80_FR_31038 80 FR 30934 - Drawbridge Operation Regulation; Mokelumne River, East Isleton, CA

80 FR 30934 - Drawbridge Operation Regulation; Mokelumne River, East Isleton, CA

DEPARTMENT OF HOMELAND SECURITY
Coast Guard

Federal Register Volume 80, Issue 104 (June 1, 2015)

Page Range30934-30934
FR Document2015-13160

The Coast Guard has issued a temporary deviation from the operating schedule that governs the California Department of Transportation highway drawbridge across the Mokelumne River, mile 3.0, at East Isleton, CA. The deviation is necessary to allow the bridge owner to perform rehabilitation to the bridge control house. This deviation allows the bridge to remain in the closed-to-navigation position during the deviation period.

Federal Register, Volume 80 Issue 104 (Monday, June 1, 2015)
[Federal Register Volume 80, Number 104 (Monday, June 1, 2015)]
[Rules and Regulations]
[Page 30934]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-13160]



[[Page 30934]]

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF HOMELAND SECURITY

Coast Guard

33 CFR Part 117

[Docket No. USCG-2015-0447]


Drawbridge Operation Regulation; Mokelumne River, East Isleton, 
CA

AGENCY: Coast Guard, DHS.

ACTION: Notice of deviation from drawbridge regulation.

-----------------------------------------------------------------------

SUMMARY: The Coast Guard has issued a temporary deviation from the 
operating schedule that governs the California Department of 
Transportation highway drawbridge across the Mokelumne River, mile 3.0, 
at East Isleton, CA. The deviation is necessary to allow the bridge 
owner to perform rehabilitation to the bridge control house. This 
deviation allows the bridge to remain in the closed-to-navigation 
position during the deviation period.

DATES: This deviation is effective from 10 p.m. on May 29, 2015 to 10 
p.m. on June 26, 2015.

ADDRESSES: The docket for this deviation, [USCG-2015-0447], is 
available at http://www.regulations.gov. Type the docket number in the 
``SEARCH'' box and click ``SEARCH.'' Click on Open Docket Folder on the 
line associated with this deviation. You may also visit the Docket 
Management Facility in Room W12-140 on the ground floor of the 
Department of Transportation West Building, 1200 New Jersey Avenue SE., 
Washington, DC 20590, between 9 a.m. and 5 p.m., Monday through Friday, 
except Federal holidays.

FOR FURTHER INFORMATION CONTACT: If you have questions on this 
temporary deviation, call or email David H. Sulouff, Chief, Bridge 
Section, Eleventh Coast Guard District; telephone 510-437-3516, email 
David.H.Sulouff@uscg.mil. If you have questions on viewing the docket, 
call Cheryl Collins, Program Manager, Docket Operations, telephone 202-
366-9826.

SUPPLEMENTARY INFORMATION: California Department of Transportation has 
requested a temporary change to the operation of the California 
Department of Transportation highway drawbridge across the Mokelumne 
River, mile 3.0, at East Isleton, CA. The drawbridge navigation span 
provides approximately 7 feet vertical clearance above Mean High Water 
in the closed-to-navigation position. In accordance with 33 CFR 
117.175(a), the draw opens on signal from November 1 through April 30 
from 9 a.m. to 5 p.m.; and from May 1 through October 31 from 6 a.m. to 
10 p.m., except that during the following periods the draw need only 
open for recreational vessels on the hour, 20 minutes past the hour, 
and 40 minutes past the hour: Saturdays, 10 a.m. until 2 p.m.; Sundays, 
11 a.m. until 6 p.m.; and Memorial Day, Fourth of July and Labor Day 11 
a.m. until 6 p.m.. At all other times the drawbridge shall open on 
signal if at least 4 hours notice is given. Navigation on the waterway 
is commercial, recreational, search and rescue, and law enforcement.
    The drawspan will be secured in the closed-to-navigation position 
from 10 p.m. on May 29, 2015 to 10 p.m. on June 26, 2015, due to 
rehabilitation of the bridge control house. This temporary deviation 
has been coordinated with the waterway users. Caltrans work plan and 
dates have been tailored to produce the least possible impacts to 
waterway traffic, land traffic, businesses and potential flood response 
plans, while allowing the work to be performed, to ensure dependable 
future operation of the drawbridge.
    Vessels able to pass through the bridge in the closed position may 
do so at any time. The bridge will not be able to open for emergencies. 
Alternative paths for recreational vessel traffic are available via 
Little Potato Slough and Georgiana Slough. The Coast Guard will inform 
waterway users of this temporary deviation via our Local and Broadcast 
Notices to Mariners, to minimize resulting navigational impacts.
    In accordance with 33 CFR 117.35(e), the drawbridge must return to 
its regular operating schedule immediately at the end of the effective 
period of this temporary deviation. This deviation from the operating 
regulations is authorized under 33 CFR 117.35.

    Dated: May 19, 2015.
D.H. Sulouff,
District Bridge Chief, Commander, Eleventh Coast Guard District.
[FR Doc. 2015-13160 Filed 5-29-15; 8:45 am]
 BILLING CODE 9110-04-P



                                           30934               Federal Register / Vol. 80, No. 104 / Monday, June 1, 2015 / Rules and Regulations

                                           DEPARTMENT OF HOMELAND                                  9 a.m. to 5 p.m.; and from May 1                      ACTION: Notice of enforcement of
                                           SECURITY                                                through October 31 from 6 a.m. to 10                  regulation.
                                                                                                   p.m., except that during the following
                                           Coast Guard                                             periods the draw need only open for                   SUMMARY:   The Coast Guard will enforce
                                                                                                   recreational vessels on the hour, 20                  the safety zone for the San Francisco
                                           33 CFR Part 117                                         minutes past the hour, and 40 minutes                 Giants Fireworks display in the Captain
                                                                                                   past the hour: Saturdays, 10 a.m. until               of the Port, San Francisco area of
                                           [Docket No. USCG–2015–0447]                                                                                   responsibility during the dates and
                                                                                                   2 p.m.; Sundays, 11 a.m. until 6 p.m.;
                                                                                                   and Memorial Day, Fourth of July and                  times noted below. This action is
                                           Drawbridge Operation Regulation;
                                                                                                   Labor Day 11 a.m. until 6 p.m.. At all                necessary to protect life and property of
                                           Mokelumne River, East Isleton, CA
                                                                                                   other times the drawbridge shall open                 the maritime public from the hazards
                                           AGENCY: Coast Guard, DHS.                               on signal if at least 4 hours notice is               associated with the fireworks display.
                                           ACTION:Notice of deviation from                         given. Navigation on the waterway is                  During the enforcement period,
                                           drawbridge regulation.                                  commercial, recreational, search and                  unauthorized persons or vessels are
                                                                                                   rescue, and law enforcement.                          prohibited from entering into, transiting
                                           SUMMARY:    The Coast Guard has issued a                   The drawspan will be secured in the                through, or anchoring in the safety zone,
                                           temporary deviation from the operating                  closed-to-navigation position from 10                 unless authorized by the Patrol
                                           schedule that governs the California                    p.m. on May 29, 2015 to 10 p.m. on June               Commander (PATCOM).
                                           Department of Transportation highway                    26, 2015, due to rehabilitation of the                DATES: The regulations in 33 CFR
                                           drawbridge across the Mokelumne                         bridge control house. This temporary                  165.1191, Table 1, Item number 1 will
                                           River, mile 3.0, at East Isleton, CA. The               deviation has been coordinated with the               be enforced from 11 a.m. to 10:30 p.m.
                                           deviation is necessary to allow the                     waterway users. Caltrans work plan and                on June 26, 2015.
                                           bridge owner to perform rehabilitation                  dates have been tailored to produce the               FOR FURTHER INFORMATION CONTACT: If
                                           to the bridge control house. This                       least possible impacts to waterway                    you have questions on this notice, call
                                           deviation allows the bridge to remain in                traffic, land traffic, businesses and                 or email Lieutenant Junior Grade Joshua
                                           the closed-to-navigation position during                potential flood response plans, while                 Dykman, U.S. Coast Guard Sector San
                                           the deviation period.                                   allowing the work to be performed, to                 Francisco; telephone (415) 399–3585 or
                                           DATES: This deviation is effective from                 ensure dependable future operation of                 email at D11-PF-MarineEvents@
                                           10 p.m. on May 29, 2015 to 10 p.m. on                   the drawbridge.                                       uscg.mil.
                                           June 26, 2015.                                             Vessels able to pass through the                   SUPPLEMENTARY INFORMATION: The Coast
                                           ADDRESSES: The docket for this                          bridge in the closed position may do so               Guard will enforce the safety zones
                                           deviation, [USCG–2015–0447], is                         at any time. The bridge will not be able              established in 33 CFR 165.1191, Table 1,
                                           available at http://www.regulations.gov.                to open for emergencies. Alternative                  Item number 1 on June 26, 2015. From
                                           Type the docket number in the                           paths for recreational vessel traffic are             11 a.m. until 10 p.m. on June 26, 2015
                                           ‘‘SEARCH’’ box and click ‘‘SEARCH.’’                    available via Little Potato Slough and                the safety zone applies to the navigable
                                           Click on Open Docket Folder on the line                 Georgiana Slough. The Coast Guard will                waters around and under the fireworks
                                           associated with this deviation. You may                 inform waterway users of this temporary               barge within a radius of 100 feet during
                                           also visit the Docket Management                        deviation via our Local and Broadcast                 the loading, transit, and arrival of the
                                           Facility in Room W12–140 on the                         Notices to Mariners, to minimize                      fireworks barge at the launch site and
                                           ground floor of the Department of                       resulting navigational impacts.                       until the start of the fireworks display.
                                           Transportation West Building, 1200                         In accordance with 33 CFR 117.35(e),               From 11 a.m. until 8:30 p.m. on June 26,
                                           New Jersey Avenue SE., Washington,                      the drawbridge must return to its regular             2015 the fireworks barge will be loading
                                           DC 20590, between 9 a.m. and 5 p.m.,                    operating schedule immediately at the                 pyrotechnics at Pier 50 in San
                                           Monday through Friday, except Federal                   end of the effective period of this                   Francisco, CA. From 8:30 p.m. to 8:40
                                           holidays.                                               temporary deviation. This deviation                   p.m. on June 26, 2015 the loaded
                                           FOR FURTHER INFORMATION CONTACT: If                     from the operating regulations is                     fireworks barge will transit from Pier 50
                                           you have questions on this temporary                    authorized under 33 CFR 117.35.                       to the launch site near Pier 48 in
                                           deviation, call or email David H.                         Dated: May 19, 2015.                                approximate position 37°46′40″ N.,
                                           Sulouff, Chief, Bridge Section, Eleventh                D.H. Sulouff,                                         122°22′58″ W. (NAD83). At the
                                           Coast Guard District; telephone 510–                                                                          conclusion of the baseball game,
                                                                                                   District Bridge Chief, Commander, Eleventh
                                           437–3516, email David.H.Sulouff@                        Coast Guard District.                                 approximately 10 p.m. on June 26, 2015,
                                           uscg.mil. If you have questions on                                                                            the safety zone will increase in size and
                                                                                                   [FR Doc. 2015–13160 Filed 5–29–15; 8:45 am]
                                           viewing the docket, call Cheryl Collins,                                                                      encompass the navigable waters around
                                                                                                   BILLING CODE 9110–04–P
                                           Program Manager, Docket Operations,                                                                           and under the fireworks barge within a
                                           telephone 202–366–9826.                                                                                       radius of 700 feet in approximate
                                           SUPPLEMENTARY INFORMATION: California                   DEPARTMENT OF HOMELAND                                position 37°46′40″ N., 122°22′58″ W.
                                           Department of Transportation has                        SECURITY                                              (NAD83) for the San Francisco Giants
                                           requested a temporary change to the                                                                           Fireworks display in 33 CFR 165.1191,
                                           operation of the California Department                  Coast Guard                                           Table 1, Item number 1. Upon the
                                           of Transportation highway drawbridge                                                                          conclusion of the fireworks display the
                                           across the Mokelumne River, mile 3.0,                   33 CFR Part 165                                       safety zone shall terminate. This safety
                                           at East Isleton, CA. The drawbridge                                                                           zone will be in effect from 11 a.m. to
Lhorne on DSK2VPTVN1PROD with RULES




                                           navigation span provides approximately                  [Docket No. USCG–2015–0234]
                                                                                                                                                         10:30 p.m. on June 26, 2015.
                                           7 feet vertical clearance above Mean                    Safety Zone; San Francisco Giants                        Under the provisions of 33 CFR
                                           High Water in the closed-to-navigation                  Fireworks, San Francisco Bay, San                     165.1191, unauthorized persons or
                                           position. In accordance with 33 CFR                     Francisco, CA                                         vessels are prohibited from entering
                                           117.175(a), the draw opens on signal                                                                          into, transiting through, or anchoring in
                                           from November 1 through April 30 from                   AGENCY:    Coast Guard, DHS.                          the safety zone during all applicable


                                      VerDate Sep<11>2014   11:41 May 29, 2015   Jkt 235001   PO 00000   Frm 00016   Fmt 4700   Sfmt 4700   E:\FR\FM\01JNR1.SGM   01JNR1



Document Created: 2015-12-15 15:18:56
Document Modified: 2015-12-15 15:18:56
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionRules and Regulations
ActionNotice of deviation from drawbridge regulation.
DatesThis deviation is effective from 10 p.m. on May 29, 2015 to 10 p.m. on June 26, 2015.
ContactIf you have questions on this temporary deviation, call or email David H. Sulouff, Chief, Bridge Section, Eleventh Coast Guard District; telephone 510-437-3516, email [email protected] If you have questions on viewing the docket, call Cheryl Collins, Program Manager, Docket Operations, telephone 202- 366-9826.
FR Citation80 FR 30934 