80_FR_29446 80 FR 29348 - Emergency Planning Exemption Requests for Decommissioning Nuclear Power Plants

80 FR 29348 - Emergency Planning Exemption Requests for Decommissioning Nuclear Power Plants

NUCLEAR REGULATORY COMMISSION

Federal Register Volume 80, Issue 98 (May 21, 2015)

Page Range29348-29350
FR Document2015-12377

The U.S. Nuclear Regulatory Commission (NRC) is issuing Interim Staff Guidance (ISG) NSIR/DPR-ISG-02, ``Emergency Planning Exemption Requests for Decommissioning Nuclear Power Plants,'' May 11, 2015. This document provides guidance for NRC staff to produce clear and consistent reviews of requests for exemptions and license amendments for defueled station emergency plans submitted by licensees after permanent cessation of operations.

Federal Register, Volume 80 Issue 98 (Thursday, May 21, 2015)
[Federal Register Volume 80, Number 98 (Thursday, May 21, 2015)]
[Notices]
[Pages 29348-29350]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-12377]


=======================================================================
-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[NRC-2014-0002]


Emergency Planning Exemption Requests for Decommissioning Nuclear 
Power Plants

AGENCY: Nuclear Regulatory Commission.

ACTION: Interim staff guidance; issuance.

-----------------------------------------------------------------------

SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is issuing 
Interim Staff Guidance (ISG) NSIR/DPR-ISG-02, ``Emergency Planning 
Exemption Requests for Decommissioning Nuclear Power Plants,'' May 11, 
2015. This document provides guidance for NRC staff to produce clear 
and consistent reviews of requests for exemptions and license 
amendments for defueled station emergency plans submitted by licensees 
after permanent cessation of operations.

ADDRESSES: Please refer to Docket ID NRC-2014-0002 when contacting the 
NRC about the availability of information regarding this document. You 
may obtain publicly-available information related to this document 
using any of the following methods:
     Federal Rulemaking Web site: Go to http://www.regulations.gov and search for Docket ID NRC-2014-0002. Address 
questions about NRC dockets to Carol Gallagher; telephone: 301-415-
3463; email: [email protected]. For technical questions, contact 
the individuals listed in the FOR FURTHER INFORMATION CONTACT section 
of this document.
     NRC's Agencywide Documents Access and Management System 
(ADAMS): You may obtain publicly available documents online in the 
ADAMS Public Documents collection at http://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``ADAMS Public Documents'' and 
then select ``Begin Web-based ADAMS Search.'' For problems with ADAMS, 
please contact the NRC's Public Document Room (PDR) reference staff at

[[Page 29349]]

1-800-397-4209, 301-415-4737, or by email to [email protected]. The 
draft NSIR/DPR-ISG-02, the final NSIR/DPR-ISG-02, the public comments, 
and the NRC staff's responses to public comments are available in ADAMS 
under Accession Nos. ML13304B442, ML14106A057, ML14225A717, and 
ML14230A346.
     NRC's PDR: You may examine and purchase copies of public 
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555 
Rockville Pike, Rockville, Maryland 20852.

FOR FURTHER INFORMATION CONTACT: Michael Wasem, telephone: 301-287-
3793, email: [email protected], or Michael Norris, telephone: 301-
287-3754, email: [email protected], both of the Office of Nuclear 
Security and Incident Response, U.S. Nuclear Regulatory Commission, 
Washington DC 20555-0001.

SUPPLEMENTARY INFORMATION: 

I. Discussion

    Currently, licensees of permanently shut down and defueled nuclear 
power plants are required to maintain emergency plans meeting the same 
requirements as emergency plans for operating nuclear power plants. 
Nuclear power plants that have permanently ceased operating and 
permanently removed fuel from the reactor vessel, with spent fuel 
stored in the spent fuel pool and/or in dry cask storage provide less 
of a risk of radiological releases than operating nuclear power plants. 
Licensees of these decommissioning plants have historically submitted 
requests for exemption from emergency preparedness regulations based on 
this lower risk. The final ISG will be used by NRC staff for future 
submittals and reflects the experience of NRC staff in the technical 
review of exemptions requested for the Kewaunee Power Station (KPS), as 
documented in SECY-14-0066, ``Request by Dominion Energy Kewaunee, Inc. 
for Exemptions from Certain Emergency Planning Requirements'' (ADAMS 
Accession No. ML14072A257), and for the review of proposed changes to 
the KPS emergency plan and emergency action level (EAL) scheme 
implementing exemptions as approved by the Commission in Staff 
Requirements Memorandum (SRM) to SECY-14-0066 ADAMS Accession No. 
ML14219A366). The final ISG is intended to provide guidance for staff 
to facilitate the clear and consistent reviews of subsequent requests 
for exemptions to specific emergency plan requirements of part 50 of 
Title 10 of the Code of Federal Regulations (10 CFR) for a permanently 
shut down and defueled power reactor, and for license amendments to 
emergency plans and EAL schemes implementing the specific emergency 
plan requirements of 10 CFR part 50, as exempted.
    Licensees have historically used the exemption process to decrease 
the burden of maintaining required parts of emergency plans in cases 
where continued application of the regulation by the licensee is not 
necessary to achieve the underlying purpose of the regulation. The 
findings from previous exemption request reviews, along with the 
results of studies such as NUREG-2161: ``Consequence Study of a Beyond-
Design-Basis Earthquake Affecting the Spent Fuel Pool for a U.S. Mark I 
Boiling Water Reactor'' (ADAMS Accession No. ML14255A365); NUREG-1738, 
``Technical Study of Spent Fuel Accident Risk at Decommissioning 
Nuclear Power Plants'' (ADAMS Accession No. ML010430066); and NUREG-
1864, ``A Pilot Probabilistic Risk Assessment of a Dry Cask Storage 
System at a Nuclear Power Plant'' (ADAMS Accession No. ML071340012), 
inform the technical review of exemptions to specific emergency plan 
requirements of 10 CFR part 50, and license amendments to a licensee's 
emergency plan and EAL scheme, as exempted.
    The Commission directed the staff in SRMs to SECY-0066 and SECY-14-
0118, ``Request by Duke Energy Florida, Inc., for Exemptions from 
Certain Emergency Planning Requirements'' (ADAMS Accession No. 
ML14219A444) to proceed with an integrated rulemaking on 
decommissioning. It is anticipated that this ISG will be replaced by 
future guidance developed in conjunction with this rulemaking.

II. Public Comments

    A draft ISG was published for public comment in the Federal 
Register on January 10, 2014 (79 FR 1900). The public comment period 
closed on April 10, 2014. The NRC received 22 comment submissions on 
the draft ISG from members of the public, non-government organizations, 
and the nuclear industry. None of the comments received from members of 
the public supported a reduction in emergency preparedness for 
decommissioning nuclear power plants. In addition, eight of the 
submissions from members of the public were directed specifically at 
decommissioning of a specific licensee. The submission from the Nuclear 
Energy Institute (NEI) provided editorial comments, comments for 
clarification, and a request that power reactors undergoing 
decommissioning need not implement Initiating Conditions PD 
[permanently defueled]-HU1 and PD-HA1 in the EALs as outlined in NEI 
99-01 (Revision 6), ``Development of Emergency Action Levels for Non-
Passive Reactors'' (ADAMS Accession No. ML12326A805). The NRC received 
six comment submissions from representatives of other non-governmental 
organizations opposing any reduction in emergency planning and 
expressing dissatisfaction with the NRC's exemption process.

III. Changes to ISG

    This ISG was revised from the draft that appeared in the Federal 
Register on January 20, 2014, based on public comments, NRC review of 
the Kewaunee exemption request, and subsequent Commission direction. A 
summary of the changes follows:
    Section 1.0, Purpose, was expanded to include a description of 
Table 1 (Exemptions for Consideration) and Attachment 1 (Staff Guidance 
for Evaluation of Permanently Defueled Emergency Plans), and a 
discussion on how they are to be used by NRC staff. The NRC also added 
a description of the process to be used for the review of changes to a 
decommissioning licensee's EALs.
    Section 2.0, Scope, was modified to reflect that licensees may 
submit exemption requests when they notify the NRC of the intent to 
permanently cease operation. The draft document incorrectly stated that 
the ISG could only be used after the licensee had certified that the 
reactor vessel was defueled.
    The NRC deleted the term ``risk factor'' and moved the discussion 
on risk from Section 3.0, Background, to Section 4.0, Overview of 
Existing Guidance. A short description of physical security 
requirements for decommissioning nuclear power reactors was added to 
Section 3.0.
    Table 1 was revised to reflect potential exemption requests based 
on the Commission's SRM dated August 7, 2014, for SECY-14-0066.
    Attachment 1 was replaced in its entirety by a table of the 
applicable guidance contained in NUREG-0654/FEMA-REP-1 (Revision 1), 
``Criteria for Preparation and Evaluation of Radiological Emergency 
Response Plans and Preparedness in Support of Nuclear Power Plants'' 
(ADAMS Accession No. ML040420012).

IV. Congressional Review Act

    NSIR/DPR-ISG-02 is a rule as defined in the Congressional Review 
Act (5 U.S.C. 801-808). However, the Office of Management and Budget 
has not found

[[Page 29350]]

it to be a major rule as defined in the Congressional Review Act.

V. Backfitting and Issue Finality

    The NRC is issuing interim guidance for the NRC staff regarding its 
review of requests from licensees of decommissioning nuclear power 
plants for exemptions from specific emergency plan requirements in 10 
CFR part 50 and license amendments to permanently defueled emergency 
plans. Issuance of the ISG does not constitute backfitting as defined 
in 10 CFR 50.109 (the Backfit Rule) and is not otherwise inconsistent 
with the issue finality provisions in 10 CFR part 52. The NRC's 
position is based upon the following considerations.
    1. The ISG positions do not constitute backfitting, inasmuch as the 
ISG is internal guidance to NRC staff.
    The ISG provides interim guidance to the staff on how to review 
certain requests for exemption or license amendments. Changes in 
internal staff guidance are not matters for which applicants or 
licensees are protected under 10 CFR 50.109 or issue finality 
provisions in 10 CFR part 52.
    2. The staff has no intention to impose the ISG on existing nuclear 
power plant licenses or holders of regulatory approvals either now or 
in the future (absent a voluntary request for change from the licensee 
or holder of a regulatory approval).
    The staff does not intend to impose or apply the positions 
described in the ISG to existing (already issued) licenses (e.g., 
operating licenses and combined licenses) and regulatory approvals. 
Hence, the ISG--even if considered guidance that is within the purview 
of the issue finality provisions in 10 CFR part 52--need not be 
evaluated as if it were a backfit or as being inconsistent with issue 
finality provisions. If, in the future, the staff seeks to impose a 
position in the ISG on holders of already issued licenses in a manner 
that does not provide issue finality as described in the applicable 
issue finality provision, then the staff must make the showing as set 
forth in the Backfit Rule, or address the criteria for avoiding issue 
finality as described in the applicable issue finality provision, as 
applicable.
    3. Backfitting and issue finality do not--with limited exceptions 
not applicable here--protect current or future applicants.
    Applicants and potential applicants are not, with certain 
exceptions, protected by either the Backfit Rule or any issue finality 
provisions under 10 CFR part 52. This is because neither the Backfit 
Rule nor the issue finality provisions under 10 CFR part 52--with 
certain exclusions discussed below--were intended to apply to every NRC 
action that substantially changes the expectations of current and 
future applicants.
    The exceptions to the general principle are applicable whenever an 
applicant references a 10 CFR part 52 license (e.g., an early site 
permit) and/or NRC regulatory approval (e.g., a design certification 
rule) with specified issue finality provisions. The staff does not, at 
this time, intend to impose the positions represented in the ISG in a 
manner that is inconsistent with any issue finality provisions.
    If, in the future, the staff seeks to impose a position in the ISG 
in a manner that does not provide issue finality as described in the 
applicable issue finality provision, then the staff must address the 
criteria for avoiding issue finality as described in the applicable 
issue finality provision.

    Dated at Rockville, Maryland, this 11th day of May, 2015.

    For the Nuclear Regulatory Commission.
Robert J. Lewis,
Director, Division of Preparedness and Response, Office of Nuclear 
Security and Incident Response.
[FR Doc. 2015-12377 Filed 5-20-15; 8:45 am]
BILLING CODE 7590-01-P



                                              29348                          Federal Register / Vol. 80, No. 98 / Thursday, May 21, 2015 / Notices

                                              material) is not publicly available to                  FOR FURTHER INFORMATION CONTACT:      Ms.             requested to submit their name and
                                              read or download from this Web site.                    Ann Delo, Science Mission Directorate,                affiliation 3 working days prior to the
                                              All submissions, including copyrighted                  NASA Headquarters, Washington, DC                     meeting to Ann Delo.
                                              material, are available for inspection                  20546, (202) 358–0750, fax (202) 358–                    It is imperative that the meeting be
                                              and copying at the OSHA Docket Office.                  2779.                                                 held on this date to accommodate the
                                              Information on using the http://                        SUPPLEMENTARY INFORMATION: The                        scheduling priorities of the key
                                              www.regulations.gov Web site to submit                  meeting will be open to the public up                 participants.
                                              comments and access the docket is                       to the capacity of the room. The meeting              Patricia D. Rausch,
                                              available at the Web site’s ‘‘User Tips’’               will also be available telephonically and             Advisory Committee Management Officer,
                                              link. Contact the OSHA Docket Office                    by WebEx. Any interested person may                   National Aeronautics and Space
                                              for information about materials not                     call the USA toll free conference call                Administration.
                                              available from the Web site, and for                    number 844–467–6272, passcode                         [FR Doc. 2015–12326 Filed 5–20–15; 8:45 am]
                                              assistance in using the Internet to locate              197792, to participate in this meeting by             BILLING CODE 7510–13–P
                                              docket submissions.                                     telephone. The WebEx link is https://
                                              V. Authority and Signature                              nasa.webex.com/; the meeting number
                                                                                                      on June 8 is 999 084 742, passcode                    NUCLEAR REGULATORY
                                                David Michaels, Ph.D., MPH,                           pps06082015!. The meeting number on
                                              Assistant Secretary of Labor for                                                                              COMMISSION
                                                                                                      June 9 is 998 176 277, passcode
                                              Occupational Safety and Health,                         pps06092015!. The meeting number on                   [NRC–2014–0002]
                                              directed the preparation of this notice.                June 10 is 998 424 135, passcode
                                              The authority for this notice is the                    pps06102015!.                                         Emergency Planning Exemption
                                              Paperwork Reduction Act of 1995 (44                        The agenda for the meeting includes                Requests for Decommissioning
                                              U.S.C. 3506 et seq.) and Secretary of                   the following topics:                                 Nuclear Power Plants
                                              Labor’s Order No. 1–2012 (77 FR 3912).                  —Update on NASA Planetary Protection                  AGENCY:  Nuclear Regulatory
                                                Signed at Washington, DC, on May 15,                     Activities and Committee on Space                  Commission.
                                              2015.                                                      Research (COSPAR)                                  ACTION: Interim staff guidance; issuance.
                                              David Michaels,                                         —Updates on NASA Mars missions
                                              Assistant Secretary of Labor for Occupational           —Other related items                                  SUMMARY:    The U.S. Nuclear Regulatory
                                              Safety and Health.                                      Attendees will be requested to sign a                 Commission (NRC) is issuing Interim
                                              [FR Doc. 2015–12288 Filed 5–20–15; 8:45 am]             register and to comply with NASA                      Staff Guidance (ISG) NSIR/DPR–ISG–02,
                                              BILLING CODE 4510–26–P                                  security requirements, including the                  ‘‘Emergency Planning Exemption
                                                                                                      presentation of a valid picture ID to                 Requests for Decommissioning Nuclear
                                                                                                      Security before access to NASA                        Power Plants,’’ May 11, 2015. This
                                                                                                      Headquarters. Due to the Real ID Act,                 document provides guidance for NRC
                                              NATIONAL AERONAUTICS AND                                                                                      staff to produce clear and consistent
                                                                                                      Public Law 109–13, any attendees with
                                              SPACE ADMINISTRATION                                                                                          reviews of requests for exemptions and
                                                                                                      drivers licenses issued from non-
                                              [Notice: 15–040]                                        compliant states/territories must present             license amendments for defueled station
                                                                                                      a second form of ID [Federal employee                 emergency plans submitted by licensees
                                              NASA Advisory Council; Science                          badge; passport; active military                      after permanent cessation of operations.
                                              Committee; Planetary Protection                         identification card; enhanced driver’s                ADDRESSES: Please refer to Docket ID
                                              Subcommittee; Meeting                                   license; U.S. Coast Guard Merchant                    NRC–2014–0002 when contacting the
                                                                                                      Mariner card; Native American tribal                  NRC about the availability of
                                              AGENCY: National Aeronautics and                        document; school identification                       information regarding this document.
                                              Space Administration.                                   accompanied by an item from LIST C                    You may obtain publicly-available
                                              ACTION: Notice of meeting.                              (documents that establish employment                  information related to this document
                                                                                                      authorization) from the ‘‘List of the                 using any of the following methods:
                                              SUMMARY:    In accordance with the
                                                                                                      Acceptable Documents’’ on Form I–9].                     • Federal Rulemaking Web site: Go to
                                              Federal Advisory Committee Act, Public
                                                                                                      Non-compliant states/territories are:                 http://www.regulations.gov and search
                                              Law 92–463, as amended, the National
                                                                                                      American Samoa, Arizona, Idaho,                       for Docket ID NRC–2014–0002. Address
                                              Aeronautics and Space Administration
                                                                                                      Louisiana, Maine, Minnesota, New                      questions about NRC dockets to Carol
                                              (NASA) announces a meeting of the
                                                                                                      Hampshire, and New York. Foreign                      Gallagher; telephone: 301–415–3463;
                                              Planetary Protection Subcommittee of
                                                                                                      nationals attending this meeting will be              email: Carol.Gallagher@nrc.gov. For
                                              the NASA Advisory Council (NAC).
                                                                                                      required to provide a copy of their                   technical questions, contact the
                                              This Subcommittee reports to the
                                                                                                      passport and visa in addition to                      individuals listed in the FOR FURTHER
                                              Science Committee of the NAC. The
                                                                                                      providing the following information no                INFORMATION CONTACT section of this
                                              Meeting will be held for the purpose of
                                                                                                      less than 10 working days prior to the                document.
                                              soliciting, from the scientific                                                                                  • NRC’s Agencywide Documents
                                                                                                      meeting: Full name; gender; date/place
                                              community and other persons, scientific                                                                       Access and Management System
                                                                                                      of birth; citizenship; visa information
                                              and technical information relevant to                                                                         (ADAMS): You may obtain publicly
                                                                                                      (number, type, expiration date);
                                              program planning.                                                                                             available documents online in the
                                                                                                      passport information (number, country,
                                              DATES: Monday, June 8, 2015, 1:00 p.m.                  expiration date); employer/affiliation                ADAMS Public Documents collection at
                                              to 4:00 p.m.; Tuesday, June 9, 2015, 8:30
tkelley on DSK3SPTVN1PROD with NOTICES




                                                                                                      information (name of institution,                     http://www.nrc.gov/reading-rm/
                                              a.m. to 5:00 p.m.; and Wednesday, June                  address, country, telephone); title/                  adams.html. To begin the search, select
                                              10, 2015, 9:30 a.m. to 4:00 p.m., Local                 position of attendee; and home address                ‘‘ADAMS Public Documents’’ and then
                                              Time.                                                   to Ann Delo via email at ann.b.delo@                  select ‘‘Begin Web-based ADAMS
                                              ADDRESSES: NASA Headquarters, Room                      nasa.gov or by fax at (202) 358–2779.                 Search.’’ For problems with ADAMS,
                                              6H41, 300 E Street SW., Washington, DC                     U.S. citizens and Permanent                        please contact the NRC’s Public
                                              20546.                                                  Residents (green card holders) are                    Document Room (PDR) reference staff at


                                         VerDate Sep<11>2014   20:28 May 20, 2015   Jkt 235001   PO 00000   Frm 00050   Fmt 4703   Sfmt 4703   E:\FR\FM\21MYN1.SGM   21MYN1


                                                                             Federal Register / Vol. 80, No. 98 / Thursday, May 21, 2015 / Notices                                          29349

                                              1–800–397–4209, 301–415–4737, or by                     defueled power reactor, and for license               [permanently defueled]-HU1 and PD–
                                              email to pdr.resource@nrc.gov. The draft                amendments to emergency plans and                     HA1 in the EALs as outlined in NEI 99–
                                              NSIR/DPR–ISG–02, the final NSIR/DPR–                    EAL schemes implementing the specific                 01 (Revision 6), ‘‘Development of
                                              ISG–02, the public comments, and the                    emergency plan requirements of 10 CFR                 Emergency Action Levels for Non-
                                              NRC staff’s responses to public                         part 50, as exempted.                                 Passive Reactors’’ (ADAMS Accession
                                              comments are available in ADAMS                            Licensees have historically used the               No. ML12326A805). The NRC received
                                              under Accession Nos. ML13304B442,                       exemption process to decrease the                     six comment submissions from
                                              ML14106A057, ML14225A717, and                           burden of maintaining required parts of               representatives of other non-
                                              ML14230A346.                                            emergency plans in cases where                        governmental organizations opposing
                                                • NRC’s PDR: You may examine and                      continued application of the regulation               any reduction in emergency planning
                                              purchase copies of public documents at                  by the licensee is not necessary to                   and expressing dissatisfaction with the
                                              the NRC’s PDR, Room O1–F21, One                         achieve the underlying purpose of the                 NRC’s exemption process.
                                              White Flint North, 11555 Rockville                      regulation. The findings from previous
                                                                                                      exemption request reviews, along with                 III. Changes to ISG
                                              Pike, Rockville, Maryland 20852.
                                              FOR FURTHER INFORMATION CONTACT:                        the results of studies such as NUREG–                    This ISG was revised from the draft
                                              Michael Wasem, telephone: 301–287–                      2161: ‘‘Consequence Study of a Beyond-                that appeared in the Federal Register on
                                              3793, email: Michael.Wasem@nrc.gov,                     Design-Basis Earthquake Affecting the                 January 20, 2014, based on public
                                              or Michael Norris, telephone: 301–287–                  Spent Fuel Pool for a U.S. Mark I                     comments, NRC review of the
                                              3754, email: Michael.Norris@nrc.gov,                    Boiling Water Reactor’’ (ADAMS                        Kewaunee exemption request, and
                                              both of the Office of Nuclear Security                  Accession No. ML14255A365); NUREG–                    subsequent Commission direction. A
                                              and Incident Response, U.S. Nuclear                     1738, ‘‘Technical Study of Spent Fuel                 summary of the changes follows:
                                              Regulatory Commission, Washington DC                    Accident Risk at Decommissioning                         Section 1.0, Purpose, was expanded to
                                              20555–0001.                                             Nuclear Power Plants’’ (ADAMS                         include a description of Table 1
                                                                                                      Accession No. ML010430066); and                       (Exemptions for Consideration) and
                                              SUPPLEMENTARY INFORMATION:                              NUREG–1864, ‘‘A Pilot Probabilistic                   Attachment 1 (Staff Guidance for
                                              I. Discussion                                           Risk Assessment of a Dry Cask Storage                 Evaluation of Permanently Defueled
                                                                                                      System at a Nuclear Power Plant’’                     Emergency Plans), and a discussion on
                                                Currently, licensees of permanently
                                                                                                      (ADAMS Accession No. ML071340012),                    how they are to be used by NRC staff.
                                              shut down and defueled nuclear power                    inform the technical review of
                                              plants are required to maintain                                                                               The NRC also added a description of the
                                                                                                      exemptions to specific emergency plan                 process to be used for the review of
                                              emergency plans meeting the same                        requirements of 10 CFR part 50, and
                                              requirements as emergency plans for                                                                           changes to a decommissioning
                                                                                                      license amendments to a licensee’s                    licensee’s EALs.
                                              operating nuclear power plants. Nuclear                 emergency plan and EAL scheme, as
                                              power plants that have permanently                                                                               Section 2.0, Scope, was modified to
                                                                                                      exempted.
                                              ceased operating and permanently                           The Commission directed the staff in               reflect that licensees may submit
                                              removed fuel from the reactor vessel,                   SRMs to SECY–0066 and SECY–14–                        exemption requests when they notify
                                              with spent fuel stored in the spent fuel                0118, ‘‘Request by Duke Energy Florida,               the NRC of the intent to permanently
                                              pool and/or in dry cask storage provide                 Inc., for Exemptions from Certain                     cease operation. The draft document
                                              less of a risk of radiological releases                 Emergency Planning Requirements’’                     incorrectly stated that the ISG could
                                              than operating nuclear power plants.                    (ADAMS Accession No. ML14219A444)                     only be used after the licensee had
                                              Licensees of these decommissioning                      to proceed with an integrated                         certified that the reactor vessel was
                                              plants have historically submitted                      rulemaking on decommissioning. It is                  defueled.
                                              requests for exemption from emergency                   anticipated that this ISG will be                        The NRC deleted the term ‘‘risk
                                              preparedness regulations based on this                  replaced by future guidance developed                 factor’’ and moved the discussion on
                                              lower risk. The final ISG will be used by               in conjunction with this rulemaking.                  risk from Section 3.0, Background, to
                                              NRC staff for future submittals and                                                                           Section 4.0, Overview of Existing
                                              reflects the experience of NRC staff in                 II. Public Comments                                   Guidance. A short description of
                                              the technical review of exemptions                         A draft ISG was published for public               physical security requirements for
                                              requested for the Kewaunee Power                        comment in the Federal Register on                    decommissioning nuclear power
                                              Station (KPS), as documented in SECY–                   January 10, 2014 (79 FR 1900). The                    reactors was added to Section 3.0.
                                              14–0066, ‘‘Request by Dominion Energy                   public comment period closed on April                    Table 1 was revised to reflect
                                              Kewaunee, Inc. for Exemptions from                      10, 2014. The NRC received 22                         potential exemption requests based on
                                              Certain Emergency Planning                              comment submissions on the draft ISG                  the Commission’s SRM dated August 7,
                                              Requirements’’ (ADAMS Accession No.                     from members of the public, non-                      2014, for SECY–14–0066.
                                              ML14072A257), and for the review of                     government organizations, and the                        Attachment 1 was replaced in its
                                              proposed changes to the KPS emergency                   nuclear industry. None of the comments                entirety by a table of the applicable
                                              plan and emergency action level (EAL)                   received from members of the public                   guidance contained in NUREG–0654/
                                              scheme implementing exemptions as                       supported a reduction in emergency                    FEMA–REP–1 (Revision 1), ‘‘Criteria for
                                              approved by the Commission in Staff                     preparedness for decommissioning                      Preparation and Evaluation of
                                              Requirements Memorandum (SRM) to                        nuclear power plants. In addition, eight              Radiological Emergency Response Plans
                                              SECY–14–0066 ADAMS Accession No.                        of the submissions from members of the                and Preparedness in Support of Nuclear
                                              ML14219A366). The final ISG is                          public were directed specifically at                  Power Plants’’ (ADAMS Accession No.
tkelley on DSK3SPTVN1PROD with NOTICES




                                              intended to provide guidance for staff to               decommissioning of a specific licensee.               ML040420012).
                                              facilitate the clear and consistent                     The submission from the Nuclear
                                                                                                                                                            IV. Congressional Review Act
                                              reviews of subsequent requests for                      Energy Institute (NEI) provided editorial
                                              exemptions to specific emergency plan                   comments, comments for clarification,                   NSIR/DPR–ISG–02 is a rule as defined
                                              requirements of part 50 of Title 10 of the              and a request that power reactors                     in the Congressional Review Act (5
                                              Code of Federal Regulations (10 CFR)                    undergoing decommissioning need not                   U.S.C. 801–808). However, the Office of
                                              for a permanently shut down and                         implement Initiating Conditions PD                    Management and Budget has not found


                                         VerDate Sep<11>2014   20:28 May 20, 2015   Jkt 235001   PO 00000   Frm 00051   Fmt 4703   Sfmt 4703   E:\FR\FM\21MYN1.SGM   21MYN1


                                              29350                          Federal Register / Vol. 80, No. 98 / Thursday, May 21, 2015 / Notices

                                              it to be a major rule as defined in the                 certain exclusions discussed below—                      • Federal Rulemaking Web site: Go to
                                              Congressional Review Act.                               were intended to apply to every NRC                   http://www.regulations.gov and search
                                                                                                      action that substantially changes the                 for Docket ID NRC–2014–0209. Address
                                              V. Backfitting and Issue Finality
                                                                                                      expectations of current and future                    questions about NRC dockets to Carol
                                                 The NRC is issuing interim guidance                  applicants.                                           Gallagher; telephone: 301–415–3463;
                                              for the NRC staff regarding its review of                  The exceptions to the general                      email: Carol.Gallagher@nrc.gov. For
                                              requests from licensees of                              principle are applicable whenever an                  technical questions, contact the
                                              decommissioning nuclear power plants                    applicant references a 10 CFR part 52                 individuals listed in the FOR FURTHER
                                              for exemptions from specific emergency                  license (e.g., an early site permit) and/             INFORMATION CONTACT section of this
                                              plan requirements in 10 CFR part 50                     or NRC regulatory approval (e.g., a                   document.
                                              and license amendments to permanently                   design certification rule) with specified                • NRC’s Agencywide Documents
                                              defueled emergency plans. Issuance of                   issue finality provisions. The staff does             Access and Management System
                                              the ISG does not constitute backfitting                 not, at this time, intend to impose the               (ADAMS): You may obtain publicly-
                                              as defined in 10 CFR 50.109 (the Backfit                positions represented in the ISG in a                 available documents online in the
                                              Rule) and is not otherwise inconsistent                 manner that is inconsistent with any                  ADAMS Public Documents collection at
                                              with the issue finality provisions in 10                issue finality provisions.                            http://www.nrc.gov/reading-rm/
                                              CFR part 52. The NRC’s position is                         If, in the future, the staff seeks to              adams.html. To begin the search, select
                                              based upon the following                                impose a position in the ISG in a                     ‘‘ADAMS Public Documents’’ and then
                                              considerations.                                         manner that does not provide issue                    select ‘‘Begin Web-based ADAMS
                                                 1. The ISG positions do not constitute               finality as described in the applicable               Search.’’ For problems with ADAMS,
                                              backfitting, inasmuch as the ISG is                     issue finality provision, then the staff              please contact the NRC’s Public
                                              internal guidance to NRC staff.                         must address the criteria for avoiding                Document Room (PDR) reference staff at
                                                 The ISG provides interim guidance to                 issue finality as described in the                    1–800–397–4209, 301–415–4737, or by
                                              the staff on how to review certain                      applicable issue finality provision.                  email to pdr.resource@nrc.gov. The
                                              requests for exemption or license                         Dated at Rockville, Maryland, this 11th day         ADAMS accession number for each
                                              amendments. Changes in internal staff                   of May, 2015.                                         document referenced (if available in
                                              guidance are not matters for which                        For the Nuclear Regulatory Commission.              ADAMS) is provided the first time that
                                              applicants or licensees are protected                   Robert J. Lewis,                                      a document is referenced. Revision 1 of
                                              under 10 CFR 50.109 or issue finality                                                                         Regulatory Guide 1.36 is available in
                                                                                                      Director, Division of Preparedness and
                                              provisions in 10 CFR part 52.                           Response, Office of Nuclear Security and              ADAMS under Accession No.
                                                 2. The staff has no intention to                     Incident Response.                                    ML15026A664. The regulatory analysis
                                              impose the ISG on existing nuclear
                                                                                                      [FR Doc. 2015–12377 Filed 5–20–15; 8:45 am]           may be found in ADAMS under
                                              power plant licenses or holders of
                                                                                                      BILLING CODE 7590–01–P                                Accession No. ML14079A669.
                                              regulatory approvals either now or in
                                                                                                                                                               • NRC’s PDR: You may examine and
                                              the future (absent a voluntary request
                                                                                                                                                            purchase copies of public documents at
                                              for change from the licensee or holder                  NUCLEAR REGULATORY                                    the NRC’s PDR, Room O1–F21, One
                                              of a regulatory approval).                              COMMISSION                                            White Flint North, 11555 Rockville
                                                 The staff does not intend to impose or
                                                                                                      [NRC–2014–0209]                                       Pike, Rockville, Maryland 20852.
                                              apply the positions described in the ISG
                                                                                                                                                               Regulatory guides are not
                                              to existing (already issued) licenses
                                                                                                      Nonmetallic Thermal Insulation for                    copyrighted, and NRC approval is not
                                              (e.g., operating licenses and combined
                                                                                                      Austenitic Stainless Steel                            required to reproduce them.
                                              licenses) and regulatory approvals.
                                              Hence, the ISG—even if considered                                                                             FOR FURTHER INFORMATION CONTACT:
                                                                                                      AGENCY:  Nuclear Regulatory
                                              guidance that is within the purview of                                                                        David W. Alley, Office of Nuclear
                                                                                                      Commission.
                                              the issue finality provisions in 10 CFR                                                                       Reactor Regulation, 301–415–2178
                                                                                                      ACTION: Regulatory guide; issuance.
                                              part 52—need not be evaluated as if it                                                                        email: Dave.Alley@nrc.gov and Richard
                                              were a backfit or as being inconsistent                 SUMMARY:    The U.S. Nuclear Regulatory               A. Jervey, Office of Nuclear Regulatory
                                              with issue finality provisions. If, in the              Commission (NRC) is issuing Revision 1                Research, 301–251–7404, email:
                                              future, the staff seeks to impose a                     to Regulatory Guide (RG) 1.36,                        Richard.Jervey@nrc.gov. Both are staff of
                                              position in the ISG on holders of already               ‘‘Nonmetallic Thermal Insulation for                  the U.S. Nuclear Regulatory
                                              issued licenses in a manner that does                   Austenitic Stainless Steel.’’ The RG                  Commission, Washington, DC 20555–
                                              not provide issue finality as described                 describes methods and procedures that                 0001.
                                              in the applicable issue finality                        the staff of the U.S. Nuclear Regulatory              SUPPLEMENTARY INFORMATION:
                                              provision, then the staff must make the                 Commission (NRC) considers acceptable
                                                                                                      when selecting and using nonmetallic                  I. Introduction
                                              showing as set forth in the Backfit Rule,
                                              or address the criteria for avoiding issue              thermal insulation to minimize any                       The NRC is issuing a revision to an
                                              finality as described in the applicable                 contamination that could promote                      existing guide in the NRC’s ‘‘Regulatory
                                              issue finality provision, as applicable.                stress-corrosion cracking in the stainless            Guide’’ series. Regulatory guides were
                                                 3. Backfitting and issue finality do                 steel portions of the reactor coolant                 developed to describe and make
                                              not—with limited exceptions not                         pressure boundary and other systems                   available to the public information and
                                              applicable here—protect current or                      important to safety. This guide applies               methods that are acceptable to the NRC
                                              future applicants.                                      to light-water-cooled reactors.                       staff for implementing specific parts of
tkelley on DSK3SPTVN1PROD with NOTICES




                                                 Applicants and potential applicants                  ADDRESSES: Please refer to Docket ID                  the agency’s regulations, techniques that
                                              are not, with certain exceptions,                       NRC–2014–0209 when contacting the                     the staff uses in evaluating specific
                                              protected by either the Backfit Rule or                 NRC about the availability of                         problems or postulated accidents, and
                                              any issue finality provisions under 10                  information regarding this document.                  data that the staff needs in its review of
                                              CFR part 52. This is because neither the                You may obtain publically-available                   applications for permits and licenses.
                                              Backfit Rule nor the issue finality                     information related to this document,                    Revision 1 of RG 1.36 was issued with
                                              provisions under 10 CFR part 52—with                    using any of the following methods:                   a temporary identification as Draft


                                         VerDate Sep<11>2014   20:28 May 20, 2015   Jkt 235001   PO 00000   Frm 00052   Fmt 4703   Sfmt 4703   E:\FR\FM\21MYN1.SGM   21MYN1



Document Created: 2018-10-24 10:26:51
Document Modified: 2018-10-24 10:26:51
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionInterim staff guidance; issuance.
ContactMichael Wasem, telephone: 301-287- 3793, email: [email protected], or Michael Norris, telephone: 301- 287-3754, email: [email protected], both of the Office of Nuclear Security and Incident Response, U.S. Nuclear Regulatory Commission, Washington DC 20555-0001.
FR Citation80 FR 29348 