                  Act 16 U.S.C. 791(a)–825(r).
                                                  ‘‘eLibrary’’ link. Enter the docket                     conditions or prescriptions must set                     h. Applicant Contact: Owen Metz,
                                                  number excluding the last three digits in               forth their evidentiary basis and                     2905 Northwest Blvd., Suite 150,
                                                  the docket number field to access the                   otherwise comply with the requirements                Plymouth, MN 55441; (763) 354–5618;
                                                  document. For assistance, contact FERC                  of 18 CFR 4.34(b). Agencies may obtain                email ometz@dominiuminc.com.
                                                  Online Support. A copy is also available                copies of the application directly from                  i. FERC Contact: Shana Murray at
                                                  for inspection and reproduction at the                  the applicant. A copy of any protest or               (202) 502–8333; or email at
                                                  address in item h above.                                motion to intervene must be served                    shana.murray@ferc.gov.
                                                     Register online at http://                           upon each representative of the                          j. Deadline for filing motions to
                                                  www.ferc.gov/docs-filing/                               applicant specified in the particular                 intervene and protests, comments, and
                                                  esubscription.asp to be notified via                    application. A copy of all other filings              final terms and conditions,
                                                  email of new filings and issuances                      in reference to this application must be              recommendations, and prescriptions: 30
                                                  related to this or other pending projects.              accompanied by proof of service on all                days from the issuance date of this
                                                  For assistance, contact FERC Online                     persons listed in the service list                    notice; reply comments are due 45 days
                                                  Support.                                                prepared by the Commission in this                    from the issuance date of this notice.
                                                     o. Any qualified applicant desiring to               proceeding, in accordance with 18 CFR                    The Commission strongly encourages
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                  file a competing application must                       4.34(b) and 385.2010.                                 electronic filing. Please file motions to
                                                  submit to the Commission, on or before                     p. Procedural Schedule: The                        intervene and protests, comments, and
                                                  the specified intervention deadline date,               application will be processed according               final terms and conditions,
                                                  a competing development application,                    to the following procedural schedule.                 recommendations, and prescriptions
                                                  or a notice of intent to file such an                   Revisions to the schedule may be made                 using the Commission’s eFiling system
                                                  application. Submission of a timely                     as appropriate.                                       at http://www.ferc.gov/docs-filing/
                                                  notice of intent allows an interested                      MILESTONE: Notice of the                           efiling.asp. Commenters can submit
                                                  person to file the competing                            availability of the EA.                               brief comments up to 6,000 characters,


                                             VerDate Sep<11>2014   18:14 Apr 30, 2015   Jkt 235001   PO 00000   Frm 00020   Fmt 4703   Sfmt 4703   E:\FR\FM\01MYN1.SGM   01MYN1



Document Created: 2018-02-21 10:21:06
Document Modified: 2018-02-21 10:21:06
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
DatesOctober 1, 2015.
FR Citation80 FR 24910 