80_FR_26391 80 FR 26303 - Compliance With Phase 2 of Order EA-13-109

80 FR 26303 - Compliance With Phase 2 of Order EA-13-109

NUCLEAR REGULATORY COMMISSION

Federal Register Volume 80, Issue 88 (May 7, 2015)

Page Range26303-26304
FR Document2015-11036

The U.S. Nuclear Regulatory Commission (NRC) is issuing its Japan Lessons-Learned Division Interim Staff Guidance (JLD-ISG), JLD- ISG-2015-01, ``Compliance with Phase 2 of Order EA-13-109, Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation under Severe Accident Conditions.'' This ISG provides guidance and clarifies the Phase 2 requirements in the order to assist the licensees that have Boiling Water Reactors (BWRs) with Mark I and Mark II Containments in the design and implementation of either a vent path from the containment drywell or a strategy that makes it unlikely that venting would be needed from the drywell before alternate reliable containment heat removal and pressure control is reestablished. This ISG also endorses, with clarifications, the industry guidance contained in Nuclear Energy Institute (NEI) 13-02, ``Industry Guidance for Compliance with Order EA-13-109,'' Revision 1.

Federal Register, Volume 80 Issue 88 (Thursday, May 7, 2015)
[Federal Register Volume 80, Number 88 (Thursday, May 7, 2015)]
[Notices]
[Pages 26303-26304]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-11036]


-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[NRC-2015-0048]


Compliance With Phase 2 of Order EA-13-109

AGENCY: Nuclear Regulatory Commission.

ACTION: Interim staff guidance; issuance.

-----------------------------------------------------------------------

SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is issuing its 
Japan Lessons-Learned Division Interim Staff Guidance (JLD-ISG), JLD-
ISG-2015-01, ``Compliance with Phase 2 of Order EA-13-109, Order 
Modifying Licenses with Regard to Reliable Hardened Containment Vents 
Capable of Operation under Severe Accident Conditions.'' This ISG 
provides guidance and clarifies the Phase 2 requirements in the order 
to assist the licensees that have Boiling Water Reactors (BWRs) with 
Mark I and Mark II Containments in the design and implementation of 
either a vent path from the containment drywell or a strategy that 
makes it unlikely that venting would be needed from the drywell before 
alternate reliable containment heat removal and pressure control is 
reestablished. This ISG also endorses, with clarifications, the 
industry guidance contained in Nuclear Energy Institute (NEI) 13-02, 
``Industry Guidance for Compliance with Order EA-13-109,'' Revision 1.

ADDRESSES: Please refer to Docket ID NRC-2015-0048 when contacting the 
NRC about the availability of information regarding this document. You 
may obtain publicly-available information related to this document by 
using any of the following methods:
     Federal Rulemaking Web site: Go to http://www.regulations.gov and search for Docket ID NRC-2015-0048. Address 
questions about NRC dockets to Carol Gallagher; telephone: 301-415-
3463; email: [email protected]. For technical questions, contact 
the individual listed in the FOR FURTHER INFORMATION CONTACT section of 
this document.
     NRC's Agencywide Documents Access and Management System 
(ADAMS): You may obtain publicly-available documents online in the 
ADAMS Public Documents collection at http://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``ADAMS Public Documents'' and 
then select ``Begin Web-based ADAMS Search.'' For problems with ADAMS, 
please contact the NRC's Public Document Room (PDR) reference staff at 
1-800-397-4209, 301-415-4737, or by email to [email protected]. The 
ADAMS accession number for each document referenced (if it available in 
ADAMS) is provided the first time that a document is referenced. The 
JLD-ISG-2015-01 is available in ADAMS under Accession No. ML15104A118. 
The ISG for complying with Phase 1 requirements of the order (JLD-ISG-
2013-02) was issued on November 14, 2013 (ADAMS Accession No. 
ML13304B836). The NEI 13-02, Revision 1 is available in ADAMS under 
Accession No. ML15113B318.
     NRC's PDR: You may examine and purchase copies of public 
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555 
Rockville Pike, Rockville, Maryland 20852.
     NRC's Interim Staff Guidance Web site: JLD-ISG documents 
are also available online under the ``Japan Lessons Learned'' heading 
at http://www.nrc.gov/reading-rm/doc-collections/isg/japan-lessons-learned.html.

FOR FURTHER INFORMATION CONTACT: Rajender Auluck, Office of Nuclear 
Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC 
20555-0001; telephone: 301-415-1025; email: Rajende[email protected].

SUPPLEMENTARY INFORMATION: The NRC developed JLD-ISG-2015-01 to provide 
guidance and clarification to assist nuclear power reactor licensees 
with the identification of methods needed to comply with Phase 2 
requirements in Order EA-13-109 (ADAMS Accession No. ML13130A067), 
``Order Modifying Licenses with Regard to Reliable Hardened Containment 
Vents Capable of Operation under Severe Accident Conditions.'' This ISG 
is not a substitute for the requirements in Order EA-13-109, and 
compliance with the ISG would not be a requirement.
    The accident at the Fukushima Dai-ichi nuclear power station 
reinforced the importance of reliable operation of containment vents 
for BWR plants with Mark I and Mark II containments. As part of its 
response to the lessons learned from the accident, on March 12, 2012, 
the NRC issued Order EA-12-050 (ADAMS Accession No. ML12056A043) 
requiring licensees to upgrade or install a reliable hardened 
containment venting system (HCVS) for Mark I and Mark II containments. 
While developing the requirements for Order EA-12-050, the NRC 
acknowledged that questions remained about maintaining containment 
integrity and limiting the release of radioactive materials if 
licensees used the venting systems during severe accident conditions.
    The NRC staff on November 26, 2012, presented the Commission with 
options to address these issues in SECY-12-0157, ``Consideration of 
Additional Requirements for Containment Venting Systems for Boiling 
Water Reactors with Mark I and Mark II Containments'' (ADAMS Accession 
No. ML12325A704). In the staff requirements memorandum (SRM) for SECY-
12-0157, dated March 19, 2013 (ADAMS Accession No. ML13078A017), the 
Commission directed the staff to: (1) Issue a modification to Order EA-
12-050 requiring BWR licensees with Mark I and Mark II containments to 
upgrade or replace the reliable hardened vents required by Order EA-12-
050 with a containment venting system designed and installed to remain 
functional during severe accident conditions, and (2) develop a 
technical basis and rulemaking for filtering strategies with drywell 
filtration and severe accident management of BWR Mark I and II 
containments. The NRC subsequently issued Order EA-13-109 to define 
requirements and schedules for licensees for BWRs with Mark I and Mark 
II containments to install severe accident capable containment venting 
systems.
    In recognition of the relative importance of venting capabilities 
from the wetwell and drywell, a phased approach to implementation is 
being used to minimize delays in implementing the requirements 
originally imposed by Order EA-12-050. Phase 1 involves upgrading the 
venting capabilities from the containment wetwell to provide reliable, 
severe accident capable hardened vents to assist in preventing core 
damage and, if necessary, to provide venting capability during severe 
accident conditions. Phase 2 involves providing additional protection 
during severe accident conditions through installation of a reliable, 
severe accident capable drywell vent system or the development of a 
reliable containment venting strategy that makes it unlikely that a 
licensee would need to vent from the containment drywell during severe 
accident conditions. For implementation of Phase 1 order requirements, 
the NRC issued JLD-ISG-2013-02 on November 14, 2013 (78 FR 70356), 
which endorsed, with exceptions and clarifications, the

[[Page 26304]]

methodologies described in the industry guidance document NEI 13-02, 
Rev. 0, ``Industry Guidance for Compliance with Order EA-13-109'' 
(ADAMS Accession No. ML13316A853). As required by the order, licensees 
submitted their site-specific overall integrated plans (OIPs) by June 
30, 2014. The NRC staff has completed its review of the OIPs and has 
issued interim staff evaluations.
    On March 10, 2015, the NRC staff issued a Federal Register notice 
(80 FR 12649) to request public comments on draft JLD-ISG-2015-01 
(ADAMS Accession No. ML15051A143). In response, the NRC received 
comments from SimplyInfo by letter dated March 11, 2015 (ADAMS 
Accession No. ML15083A277), and the NEI by letter dated April 9, 2015 
(ADAMS Accession No. ML15104A316). Several of these comments have been 
previously submitted to the NRC for staff's consideration. The 
resolution of these comments has been documented and publicly available 
(ADAMS Accession No. ML15114A051).
    The focus of this ISG is to provide guidance for implementing Phase 
2 requirements of the order. The Phase 2 portion of Order EA-13-109 
builds on the Phase 1 activities, and is intended to be consistent with 
the expected outcome of the development of a regulatory basis for the 
Containment Protection and Release Reduction (CPRR) rulemaking. 
Specifically, the industry described a containment venting approach 
that includes severe accident water addition (SAWA) and severe accident 
water management (SAWM) strategies that would preserve the use of a 
wetwell vent path, in addition to providing other benefits. Evaluations 
performed in support of the CPRR rulemaking confirmed significant 
benefits to including SAWA as part of a severe accident management 
strategy. Therefore, SAWA will facilitate implementation of Phase 2 of 
Order EA-13-109 by establishing the design conditions for a drywell 
vent and supporting SAWM for licensees choosing to pursue that option 
as a strategy that makes it unlikely that a licensee would need to vent 
from the drywell.
    On April 23, 2015, NEI submitted NEI 13-02, ``Industry Guidance for 
Compliance with Order EA-13-109,'' Rev. 1 (ADAMS Accession No. 
ML15113B318) to assist nuclear power licensees with the identification 
of measures needed to comply with the Phase 2 requirements of Order EA-
13-109 regarding reliable hardened containment vents capable of 
operation under severe accident conditions. The NEI document includes 
guidance for implementing order requirements for both Phase 1 and Phase 
2, including the industry's proposed approach to use the SAWA and SAWM 
strategies to control the water levels in the suppression pool and 
maintain capabilities to address over-pressure conditions without a 
severe accident drywell vent. This ISG endorses, with clarifications, 
the methodologies described in the industry guidance document NEI 13-
02, Revision 1.

    Dated at Rockville, Maryland, this 29th day of April 2015.

    For the Nuclear Regulatory Commission.
Jack R. Davis,
Director, Japan Lessons-Learned Division, Office of Nuclear Reactor 
Regulation.
[FR Doc. 2015-11036 Filed 5-6-15; 8:45 am]
 BILLING CODE 7590-01-P



                                                                                  Federal Register / Vol. 80, No. 88 / Thursday, May 7, 2015 / Notices                                             26303

                                                    Dated at Rockville, Maryland, this 1st day            ADAMS Public Documents collection at                  containments. While developing the
                                                  of May 2014.                                            http://www.nrc.gov/reading-rm/                        requirements for Order EA–12–050, the
                                                    For the Nuclear Regulatory Commission.                adams.html. To begin the search, select               NRC acknowledged that questions
                                                  Mark Delligatti,                                        ‘‘ADAMS Public Documents’’ and then                   remained about maintaining
                                                  Deputy Director, Division of New Reactor                select ‘‘Begin Web-based ADAMS                        containment integrity and limiting the
                                                  Licensing, Office of New Reactors.                      Search.’’ For problems with ADAMS,                    release of radioactive materials if
                                                  [FR Doc. 2015–11038 Filed 5–6–15; 8:45 am]              please contact the NRC’s Public                       licensees used the venting systems
                                                  BILLING CODE 7590–01–P                                  Document Room (PDR) reference staff at                during severe accident conditions.
                                                                                                          1–800–397–4209, 301–415–4737, or by                      The NRC staff on November 26, 2012,
                                                                                                          email to pdr.resource@nrc.gov. The                    presented the Commission with options
                                                  NUCLEAR REGULATORY                                      ADAMS accession number for each                       to address these issues in SECY–12–
                                                  COMMISSION                                              document referenced (if it available in               0157, ‘‘Consideration of Additional
                                                                                                          ADAMS) is provided the first time that                Requirements for Containment Venting
                                                  [NRC–2015–0048]
                                                                                                          a document is referenced. The JLD–ISG–                Systems for Boiling Water Reactors with
                                                  Compliance With Phase 2 of Order EA–                    2015–01 is available in ADAMS under                   Mark I and Mark II Containments’’
                                                  13–109                                                  Accession No. ML15104A118. The ISG                    (ADAMS Accession No. ML12325A704).
                                                                                                          for complying with Phase 1                            In the staff requirements memorandum
                                                  AGENCY:  Nuclear Regulatory                             requirements of the order (JLD–ISG–                   (SRM) for SECY–12–0157, dated March
                                                  Commission.                                             2013–02) was issued on November 14,                   19, 2013 (ADAMS Accession No.
                                                  ACTION: Interim staff guidance; issuance.               2013 (ADAMS Accession No.                             ML13078A017), the Commission
                                                                                                          ML13304B836). The NEI 13–02,                          directed the staff to: (1) Issue a
                                                  SUMMARY:   The U.S. Nuclear Regulatory                                                                        modification to Order EA–12–050
                                                  Commission (NRC) is issuing its Japan                   Revision 1 is available in ADAMS under
                                                                                                          Accession No. ML15113B318.                            requiring BWR licensees with Mark I
                                                  Lessons-Learned Division Interim Staff
                                                  Guidance (JLD–ISG), JLD–ISG–2015–01,                       • NRC’s PDR: You may examine and                   and Mark II containments to upgrade or
                                                                                                          purchase copies of public documents at                replace the reliable hardened vents
                                                  ‘‘Compliance with Phase 2 of Order EA–                                                                        required by Order EA–12–050 with a
                                                  13–109, Order Modifying Licenses with                   the NRC’s PDR, Room O1–F21, One
                                                                                                          White Flint North, 11555 Rockville                    containment venting system designed
                                                  Regard to Reliable Hardened                                                                                   and installed to remain functional
                                                  Containment Vents Capable of                            Pike, Rockville, Maryland 20852.
                                                  Operation under Severe Accident                            • NRC’s Interim Staff Guidance Web                 during severe accident conditions, and
                                                                                                          site: JLD–ISG documents are also                      (2) develop a technical basis and
                                                  Conditions.’’ This ISG provides                                                                               rulemaking for filtering strategies with
                                                  guidance and clarifies the Phase 2                      available online under the ‘‘Japan
                                                                                                          Lessons Learned’’ heading at http://                  drywell filtration and severe accident
                                                  requirements in the order to assist the                                                                       management of BWR Mark I and II
                                                  licensees that have Boiling Water                       www.nrc.gov/reading-rm/doc-
                                                                                                          collections/isg/japan-lessons-                        containments. The NRC subsequently
                                                  Reactors (BWRs) with Mark I and Mark                                                                          issued Order EA–13–109 to define
                                                  II Containments in the design and                       learned.html.
                                                                                                                                                                requirements and schedules for
                                                  implementation of either a vent path                    FOR FURTHER INFORMATION CONTACT:
                                                                                                                                                                licensees for BWRs with Mark I and
                                                  from the containment drywell or a                       Rajender Auluck, Office of Nuclear                    Mark II containments to install severe
                                                  strategy that makes it unlikely that                    Reactor Regulation, U.S. Nuclear                      accident capable containment venting
                                                  venting would be needed from the                        Regulatory Commission, Washington,                    systems.
                                                  drywell before alternate reliable                       DC 20555–0001; telephone: 301–415–                       In recognition of the relative
                                                  containment heat removal and pressure                   1025; email: Rajender.Auluck@nrc.gov.                 importance of venting capabilities from
                                                  control is reestablished. This ISG also                 SUPPLEMENTARY INFORMATION: The NRC                    the wetwell and drywell, a phased
                                                  endorses, with clarifications, the                      developed JLD–ISG–2015–01 to provide                  approach to implementation is being
                                                  industry guidance contained in Nuclear                  guidance and clarification to assist                  used to minimize delays in
                                                  Energy Institute (NEI) 13–02, ‘‘Industry                nuclear power reactor licensees with the              implementing the requirements
                                                  Guidance for Compliance with Order                      identification of methods needed to                   originally imposed by Order EA–12–
                                                  EA–13–109,’’ Revision 1.                                comply with Phase 2 requirements in                   050. Phase 1 involves upgrading the
                                                  ADDRESSES: Please refer to Docket ID                    Order EA–13–109 (ADAMS Accession                      venting capabilities from the
                                                  NRC–2015–0048 when contacting the                       No. ML13130A067), ‘‘Order Modifying                   containment wetwell to provide
                                                  NRC about the availability of                           Licenses with Regard to Reliable                      reliable, severe accident capable
                                                  information regarding this document.                    Hardened Containment Vents Capable                    hardened vents to assist in preventing
                                                  You may obtain publicly-available                       of Operation under Severe Accident                    core damage and, if necessary, to
                                                  information related to this document by                 Conditions.’’ This ISG is not a substitute            provide venting capability during severe
                                                  using any of the following methods:                     for the requirements in Order EA–13–                  accident conditions. Phase 2 involves
                                                     • Federal Rulemaking Web site: Go to                 109, and compliance with the ISG                      providing additional protection during
                                                  http://www.regulations.gov and search                   would not be a requirement.                           severe accident conditions through
                                                  for Docket ID NRC–2015–0048. Address                       The accident at the Fukushima Dai-                 installation of a reliable, severe accident
                                                  questions about NRC dockets to Carol                    ichi nuclear power station reinforced                 capable drywell vent system or the
                                                  Gallagher; telephone: 301–415–3463;                     the importance of reliable operation of               development of a reliable containment
                                                  email: Carol.Gallagher@nrc.gov. For                     containment vents for BWR plants with                 venting strategy that makes it unlikely
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                  technical questions, contact the                        Mark I and Mark II containments. As                   that a licensee would need to vent from
                                                  individual listed in the FOR FURTHER                    part of its response to the lessons                   the containment drywell during severe
                                                  INFORMATION CONTACT section of this                     learned from the accident, on March 12,               accident conditions. For
                                                  document.                                               2012, the NRC issued Order EA–12–050                  implementation of Phase 1 order
                                                     • NRC’s Agencywide Documents                         (ADAMS Accession No. ML12056A043)                     requirements, the NRC issued JLD–ISG–
                                                  Access and Management System                            requiring licensees to upgrade or install             2013–02 on November 14, 2013 (78 FR
                                                  (ADAMS): You may obtain publicly-                       a reliable hardened containment venting               70356), which endorsed, with
                                                  available documents online in the                       system (HCVS) for Mark I and Mark II                  exceptions and clarifications, the


                                             VerDate Sep<11>2014   18:07 May 06, 2015   Jkt 235001   PO 00000   Frm 00088   Fmt 4703   Sfmt 4703   E:\FR\FM\07MYN1.SGM   07MYN1


                                                  26304                           Federal Register / Vol. 80, No. 88 / Thursday, May 7, 2015 / Notices

                                                  methodologies described in the industry                 NEI document includes guidance for                      II. Self-Regulatory Organization’s
                                                  guidance document NEI 13–02, Rev. 0,                    implementing order requirements for                     Statement of the Purpose of, and
                                                  ‘‘Industry Guidance for Compliance                      both Phase 1 and Phase 2, including the                 Statutory Basis for, the Proposed Rule
                                                  with Order EA–13–109’’ (ADAMS                           industry’s proposed approach to use the                 Change
                                                  Accession No. ML13316A853). As                          SAWA and SAWM strategies to control
                                                                                                                                                                    In its filing with the Commission, the
                                                  required by the order, licensees                        the water levels in the suppression pool
                                                                                                                                                                  Exchange included statements
                                                  submitted their site-specific overall                   and maintain capabilities to address
                                                                                                                                                                  concerning the purpose of and basis for
                                                  integrated plans (OIPs) by June 30, 2014.               over-pressure conditions without a
                                                                                                                                                                  the proposed rule change and discussed
                                                  The NRC staff has completed its review                  severe accident drywell vent. This ISG
                                                  of the OIPs and has issued interim staff                                                                        any comments it received on the
                                                                                                          endorses, with clarifications, the
                                                  evaluations.                                                                                                    proposed rule change. The text of these
                                                                                                          methodologies described in the industry
                                                     On March 10, 2015, the NRC staff                                                                             statements may be examined at the
                                                                                                          guidance document NEI 13–02, Revision
                                                  issued a Federal Register notice (80 FR                                                                         places specified in Item IV below. The
                                                                                                          1.
                                                  12649) to request public comments on                                                                            Exchange has prepared summaries, set
                                                                                                            Dated at Rockville, Maryland, this 29th day           forth in sections A, B, and C below, of
                                                  draft JLD–ISG–2015–01 (ADAMS                            of April 2015.
                                                  Accession No. ML15051A143). In                                                                                  the most significant aspects of such
                                                                                                            For the Nuclear Regulatory Commission.                statements.
                                                  response, the NRC received comments
                                                  from SimplyInfo by letter dated March                   Jack R. Davis,
                                                                                                                                                                  A. Self-Regulatory Organization’s
                                                  11, 2015 (ADAMS Accession No.                           Director, Japan Lessons-Learned Division,
                                                                                                          Office of Nuclear Reactor Regulation.
                                                                                                                                                                  Statement of the Purpose of, and
                                                  ML15083A277), and the NEI by letter                                                                             Statutory Basis for, the Proposed Rule
                                                  dated April 9, 2015 (ADAMS Accession                    [FR Doc. 2015–11036 Filed 5–6–15; 8:45 am]
                                                                                                                                                                  Change
                                                  No. ML15104A316). Several of these                      BILLING CODE 7590–01–P
                                                  comments have been previously                                                                                   1. Purpose
                                                  submitted to the NRC for staff’s                                                                                  The Exchange proposes to modify the
                                                  consideration. The resolution of these                                                                          monthly Trading Permit fees that apply
                                                  comments has been documented and                        SECURITIES AND EXCHANGE                                 to Market Makers (‘‘MMs’’). Specifically,
                                                  publicly available (ADAMS Accession                     COMMISSION                                              the Exchange proposes to adopt the
                                                  No. ML15114A051).                                                                                               following fees: (i) $7,000 for MM
                                                     The focus of this ISG is to provide                  [Release No. 34–74856; File No. SR–MIAX–                Assignments in up to 10 option classes
                                                  guidance for implementing Phase 2                       2015–31]                                                or up to 20% of option classes by
                                                  requirements of the order. The Phase 2                                                                          volume; (ii) $12,000 for MM
                                                  portion of Order EA–13–109 builds on                    Self-Regulatory Organizations; Miami
                                                                                                                                                                  Assignments in up to 40 option classes
                                                  the Phase 1 activities, and is intended                 International Securities Exchange LLC;
                                                                                                                                                                  or up to 35% of option classes by
                                                  to be consistent with the expected                      Notice of Filing and Immediate
                                                                                                                                                                  volume; (iii) $17,000 for MM
                                                  outcome of the development of a                         Effectiveness of a Proposed Rule
                                                                                                                                                                  Assignments in up to 100 option classes
                                                  regulatory basis for the Containment                    Change To Amend Its Fee Schedule
                                                                                                                                                                  or up to 50% of option classes by
                                                  Protection and Release Reduction                                                                                volume; and (iv) $22,000.00 for MM
                                                                                                          May 1, 2015.
                                                  (CPRR) rulemaking. Specifically, the                                                                            Assignments in over 100 option classes
                                                  industry described a containment                           Pursuant to the provisions of section
                                                                                                          19(b)(1) of the Securities Exchange Act                 or over 50% of option classes up to all
                                                  venting approach that includes severe
                                                                                                          of 1934 (‘‘Act’’) 1 and Rule 19b–4                      option classes listed on MIAX.
                                                  accident water addition (SAWA) and
                                                                                                          thereunder,2 notice is hereby given that                  The Exchange issues Trading Permits
                                                  severe accident water management
                                                  (SAWM) strategies that would preserve                   on April 29, 2015, Miami International                  that confer the ability to transact on the
                                                  the use of a wetwell vent path, in                      Securities Exchange LLC (‘‘MIAX’’ or                    Exchange.3 Currently, all MMs, whether
                                                  addition to providing other benefits.                   ‘‘Exchange’’) filed with the Securities                 they are a RMM, LMM or PLMM, are
                                                  Evaluations performed in support of the                 and Exchange Commission                                 assessed $15,000 per month for a
                                                  CPRR rulemaking confirmed significant                   (‘‘Commission’’) a proposed rule change                 Trading Permit for an assignment in up
                                                  benefits to including SAWA as part of                   as described in Items I, II, and III below,             to 250 option classes, or $22,000 per
                                                  a severe accident management strategy.                  which Items have been prepared by the                   month for a Trading Permit for an
                                                  Therefore, SAWA will facilitate                         Exchange. The Commission is                             assignment in over 250 option classes
                                                  implementation of Phase 2 of Order EA–                  publishing this notice to solicit                       up to all option classes listed on the
                                                  13–109 by establishing the design                       comments on the proposed rule change                    Exchange.4 The Exchange notes that the
                                                  conditions for a drywell vent and                       from interested persons.
                                                                                                                                                                     3 There is no limit on the number of Trading
                                                  supporting SAWM for licensees                           I. Self-Regulatory Organization’s                       Permits that may be issued by the Exchange;
                                                  choosing to pursue that option as a                     Statement of the Terms of Substance of                  however the Exchange has the authority to limit or
                                                  strategy that makes it unlikely that a                  the Proposed Rule Change                                decrease the number of Trading Permits it has
                                                  licensee would need to vent from the                                                                            determined to issue provided it complies with the
                                                                                                             The Exchange is filing a proposal to                 provisions set forth in Rule 200(a) and section
                                                  drywell.                                                                                                        6(c)(4) of the Exchange Act. See 15 U.S.C.
                                                     On April 23, 2015, NEI submitted NEI                 modify the Market Maker Trading                         78(f)(c)(4). For a complete description of MIAX
                                                  13–02, ‘‘Industry Guidance for                          Permit Fee.                                             Trading Permits, see MIAX Rule 200.
                                                  Compliance with Order EA–13–109,’’                         The text of the proposed rule change                    4 The monthly Trading Permit Fee is in addition

                                                                                                                                                                  to the one-time application fee for MIAX
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                  Rev. 1 (ADAMS Accession No.                             is available on the Exchange’s Web site
                                                                                                                                                                  Membership. The Exchange charges a one-time
                                                  ML15113B318) to assist nuclear power                    at http://www.miaxoptions.com/filter/                   application fee based upon the applicant’s status as
                                                  licensees with the identification of                    wotitle/rule_filing, at MIAX’s principal                either an Electronic Exchange Member (‘‘EEM’’) or
                                                  measures needed to comply with the                      office, and at the Commission’s Public                  as a Market Maker. Applicants for MIAX
                                                  Phase 2 requirements of Order EA–13–                    Reference Room.                                         Membership as an EEM are assessed a one-time
                                                                                                                                                                  Application Fee of $2,500.00. Applicants for MIAX
                                                  109 regarding reliable hardened                                                                                 Membership as a Market Maker are assessed a one-
                                                  containment vents capable of operation                    1 15   U.S.C. 78s(b)(1).                              time Application Fee of $3,000.00. The difference
                                                  under severe accident conditions. The                     2 17   CFR 240.19b–4.                                 in the fee charged to EEMs and Market Makers



                                             VerDate Sep<11>2014   18:07 May 06, 2015   Jkt 235001   PO 00000   Frm 00089     Fmt 4703   Sfmt 4703   E:\FR\FM\07MYN1.SGM   07MYN1



Document Created: 2015-12-16 07:49:49
Document Modified: 2015-12-16 07:49:49
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionInterim staff guidance; issuance.
ContactRajender Auluck, Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; telephone: 301-415-1025; email: [email protected]
FR Citation80 FR 26303 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR