80_FR_26336 80 FR 26248 - FFP Project 92, LLC; Notice of Application Tendered for Filing With the Commission and Establishing Procedural Schedule for Licensing and Deadline for Submission of Final Amendments

80 FR 26248 - FFP Project 92, LLC; Notice of Application Tendered for Filing With the Commission and Establishing Procedural Schedule for Licensing and Deadline for Submission of Final Amendments

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 80, Issue 88 (May 7, 2015)

Page Range26248-26249
FR Document2015-10975

Federal Register, Volume 80 Issue 88 (Thursday, May 7, 2015)
[Federal Register Volume 80, Number 88 (Thursday, May 7, 2015)]
[Notices]
[Pages 26248-26249]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-10975]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

 [Project No. 14276-002]


FFP Project 92, LLC; Notice of Application Tendered for Filing 
With the Commission and Establishing Procedural Schedule for Licensing 
and Deadline for Submission of Final Amendments

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: Original Major License.
    b. Project No.: 14276-002.
    c. Date Filed: April 16, 2015.
    d. Applicant: FFP Project 92, LLC.
    e. Name of Project: Kentucky River Lock and Dam No. 11 
Hydroelectric Project.
    f. Location: The proposed project would be located on the Kentucky 
River in Estill and Madison Counties, Kentucky, at the existing 
Kentucky River Lock and Dam No. 11 which is owned by the Commonwealth 
of Kentucky and operated by the Kentucky River Authority. The project 
would not affect federal land.
    g. Filed Pursuant to: 18 CFR part 5 of the Commission's regulations 
and Hydropower Regulatory Efficiency Act of 2013.
    h. Applicant Contact: Elvir Mujanovic, Vice President of Finance, 
Rye Development, LLC, 745 Atlantic Avenue, 8th floor, Boston, MA 02111; 
Telephone (781) 856-2030; [email protected].
    i. FERC Contact: Sarah Salazar, (202) 502-6863 or 
[email protected].
    j. This application is not ready for environmental analysis at this 
time.
    k. Project Description: The proposed project would be located at 
the Commonwealth of Kentucky's existing Kentucky River Lock and Dam No. 
11, which was originally constructed from 1904 to 1906 by the U.S. 
Corps of Engineers for the purpose of transportation. There is a single 
lock chamber with a total length of 148 feet and width of 52 feet on 
the south end of the dam. However, a concrete bulkhead and miter gates 
were installed in front of the lock structure and it is no longer being 
used for navigational purposes. The Kentucky River Authority currently 
operates the dam to maintain the upriver channel depth and an 
impoundment to withdraw water for municipal drinking water purposes. 
The impoundment also serves the purposes of providing opportunities for 
recreation and habitat for fish and wildlife.
    The proposed project would be operated in a run-of-river mode. The 
proposed project would include: (1) The existing 579-acre impoundment, 
with a normal pool elevation of 585.60 feet North American Vertical 
Datum of 1988; (2) the existing 208-foot-long, 35-foot-high fixed crest 
dam; (3) a new 3.5-foot-high adjustable crest gate attached to the top 
of the dam that would be used to maintain the water surface elevation 
of the impoundment during project operations (i.e., when inflow would 
be diverted from the spillway to the proposed turbines); (4) a new 275-
foot-long, 75-foot-wide reinforced concrete intake channel equipped 
with trashracks with 3-inch bar spacing; (5) a new 140-foot-long, 64.5-
foot-wide powerhouse built within the existing lock structure, with two 
horizontal Pit Kaplan turbine generator units each rated at 2.5 
megawatts (MW) for a total installed capacity of 5 MW; (6) a new 190-
foot-long, 78-foot-wide tailrace; (7) a new 40-foot-long, 40-foot-wide 
substation; (8) a new approximately 4.5-mile-long, 69-kilovolt 
transmission line extending from the new substation at the powerhouse 
to an existing substation located near Waco, Kentucky; and (9) 
appurtenant facilities. The proposed project would generate about 
18,500 megawatt-hours annually, which would be sold to a local utility.
    l. Locations of the Application: A copy of the application is 
available for review at the Commission in the Public Reference Room or 
may be viewed on

[[Page 26249]]

the Commission's Web site at http://www.ferc.gov using the ``eLibrary'' 
link. Enter the docket number excluding the last three digits in the 
docket number field to access the document. For assistance, please 
contact FERC Online Support at [email protected], (866) 208-
3676 (toll free), or (202) 502-8659 (TTY). A copy is also available for 
inspection and reproduction at the address in item (h) above.
    m. You may also register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    n. Procedural Schedule: The application will be processed according 
to the following preliminary Hydro Licensing Schedule. Revisions to the 
schedule may be made as appropriate.

------------------------------------------------------------------------
               Milestone                           Target date
------------------------------------------------------------------------
Notice of Acceptance/Notice of Ready    July 2015
 for Environmental Analysis.
Filing of recommendations, preliminary  September 2015
 terms and conditions, and fishway
 prescriptions.
Commission issues Environmental         December 2015
 Assessment (EA).
Comments on EA, modified terms and      January 2016
 conditions.
------------------------------------------------------------------------

    o. Final amendments to the application must be filed with the 
Commission no later than 30 days from the issuance date of the notice 
of ready for environmental analysis.

    Dated: May 1, 2015.
 Kimberly D. Bose,
 Secretary.
[FR Doc. 2015-10975 Filed 5-6-15; 8:45 am]
BILLING CODE 6717-01-P



                                                  26248                           Federal Register / Vol. 80, No. 88 / Thursday, May 7, 2015 / Notices

                                                  the temporary variance is necessary to                  protests should relate to project works               Rye Development, LLC, 745 Atlantic
                                                  conserve water in order to ensure                       which are the subject of the license                  Avenue, 8th floor, Boston, MA 02111;
                                                  minimum flow releases through the fall                  surrender. Agencies may obtain copies                 Telephone (781) 856–2030; elvir@
                                                  and to maintain an adequate level to                    of the application directly from the                  ryedevelopment.com.
                                                  recreation opportunities at the Upper                   applicant. A copy of any protest or                      i. FERC Contact: Sarah Salazar, (202)
                                                  Lakes this summer.                                      motion to intervene must be served                    502–6863 or sarah.salazar@ferc.gov.
                                                     l. Locations of the Application: A                   upon each representative of the                          j. This application is not ready for
                                                  copy of the application is available for                applicant specified in the particular                 environmental analysis at this time.
                                                  inspection and reproduction at the                      application. If an intervener files                      k. Project Description: The proposed
                                                  Commission’s Public Reference Room,                     comments or documents with the                        project would be located at the
                                                  located at 888 First Street NE., Room                   Commission relating to the merits of an               Commonwealth of Kentucky’s existing
                                                  2A, Washington, DC 20426, or by calling                 issue that may affect the responsibilities            Kentucky River Lock and Dam No. 11,
                                                  (202) 502–8371. This filing may also be                 of a particular resource agency, they                 which was originally constructed from
                                                  viewed on the Commission’s Web site at                  must also serve a copy of the document                1904 to 1906 by the U.S. Corps of
                                                  http://www.ferc.gov/docs-filing/                        on that resource agency. A copy of all                Engineers for the purpose of
                                                  elibrary.asp. Enter the docket number                   other filings in reference to this                    transportation. There is a single lock
                                                  excluding the last three digits in the                  application must be accompanied by                    chamber with a total length of 148 feet
                                                  docket number field to access the                       proof of service on all persons listed in             and width of 52 feet on the south end
                                                  document. You may also register online                  the service list prepared by the                      of the dam. However, a concrete
                                                  at http://www.ferc.gov/docs-filing/                     Commission in this proceeding, in                     bulkhead and miter gates were installed
                                                  esubscription.asp to be notified via                    accordance with 18 CFR 4.34(b) and                    in front of the lock structure and it is no
                                                  email of new filings and issuances                      385.2010.                                             longer being used for navigational
                                                  related to this or other pending projects.                                                                    purposes. The Kentucky River Authority
                                                                                                            Dated: May 1, 2015.                                 currently operates the dam to maintain
                                                  For assistance, call 1–866–208–3676 or
                                                                                                          Kimberly D. Bose,                                     the upriver channel depth and an
                                                  email FERCOnlineSupport@ferc.gov, for
                                                  TTY, call (202) 502–8659. A copy is also                Secretary.                                            impoundment to withdraw water for
                                                  available for inspection and                            [FR Doc. 2015–10972 Filed 5–6–15; 8:45 am]            municipal drinking water purposes. The
                                                  reproduction at the address in item (h)                 BILLING CODE 6717–01–P                                impoundment also serves the purposes
                                                  above.                                                                                                        of providing opportunities for recreation
                                                     m. Individuals desiring to be included                                                                     and habitat for fish and wildlife.
                                                  on the Commission’s mailing list should                 DEPARTMENT OF ENERGY                                     The proposed project would be
                                                  so indicate by writing to the Secretary                                                                       operated in a run-of-river mode. The
                                                  of the Commission.                                      Federal Energy Regulatory                             proposed project would include: (1) The
                                                     n. Comments, Protests, or Motions to                 Commission                                            existing 579-acre impoundment, with a
                                                  Intervene: Anyone may submit                            [Project No. 14276–002]                               normal pool elevation of 585.60 feet
                                                  comments, a protest, or a motion to                                                                           North American Vertical Datum of 1988;
                                                  intervene in accordance with the                        FFP Project 92, LLC; Notice of                        (2) the existing 208-foot-long, 35-foot-
                                                  requirements of Rules of Practice and                   Application Tendered for Filing With                  high fixed crest dam; (3) a new 3.5-foot-
                                                  Procedure, 18 CFR 385.210, .211, .214.                  the Commission and Establishing                       high adjustable crest gate attached to the
                                                  In determining the appropriate action to                Procedural Schedule for Licensing and                 top of the dam that would be used to
                                                  take, the Commission will consider all                  Deadline for Submission of Final                      maintain the water surface elevation of
                                                  protests or other comments filed, but                   Amendments                                            the impoundment during project
                                                  only those who file a motion to                                                                               operations (i.e., when inflow would be
                                                                                                            Take notice that the following                      diverted from the spillway to the
                                                  intervene in accordance with the
                                                                                                          hydroelectric application has been filed              proposed turbines); (4) a new 275-foot-
                                                  Commission’s Rules may become a
                                                                                                          with the Commission and is available                  long, 75-foot-wide reinforced concrete
                                                  party to the proceeding. Any comments,
                                                                                                          for public inspection.                                intake channel equipped with
                                                  protests, or motions to intervene must                    a. Type of Application: Original Major
                                                  be received on or before the specified                                                                        trashracks with 3-inch bar spacing; (5) a
                                                                                                          License.
                                                  comment date for the particular                           b. Project No.: 14276–002.                          new 140-foot-long, 64.5-foot-wide
                                                  application.                                              c. Date Filed: April 16, 2015.                      powerhouse built within the existing
                                                     o. Filing and Service of Responsive                    d. Applicant: FFP Project 92, LLC.                  lock structure, with two horizontal Pit
                                                  Documents: Any filing must (1) bear in                    e. Name of Project: Kentucky River                  Kaplan turbine generator units each
                                                  all capital letters the title                           Lock and Dam No. 11 Hydroelectric                     rated at 2.5 megawatts (MW) for a total
                                                  ‘‘COMMENTS’’, ‘‘PROTEST’’, or                           Project.                                              installed capacity of 5 MW; (6) a new
                                                  ‘‘MOTION TO INTERVENE’’ as                                f. Location: The proposed project                   190-foot-long, 78-foot-wide tailrace; (7)
                                                  applicable; (2) set forth in the heading                would be located on the Kentucky River                a new 40-foot-long, 40-foot-wide
                                                  the name of the applicant and the                       in Estill and Madison Counties,                       substation; (8) a new approximately 4.5-
                                                  project number of the application to                    Kentucky, at the existing Kentucky                    mile-long, 69-kilovolt transmission line
                                                  which the filing responds; (3) furnish                  River Lock and Dam No. 11 which is                    extending from the new substation at
                                                  the name, address, and telephone                        owned by the Commonwealth of                          the powerhouse to an existing
                                                  number of the person protesting or                      Kentucky and operated by the Kentucky                 substation located near Waco, Kentucky;
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                  intervening; and (4) otherwise comply                   River Authority. The project would not                and (9) appurtenant facilities. The
                                                  with the requirements of 18 CFR                         affect federal land.                                  proposed project would generate about
                                                  385.2001 through 385.2005. All                             g. Filed Pursuant to: 18 CFR part 5 of             18,500 megawatt-hours annually, which
                                                  comments, motions to intervene, or                      the Commission’s regulations and                      would be sold to a local utility.
                                                  protests must set forth their evidentiary               Hydropower Regulatory Efficiency Act                     l. Locations of the Application: A
                                                  basis and otherwise comply with the                     of 2013.                                              copy of the application is available for
                                                  requirements of 18 CFR 4.34(b). All                        h. Applicant Contact: Elvir                        review at the Commission in the Public
                                                  comments, motions to intervene, or                      Mujanovic, Vice President of Finance,                 Reference Room or may be viewed on


                                             VerDate Sep<11>2014   18:07 May 06, 2015   Jkt 235001   PO 00000   Frm 00033   Fmt 4703   Sfmt 4703   E:\FR\FM\07MYN1.SGM   07MYN1


                                                                                        Federal Register / Vol. 80, No. 88 / Thursday, May 7, 2015 / Notices                                                                      26249

                                                  the Commission’s Web site at http://                             (202) 502–8659 (TTY). A copy is also                             related to this or other pending projects.
                                                  www.ferc.gov using the ‘‘eLibrary’’ link.                        available for inspection and                                     For assistance, contact FERC Online
                                                  Enter the docket number excluding the                            reproduction at the address in item (h)                          Support.
                                                  last three digits in the docket number                           above.                                                             n. Procedural Schedule: The
                                                  field to access the document. For                                  m. You may also register online at                             application will be processed according
                                                  assistance, please contact FERC Online                           http://www.ferc.gov/docs-filing/                                 to the following preliminary Hydro
                                                  Support at FERCOnlineSupport@                                    esubscription.asp to be notified via                             Licensing Schedule. Revisions to the
                                                  ferc.gov, (866) 208–3676 (toll free), or                         email of new filings and issuances                               schedule may be made as appropriate.

                                                                                                                            Milestone                                                                                      Target date

                                                  Notice of Acceptance/Notice of Ready for Environmental Analysis ..........................................................................................           July 2015
                                                  Filing of recommendations, preliminary terms and conditions, and fishway prescriptions .......................................................                       September 2015
                                                  Commission issues Environmental Assessment (EA) ...............................................................................................................      December 2015
                                                  Comments on EA, modified terms and conditions ....................................................................................................................   January 2016



                                                    o. Final amendments to the                                     ADDRESSES:   EPA has established a                               accessed at http://www.epa.gov/otaq/
                                                  application must be filed with the                               docket for this action under Docket ID                           cafr.htm.
                                                  Commission no later than 30 days from                            EPA–HQ–OAR–2014–0060. All                                        FOR FURTHER INFORMATION CONTACT:
                                                  the issuance date of the notice of ready                         documents relied upon in making this                             David Dickinson, Attorney-Advisor,
                                                  for environmental analysis.                                      decision, including those submitted to                           Compliance Division, Office of
                                                    Dated: May 1, 2015.                                            EPA by CARB, are contained in the                                Transportation and Air Quality, U.S.
                                                  Kimberly D. Bose,                                                public docket. Publicly available docket                         Environmental Protection Agency, 1200
                                                  Secretary.
                                                                                                                   materials are available either                                   Pennsylvania Ave. NW., Washington,
                                                                                                                   electronically through                                           DC 20460. Telephone: (202) 343–9256.
                                                  [FR Doc. 2015–10975 Filed 5–6–15; 8:45 am]
                                                                                                                   www.regulations.gov or in hard copy at                           Fax: (202) 343–2804. Email:
                                                  BILLING CODE 6717–01–P
                                                                                                                   the Air and Radiation Docket in the EPA                          dickinson.david@epa.gov.
                                                                                                                   Headquarters Library, EPA West                                   SUPPLEMENTARY INFORMATION:
                                                                                                                   Building, Room 3334, located at 1301
                                                  ENVIRONMENTAL PROTECTION                                         Constitution Avenue NW., Washington,                             I. Background
                                                  AGENCY                                                           DC. The Public Reading Room is open                                 CARB first adopted its CHE regulation
                                                  [EPA–HQ–OAR–2014–0060; FRL–9927–30–                              to the public on all federal government                          on December 31, 2006. The regulation
                                                  OAR]                                                             working days from 8:30 a.m. to 4:30                              applied to newly purchased, leased, or
                                                                                                                   p.m.; generally, it is open Monday                               rented on- and off-road vehicles and
                                                  California State Nonroad Engine                                  through Friday, excluding holidays. The                          equipment, as well as to in-use on- and
                                                  Pollution Control Standards; Mobile                              telephone number for the Reading Room                            off-road vehicles and equipment with
                                                  Cargo Handling Equipment at Ports                                is (202) 566–1744. The Air and                                   compression-ignition (CI) engines that
                                                  and Intermodal Rail Yards Regulations;                           Radiation Docket and Information                                 operate at ports and intermodal rail
                                                  Notice of Decision                                               Center’s Web site is http://www.epa.gov/                         yards.1 On February 21, 2012, EPA
                                                  AGENCY: Environmental Protection                                 oar/docket.html. The electronic mail                             granted California a full waiver for those
                                                  Agency (EPA).                                                    (email) address for the Air and                                  parts of the CHE regulation establishing
                                                  ACTION: Notice of decision.
                                                                                                                   Radiation Docket is: a-and-r-Docket@                             emission standards for new on-road
                                                                                                                   epa.gov, the telephone number is (202)                           motor vehicles and full authorization for
                                                  SUMMARY:     The Environmental Protection                        566–1742, and the fax number is (202)                            standards and other requirements
                                                  Agency (‘‘EPA’’) is granting the                                 566–9744. An electronic version of the                           related to the control of emissions
                                                  California Air Resources Board’s                                 public docket is available through the                           affecting new and in-use nonroad
                                                  (‘‘CARB’’) request for authorization of                          federal government’s electronic public                           engines.2 CARB formally adopted the
                                                  amendments to its mobile cargo                                   docket and comment system. You may                               CHE amendments on October 14, 2012,3
                                                  handling equipment at ports and                                  access EPA dockets at http://                                    and they are codified at title 13,
                                                  intermodal rail yards regulations (‘‘CHE                         www.regulations.gov. After opening the                           California Code of Regulations (CCR),
                                                  amendments’’). EPA is also confirming                            www.regulations.gov Web site, enter                              section 2479. The CHE amendments
                                                  that certain CHE amendments are                                  EPA–HQ–OAR–2014–0060 in the ‘‘Enter                              modify certain retrofit, operational, and
                                                  within the scope of prior EPA                                    Keyword or ID’’ fill-in box to view                              compliance requirements; strengthen
                                                  authorizations. CARB’s mobile cargo                              documents in the record. Although a                              certain emission standards; and address
                                                  handling equipment at ports and                                  part of the official docket, the public                          definitions and provide other clarifying
                                                  intermodal rail yard regulations apply to                        docket does not include Confidential                             language. By letter dated May 16, 2013,
                                                  all newly purchased, leased or rented                            Business Information (‘‘CBI’’) or other                          CARB submitted a request to EPA
                                                  on- and off-road vehicles and                                    information whose disclosure is                                  pursuant to section 209(e) of the Act,
                                                  equipment, as well as in-use on- and off-                        restricted by statute.                                           seeking EPA’s confirmation that certain
                                                  road vehicles and equipment, with                                                                                                 CHE amendments fall within the scope
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                                                                                      EPA’s Office of Transportation and
                                                  compression-ignition engines that                                Air Quality (‘‘OTAQ’’) maintains a Web                           of EPA’s February 2012 authorization
                                                  operate at ports and intermodal rail                             page that contains general information
                                                  yards. This decision is issued under the                         on its review of California waiver and                             1 The federal term ‘‘nonroad’’ and the California

                                                  authority of the Clean Air Act (‘‘CAA’’                                                                                           term ‘‘off-road’’ are used interchangeably.
                                                                                                                   authorization requests. Included on that                           2 77 FR 9916 (February 21, 2012).
                                                  or ‘‘Act’’).                                                     page are links to prior waiver Federal                             3 CARB ‘‘Resolution 11–30,’’ September 22, 2011;
                                                  DATES: Petitions for review must be filed                        Register notices, some of which are                              CARB ‘‘Executive Order R–12–009,’’ August 2,
                                                  by July 6, 2015.                                                 cited in today’s notice; the page can be                         2012.



                                             VerDate Sep<11>2014      18:07 May 06, 2015      Jkt 235001    PO 00000     Frm 00034      Fmt 4703    Sfmt 4703     E:\FR\FM\07MYN1.SGM          07MYN1



Document Created: 2015-12-16 07:49:59
Document Modified: 2015-12-16 07:49:59
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation80 FR 26248 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR