ENVIRONMENTAL PROTECTION AGENCY

Federal Register Volume 80, Issue 113 (June 12, 2015)

Page Range33518-33519
FR Document2015-14445

The Environmental Protection Agency is planning to submit an information collection request (ICR), ``Risk Management Program Requirements and Petitions to Modify the List of Regulated Substances under section 112(r) of the Clean Air Act (CAA).'' (EPA ICR No. 1656.15, OMB Control No. 2050-0144) to the Office of Management and Budget (OMB) for review and approval in accordance with the Paperwork Reduction Act. Before doing so, EPA is soliciting public comments on specific aspects of the proposed information collection as described below. This is a proposed extension of the ICR, which is currently approved through December 31, 2015. An Agency may not conduct or sponsor and a person is not required to respond to a collection of information unless it displays a currently valid OMB control number.

Federal Register, Volume 80 Issue 113 (Friday, June 12, 2015)
[Federal Register Volume 80, Number 113 (Friday, June 12, 2015)]
[Notices]
[Pages 33518-33519]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-14445]


-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[EPA-HQ-OAR-2003-0052; FRL-9929-14-OSWER]


Proposed Information Collection Request; Comment Request; Risk 
Management Program; Requirements and Petitions to Modify the List of 
Regulated Substances Under Section 112(r) of the Clean Air Act (CAA)

AGENCY: Environmental Protection Agency (EPA).

ACTION: Notice.

-----------------------------------------------------------------------

SUMMARY: The Environmental Protection Agency is planning to submit an 
information collection request (ICR), ``Risk Management Program 
Requirements and Petitions to Modify the List of Regulated Substances 
under section 112(r) of the Clean Air Act (CAA).'' (EPA ICR No. 
1656.15, OMB Control No. 2050-0144) to the Office of Management and 
Budget (OMB) for review and approval in accordance with the Paperwork 
Reduction Act. Before doing so, EPA is soliciting public comments on 
specific aspects of the proposed information collection as described 
below. This is a proposed extension of the ICR, which is currently 
approved through December 31, 2015. An Agency may not conduct or 
sponsor and a person is not required to respond to a collection of 
information unless it displays a currently valid OMB control number.

DATES: Comments must be submitted on or before August 11, 2015.

ADDRESSES: Submit your comments, referencing Docket ID No. EPA-HQ-OAR-
2003-0052, online using www.regulations.gov (our preferred method), or 
by mail to: EPA Docket Center, Environmental Protection Agency, Mail 
Code 28221T, 1200 Pennsylvania Ave., NW., Washington, DC 20460.
    EPA's policy is that all comments received will be included in the 
public docket without change including any personal information 
provided, unless the comment includes profanity, threats, information 
claimed to be Confidential Business Information (CBI) or other 
information whose disclosure is restricted by statute.

FOR FURTHER INFORMATION CONTACT: James Belke, Office of Emergency 
Management, mail code 5104A, Environmental Protection Agency, 1200 
Pennsylvania Ave., NW., Washington, DC 20460; telephone number: (202) 
564-8023; fax number: (202) 564-2625; email address: [email protected].

SUPPLEMENTARY INFORMATION: Supporting documents which explain in detail 
the information that the EPA will be collecting are available in the 
public docket for this ICR. The docket can be viewed online at 
www.regulations.gov or in person at the EPA Docket Center, WJC West, 
Room 3334, 1301 Constitution Ave., NW., Washington, DC. The telephone 
number for the Docket Center is 202-566-1744. For additional 
information about EPA's public docket, visit http://www.epa.gov/dockets.
    Pursuant to section 3506(c)(2)(A) of the PRA, EPA is soliciting 
comments and information to enable it to: (i) Evaluate whether the 
proposed collection of information is necessary for the proper 
performance of the functions of the Agency, including whether the 
information will have practical utility; (ii) evaluate the accuracy of 
the Agency's estimate of the burden of the proposed collection of 
information, including the validity of the methodology and assumptions 
used; (iii) enhance the quality, utility, and clarity of the 
information to be collected; and (iv) minimize the burden of the 
collection of information on those who are to respond, including 
through the use of appropriate automated electronic, mechanical, or 
other technological collection techniques or other forms of information 
technology, e.g., permitting electronic submission of responses. EPA 
will consider the comments received and amend the ICR as appropriate. 
The final ICR package will then be submitted to OMB for review and 
approval. At that time, EPA will issue another Federal Register notice 
to announce the submission of the ICR to OMB and the opportunity to 
submit additional comments to OMB.
    Abstract: The 1990 CAA Amendments added section 112(r) to provide 
for the prevention and mitigation of accidental releases. Section 
112(r) mandates that EPA promulgate a list of ``regulated substances'' 
with threshold quantities and establish procedures for the addition and 
deletion of substances from the list of regulated substances. Processes 
at stationary sources that contain more than a threshold quantity of a 
regulated substance are subject to accidental release prevention 
regulations promulgated under CAA section 112(r)(7). These two rules 
are codified as 40 CFR part 68.
    Part 68 requires that sources with more than a threshold quantity 
of a regulated substance in a process develop and implement a risk 
management program and submit a risk management plan to EPA. EPA uses 
risk management plans to conduct oversight of regulated sources, and to 
communicate information concerning them to federal, state, and local 
agencies and the public, as appropriate.
    The compliance schedule for the part 68 requirements was 
established by rule on June 20, 1996. The burden to sources that are 
currently covered by part 68, for initial rule compliance, including 
rule familiarization and program implementation was accounted for in 
previous ICRs. Sources submitted their first RMPs by June 21, 1999. For 
most sources, the next compliance deadlines occurred thereafter at five 
year intervals--in 2004, 2009, and 2014. A source submitting an RMP 
update to comply with their five-year compliance deadline will often 
submit their updated RMP several days or weeks early to ensure it is 
received by EPA before their deadline--these sources are assigned a new 
five-year deadline based off of the actual date of their most recent 
submission. Therefore, resubmissions tend to occur in ``waves'' peaking 
each

[[Page 33519]]

fifth year. Some sources revised and resubmitted their RMPs between the 
five-year deadlines, because of changes occurring at the source that 
triggered an earlier resubmission. These sources were then assigned a 
new five-year compliance deadline based on the date of their most 
recent revised plan submission. However, since most sources are not 
required to resubmit earlier than their five-year compliance deadline, 
the next RMP submission deadline for most sources occurs in 2019. The 
remaining sources have been assigned a different deadline in 2016, 
2017, 2018, or 2020 based on the date of their most recent submission. 
Only the first three years are within the period covered by this ICR.
    In this ICR, EPA has accounted for burden for new sources that may 
become subject to the regulations, currently covered sources with 
compliance deadlines in this ICR period (2016 to 2018), sources that 
are out of compliance since the last regulatory deadline but are 
expected to comply during this ICR period, and sources that have 
deadlines beyond this ICR period but are required to comply with 
certain prevention program documentation requirements during this ICR 
period.
    Form numbers: Risk Management Plan Form: EPA Form 8700-25; CBI 
Substantiation Form: EPA Form 8700-27; CBI Unsanitized Data Element 
Form: EPA Form 8700-28.
    Respondents/affected entities: Entities potentially affected by 
this action are chemical manufacturers, petroleum refineries, water 
treatment systems, agricultural chemical distributors, refrigerated 
warehouses, chemical distributors, non-chemical manufacturers, 
wholesale fuel distributors, energy generation facilities, etc.
    Respondent's obligation to respond: Mandatory (40 CFR part 68).
    Estimated number of respondents: 12,600 (total).
    Frequency of response: Sources must resubmit RMPs at least every 
five years and update certain on-site documentation more frequently.
    Total estimated burden: 80,546 hours (per year). Burden is defined 
at 5 CFR 1320.03(b).
    Total estimated cost: $6,736,212 (per year), includes $0 annualized 
capital or operation & maintenance costs.
    Changes in estimates: The above burden estimates are based on the 
current approved ICR. In the final notice for the renewed ICR, EPA will 
publish revised burden estimates based on updates to respondent data 
and unit costs. The revised burden estimates may decrease slightly from 
the current ICR, as the total universe of respondents has decreased 
slightly, and also because the new ICR period will not include a major 
(five-year) reporting cycle year. The most recent five-year reporting 
cycle year was 2014, which is covered by the current approved ICR. The 
next major five-year reporting cycle year is 2019, which is after the 
period covered by the new ICR. However, wage inflation may offset this 
decrease or even result in a marginal increase in burden compared with 
the ICR currently approved by OMB.

    Dated: June 1, 2015.
Reggie Cheatham,
Acting Director, Office of Emergency Management.
[FR Doc. 2015-14445 Filed 6-11-15; 8:45 am]
 BILLING CODE 6560-50-P



                                                  33518                           Federal Register / Vol. 80, No. 113 / Friday, June 12, 2015 / Notices

                                                  nominations of women and men of all                     Management and Budget (OMB) for                        the methodology and assumptions used;
                                                  racial and ethnic groups.                               review and approval in accordance with                 (iii) enhance the quality, utility, and
                                                                                                          the Paperwork Reduction Act. Before                    clarity of the information to be
                                                  IV. Selection Criteria
                                                                                                          doing so, EPA is soliciting public                     collected; and (iv) minimize the burden
                                                     In selecting members, EPA will also                  comments on specific aspects of the                    of the collection of information on those
                                                  consider the differing perspectives and                 proposed information collection as                     who are to respond, including through
                                                  breadth of collective experience needed                 described below. This is a proposed                    the use of appropriate automated
                                                  to address EPA’s charge to the CSAC, as                 extension of the ICR, which is currently               electronic, mechanical, or other
                                                  well as the following:                                  approved through December 31, 2015.                    technological collection techniques or
                                                     D Demonstrated ability to work                       An Agency may not conduct or sponsor                   other forms of information technology,
                                                  constructively and effectively in a                     and a person is not required to respond                e.g., permitting electronic submission of
                                                  committee setting;                                      to a collection of information unless it               responses. EPA will consider the
                                                     D Absence of financial conflicts of                  displays a currently valid OMB control                 comments received and amend the ICR
                                                  interest or the appearance of lack of                   number.                                                as appropriate. The final ICR package
                                                  impartiality;                                           DATES: Comments must be submitted on                   will then be submitted to OMB for
                                                     D Skills and experience working on                   or before August 11, 2015.                             review and approval. At that time, EPA
                                                  committees and advisory panels;                         ADDRESSES: Submit your comments,                       will issue another Federal Register
                                                     D Background and experiences that                    referencing Docket ID No. EPA–HQ–                      notice to announce the submission of
                                                  would contribute to the diversity of                    OAR–2003–0052, online using                            the ICR to OMB and the opportunity to
                                                  viewpoints on the committee, e.g.,                      www.regulations.gov (our preferred                     submit additional comments to OMB.
                                                  workforce sector; geographical location;                method), or by mail to: EPA Docket                        Abstract: The 1990 CAA Amendments
                                                  social, cultural, and educational                       Center, Environmental Protection                       added section 112(r) to provide for the
                                                  backgrounds; and professional                           Agency, Mail Code 28221T, 1200                         prevention and mitigation of accidental
                                                  affiliations;                                           Pennsylvania Ave., NW., Washington,                    releases. Section 112(r) mandates that
                                                     D Willingness to commit adequate                     DC 20460.                                              EPA promulgate a list of ‘‘regulated
                                                  time for the thorough review of                           EPA’s policy is that all comments                    substances’’ with threshold quantities
                                                  materials provided to the committee;                    received will be included in the public                and establish procedures for the
                                                  and                                                     docket without change including any                    addition and deletion of substances
                                                     D Availability to participate in                     personal information provided, unless                  from the list of regulated substances.
                                                  committee meetings.                                     the comment includes profanity, threats,               Processes at stationary sources that
                                                     Names, affiliations and a brief                      information claimed to be Confidential                 contain more than a threshold quantity
                                                  biographical sketch of the nominees                     Business Information (CBI) or other                    of a regulated substance are subject to
                                                  selected to serve on the CSAC will be                   information whose disclosure is                        accidental release prevention
                                                  available on the EPA Web site.                          restricted by statute.                                 regulations promulgated under CAA
                                                                                                                                                                 section 112(r)(7). These two rules are
                                                     Authority: 5 U.S.C. Appendix 2.                      FOR FURTHER INFORMATION CONTACT:
                                                                                                                                                                 codified as 40 CFR part 68.
                                                    Dated: June 4, 2015.                                  James Belke, Office of Emergency                          Part 68 requires that sources with
                                                  James Jones,                                            Management, mail code 5104A,                           more than a threshold quantity of a
                                                                                                          Environmental Protection Agency, 1200                  regulated substance in a process
                                                  Assistant Administrator, Office of Chemical
                                                  Safety and Pollution Prevention.                        Pennsylvania Ave., NW., Washington,                    develop and implement a risk
                                                                                                          DC 20460; telephone number: (202)                      management program and submit a risk
                                                  [FR Doc. 2015–14331 Filed 6–11–15; 8:45 am]
                                                                                                          564–8023; fax number: (202) 564–2625;                  management plan to EPA. EPA uses risk
                                                  BILLING CODE 6560–50–P
                                                                                                          email address: belke.jim@epa.gov.                      management plans to conduct oversight
                                                                                                          SUPPLEMENTARY INFORMATION:                             of regulated sources, and to
                                                  ENVIRONMENTAL PROTECTION                                Supporting documents which explain in                  communicate information concerning
                                                  AGENCY                                                  detail the information that the EPA will               them to federal, state, and local agencies
                                                                                                          be collecting are available in the public              and the public, as appropriate.
                                                  [EPA–HQ–OAR–2003–0052; FRL–9929–14–                     docket for this ICR. The docket can be                    The compliance schedule for the part
                                                  OSWER]                                                  viewed online at www.regulations.gov                   68 requirements was established by rule
                                                  Proposed Information Collection                         or in person at the EPA Docket Center,                 on June 20, 1996. The burden to sources
                                                  Request; Comment Request; Risk                          WJC West, Room 3334, 1301                              that are currently covered by part 68, for
                                                  Management Program; Requirements                        Constitution Ave., NW., Washington,                    initial rule compliance, including rule
                                                  and Petitions to Modify the List of                     DC. The telephone number for the                       familiarization and program
                                                  Regulated Substances Under Section                      Docket Center is 202–566–1744. For                     implementation was accounted for in
                                                  112(r) of the Clean Air Act (CAA)                       additional information about EPA’s                     previous ICRs. Sources submitted their
                                                                                                          public docket, visit http://www.epa.gov/               first RMPs by June 21, 1999. For most
                                                  AGENCY: Environmental Protection                        dockets.                                               sources, the next compliance deadlines
                                                  Agency (EPA).                                             Pursuant to section 3506(c)(2)(A) of                 occurred thereafter at five year
                                                  ACTION: Notice.                                         the PRA, EPA is soliciting comments                    intervals—in 2004, 2009, and 2014. A
                                                                                                          and information to enable it to: (i)                   source submitting an RMP update to
                                                  SUMMARY:    The Environmental Protection                Evaluate whether the proposed                          comply with their five-year compliance
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                  Agency is planning to submit an                         collection of information is necessary                 deadline will often submit their updated
                                                  information collection request (ICR),                   for the proper performance of the                      RMP several days or weeks early to
                                                  ‘‘Risk Management Program                               functions of the Agency, including                     ensure it is received by EPA before their
                                                  Requirements and Petitions to Modify                    whether the information will have                      deadline—these sources are assigned a
                                                  the List of Regulated Substances under                  practical utility; (ii) evaluate the                   new five-year deadline based off of the
                                                  section 112(r) of the Clean Air Act                     accuracy of the Agency’s estimate of the               actual date of their most recent
                                                  (CAA).’’ (EPA ICR No. 1656.15, OMB                      burden of the proposed collection of                   submission. Therefore, resubmissions
                                                  Control No. 2050–0144) to the Office of                 information, including the validity of                 tend to occur in ‘‘waves’’ peaking each


                                             VerDate Sep<11>2014   19:05 Jun 11, 2015   Jkt 235001   PO 00000   Frm 00044   Fmt 4703   Sfmt 4703   E:\FR\FM\12JNN1.SGM   12JNN1


                                                                                  Federal Register / Vol. 80, No. 113 / Friday, June 12, 2015 / Notices                                                  33519

                                                  fifth year. Some sources revised and                    as the total universe of respondents has                 08/11/2015, Contact: Keith Rigtrup
                                                  resubmitted their RMPs between the                      decreased slightly, and also because the                 435–865–3063.
                                                  five-year deadlines, because of changes                 new ICR period will not include a major                EIS No. 20150165, Final, APHIS,
                                                  occurring at the source that triggered an               (five-year) reporting cycle year. The                    National, Feral Swine Damage
                                                  earlier resubmission. These sources                     most recent five-year reporting cycle                    Management—A National Approach,
                                                  were then assigned a new five-year                      year was 2014, which is covered by the                   Review Period Ends: 07/13/2015,
                                                  compliance deadline based on the date                   current approved ICR. The next major                     Contact: Kimberly Wagner 608–837–
                                                  of their most recent revised plan                       five-year reporting cycle year is 2019,                  2727.
                                                  submission. However, since most                         which is after the period covered by the
                                                  sources are not required to resubmit                                                                           EIS No. 20150166, Final, USFS, CO,
                                                                                                          new ICR. However, wage inflation may
                                                  earlier than their five-year compliance                                                                          Invasive Plant Management for the
                                                                                                          offset this decrease or even result in a
                                                  deadline, the next RMP submission                                                                                Medicine Bow- Routt National Forests
                                                                                                          marginal increase in burden compared
                                                  deadline for most sources occurs in                                                                              and Thunder Basin National
                                                                                                          with the ICR currently approved by
                                                  2019. The remaining sources have been                                                                            Grasslands, Review Period Ends: 07/
                                                                                                          OMB.
                                                  assigned a different deadline in 2016,                                                                           27/2015, Contact: Misty Hays 307–
                                                                                                            Dated: June 1, 2015.                                   358–7102.
                                                  2017, 2018, or 2020 based on the date
                                                                                                          Reggie Cheatham,                                       EIS No. 20150167, Final, USFS, MT,
                                                  of their most recent submission. Only
                                                                                                          Acting Director, Office of Emergency                     Como Forest Health Project (FHP),
                                                  the first three years are within the
                                                                                                          Management.                                              Review Period Ends: 07/13/2015,
                                                  period covered by this ICR.
                                                     In this ICR, EPA has accounted for                   [FR Doc. 2015–14445 Filed 6–11–15; 8:45 am]              Contact: Sara Grove 406–821–3269.
                                                  burden for new sources that may                         BILLING CODE 6560–50–P
                                                                                                                                                                   Dated: June 9, 2015.
                                                  become subject to the regulations,                                                                             Dawn Roberts,
                                                  currently covered sources with                                                                                 Management Analyst, NEPA Compliance
                                                  compliance deadlines in this ICR period                 ENVIRONMENTAL PROTECTION
                                                                                                          AGENCY                                                 Division, Office of Federal Activities.
                                                  (2016 to 2018), sources that are out of                                                                        [FR Doc. 2015–14435 Filed 6–11–15; 8:45 am]
                                                  compliance since the last regulatory                    [ER–FRL–9021–4]                                        BILLING CODE 6560–50–P
                                                  deadline but are expected to comply
                                                  during this ICR period, and sources that                Environmental Impact Statements;
                                                  have deadlines beyond this ICR period                   Notice of Availability
                                                  but are required to comply with certain                                                                        FEDERAL DEPOSIT INSURANCE
                                                  prevention program documentation                          Responsible Agency: Office of Federal
                                                                                                          Activities, General Information (202)                  CORPORATION
                                                  requirements during this ICR period.
                                                     Form numbers: Risk Management                        564–7146 or http://www.epa.gov/
                                                                                                                                                                 Sunshine Act Meeting
                                                  Plan Form: EPA Form 8700–25; CBI                        compliance/nepa/.
                                                  Substantiation Form: EPA Form 8700–                     Weekly receipt of Environmental Impact                    Pursuant to the provisions of the
                                                  27; CBI Unsanitized Data Element Form:                    Statements (EISs)                                    ‘‘Government in the Sunshine Act’’ (5
                                                  EPA Form 8700–28.                                       Filed 06/01/2015 Through 06/05/2015                    U.S.C. 552b), notice is hereby given that
                                                     Respondents/affected entities: Entities              Pursuant to 40 CFR 1506.9.                             the Federal Deposit Insurance
                                                  potentially affected by this action are                   Notice: Section 309(a) of the Clean Air              Corporation’s Board of Directors will
                                                  chemical manufacturers, petroleum                       Act requires that EPA make public its                  meet in open session at 10:00 a.m. on
                                                  refineries, water treatment systems,                    comments on EISs issued by other                       Tuesday, June 16, 2015, to consider the
                                                  agricultural chemical distributors,                     Federal agencies. EPA’s comment letters                following matters:
                                                  refrigerated warehouses, chemical                       on EISs are available at: https://                        Summary Agenda: No substantive
                                                  distributors, non-chemical                              cdxnodengn.epa.gov/cdx-enepa-public/                   discussion of the following items is
                                                  manufacturers, wholesale fuel                           action/eis/search.                                     anticipated. These matters will be
                                                  distributors, energy generation facilities,
                                                                                                          EIS No. 20150160, Draft, USFWS, HI, Na                 resolved with a single vote unless a
                                                  etc.
                                                     Respondent’s obligation to respond:                    Pua Makani Wind Project and Habitat                  member of the Board of Directors
                                                  Mandatory (40 CFR part 68).                               Conservation Plan, Comment Period                    requests that an item be moved to the
                                                     Estimated number of respondents:                       Ends: 08/11/2015, Contact: Jodi                      discussion agenda.
                                                  12,600 (total).                                           Charrier 808–792–9400.                                  Disposition of minutes of previous
                                                     Frequency of response: Sources must                  EIS No. 20150161, Draft, DOE, VT, New                  Board of Directors’ Meetings.
                                                  resubmit RMPs at least every five years                   England Clean Power Link
                                                                                                                                                                    Memorandum and resolution re:
                                                  and update certain on-site                                Transmission Line Project, Comment
                                                                                                                                                                 Regulatory Capital Rules: Regulatory
                                                  documentation more frequently.                            Period Ends: 08/11/2015, Contact:
                                                                                                                                                                 Capital, Revisions Applicable to
                                                     Total estimated burden: 80,546 hours                   Brian Mills 202–586–8267.
                                                                                                                                                                 Banking Organizations Subject to the
                                                  (per year). Burden is defined at 5 CFR                  EIS No. 20150162, Draft Supplement,
                                                                                                                                                                 Advanced Approaches Risk-Based
                                                  1320.03(b).                                               FTA, CA, Regional Connector Transit
                                                                                                                                                                 Capital Rule.
                                                     Total estimated cost: $6,736,212 (per                  Corridor, Comment Period Ends: 07/
                                                  year), includes $0 annualized capital or                  27/2015, Contact: Mary Nguyen 213–                      Memorandum and resolution re: Final
                                                  operation & maintenance costs.                            202–3960.                                            Rule to Implement Requirements of the
                                                                                                                                                                 Biggert-Waters Flood Insurance Reform
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                     Changes in estimates: The above                      EIS No. 20150163, Final, BLM, CA,
                                                  burden estimates are based on the                         Soda Mountain Solar Project                          Act and the Homeowner Flood
                                                  current approved ICR. In the final notice                 Proposed Plan Amendment, Review                      Insurance Affordability Act.
                                                  for the renewed ICR, EPA will publish                     Period Ends: 07/13/2015, Contact: Jeff                  Summary reports, status reports,
                                                  revised burden estimates based on                         Childers 760–252–6000.                               reports of the Office of Inspector
                                                  updates to respondent data and unit                     EIS No. 20150164, Draft Supplement,                    General, and reports of actions taken
                                                  costs. The revised burden estimates may                   BLM, UT, Alton Coal Tract Lease by                   pursuant to authority delegated by the
                                                  decrease slightly from the current ICR,                   Application, Comment Period Ends:                    Board of Directors.


                                             VerDate Sep<11>2014   19:05 Jun 11, 2015   Jkt 235001   PO 00000   Frm 00045   Fmt 4703   Sfmt 4703   E:\FR\FM\12JNN1.SGM   12JNN1



Document Created: 2018-02-22 10:16:10
Document Modified: 2018-02-22 10:16:10
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice.
DatesComments must be submitted on or before August 11, 2015.
ContactJames Belke, Office of Emergency Management, mail code 5104A, Environmental Protection Agency, 1200 Pennsylvania Ave., NW., Washington, DC 20460; telephone number: (202)
FR Citation80 FR 33518 